This is a Scope of Services document for St. Louis Public Schools (SLPS) detailing tornado restoration and mitigation work required at Hickey Elementary School following an EF3 tornado that struck on May 16th, 2025. The project encompasses comprehensive repairs across multiple building systems including windows, fencing, steel structures, carpentry, electrical, painting, flooring, and roofing. Specific work items include furnishing and installing six replacement WINCO 4410 Series windows with sealant work; replacing 418 linear feet of 6-foot-high and 100 linear feet of 4-foot-high black vinyl-coated chain link fence; repairing or replacing 10 damaged metal posts and extensive cyclone fencing mesh totaling approximately 800 square feet; removing and replacing damaged decorative steel grates; restoring acoustic ceiling tiles across 19 rooms and hallways; repainting stained brick walls in multiple locations; repairing electrical systems with required testing reports; replacing 308 square feet of damaged vinyl floor tiles; and removing and replacing 7,272 square feet of flat asphalt roof membrane along with eight fiberglass roof vents, roof drains, and edge flashing. The project involves restoring a 62,222-square-foot elementary school building constructed in 1966, located in the Greater Ville neighborhood at 3111 Cora Avenue, St. Louis, Missouri.
The document specifies paint materials including Duration semi-gloss paint on walls and Sherwin Williams Pro Industrial alkyd urethane enamel on metal frames, with all painted surfaces receiving one primer coat and two finish coats. An alternate scope proposes enhanced mitigation measures including impact-resistant glazing systems rated for EF3 wind loads and sealed, moisture-rated electrical fixtures with surge protection. The WINCO 4410 Series windows feature 0.080-inch nominal wall thickness, class 5 balance systems, and performance ratings including air leakage less than 0.10 CFM/FT2 at 6.24 PSF and a U-value of 0.41 Btu/Hr-Ft2-F. The windows carry a 10-year warranty against thermal break shrinkage. No specific pricing, response deadline, award date, contract term, or funding source information is provided in the scope document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
SCOPE OF SERVICES
RFP TITLE: Hickey Restoration:
RFP #:
Scope of Services:
St. Louis Public Schools is seeking a qualified contractor to repair and replace all damages to schools affected by May 16th, 2025, Tornado. It is our goal to get a complete warranty for all which includes:
1.1: Windows:
• Furnish and install replacement windows for (6) openings using WINCO 4410 Series windows
• (Contractor will need to have a “Clean” opening for the new windows) Replace
(1) broken unit
• Window Sealant at 6 openings
• Remove existing sealants from window perimeters
• Clean and prep both edges
• Solvent wipe
• Install backing to proper depth
• Apply silicone sealant by Contractor 795 with no less than 100% elasticity, tool to concave finish
• Room 301-Replace window - (3’4” X 3’3”)
• Install a new window trim as needed.
• Remove and replace (1) broken Single -Pane Window 3’ x 30”, damaged by strong winds and wind-blown debris caused by the EF3 Tornado in the Courtyard
1.2: Fencing:
• Replace 418’ of 6’ high black vinyl coated chain link fence
• Replace 100’ of 4’ high black vinyl coated chain link fence
• Replace (5) damaged 4”x10’ metal post to the rear of the building
• Remove and replace 480 sq. ft of (8’x6’) damaged/missing Cyclone Fencing Mesh Galvanized near playground area
• Remove and replace (10) damaged Cyclone fence posts, (10) Cyclone Fence Post Top caps, (10) Cyclone Fence Top Pole, (10) Cyclone Fence Bottom Poles to the rear of the building
• Remove and replace 80sq. ft of damaged Cyclone Fence Mesh Galvanized (20’x 4’) to the rear of the building
• Remove and replace (3) damaged (3”dia x 4’L) damaged Cyclone fence posts, top caps, top poles and bottom poles to the rear of building
• Remove and replace 240sq. ft. of damaged Metal Mesh Fencing (30’w x 8’L) to the rear of building by playground
1.3: Steel:
• Grating Awning repair (10ea)
• 10’ high metal screening is located on the lower roof between the main building and the annex 215’ which includes two sides of the roof.
• Replace damaged (16’x6’) (3’x6’) decorative steel grates to the front of the building on the Northwest side
• Remove and replace damaged (3’x5’) double pane windows to the front of the building
• Remove and replace (13) damaged (5’x3’) double pane windows to the rear of the building
• Remove and replace (13) (14’x5’) damaged decorative steel grates to the rear of the building (Southeast Side)
1.4: Carpentry:
• Remove and replace ceiling insulation
• Replace 2’X4’ acoustic ceiling tiles – including cleaning ACT grid in First floor
Hallway. (ceiling tile to match existing tile throughout the building)
• Remove and replace damaged (4’L x 2’ W) Acoustical Ceiling Tiles in rooms, 301, 315, 310, 308, 314, 209, 313, 210, 213, 212, 026, 105, 205, 206, 207, 203, 211, 200, and 1st Floor Hallway
• Paint (6’w x 8’L) stained brick wall. (1) Coat Primer & (2) coats finish paint in office #203
• Paint (30’ x 10’) stained brick wall in room 305, 1 coat primer, 2 coats finish paint
• Paint (30’ x 8’) stained brick wall in room 304, (1) coat primer, (2) coats finish paint
1.5: Electrical:
• Electrical system testing-Test electrical system and components as needed
• Electrical system repairs- Repair electrical system components. Provide testing reports for repairs
1.6: Painting:
• Fill all holes and imperfections in window trims ready to receive new primer/paint/stain/finishes
• Prime and paint the entire wall where the windows are replaced.
