This document provides evaluation criteria and definitions for a federal solicitation from the Department of Agriculture Forest Service seeking proposals for roof replacement at the Gauly Ranger Station. Key elements include technical, past performance, and cost/price factors for evaluation, with definitions for ratings including exceptional, very good, satisfactory, marginal, and unsatisfactory. Technical factors include completed similar project lists and details, while past performance requires a list of completed projects and references to be evaluated. Cost is evaluated on a best value basis.

View the file

Other files

File Type Posted
12445523Q0086 Amendment 1 SF 30 (11_2016) (4).pdf PDF
Gauley Ranger District Roof Pre Bid Notes.docx DOCX document
Gauley Admin_Roof Leak Locations.pdf PDF
wv21.txt TXT text file
12445523Q0086 SF 1442(8_2014).pdf PDF
12-Gauley Roof SOW.pdf PDF
05-Vicinity Map.pdf PDF
08-Gauley Roof SOI.pdf PDF
12445523Q0086 RFQ.docx DOCX document
06-Gauley Roof Specs.pdf PDF
04-Area Map.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Proposal Evaluation Criteria

Contents Section 1: Evaluation Methodology Section 2: Evaluation Factors

1.1 Factor 1: Technical

1.1.1 Subfactor 1: Technical

1.2 Factor 2: Past Performance

1.2.1 Past Performance

1.3 Factor 3: Cost/Price

1.3.1 Contract Cost/Price

Section 3: Definitions

2.1 Go/No Go Ratings

2.2 Adjectival Ratings

2.3 Technical Confidence Rating

2.4 Past Performance Confidence

2.5 Performance Confidence Assessment

2.6 Quote/Proposal Metrics

Section 1: Evaluation Methodology Evaluations shall be based on the below factors.

Section 2: Evaluation Factors

1.1 Factor 1: Technical

1.1.1 Subfactor 1: Technical

Submission Requirements:

Contractor must submit a list of completed projects that are similar in nature to the proposed project, and details about the projects including scope, total cost.

Evaluation Criteria/Methodology:

Type, size, and relevance of projects shall be considered as part of this evaluation.

1.2 Factor 2: Past Performance

1.2.1 Past Performance

Submission Requirements:

Contractor shall submit a list of completed site work and controls projects, along with a list of references to be evaluated for past performance.

Evaluation Criteria/Methodology:

List of completed projects to include change orders, schedule adherence, and cost overrun. References shall be asked about these items as well.

1.3 Factor 3: Cost/Price

1.3.1 Contract Cost/Price

Submission Requirements:

Contractor shall submit a bid to complete the work in the project scope.

Evaluation Criteria/Methodology:

Bids shall be evaluated on a best value basis. Lowest bid may not be accepted, pending the above listed evaluation factors.

Section 3: Definitions

2.1 Go/No Go Ratings

The term “Pass/Fail” will not be utilized in any rating; instead “Go/No Go” will be utilized. When Go/No Go ratings are utilized the following sentence shall appear in the request “Specifically, for a vendor to be considered for an award, the proposed solution must meet the minimum technical criteria listed.”

2.2 Adjectival Ratings

Adjectival Rating Definition Exceptional Quote/Offer contains no deficiencies and fully addresses all aspects of the criteria and demonstrates an excellent approach/solution and understanding of the requirements. Many strengths exist, far outweighing any weaknesses. The highest quality of contract performance is anticipated with very low risk.

Very Good Quote/Offer contains no deficiencies; fully addresses all aspects of the criteria and demonstrates a very effective approach/solution and understanding of the requirements. Some weaknesses may exist; however, the weaknesses, if any, are outweighed by strengths. A high quality of contract performance is anticipated with low risk.

Satisfactory Quote/Offer contains no deficiencies; addresses all aspects of the criteria and demonstrates an adequate approach/solution and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. A quality contract performance is anticipated with an acceptable amount of risk.

Marginal Quote/Offer may contain deficiencies; fails to address all of the criteria and does not demonstrate an adequate approach/solution or understanding of the requirements. One or more weaknesses exist which are not offset by strengths.

Contract performance is anticipated with high risk.

Unsatisfactory Quote/Offer contains many deficiencies and does not address all aspects of the criteria and/or does not present evidence demonstrating an adequate approach/solution and understanding of the requirements. Many weaknesses and/or omissions exist creating an unacceptable risk.

2.3 Technical Confidence Rating

Confidence Rating Definition

High Confidence (Low Risk)

The Government has high confidence the vendor understands the requirement, proposes a sound approach, and will be successful in performing the contract with little or no Government intervention.

Some Confidence (Moderate Risk)

The Government has some confidence the vendor understands the requirement, proposes a sound approach, and will be successful in performing the contract with some Government intervention.

Low Confidence (High Risk)

The Government has low confidence the vendor understands the requirement, proposes a sound approach, or will be successful in performing the contract even with Government intervention.

2.4 Past Performance Confidence

Rating Description

Relevant Past/present performance effort involved much of the similarity, magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Past/present performance effort involved some of the similarity, magnitude of effort and complexities this solicitation requires.

Not Relevant

Past/present performance effort did not involve any of the similarity, magnitude of effort and complexities this solicitation required.

2.5 Performance Confidence Assessment

2.6 Quote/Proposal Metrics

When identifying the merits of a quote/proposal the following three terms shall be utilized along with the definitions.

Narrative Element Definition Strength A significant, outstanding, or exceptionally positive aspect of a Quote/Offer.

Weakness Any aspect of a Quote/Offer increasing the potential for problems and issues with regard to contract performance. The Quote/Offer provides a minimally acceptable response to the Government’s requirements. The response leaves the evaluator with uncertainty as to the understanding of the work, capability to successfully perform the work, or capability to effectively manage the work effort.

Deficiency A material failure of a Quote/Offer to meet a Government requirement or a combination of significant weaknesses in a Quote/Offer increasing the risk of unsuccessful contract performance to an unacceptable level.

Rating Description

Substantial Confidence Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.

Limited Confidence Based on the offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s performance record, the government has no expectation that the offeror will be able to successfully perform the required effort.

Unknown Confidence No performance record is identifiable, or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.