These documents comprise electrical and fire protection specifications and drawings for a hospital facility renovation project, prepared by TLC Engineering Solutions for Halifax Health in Daytona Beach, Florida. The project includes comprehensive electrical system upgrades involving power distribution, lighting systems, alarm systems, and fire protection infrastructure. Key electrical specifications include installing new electrical systems in compliance with National Electrical Code (NEC), Florida Building Code (8th Edition), and various NFPA standards, with all materials required to be new, U.L. listed, and meeting rigorous testing standards.
The project involves complex electrical infrastructure, including multiple switchgear and distribution panels with varying amperage ratings, automatic transfer switches, and a fire pump system. The electrical system specifications mandate a one-year guarantee, require contractor verification of system operations, and specify detailed requirements for conduit systems, wiring, circuit breakers, and installation practices. The fire protection components include a Patterson fire pump with 125 HP motor and a Grundfos jockey pump, designed to meet stringent healthcare facility fire protection standards. The project appears to be a comprehensive upgrade to the electrical and fire protection systems of a healthcare facility, with precise technical specifications and multiple layers of regulatory compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. EQUIPMENT SHALL BE OF MATERIALS SUITABLE FOR AND RATED FOR THE ENVIRONMENT IN
WHICH THEY ARE TO BE INSTALLED.
2. WORKING CLEARANCES FOR ELECTRICAL EQUIPMENT SHALL BE IN COMPLIANCE WITH NEC 110.
A. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO STRUCTURAL
CEILING WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE
CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT
OR ARCHITECTURAL APPURTENANCES IN ACCORDANCE WITH NEC 408.
3. CRITICAL AND LIFE SAFETY LIGHT SWITCHES SHALL BE ROUTED IN CONDUIT AND BOXES
OTHER THAN THAT FOR THE NORMAL BRANCH. ESSENTIAL SYSTEM SWITCHES SHALL BE RED
IN COLOR.
4. PATIENT CARE AREAS SHALL BE PROVIDED WITH GROUNDING IN ACCORDANCE WITH NEC 517.
5. WHEN ELECTRICAL BOXES ARE LOCATED IN VERTICAL FIRE RESISTIVE ASSEMBLIES,
(CLASSIFIED AS FIRE/SMOKE AND SMOKE PARTITIONS), THEY SHALL BE INSTALLED WITHOUT
AFFECTING THE FIRE CLASSIFICATION. ALL OF THE FOLLOWING CONDITIONS SHALL BE MET:
A. ALL ELECTRICAL BOXES SHALL BE METALLIC.
B. BOX OPENING SHALL OCCUR ONLY ON ONE SIDE OF FRAMING SPACE.
C. BOX OPENING SHALL NOT EXCEED 16 SQUARE INCHES.
D. ALL CLEARANCES BETWEEN OUTLET BOX AND GYPSUM BOARD SHALL BE COMPLETELY
FILLED WITH JOINT COMPOUND (OR OTHER APPROVED MATERIAL).
E. PROVIDE A WALL AROUND OUTLETS LARGER THAN 16 SQUARE INCHES. THE INTEGRITY
OF THE WALL RATING SHALL BE MAINTAINED.
F. THE TOTAL AGGREGATE SURFACE AREA OF THE BOXES SHALL NOT EXCEED 100
SQUARE INCHES PER 100 SQUARE FEET.
G. OUTLET BOXES LOCATED ON OPPOSITE SIDES OF FIRE RESISTIVE ASSEMBLIES SHALL
BE SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES.
H. OUTLET BOXES SHALL BE SECURELY FASTENED TO WALL FRAMING MEMBERS.
I. THE OPENING IN THE GYPSUM BOARD FACING SHALL BE CUT NOT TO EXCEED 1/8 INCH
BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES OF THE OPENING.
6. NON-METALLIC RACEWAYS SHALL NOT BE USED TO SERVE ANY PATIENT CARE SPACE. ALL
WIRING SHALL BE MECHANICALLY PROTECTED BY INSTALLATION IN METALLIC RACEWAYS.
7. ALL DEVICES SHALL BE MOUNTED VERTICAL, UNLESS OTHERWISE NOTED.
8. ALL RECEPTACLES SHALL BE MOUNTED SUCH THAT THE GROUND PIN IS MOUNTED UP.
9. THE NUMBER OF ARROWHEADS ON THE HOMERUNS DENOTES THE NUMBER OF CIRCUITS.
10. CONTRACTOR SHALL COORDINATE WITH THE HOSPITAL PRIOR TO COMMENCING WORK AND
DURING CONSTRUCTION FOR POWER AND/OR SYSTEM OUTAGES AS WELL AS GENERAL
REQUIREMENTS.
GENERAL NOTES:
CONTRACTOR NOTE:
CONTRACTOR SHALL HAVE A $25,000
FIELD UNFORESEEN CONDITIONS
ALLOWANCE TO BE USED AS
DETERMINED BY THE ENGINEER. NO
ALLOWANCE DOLLARS SHALL BE
SPENT WITHOUT APPROVAL FROM THE
ENGINEER. ANY UNUSED ALLOWANCE
DOLLARS AT THE END OF THE
PROJECT SHALL BE CREDIT BACK TO
THE OWNER.
ALLOWANCE NOTE
ELECTRICAL SPECIFICATIONS
1. THE WORK REQUIRED UNDER THIS DIVISION SHALL INCLUDE ALL MATERIALS, LABOR AND AUXILIARIES REQUIRED
TO INSTALL A COMPLETE AND PROPERLY OPERATING ELECTRICAL SYSTEM. THE ELECTRICAL SYSTEM REQUIRED UNDER THIS DIVISION CONSISTS BASICALLY OF, BUT IS NOT LIMITED TO THE FOLLOWING: LIGHTING SYSTEM, POWER SYSTEM, ALARM SYSTEM, POWER DISTRIBUTION, EQUIPMENT CONNECTIONS, ACCESS PANELS, EMPTY
CONDUIT SYSTEMS AND ALL REQUIRED WIRING.
2. INSTALL IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND THE REGULATIONS OF GOVERNING LOCAL, STATE, COUNTY AND OTHER APPLICABLE CODES. PAY FOR ALL REQUIRED LICENSES, FEES AND INSPECTIONS.
3. ALL WORK AND EQUIPMENT UNDER THIS DIVISION SHALL BE IN STRICT COMPLIANCE WITH THE APPLICABLE
PROVISIONS OF THE FOLLOWING CODES AND STANDARDS:
A. LIFE SAFETY CODE - NFPA 101 (2021 EDITION).
B. FLORIDA BUILDING CODE - 8TH EDITION
C. NATIONAL ELECTRICAL CODE - NFPA 70 (2023 EDITION).
D. STANDARD FOR HEALTH CARE FACILITIES - NFPA 99 (2021 EDITION).
E. NATIONAL FIRE PROTECTION CODE - NFPA 72 (2019 EDITION)
F. FGI - GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTHCARE CARE FACILITIES (2022 EDITION)
4A, ALL MATERIALS SHALL BE NEW AND FREE OF DEFECTS, AND SHALL BE U.L. LISTED, BEAR THE U.L. LABEL OR BE LABELED OR LISTED WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY. WHERE NO LABELING OR LISTING SERVICE IS AVAILABLE FOR CERTAIN TYPES OF EQUIPMENT, TEST DATA SHALL BE SUBMITTED TO PROVE TO THE ENGINEER THAT EQUIPMENT MEETS OR EXCEEDS AVAILABLE STANDARDS.
4B. PROVIDE SHOP DRAWING SUBMITTALS TO THE ARCHITECT/ENGINEER FOR APPROVAL FOR ALL MATERIAL PROVIDED UNDER THIS DIVISION. EQUIPMENT SHALL NOT BE ORDERED PRIOR TO APPROVAL FROM THE ARCHITECT/ENGINEER.
5. PROVIDE AND INSTALL ALL ELECTRICAL SYSTEMS AND ANY NECESSARY ACCESSORIES AS PER NEC AND LOCAL CODES WHETHER SPECIFIED HEREIN OR SHOWN ON DRAWINGS OR NOT. THE CONTENT OF THESE SPECIFICATIONS (DIVISION 16) AND CONTRACT DOCUMENTS IN GENERAL ONLY REFERS TO WORK REQUIRED ABOVE AND BEYOND
THE REQUIREMENTS OF THE NEC AND LOCAL CODES.