1.7: Specifications:
Painting
• Use Duration semi-gloss paint or better on walls.
• Metal door & window frames – Sherwin Williams Pro industrial alkyd urethane enamel.
• Existing hard surfaces with high gloss paint should receive a bonding primer or adhesion test requested.
• All painted surfaces should include one coat primer, and two coats finish paint
• All new plasters should receive one coat primer
1.8: Flooring:
• Remove and replace 36 sq. ft of 12”x12” damaged Vinyl Floor Tiles in the Library
• Remove and replace 272 sq. ft 12” x 12” damaged Vinyl Floor Tiles in the Gymnasium
1.9: Roof Area:
• Remove and replace (8) damaged/missing Fiberglass Roof Vents Cover, 3 FT long x 3 FT wide, damaged and broken by strong winds and wind-blown debris caused by EF3 Tornado.
• Remove and replace (1) damaged/missing Fiberglass Roof Vents, 18 IN long x 18 IN wide, damaged by strong winds and wind-blown debris caused by the EF3 Tornado.
• Remove and replace 7,272 SF of damaged “Flat Asphalt Roof Membrane, 202 FT long x 36 FT wide, damaged by strong winds and wind-blown debris caused by the EF3 Tornado.
• Remove and replace (4) damaged Roof Drain (1 FT DIAM), damaged by strong winds and wind-blown debris caused by the EF3 Tornado
• Remove and replace 33.3333 SF of damaged Edge Roof Flashing, 50 FT long x 8 IN wide, damaged by strong winds and wind-blown debris caused by the EF3 Tornado.
Alternate 1:
These measures are proposed to reduce future vulnerability and align with FEMA’s mitigation guidance:
1. Window System Upgrades
• Replace damaged windows with impact-resistant glazing systems rated for EF3 wind loads
• Install reinforced frames and anchoring systems to prevent blowouts
2. Lighting and Electrical Resilience
• Replace damaged fixtures with sealed, moisture-rated units
• Elevate electrical junctions and install surge protection to reduce future storm-related outages
Features & Custom Options
• Azon “Azo-Brader” thermally broken frame and sash, backed by a 10-year warranty against thermal break shrinkage
• Vertical and horizontal stacking members
• Integral lift handle on operable sash
• 4 sided fin seal weather-strip on the exterior
• Various glazing thicknesses available
• Dual glazing with optional integral blinds providing dynamic light control
• Accessory line of receptors, mullions, panning and trim for a customized look
• Blast, ballistic and impact glazing available
• Optional aluminum extruded screens
• Accompanying fixed frame options
Performance Data*
Product Overview The 4410 Series is a fixed and single hung window that will provide years of low maintenance performance. With 0.080” nominal wall thickness throughout the mainframe and sash and a 3/32” thick aluminum sill, the 4410 is up to the task that your project demands. The large window sash is no problem and will lift easily when using our class 5 balance system.
GREEN COMMITMENT HISTORIC REPLICATION
NOISE CONTROL
BLAST SHIELD WIND PROTECTION
https://wincowindow.com/products/historic https://wincowindow.com/products/single-hung-double-hung/4410 https://wincowindow.com/products/single-hung-double-hung/4410
Type Air
(CFM/FT2 @ 6.24 PSF)
Water (PSF) Structural
(PSF) CRF
U-Value
(Btu/Hr-Ft²-°F) STC
AW-PG65-Hung Less than 0.10
(Higher levels may be available upon request)
+/- 97.5 52* 0.41* Contact your local Rep
*U-Value, CRF, Water and AW ratings are based on a particular type of glazing and window configuration being used. They are provided for comparison purposes only. They are based on products of standard configuration, tested in accordance with NFRC/FGIA/AAMA specifications, in a laboratory environment under optimum conditions. Performance values will vary according to project specifications, installation, size, configuration, hardware, glass, etc. Any required field testing should be done in accordance with the project specifications and FGIA/AAMA field testing protocol, not this data.
Series 4410 - 4” Architectural Grade Thermal Window System \ Fixed - Single-Hung Series
4410 Detail Drawings https://wincowindow.com/find-a-rep
HICKEY ELEMENTARY SCHOOL
E SAINT LOUIS PUBLIC SCHOOLS FACILITY MASTER PLAN
SCHOOL TYPE: ELEMENTARY SITE ACREAGE: 2.80 DISTRICT ZONE: NORTH
GRADE SPAN: PK-06 BUILDING GSF: 62,222 SF WARD: 12
BUILDING INFORMATION SUMMARY
GREATER VILLE
3111 CORA AVE, ST LOUIS, MO 63115
FLOOR PLAN
VOLUME ONE NORTH ZONE
2024 ENROLLMENT: 273 BUILD YEAR: 1966 NEIGHBORHOOD:
VOLUME ONE NORTH ZONE 51
ELMBANK AVE
NOT TO SCALE
SITE PLAN DIAGRAM
E
SAINT LOUIS PUBLIC SCHOOLS FACILITY MASTER PLAN
VOLUME ONE NORTH ZONE 53
SAINT LOUIS PUBLIC SCHOOLS FACILITY MASTER PLAN E
VOLUME ONE NORTH ZONE 55
| Features & Custom Options |
| HICKEY ELEMENTARY SCHOOL |
| VOLUME ONE NORTH ZONE 51 |
File details come from the government source that posted it. Updated .