6. DRAWINGS ARE DIAGRAMMATIC. COORDINATE FINAL EQUIPMENT LOCATIONS WITH GOVERNING ARCHITECTURAL AND STRUCTURAL DRAWINGS. LAY OUT BEFORE INSTALLATION SO THAT ALL TRADES MAY INSTALL EQUIPMENT IN SPACES AVAILABLE. PROVIDE COORDINATION AS REQUIRED FOR INSTALLATION IN A NEAT AND WORKMANLIKE
MANNER.
7. CHECK SITE AND EXISTING CONDITIONS THOROUGHLY BEFORE BIDDING. ADVISE ENGINEER OF DISCREPANCIES OR
QUESTIONS NOTED.
8. PROVIDE FIELD SUPERINTENDENT WHO HAS HAD A MINIMUM OF FOUR (4) YEARS PREVIOUS SUCCESSFUL EXPERIENCE ON PROJECTS OF COMPARABLE SIZES AND COMPLEXITY. SUPERINTENDENT SHALL BE PRESENT AT ALL TIMES THAT WORK UNDER THIS DIVISION IS BEING INSTALLED OR AFFECTED. SUPERINTENDENT SHALL HAVE PASSED A PROCTORED H.H. BLOCK JOURNEYMAN EXAM WITH 75% GRADE OR BETTER AND SHALL BE A LICENSED JOURNEYMAN. A RESUME OF THE SUPERINTENDENT'S EXPERIENCE SHALL BE SUBMITTED TO ENGINEER BEFORE STARTING WORK. AT LEAST ONE MEMBER OF THE ELECTRICAL CONTRACTING FIRM SHALL HOLD A STATE MASTER
CERTIFICATE OF COMPETENCY.
9. PROVIDE ALL REQUIRED COORDINATION AND SUPERVISION WHERE WORK CONNECTS TO OR IS AFFECTED BY WORK
OF OTHERS, AND COMPLY WITH ALL REQUIREMENTS AFFECTING THIS DIVISION.
10. SUITABLY PROTECT ALL EQUIPMENT FURNISHED UNDER THIS DIVISION DURING CONSTRUCTION. RESTORE ALL DAMAGED SURFACES AND ITEMS TO "LIKE NEW" CONDITION BEFORE A REQUEST FOR SUBSTANTIAL COMPLETION
INSPECTION.
11. THE WORK REQUIRED UNDER THIS DIVISION SHALL INCLUDE A ONE-YEAR GUARANTEE. THIS GUARANTEE SHALL BE BY THE CONTRACTOR TO THE OWNER FOR ANY DEFECTIVE WORKMANSHIP OR MATERIAL WHICH HAS BEEN FURNISHED UNDER THIS CONTRACT AT NO COST TO THE OWNER FOR A PERIOD OF ONE YEAR FROM THE DATE OF
SUBSTANTIAL COMPLETION OF THE WORK.
12A. PERFORM VERIFICATION WORK AS REQUIRED TO SHOW THAT THE SYSTEM IS OPERATING CORRECTLY IN ACCORDANCE WITH CONTRACT DOCUMENTS AND MANUFACTURER'S LITERATURE. ALL VERIFICATION SHALL BE DONE AFTER 3-DAY FULL OPERATIONAL PERIOD. ALL WORK ON THE SYSTEM SHALL BE COMPLETED, AND ALL FORMS AND OTHER INFORMATION SHALL BE SUBMITTED FOR APPROVAL ONE WEEK BEFORE THE REQUEST FOR
FINAL INSPECTION OF THE BUILDING.
12B. CONTRACTOR SHALL CLOSELY COORDINATE WITH THE HOSPITAL PRIOR TO COMMENCING WORK AND DURING CONSTRUCTION FOR POWER AND/OR SYSTEM OUTAGES AS WELL AS GENERAL REQUIREMENTS. A SEVEN (7) DAY NOTICE SHALL BE GIVEN FOR ALL POWER OUTAGES. CONTRACTOR SHALL WORK DURING OFF HOURS (EVENINGS &
WEEKENDS) WHEN DEEMED NECESSARY BY THE HOSPITAL.
13. WHERE THE REQUIREMENTS OF ANOTHER DIVISION, SECTION, OR PART OF THESE SPECIFICATIONS EXCEED THE
REQUIREMENTS OF THIS DIVISION, THOSE REQUIREMENTS SHALL GOVERN.
14. THE ENTIRE INSTALLATION SHALL BE IN HOT DIPPED RIGID GALVANIZED CONDUIT, OR ELECTRIC METALLIC TUBING, UNLESS SPECIFICALLY NOTED OTHERWISE. RIGID METAL GALVANIZED CONDUIT SHALL BE USED IN ALL DAMP OR WET LOCATIONS OR WHERE SUBJECT TO MECHANICAL DAMAGE. ELECTRIC METALLIC TUBING SHALL HAVE STEEL COMPRESSION TYPE COUPLINGS AND BE USED INSIDE OF BUILDINGS AND ONLY IN DRY AREAS WHERE NOT EXPOSED TO MECHANICAL DAMAGE. MINIMUM CONDUIT SIZE FOR ALL SYSTEMS SHALL BE 3/4". PROVIDE INSULATED BUSHINGS AT ENDS OF ALL CONDUITS. ALL CONDUITS AND BACKBOXES SHALL BE COLOR CODED (FOR FIRE ALARM
- RED, FOR LIFE SAFETY - YELLOW). SUPPORT CONDUIT IN ACCORDANCE WITH THE NEC.
15. BRANCH CIRCUIT AND FEEDER CONDUCTORS FOR ELECTRIC POWER SHALL BE COPPER TYPE THHN/THWN INSULATION FOR BRANCH CIRCUITS AND THWN INSULATION FOR FEEDERS. NO ALUMINUM WIRING SHALL BE PERMITTED. ALL WIRE SHALL BE SIZE SHOWN ON THE DRAWINGS. IF NO SIZE IS SHOWN, WIRE SHALL BE MINIMUM NO. 12, EXCEPT THAT BRANCH "HOMERUNS" OVER 50 FT. IN LENGTH SHALL BE MINIMUM NO. 10. WIRE IN VICINITY OF HEAT-PRODUCING EQUIPMENT SHALL BE TYPE XHHW INSULATION. ALL WIRING SHALL BE MANUFACTURED IN THE
USA. WIRING SHALL BE COLOR CODED ACCORDING TO EXISTING HOSPITAL STANDARDS.
18. MOLDED CASE CIRCUIT BREAKERS: ALL PANELBOARD BRANCH CIRCUIT BREAKERS SHALL BE BOLT-ON THERMAL-MAGNETIC MOLDED CASE TYPE. BREAKERS SHALL BE 1, 2 OR 3 POLE WITH AN INTEGRAL CROSSBAR TO ASSURE SIMULTANEOUS OPENING OF ALL POLES IN MULTI-POLE CIRCUIT BREAKERS. BREAKERS SHALL HAVE AN OVERCENTER,TRIP-FREE,TOGGLE-TYPE OPERATING MECHANISM WITH QUICK- MAKE, QUICK-BREAK ACTION AND ACTIVE HANDLE INDICATION. HANDLES SHALL HAVE "ON", "OFF", AND "TRIPPED" POSITIONS. BOLT-ON CIRCUIT BREAKERS SHALL BE ABLE TO BE INSTALLED IN THE PANELBOARD WITHOUT REQUIRING ADDITIONAL MOUNTING HARDWARE. 120/208 VOLT CIRCUIT BREAKERS SHALL HAVE INTERRUPTING RATINGS A MINIMUM OF 10,000 RMS
SYMMETRICAL AMPERES AT 240VAC.
19. AT THE COMPLETION OF WORK, CONTRACTOR SHALL PROVIDE TWO SETS OF RECORD "AS-BUILT" DRAWINGS IN ACCORDANCE WITH DIVISION 1, SHOWING THE ACTUAL LOCATION OF ALL EQUIPMENT INSTALLED INCLUDING
UNDERGROUND CONDUITS AND JUNCTION BOXES.
20. PROVIDE EXPANSION FITTINGS, WHERE NECESSARY TO COMPENSATE FOR THERMAL EXPANSION AND CONTRACTION, AND FOR CONDUITS RUNNING FROM BUILDING STRUCTURE TO THE OTHER SEPARATE BY
EXPANSION JOINTS. PER NEC 300.7.
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT.
ELECTRICAL SYMBOL LEGEND
DN
UP
SYMBOL DESCRIPTION
DDC
VFD
AUTOMATIC TRANSFER SWITCH
DIRECT DIGITAL CONTROL PANEL
VARIABLE FREQUENCY DRIVE
MOTOR CONNECTION
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
FLEXIBLE CONDUIT
CONDUIT CONTINUED
CONDUIT STUBBED OUT OR UP
CONDUIT TURNING DOWN
CONDUIT TURNING UP
GROUND OR GROUND ROD AS NOTED
CONDUIT EXPOSED
CONDUIT CONCEALED IN SLAB, UNDERGROUND OR UNDER FLOOR
CONDUIT CONCEALED ABOVE CEILING OR IN WAL
BRANCH CIRCUIT PANELBOARD, OVER 240 VOLTS, SURFACE MOUNTED
MULTI-SERVICE RACEWAY WITH 5-20R RECEPTACLES, 18" O.C. UNLESS
OTHERWISE NOTED
SPECIAL PURPOSE RECEPTACLE, NEMA CONFIGURATION AS NOTED
NOTE: DIAGONAL MARKS INDICATED ON ANY DEVICE REPRESENTS DEVICE
CONNECTED TO EMERGENCY CIRCUIT (RED DEVICE FOR RECEPTACLE);
TYPICAL FOR ANY DEVICE IN LEGEND
TWO DUPLEX RECEPTACLES (QUAD) WITH COMMON COVER MOUNTED ABOVE COUNTER
TWO DUPLEX RECEPTACLES (QUAD) WITH COMMON COVERPLATE
GFCI RECEPTACLE; "WP" INDICATES CAST METAL "IN-USE" WEATHERPROOF COVER,
WEATHER-RESISTANT LISTED
DUPLEX RECEPTACLE MOUNTED ABOVE COUNTER
MULTI-SERVICE FLOOR BOX WITH DUPLEX RECEPTACLE, VOICE/DATA/AV DEVICES
(REFER TO TECHNOLOGY DRAWINGS OR OWNER'S VENDOR DRAWINGS FOR LOW
VOLTAGE REQUIREMENTS)
FLOOR BOX WITH DUPLEX RECEPTACLE WITH APPROPRIATE FLANGE
30AR
20AF
PEDESTAL MOUNTED DUPLEX RECEPTACLE
DUPLEX RECEPTACLE
NF
30AR NON-FUSED DISCONNECT SWITCH, RATING AS NOTED
NF = NON-FUSED
AR = AMPERE RATING OF SWITCH
4X SS = NEMA 4X STAINLESS STEEL ENCLOSURE
COMBINATION MAGNETIC MOTOR STARTER, SIZE AS NOTED, 3-POLE UNLESS OTHERWISE
NOTED
30/3
3R
MCP
AMPERE
RATING
# OF POLES
NEMA STARTER SIZE
SINGLE RECEPTACLE
FUSED DISCONNECT
BASIC MATERIALS
MOTORIZED DAMPER CONNECTIONMD
FLOOR BOX, TWO DUPLEX RECEPTACLES (QUAD) WITH APPROPRIATE FLANGE
DEVICE ABBREVIATION TAGS:
DUPLEX RECEPTACLE, CEILING MOUNTED
TWO DUPLEX RECEPTACLES (QUAD) WITH COMMON COVERPLATE, CEILING MOUNTED
J
MULTI-SERVICE FLOOR BOX WITH TWO DUPLEX RECEPTACLES (QUAD) , VOICE/DATA/AV
DEVICES (REFER TO TECHNOLOGY DRAWINGS OR OWNER'S VENDOR DRAWINGS FOR
LOW VOLTAGE REQUIREMENTS)
GFCI RECEPTACLE MOUNTED ABOVE COUNTER
DUPLEX RECEPTACLE; EACH RECEPTACLE ON SEPARATE CIRCUIT (PROVIDE
BREAKER WITH 2-POLE COMMON TRIP HANDLE)
SPLIT-WIRED CONTROLLED DUPLEX RECEPTACLE
TWO GFCI DUPLEX RECEPTACLES (QUAD) WITH COMMON COVERPLATE
MULTI-SERVICE POWER & DATA FLOOR BOX WITH FURNITURE FEED CONNECTION
(REFER TO TECHNOLOGY DRAWINGS OR OWNER'S VENDOR DRAWINGS FOR LOW
VOLTAGE REQUIREMENTS)
J JUNCTION BOX WALL MOUNTED
J JUNCTION BOX MOUNTED IN OR ABOVE CEILING OR IN STRUCTURE
J WALL MOUNTED FURNITURE FEED POWER CONNECTION
C CLOCK RECEPTACLE, WALL MOUNTED
GROUND BUS BAR, COPPERGND
CONDUIT SEAL-OFF FITTING
SPD SURGE PROTECTIVE DEVICE
ST
SHUNT-TRIP PUSHBUTTON; SEMI-FLUSH WALL MOUNTED UNLESS OTHERWISE NOTED;
NEMA 3R FOR EXTERIOR LOCATIONS
OVERHEAD DOOR PUSHBUTTON CONTROL STATION
PUSHBUTTON STATION
BAS BUILDING AUTOMATION SYSTEM CONTROL PANEL
LCP LIGHTING CONTROL PANEL
NEMA RATING; NEMA 1 UNLESS OTHERWISE NOTED
3R
3R
AF = AMPERE RATING OF FUSE
AR = AMPERE RATING OF SWITCH
4X SS = NEMA 4X STAINLESS STEEL ENCLOSURE
BRANCH CIRCUIT PANELBOARD, OVER 240 VOLTS, FLUSH MOUNTED
BRANCH CIRCUIT PANELBOARD, UNDER 240 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, UNDER 240 VOLTS, FLUSH MOUNTED
CONDUIT HOMERUN TO ELECTRICAL PANEL
ATS
NEMA RATING; NEMA 1 UNLESS OTHERWISE NOTED
NEMA RATING; NEMA 1 UNLESS OTHERWISE NOTED
4X SS = NEMA 4X STAINLESS STEEL ENCLOSURE
SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL
EPO EMERGENCY POWER OFF SHUNT-TRIP PUSHBUTTON, RED MUSHROOM HEAD, CLEAR
LEXAN PROTECTIVE COVER
A
EMERGENCY TWIN-HEAD LIGHT WITH INTEGRAL BATTERY PACK, WALL MOUNTED
TRACK WITH TRACK LIGHT FIXTURE (TRIANGLES INDICATE QUANTITY OF TRACK HEADS)
EXTERIOR POLE-MOUNTED AREA LIGHT FIXTURE, ARMS AS INDICATED ON DRAWINGS
EXIT LIGHT, WALL MOUNTED
EXIT LIGHT, CEILING OR PENDANT MOUNTED; DIRECTIONAL ARROWS AS INDICATED;
SHADED QUADRANT INDICATES FACE(S) OF FIXTURE
CEILING WALLWASHER, ACCENT LIGHT, LANDSCAPING TREE ACCENT LIGHT, FACADE LIGHT
RECESSED, PENDANT OR SURFACE CEILING
FIXTURE RECESSED, PENDANT OR SURFACE CEILING
DIAGONAL HALF SHADING INDICATE FIXTURE CONNECTED TO CRITICAL CIRCUIT OR
PROVIDED WITH INTEGRAL EMERGENCY BATTERY PACK; "E" AFTER FIXTURE TYPE TAG
INDICATES INTEGRAL BATTERY PACK UNLESS OTHERWISE NOTED ON LIGHT FIXTURE
SCHEDULE (TYPICAL FOR ALL LIGHT FIXTURE SYMBOLS)
FULL SHADING INDICATE FIXTURE CONNECTED TO LIFE SAFETY CIRCUIT.
FIXTURE, RECESSED, PENDANT OR SURFACE CEILING
STRIP FIXTURE
FIXTURE, WALL MOUNTED
FIXTURE TYPE
LOWER CASE LETTER INDICATES CONTROLLING SWITCH
a
CIRCUIT NUMBER
LIGHTING
WALL MOUNTED
LINEAR RECESSED, PENDANT OR SURFACE CEILING
ZX-X
LIGHTING CONTROL ZONE NUMBER
EXTERIOR PEDESTRIAN SIDEWALK BOLLARD OR POST-TOP LIGHT FIXTURE
H
H
FS
FS
TS
F
RT
R
F
FIRE ALARM ANNUNCIATOR PANEL - FLUSH MOUNTED
FIRE ALARM TERMINAL CABINET
FIRE ALARM CONTROL PANELFACP
HEAT DETECTOR 135°F FIXED TEMPERATURE, UNLESS OTHERWISE NOTED,
CEILING MOUNTED
ELECTROMAGNETIC DOOR HOLD OPEN DEVICE
SPRINKLER WATERFLOW SWITCH CONNECTION
P
SPRINKLER TAMPER SWITCH CONNECTION
FIREMAN'S PHONE JACK
STROBE, WALL MOUNTED, 75CD UNLESS OTHERWISE NOTED
CD = CANDELA RATING
COMBINATION SPEAKER/STROBE, CEILING MOUNTED, 75CD UNLESS OTHERWISE
NOTED
HORN ONLY, WALL MOUNTED
DUCT SMOKE DETECTOR REMOTE TEST SWITCH WITH INDICATING LAMP, WALL
MOUNTED AT 48" AFF, UNLESS OTHERWISE NOTED
SUPERVISED ADDRESSABLE FIRE ALARM CONTROL RELAY
S = SUPPLY
R = RETURN
DUCT SMOKE DETECTOR
E = ELEVATOR WITH RECALL CONTACTS
I = IONIZATION
CEILING SMOKE DETECTOR, PHOTOELECTRIC TYPE UNLESS OTHERWISE
NOTED
MANUAL PULL STATION
FIRE ALARM / DETECTION SYSTEM
F
XXCD CD = CANDELA RATING
COMBINATION SPEAKER/STROBE, WALL MOUNTED, 75CD UNLESS OTHERWISE
NOTED
CD = CANDELA RATING
STROBE, CEILING MOUNTED, 75 CD UNLESS OTHERWISE NOTED
SS SPEAKER ONLY, CEILING MOUNTED
PS PRESSURE SWITCH CONNECTION
XXCD
B R
BEAM SMOKE DETECTOR
BT OR T = BEAM DETECTOR TRANSMITTER
BR OR R = BEAM DETECTOR RECEIVER
F
XXCD
SPEAKER ONLY, WALL MOUNTEDSS
FATC
FAA
VOICE EVACUATION PANELEVAC
MASS NOTIFICATION SYSTEM PANELMNS
SYMBOL DESCRIPTION
NFPA / LEGACY
F
S
S
BR
S
H
DH
XXCD
F H
XXCD
C
S C
S
VS
WS
PS
FACP
FATC
FAA
EVAC
MNS
R
MASS NOTIFICATION SYSTEM PANELDACTDACT
255 S. Orange Avenue Suite 1600
Orlando, FL 32801 P 407.841.9050 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No. :
COA 15
Emory Neal Boothe, P.E.
Florida License #54603
This item has been electronically signed and sealed Emory Neal Boothe using a Digital Signature and date.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Seal
Drawing No.:
Scale:
Issuance:
Drawing Title:
Approved By:
Project No.:
Drawn By:
Consultants:
925854
12" = 1'-0"
/4 /2
:4
:0
P
M C
R e vi t
L o ca ls \9
-H
H F ir e
P u m p R m E
L E
C -F
IR
E
P R
O T
R
C o d y.
M o rg a n
T
Q C
Y .r vt
H A
L
IF
A X
H E
A L
T H
D A
Y T
O N
A F
IR
E
P U
M P
R O
O M
N
C ly d e
M o rr is
B lv d
D a yt o n a
B e a c h
F
L
925854
CWM
ENB
GENERAL
INFORMATION -
ELECTRICAL
E001
No. Date Description
ELECTRICAL DRAWING INDEX
SHEET DESCRIPTION
E001 GENERAL INFORMATION - ELECTRICAL
E002 ELECTRICAL ONE-LINE DIAGRAM
E111 DEMO & RENO FLOOR PLANS - ELECTRICAL
T-NHA1DPC
BRANCH OF
POWER
N=NORMAL
C=CRITICAL
Q=EQUIPMENT
L=LIFE SAFETY
E=ESSENTIAL
U=UPS
VOLTAGE
H=277/480V
L=120/208V
TRANSFORMER
BLANK =
PANEL AREA SERVED
A=FREESTANDING ED
B=ASC
C=MOB
D=HOSPITAL
FLOOR #
P=PENTHOUSE
G=GROUND
1=FIRST
2=SECOND
PANEL TYPE
DP=DISTRIBUTION
BLANK=BRANCH
PANEL
SG=SWITCHGEAR
SB=SWITCHBOARD
PANEL
DESIGNATION
A,B,C,...
NEW PANEL/TRANSFORMER
DESIGNATIONS
FPL XFMRS VAULT
(2) 1500 KVA
277/480V, 3∅, 4W
1600AF
1600AT
CHILLER #2
(SOUTH CHILLER
BUILDING, 1200 TON)
2500AF
2500AT
200AF
100AT
ATS
1200AF
960AT
PANEL "DPH-1"
(ONCOLOGY)
1200AF
1200AT
800AF
800AT
PANEL "S"
(PHYSICAL FITNESS)
2000AF
1800AT
2500AF
2500AT
MAIN SWITCHGEAR (#1)
(65,000 AIC)
(60,862 SCA)
277/480V, 3∅, 4W
(ONCOLOGY)
5 SETS OF
(3) 750KCMIL,
(1) 500KCMIL
(1) 2/0 GND
4" C.
3 SETS OF
(4) 400KCMIL,
(1)#2/0 GND
4" C.
7 SETS OF
(4) 500KCMIL,
(1) 350KCMIL GND
4" C.
2 SETS OF
(4) 600KCMIL,
(1)#1/0 GND
4" C.
4 SETS OF
(4) 600KCMIL,
(1)#4/0 GND
4" C.
7 SETS OF
(4) 500KCMIL,
(1) 350KCMIL GND
4" C.
MULTI-TAP BOX
2000 AMPS
ESB
277/480V, 3∅, 4W
100 400 600 1200 400 400
SPARE
1250KW @ 0.8 PF
480/277V
60 HZ
2000AF/1800AT
(18,000 AIC)
(10,217 SCA)
5 SETS OF
(3) 750KCMIL,
(1) 500KCMIL
(1) 2/0 GND
4" C.
(18,000 AIC)
(10,185 SCA)
ATS-MCCC-MCC
C-MCC MDP-1
MM
277/480V, 3PH, 4W
2500 AMPS(60,862 SCA)
(65,000 AIC)
NSB
ATS-EQP
600A,4P
(65,000 WSR)
(60,862 SCA)
ATS-LS
400A,4P
(65,000 WSR)
(60,862 SCA)
277/480V, 3PH, 4W
400 AMPS(60,862 SCA)
(65,000 AIC)
LS
T-LLS
9 KVA
480V-
120/208V
SCA = 64,212 AMPS
E-G SET #4 (SOUTH HILL)
FIRE PUMP
277/480V, 3PH, 4W
2500 AMPS(60,862 SCA)
(65,000 AIC)
EQP
TO FP JOCKEY PUMP
LLS
(10,000 AIC)
(100,000 AIC)
(64,000 SCA)
400 600
15 15
ONE-LINE DIAGRAM LEGEND
NEW EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
EXISTING EQUIPMENT AFFECTED BY PROJECT
EXISTING EQUIPMENT TO BE DEMOLISHED
FUTURE EQUIPMENT
GENERAL ONE-LINE DIAGRAM NOTES
1 REFER TO PANEL SCHEDULES FOR ADDITIONAL LOADS/PANELBOARD REQUIREMENTS NOT
SPECIFICALLY INDICATED ON THIS SHEET.
2 COORDINATE CIRCUIT BREAKER SELECTION AND LUG CAPACITIES WITH SPECIFIED WIRE
SIZES, PROVIDE LUG KITS AS REQUIRED. ALL EQUIPMENT WITH MANUFACTURER'S
RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT.
3 CONDUITS SIZED PER EMT, CONTRACTOR TO RESIZE IF USING OTHER TYPES OF CONDUIT.
4 BASIS OF DESIGN: SQUARE 'D'
5 REFER TO SPECIFICATION 260513 2.1 FOR WIRE AND CONDUCTOR TYPE.
ONE-LINE DIAGRAM NOTES:
FIRE PUMP FEEDER TERMINATION ON FP&L BUS INSIDE THE VAULT. COORDINATE
WITH FP&L.
(4) 500 KCMIL - 4" CONDUIT (RGS) ROUTED ON EXTERIOR OF THE SERVICE BUILDING,
TERMINATING AT THE FIRE PUMP CONTROLLERS/ATS AND THE FP&L VAULT.
(3) 500 KCMIL AND (1) 4/0 GROUND - 4" CONDUIT (RGS) ROUTED ON EXTERIOR OF THE
SERVICE BUILDING, TERMINATING AT THE FIRE PUMP CONTROLLERS/ATS AND THE
ESB BOARD.
FIRE PUMP (SERVICE ENTRANCE RATED) CONTROLLER/ATS (REFER TO FP DRAWINGS
FOR SPECS).
4/0 GROUNDING ELECTRODE CONDUCTOR (NEUTRAL/GROUND BOND WITHIN SERVICE
ENTRANCE CONTROLLER).
PROVIDE GROUNDING ELECTRODE (GROUND RODS, BONDING OF STEEL STRUCTURE
AND BONDING OF COLD WATER PIPE).
1" CONDUIT WITH SIGNAL AND ALARM WIRING TO EMERGENCY GENERATOR START
CIRCUIT AND TO FIRE PUMP ANNUNCIATOR (LOCATED IN FOUNTAIN TOWER PBX
LOCATION).
FIRE PUMP EMERGENCY BREAKER SHALL BE ADJUSTABLE TYPE WITH "LSI" SETTINGS.
255 S. Orange Avenue Suite 1600
Orlando, FL 32801 P 407.841.9050 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No. :
COA 15
Emory Neal Boothe, P.E.
Florida License #54603
This item has been electronically signed and sealed Emory Neal Boothe using a Digital Signature and date.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Seal
Drawing No.:
Scale:
Issuance:
Drawing Title:
Approved By:
Project No.:
Drawn By:
Consultants:
925854
12" = 1'-0"
/4 /2
:4
:0
P
M C
R e v it
L o c a ls
\9
-H
H F ir e
P u m p R m E
L E
C -F
IR
E
P R
O T
R
C o d y .M o rg a n
T
Q C
Y .r v t
H A
L
IF
A X
H E
A L
T H
D A
Y T
O N
A F
IR
E
P U
M P
R O
O M
N
C ly d e
M o rr is
B lv d
D a y to n a
B e a c h
F
L
925854
CWM
ENB
ELECTRICAL
ONE-LINE DIAGRAM
E002
No. Date Description
FIRE PUMP
S
FIRE PUMP
GENERATOR ROOM (GROUND FLOOR)
FP&L VAULT
ELEC RM 02
ELEC RM
DN
C
J
WS VS VS
JOCKEY PUMP
CONTROLLER
VS
VS
FUEL TANK
DIESEL FIRE
PUMP
EXHAUST FAN
FRESH AIR INTAKE
FIRE PUMP
CONTROLLER
EQ
FIRE PUMP CONTROLLER/ATS
SERVICE ENTRANCE
EXISTING "ESB"
EXISTING "EQP" EXISTING "LLS"
DOWN
UP TO ROOF
DOWN TO VAULT
SCOPE OF WORK
255 S. Orange Avenue Suite 1600
Orlando, FL 32801 P 407.841.9050 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No. :
COA 15
Emory Neal Boothe, P.E.
Florida License #54603
This item has been electronically signed and sealed Emory Neal Boothe using a Digital Signature and date.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Seal
Drawing No.:
Scale:
Issuance:
Drawing Title:
Approved By:
Project No.:
Drawn By:
Consultants:
925854
As indicated
/4 /2
:4
:1
P
M C
R e v it
L o c a ls
\9
-H
H F ir e
P u m p R m E
L E
C -F
IR
E
P R
O T
R
C o d y .M o rg a n
T
Q C
Y .r v t
H A
L
IF
A X
H E
A L
T H
D A
Y T
O N
A F
IR
E
P U
M P
R O
O M
N
C ly d e
M o rr is
B lv d
D a y to n a
B e a c h
F
L
925854
CWM
ENB
DEMO & RENO
FLOOR PLANS -
ELECTRICAL
E111
1/4" = 1'-0"
GROUND FLOOR DEMOLITION PLAN - ELECTRICAL
1/4" = 1'-0"
GROUND FLOOR PLAN - POWER
CODED NOTES
1 NEW FEEDS TO ELECTRIC FIRE PUMP TO BE ROUTED TO ROOF OF SERVICE BUILDING (CONDUIT SHALL BE
RIGID GALVANIZED STEEL.
2 NEW ELECTRIC FIRE PUMP.
3 EXISTING ELECTRICAL WITHIN FIRE PUMP ROOM ASSOCIATED WITH THE EXISTING FIRE PUMP SHALL BE
DEMOLISHED. EXISTING LIGHTING, RECEPTACLES, ETC SHALL REMAIN.
4 NEW FIRE PUMP CONTROLLER/ATS SERVICE ENTRANCE RATED.
5 NEW FIRE PUMP JOCKEY PUMP AND CONTROLLER.
6 CONNECT TO EQUIPMENT BRANCH PANEL "EQP", (1) 3PH - 20A CIRCUIT BREAKER.
7 REMOVE ALL ELECTRICAL ASSOCIATED WITH EXISTING JOCKEY PUMP CONTROLLER.
8 REMOVE ALL ELECTRICAL ASSOCIATED WITH EXISTING FUEL TANK.
9 REMOVE ALL ELECTRICAL ASSOCIATED WITH EXISTING DIESEL FIRE PUMP.
10 EXISTING EXHAUST AND FRESH AIR INTAKE COMPONENTS TO REMAIN.
11 EXISTING FIRE ALARM SYSTEM FLOW AND TAMPER SWITCHES TO BE RELOCATED TO NEW FIRE PUMP PIPING
AND VALVES.
12 EXISTING LIGHT FIXTURES TO REMAIN, RECONNECT TO LIFE SAFETY BRANCH CIRCUITING.
13 EXISTING EMERGENCY BATTERY PACK LIGHTING TO REMAIN.
14 RECONNECT LIGHTING AND RECEPTACLE TO LIFE SAFETY BRANCH "LLS", (1) 1PH - 20A CIRCUIT BREAKER.
15 CHANGE LIGHT SWITCH AND RECEPTACLE TO RED DEVICES AND PROVIDE TAG INDICATING LIFE SAFETY
BRANCH PANEL AND CIRCUIT.
16 EXISTING FIRE ALARM DEVICE TO REMAIN.
17 NEW FEEDS TO ELECTRIC FIRE PUMP TO BE ROUTED ON THE ROOF OF THE SERVICE BUILDING (CONDUIT
SHALL BE RIGID GALVANIZED STEEL).
18 DOWN EXTERIOR WALL WITH CONDUIT FEEDS OVER TO FIRE PUMP ROOM.
19 REMOVE ALL ELECTRICAL ASSOCIATED WITH EXISTING FIRE PUMP CONTROLLER.
GENERAL POWER PLAN NOTES
1 VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH MANUFACTURER'S
RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT. MODIFY LAYOUT AS REQUIRED PER
MANUFACTURER'S SPACE REQUIREMENTS.
2 COORDINATE FINAL LOCATIONS OF ALL DIVISION 23 EQUIPMENT IN FIELD WITH DIVISION 23. FIELD
LOCATIONS SHALL DICTATE.
3 COORDINATE MOUNTING HEIGHTS AND LOCATIONS OF ALL DEVICES WITH ARCHITECTURAL ELEVATIONS AND
CASEWORK.
1/8" = 1'-0"
FIRST FLOOR - POWER
N N N
N
No. Date Description
1" = 80'-0"
SITE PLAN - ELECTRICAL
2 1/2"
2 1/2"
3-0
FIRE PROTECTION DRAWING INDEX
FIRE PROTECTION LEGEND
FIRE PROTECTION DESIGN CRITERIA
1. FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA 13 AND ALL APPLICABLE STATE CODES.
2. FINAL INSPECTION AND APPROVAL BY LOCAL FIRE MARSHAL AND ARCHITECT/ENGINEER.
3. SPRINKLER SHOP DRAWINGS AND MATERIAL SUBMITTALS SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER AND STATE FIRE MARSHAL AND SHALL BE APPROVED PRIOR TO ANY
INSTALLATION.
4. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO
PROVIDE ANY ADDITIONAL OFFSETS REQUIRED FOR PROPER INSTALLATION AND COORDINATION
WITH OTHER TRADES.
5. PIPING IN AREAS WITH EXPOSED STRUCTURE SHALL BE INSTALLED AS HIGH AS POSSIBLE TO
ALLOW THE OWNER MAXIMUM USE OF THE SPACE.
6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING DESCRIPTIONS AND HEIGHTS.
7. SPRINKLERS ARE TO BE COORDINATED WITH ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES AND CEILING SYSTEMS. SPACING OF SPRINKLERS SHALL BE IN ACCORDANCE WITH NFPA 13 AND THE
LISTING OF THE SPRINKLER.
8. SPRINKLER LOCATIONS SHALL BE CENTERED IN THE TILE. PROVIDE ARMOVER OR SWING JOINT AS
REQUIRED.
9. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION) SHALL BE
INSTALLED WITH DEFLECTOR 1" BELOW THE BOTTOM OF THE BEAM (MAXIMUM 22" BELOW ROOF
DECK). EXPOSED BAR JOISTS THAT HAVE SPRAY-ON FIRE PROOFING THAT MAKES THE JOIST SOLID
SHALL BE TREATED LIKE A BEAM WITH THE SPRINKLERS 1" BELOW THE BOTTOM OF THE FIRE
PROOFING.
10. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND FLOORS WITH U/L LISTED ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING OF
THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES.
11. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON-ACCESSIBLE CEILINGS AND CHASES.
12. PROVIDE A PERMANENTLY ATTACHED NAME TAG TO THE RISER STATING THE REQUIRED DESIGN
CRITERIA FOR EACH HYDRAULICALLY-DESIGNED SYSTEM.
13. PROVIDE SPRINKLERS UNDERNEATH ALL EXPOSED DUCTWORK WHICH IS OVER 48" WIDE AND SPACE HEADS AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13. HEADS UNDER DUCTS
ARE NOT INDICATED ON THE DRAWINGS BUT ARE REQUIRED AND SHALL BE PROVIDED IN
ACCORDANCE WITH NFPA 13. SPRINKLER LOCATIONS UNDER DUCTWORK AND AROUND
OBSTRUCTIONS SHALL BE GOVERNED BY FINAL INSTALLED LOCATIONS.
14. PROVIDE SPRINKLERS AT THE TOP AND BOTTOM OF ALL STAIRWELLS AND AT THE LANDING OF
EACH FLOOR THAT OPENS INTO MORE THAN ONE FIRE ZONE.
15. PROVIDE SPRINKLER GUARDS ON ALL HEADS IN ELECTRIC ROOMS, TELEPHONE ROOMS, ELEVATOR
ROOMS, ELEVATOR SHAFTS AND ON ANY HEADS LESS THAN 7'-0" ABOVE THE FLOOR.
16. IF SYSTEM PRESSURE EXCEEDS 100 PSI PROVIDE HANGERS PER NFPA 13 17.4.3.4.4 AND 17.4.3.5.2 THAT PREVENTS UPWARD MOVEMENT OF THE PIPE FOR SPRINKLERS IN THE PENDENT POSITION. A MAXIMUM OF 12" FROM THE END SPRINKLER ON A BRANCH LINE AND ALL ARM-OVERS OVER 12".
17. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS, TRANSFORMERS, ETC.) PRIOR TO
ANY INSTALLATION. DO NOT ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES. ANY PIPING RUN OVER ELECTRICAL SHALL BE REROUTED AT NO ADDITIONAL
COST.
18. SPRINKLERS IN EQUIPMENT ROOMS ARE TO BE INTERMEDIATE TEMPERATURE 200°F SPRINKLERS
PER NFPA 13.
19. WET BULK SUPPLY MAINS AND HOSE SUPPLY MAINS EXPOSED TO THE WEATHER SHALL BE
INSULATED AND PROVIDED WITH AN ALUMINUM JACKET.
20. PROVIDE A TEMPORARY STANDPIPE SYSTEM WITH FIRE DEPARTMENT CONNECTIONS DURING
CONSTRUCTION.
GENERAL NOTES
a. THE POINT OF SERVICE AND THE WATER SUPPLY CHARACTERISTIC'S FOR THE FIRE
PROTECTION SYSTEM IS SHOWN ON THE FIRE PROTECTION SITE PLAN.
b. THE FIRE PROTECTION DESIGN, CALCULATIONS, INSTALLATION AND THE ACCEPTANCE TESTING OF THE FIRE PROTECTION SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13, 2019 EDITION; THE FLORIDA BUILDING CODE AND THE FLORIDA FIRE PREVENTION CODE 8TH EDITION (2023) AND
ALL LOCAL CODES REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
c. AREA OCCUPANCIES AND HAZARD CLASSIFICATIONS ARE LISTED IN THE DESIGN CRITERIA NOTE
LOCATED ON THE CONTRACT DOCUMENTS.
d. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE AND PROVIDE FIRE PROTECTION SYSTEM
LAYOUT DOCUMENTS WITH HYDRAULIC CALCULATIONS. FIRE PROTECTION SYSTEM LAYOUT
DOCUMENTS WITH HYDRAULIC CALCULATIONS SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER AND THE LOCAL AHJ FOR ACCEPTANCE PRIOR TO PERMITTING.
e. SEE SITE PLAN FOR THE CHARACTERISTICS WATER SUPPLY PIPING.
f. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE A HYDRANT FLOW TEST AND PERFORM
HYDRAULIC CALCULATIONS FOR PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT
DOCUMENTS (WORKING PLANS).
g. ALL SYSTEM CONTROL VALVES SHALL BE PROVIDED WITH TAMPER SWITCHES AND INTERFACE
THE ALARM CIRCUIT.
h. THE WATER SUPPLY FOR THE FIRE PROTECTION SYSTEM HAS NOT SHOWN ANY EVIDENCE OF
MICROBIAL INDUCED CORROSION (MIC). THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY
THE ARCHITECT/ENGINEER OF ANY EVIDENCE OF MIC AND PROVIDE NECESSARY WATER
TREATMENT AS NEEDED TO REDUCE OR ELIMINATE MIC.
i. ALL METERING AND BACK FLOW PREVENTION DEVICES SHALL MEET WITH ALL WATER
PURVEYORS REQUIREMENTS.
j. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE LISTED AND TESTED FOR FIRE
PROTECTION USE. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE THE U.L.
LISTED AND FM APPROVED.
FLORIDA ADMINISTRATIVE CODE
CHAPTER 61G15-32 NOTES
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
SYMBOL DESCRIPTION
- CONTROL VALVE w/TAMPER SWITCH
- HYDRAULIC REFERENCE NODE
- EXISTING SPRINKLER PIPING
- FIRE VALVE CABINET
- REVISION REFERENCE
OR
- CONNECT TO
- DEMO TO
- DEMOLISHED SPRINKLER PIPING
- NEW SPRINKLER PIPING
- U/G GATE VALVE
# - KEYNOTE
- HYDRAULIC REMOTE AREA
- CONTROL VALVE W/ TAMPER SWITCH
- PIPE SIZE
- 2-1/2" FIRE DEPARTMENT VALVE W/ CAP AND CHAIN
- PIPE SIZE AND LENGTH
GENERAL PROVISIONS
PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT FOR A COMPLETE AND PROPERLY
OPERATING FIRE PROTECTION SYSTEM.
CODES AND STANDARDS: THE FIRE SPRINKLER PROTECTION SYSTEMS INSTALLATION,
FLUSHING AND TESTING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 13, AND 24 AND
ALL LOCAL CODES HAVING JURISDICTION.
PIPE THREAD PATTERN: ALL THREADS SHALL BE IN ACCORDANCE WITH LOCAL FIRE
DEPARTMENT SPECIFICATIONS AND NFPA 1963, 2019 REVISION.
UL/FM APPROVAL: ALL EQUIPMENT, VALVES, COUPLINGS, HANGERS AND DEVICES SHALL BE
APPROVED BY UNDERWRITERS' LABORATORY (UL) OR FACTORY MUTUAL (FM) FOR USE IN FIRE
PROTECTION SERVICE.
LICENSURE: THE FIRE PROTECTION SYSTEMS SHALL BE INSTALLED BY A STATE OF FLORIDA
CERTIFIED FIRE PROTECTION CONTRACTOR.
ALL FIRE PROTECTION WORK SHALL BE DONE IN A NEAT AND WORKMAN-LIKE MANNER.
CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND FEES, ETC., REQUIRED FOR THE
EXECUTION OF THIS WORK.
CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES BEFORE FABRICATION OR
INSTALLATION. OFFSETS AND/OR TRANSITIONS REQUIRED SHALL BE PROVIDED WITHOUT
ADDITIONAL COST. CONTRACTOR SHALL COORDINATE AND INSTALL WORK IN A TIMELY
MANNER TO PREVENT DELAYS IN THE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE DAMAGED EQUIPMENT AND/OR
MATERIAL.
PIPING SHOP DRAWINGS: SUBMIT 1/8" SCALE PIPING SHOP DRAWINGS. SHOP DRAWINGS SHALL
INCLUDE SPRINKLER PIPING CUT LENGTHS, OFFSETS, FITTINGS AND DEVICES, ELEVATIONS,
HANGER LOCATIONS, SPRINKLER HEAD COUNT BY TYPE, ELEVATION SECTIONS AND OTHER
INSTALLATION INFORMATION. SUBMIT HYDRAULIC CALCULATIONS PROVING THE VIABILITY OF
THE MOST HYDRAULICALLY-REMOTE AREAS OF THE PROJECT. INDICATE HYDRAULIC
REFERENCE POINTS AND SUBMIT COMPUTER ANALYZED NODAL CALCULATIONS IN BOTH
TABULAR AND GRAPHICAL FORMATS. HYDRAULIC IMBALANCE SHALL NOT EXCEED 0.01 GPM AT
ANY NODE, AND WATER VELOCITY SHALL NOT EXCEED 20 FEET PER SECOND. DEMONSTRATE
COMPLIANCE WITH THE REQUIREMENTS OF NFPA-13 REGARDING DENSITY, AREA OF
APPLICATION, SELECTION OF HYDRAULICALLY-REMOTE AREAS, AND MAXIMUM COVERAGE PER
SPRINKLER.
COORDINATE ALL PIPE ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION. ROUTE ALL
PIPING TO AVOID DUCTWORK, PIPING, AND BUILDING STRUCTURE.
BASIC MATERIALS AND METHODS
GENERAL: ONLY THE FOLLOWING MATERIALS DESIGNED FOR 175 PSIG CWP SHALL BE USED
FOR FIRE PROTECTION PIPING UNLESS SPECIFICALLY INDICATED OTHERWISE. ALL PIPING
MATERIALS SHALL HAVE A CORROSION RESISTANCE RATING (CCR) OF 1.0 OR GREATER.
PIPE: 2 INCH OR SMALLER PIPE, AND ALL THREADED PIPING SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-53. 2-1/2 INCH AND LARGER PIPE MAY BE BLACK STEEL, SCHEDULE 10, ASTM A-135.
FITTINGS: SCHEDULE 40 BLACK STEEL PIPE SHALL BE JOINED BY MECHANICAL COUPLINGS,
THREADED OR WELDED FITTINGS; SCHEDULE 10 BLACK STEEL PIPE SHALL BE JOINED BY
ROLLED GROOVE COUPLINGS OR WELDED FITTINGS ONLY. WELDED BRANCH CONNECTIONS
WHICH ARE AT LEAST 2 NOMINAL PIPE SIZES SMALLER THAN THE MAINS ARE PERMITTED.
THREADED FITTINGS ARE ACCEPTABLE ONLY FOR PIPING 2 INCHES AND SMALLER.
HANGERS: ALL HANGER SPACING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA-13.
SPRINKLER HEAD LOCATION: INSTALL SPRINKLER HEADS IN THE CENTER OF THE CEILING TILES
FOR SUSPENDED CEILING APPLICATIONS.
SPRINKLER CAGE GUARD: PROVIDE HEAD GUARDS ON ALL HEADS IN ELECTRICAL ROOMS AND
ON ALL HEADS LESS THAN 7'-0" ABOVE FINISHED FLOOR.
GAUGES: PROVIDE GAUGES AND GAUGE VALVES AS REQUIRED BY NFPA 13. GAUGE
SCALE SHALL BE 0-300 PSI UNLESS OTHERWISE INDICATED.
ACCESS PANELS: PROVIDE ACCESS PANELS TO ALL VALVES WITHIN CHASES OR ABOVE NON-
ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
HYDROSTATIC TESTS: ABOVE GROUND AND BELOW GROUND PIPING SYSTEMS SHALL BE
HYDROSTATICALLY TESTED AT NOT LESS THAN 200 PSI PRESSURE, OR AT 50 PSI IN EXCESS OF
THE MAXIMUM PRESSURE, WHICHEVER IS GREATER, FOR A PERIOD OF 2 HOURS. THE TEST
PRESSURE SHALL BE READ FROM A GAUGE LOCATED AT THE LOW ELEVATION POINT OF THE
INDIVIDUAL SYSTEM OR PORTION OF THE SYSTEM BEING TESTED. THE SPRINKLER PIPING
SHALL NOT HAVE LEAKAGE EXCEEDING THE AMOUNTS SPECIFIED IN NFPA 24. LEAKAGE
QUANTITIES SHALL BE DETERMINED BY PUMPING AT THE SPECIFIED TEST PRESSURE FROM A
CALIBRATED CONTAINER. REPAIR LEAKING JOINTS AND RETEST AS NECESSARY UNTIL ALL
SYSTEMS HAVE BEEN TESTED. TEST THE PIPING BETWEEN THE CHECK VALVE IN THE FIRE
DEPARTMENT INLET PIPE AND THE OUTSIDE CONNECTION THE SAME AS THE BALANCE OF THE
SYSTEM.
FIRE PROTECTION VALVES AND ACCESSORIES
QUICK-RESPONSE UPRIGHT SPRINKLERS: SPRINKLER HEADS SHALL BE MANUFACTURED WITH
UPRIGHT DEFLECTORS FOR INSTALLATION ABOVE THE BRANCH LINE WITH BRASS FINISH -
CENTRAL GB-QR OR VIKING MICROFAST MODEL M.
QUICK RESPONSE SEMI-RECESSED SPRINKLERS: SPRINKLER HEADS SHALL BE MANUFACTURED
WITH PENDANT DEFLECTOR FOR INSTALLATION BELOW THE BRANCH LINE WITH CHROME-
PLATED FINISH - RELIABLE G5-56 OR VIKING MICROFAST MODEL M WITH MODEL F-1
ESCUTCHEON.
QUICK-RESPONSE CONCEALED SPRINKLERS: SPRINKLER HEADS SHALL BE MANUFACTURED
WITH PENDANT DEFLECTOR FOR INSTALLATION BELOW THE BRANCH LINE WITH WHITE FINISH -
O:\TLC RELIABLE G5-56 OR VIKING MICROFAST MODEL M.
SPRINKLER CAGE GUARD: PROVIDE SPRINKLER HEAD OPEN-WIRE CAGE GUARD TO PROTECT
HEADS FROM INJURY. CAGE WIRE SHALL BE CADMIUM-PLATED STEEL - TYCO SPRINKLER
GUARD OR VIKING MODEL SPRINKLER GUARD.
BUTTERFLY TYPE ISOLATION, 2-1/2 INCH AND LARGER: ISOLATION VALVES 2-1/2 INCH AND
LARGER SHALL BE CAST IRON BODY BUTTERFLY VALVES WITH THE VALVE SIZE, PRESSURE
RATING, MANUFACTURER AND "UL" AND "FM" CAST INTO THE BODY. VALVE SHALL HAVE
BRONZE OR CAST IRON DISC, NEOPRENE DISC LINER, CAST IRON HANDWHEEL WITH DISC
POSITION INDICATOR, INTEGRAL TAMPER SWITCH, 175 PSIG CWP WORKING PRESSURE, 350
PSIG CWP TEST PRESSURE, AND FLANGED OR GROOVED CONNECTIONS - GRINNELL 8000 FP OR
EQUAL.
ISOLATION VALVE TAMPER SWITCH: PROVIDE AN ELECTRONIC SUPERVISORY OR TAMPER
SWITCH ON EACH ISOLATION VALVE IN THE SPRINKLER SYSTEM. UNIT SHALL HAVE A RED
TAMPER-PROOF COVER WHICH WILL ACTIVATE AN ALARM OR TROUBLE SIGNAL WHEN
ADJUSTED. PROVIDE UNIT WITH SINGLE-POLE, NORMALLY CLOSED MICROSWITCH, MOUNTING
BRACKET, AND NON-RESETTABLE LOCK WITH REMOVABLE RESET KEY - SIMPLEX 2097-9035.
FLOW SWITCH: PROVIDE AN ELECTRIC FLOW SWITCH WHERE INDICATED OR REQUIRED. FLOW
SHALL BE SENSED BY AN IMMERSION PADDLE, WITH AN ADJUSTABLE RETARD SETTING FROM 0
TO 70 SECONDS TO MINIMIZE FALSE ALARMS. FLOW SWITCH SHALL HAVE 2 SEPARATE SINGLE
POLE, DOUBLE THROW MICROSWITCHES TO ACTIVATE A FLOW ALARM, OR TO INDICATE A
TROUBLE SIGNAL IF THE FLOW SWITCH HOUSING IS TAMPERED. FLOW ALARM SHALL BE
AUTOMATICALLY RESETTING. PROVIDE CLAMP-ON HOUSING TO SECURE UNIT TO PIPE, OR
THREADED CONNECTION FOR TEE FITTING - POTTER ELECTRIC SIGNAL CO. VSR-S.
INSPECTOR'S TEST AND DRAIN: TEST AND DRAIN SHALL BE PROVIDED WITH INTEGRAL SIGHT
GLASS, INTEGRAL 1/2 INCH TEST ORIFICE AND POSITIVE POSITIONING OF HANDLE FOR OFF, TEST AND DRAIN OPERATIONS - G/J INNOVATIONS, INC "SURE-TEST" OR AGF MANUFACTURING, INC. "TESTDRAIN".
100 -
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
2.00 -
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3.00 -
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
SPECIFICATIONS
210100 - AUTOMATIC SPRINKLERS SYSTEMS
FIRE SPRINKLER:
SCOPE OF WORK:
REPLACE EXISTING FIRE PUMP WITH NEW ELECTRIC FIRE PUMP OF EQUAL SIZE AND CAPACITY.
• REMOVE EXISTING FUEL TANKS MUFFLER AND CONTROLLERS.
• REMOVE EXISTING JOCKEY PUMP
• PROVIDE A TEMPORARY FIRE PUMP WHILE THE EXISTING PUMP IS BEING REPLACED
• THE CONTRACTOR TO SECURE, PAY FOR AND OBTAIN A CURRENT FLOW TEST/DATA BEFORE
ORDERING THE NEW FIRE PUMP
PROVIDE NEW:
• NEW 1000 GPM @ 115 PSI ELECTRIC FIRE PUMP.
• VARIABLE SPEED CONTROLLER W/ TRANSFER SWITCH
• NEW JOCKEY PUMP
• NEW JOCKEY PUMP CONTROLLER
• REMOTE FPAP (FIRE PUMP ANNUCIATOR PANEL) TO BE LOCATED AT THE PBX.
THE CONTRACTOR SHALL PREPARE SYSTEM LAYOUT DRAWINGS PER CHAPTER 27, OF NFPA
13 - 2019 EDITION. THE CONTRACTOR SHALL PERFORM HYDRAULIC CALCULATIONS.
CONTRACTOR'S SPRINKLER SYSTEM LAYOUT (SHOP DRAWINGS), HYDRAULIC CALCULATIONS
AND MATERIAL DATA SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER AND AUTHORITY
HAVING JURISDICTION FOR APPROVAL PRIOR TO SYSTEM INSTALLATION.
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING. THE BUILDING SHALL
NOT BE WITH OUT FIRE SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION
EXCEPT FOR THE TIME OF CONNECTING THE NEW FIRE PUMP AND DISCONNECTING THE
EXISTING FIRE PUMP. PROVIDE 72 HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT
DOWNS. COORDINATION WITH THE OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE
SPRINKLER SYSTEM IS REQUIRED TO IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE
BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY FIRE PUMP WHILE THE EXISTING FIRE PUMP IS BEING REPLACED.
FIRE SPRINKLER CONSTRUCTION CONSIDERATIONS
ALL WORK CONTAINED WITHIN THESE DOCUMENTS SHALL BE IN FULL COMPLIANCE
WITH ALL FEDERAL, STATE AND LOCAL CODES AND STANDARDS INCLUDING, BUT
NOT LIMITED TO THE FOLLOWING.
APPLICABLE CODES AND STANDARDS
1. FLORIDA ADMINISTRATIVE CODE SECTION 59A-3.080
2. FLORIDA BUILDING CODE: BUILDING, 8TH EDITION (2023)
3. FLORIDA FIRE PREVENTION CODE, 8TH EDITION (2023)
4. NFPA 1, FIRE CODE - 2019 EDITION (FLORIDA SPECIFIC EDITION)
5. NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS - 2019 EDITION
6. NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION.
7. NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
APPURTENANCES - 2019 EDITION
8. NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED
FIRE PROTECTION SYSTEMS, 2020 EDITION.
9. NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE - 2019 EDITION
10. NFPA 101, LIFE SAFETY CODE - 2021 EDITION (FLORIDA SPECIFIC EDITION)
11. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS, 2019 EDITION.
12. NFPA 2001, STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS - 2018 EDITION.
13. FGI, GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF HOSPITALS - 2022 EDITION
255 S. Orange Avenue Suite 1600
Orlando, FL 32801 P 407.841.9050 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No. :
COA 15
Aaron Lee Johnson, P.E.
Florida License #71576
This item has been electronically signed and sealed by Aaron Lee Johnson using a Digital Signature and date.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Seal
Drawing No.:
Scale:
Issuance:
Drawing Title:
Approved By:
Project No.:
Drawn By:
Consultants:
925854
12" = 1'-0"
/4 /2
:2
:0
A
M C
R e v it
L o c a ls
\9
-H
H F ir e P u m p R m E
L E
C -F
IR
E
P R
O T
R ja c k ie
.l u k e r.
rv t
H A
L
IF
A X
H E
A L
T H
D A
Y T
O N
A F
IR
E
P U
M P
R O
O M
N
C ly d e
M o rr is
B lv d
D a y to n a
B e a c h
F
L
925854
JLL
ALJ
GENERAL
INFORMATION - FIRE
PROTECTION
FP001
SHEET DESCRIPTION
FP001 GENERAL INFORMATION - FIRE PROTECTION
FP111 DEMO & RENO FLOOR PLANS - FIRE PROTECTION
No. Date Description
11/4/2025 CONSTRUCTION
DOCUMENTS
FIRE PUMPFIRE PUMP
N
255 S. Orange Avenue Suite 1600
Orlando, FL 32801 P 407.841.9050 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No. :
COA 15
Aaron Lee Johnson, P.E.
Florida License #71576
This item has been electronically signed and sealed by Aaron Lee Johnson using a Digital Signature and date.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Seal
Drawing No.:
Scale:
Issuance:
Drawing Title:
Approved By:
Project No.:
Drawn By:
Consultants:
925854
As indicated
/4 /2
:2
:0
A
M C
R e v it
L o c a ls
\9
-H
H F ir e P u m p R m E
L E
C -F
IR
E
P R
O T
R ja c k ie
.l u k e r.
rv t
H A
L
IF
A X
H E
A L
T H
D A
Y T
O N
A F
IR
E
P U
M P
R O
O M
N
C ly d e
M o rr is
B lv d
D a y to n a
B e a c h
F
L
925854
JLL
ALJ
DEMO & RENO
FLOOR PLANS - FIRE
PROTECTION
FP111
1/2" = 1'-0"
LEVEL 1 PLAN - FIRE PROTECTION
1/2" = 1'-0"
LEVEL 1 DEMOLITION PLAN - FIRE PROTECTION
FIRE PROTECTION KEYNOTES
1 EXISTING DIESEL FIRE PUMP TO BE REMOVED.
2 EXISTING FUEL TANK TO BE REOMVED
3 EXISTING FIRE PUMP CONTROLLER TO BE REMOVED
4 EXISTING MUFFLER TO BE REMOVED
5 NEW VARIABLE SPEED FIRE PUMP CONTROLLER W/ TRANSFER SWITCH
6 NEW ELECTRIC FIRE PUMP
7 EXISTING PRESSURE RELIEF VALVE TO REMAIN.
8 DEMO EXISTING JOCKEY PUMP
9 DEMO EXISTING JOCKEY PUMP CONTROLLER
10 NEW JOCKEY PUMP
11 NEW JOCKEY PUMP CONTROLLER
12 8" SUPPLY FROM CITY WATER MAIN
13 EXISTING 8" BACKFLOW PREVENTER WITH TAMPER SWITCHES
14 EXISTING 4-VALVE TEST HEADER
15 EXISTING FIRE DEPARTMENT CONNECTION
PUMP SCHEDULE
DESCRIPTION MANUFACTURER MODEL
INLET
SIZE
OUTLET
SIZE
RATED
PRESSU
RE
RATED
FLOW TYPE
ELECTRICAL
MOTOR HP MOTOR RPM PHASE HERTZ VOLTS
FIRE PUMP PATTERSON 6x5x17SSC 6" 5" 115 1000 HORIZONTAL 125 1775 3 60 480
JOCKEY PUMP GRUNDFOS CR 3-11 1" 1" 131 10 EDIT ME 2 3452 3 60 480
1" = 20'-0"
SITE PLAN - FIRE PROTECTION
No. Date Description
11/4/2025 CONSTRUCTION
DOCUMENTS
| E001 - GENERAL INFORMATION - ELECTRICAL |
| Sheets |
| E001 - GENERAL INFORMATION - ELECTRICAL |
| E002 - ELECTRICAL ONE-LINE DIAGRAM |
| Sheets |
| E002 - ELECTRICAL ONE-LINE DIAGRAM |
| E111 - DEMO & RENO FLOOR PLANS - ELECTRICAL |
| Sheets |
| E111 - DEMO & RENO FLOOR PLANS - ELECTRICAL |
| FP001 - GENERAL INFORMATION - FIRE PROTECTION |
| Sheets |
| FP001 - GENERAL INFORMATION - FIRE PROTECTION |
| FP111 - DEMO & RENO FLOOR PLANS - FIRE PROTECTION |
| Sheets |
| FP111 - DEMO & RENO FLOOR PLANS - FIRE PROTECTION |