10-9019.00 PLAN PAGE.pdf

PDF 441 KB Posted

Attached to
Demolition Svc Powell Co P. 08
Solicitation number
RFB 605 2400000789 1
Issued by
Rowan County, Kentucky

About this file

This is a plan sheet document from the Commonwealth of Kentucky Department of Highways for Powell County, detailing infrastructure improvements to Halls Lane (Project 10-9019.00). The project encompasses roadway construction and improvements extending from Station 49+79.81 to Station 54+00.00, with construction limits beginning at Station 49+91.77. The scope of work includes ditch construction with various channel linings (surfaced "V" ditches and trapezoidal configurations) totaling approximately 282 square yards across multiple stations, standard curb and gutter installation for 458 linear feet along Halls Lane, sidewalk construction consisting of 247 square yards of 5-foot concrete sidewalk on the left side between Stations 50+11 and 54+00, entrance pipe installations at three locations (Stations 51+12.00, 51+60.00, and 52+92.00) with widths ranging from 9 to 19 feet, and sodding of 324 square yards. Additional features include sidewalk ramps, perforated and non-perforated drainage pipe, and storm sewer information with technical specifications for the curve geometry and runoff parameters.

The plan sheet indicates this is a detailed design document prepared by the Kentucky Transportation Cabinet showing horizontal and vertical alignment data, property boundary information, and utility considerations. The document notes that contractors must coordinate with Kentucky 811 (KY 811) for underground utility location notification at least two to ten business days prior to excavation, and must exercise extreme caution when working near gas lines. The plan identifies several property owners in the project area including Cider Hill LLC, Graham's, Kelly Jean Brown, Donald Block, and Powell County Board of Education, along with Clark Energy Cooperative. The document was plotted on September 7, 2005, and includes references to supporting documents such as before-improvement photographs, a cost estimate memo, and a full-size plan sheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N26° 56'

16" W

N16°52'59"E

S I G

N

S I G

N

S A

N M

H

S A

N M

H

S I G

N

W V

S A

N M

H

S I G

N

I P

I P

S I G

N

S A

N

F M

I P

I P

P O

S T

S

S

S A

N M

H

C P

SAN

FM

C O

M M

E R

C I A

L

C O

N C

R E

T E

F

O U

N D

A T I O

N

S

T O

R Y

C O

M M

E R

C I A

L

F D

T N

C O

N C

R E

T E

S

T O

R Y

R E S I D

E N

T I A

L

B R I C

K

S

T O

R Y

R E S I D

E N

T I A

L

F O

U N

D A

T I O

N

C O

N C

R E

T E

S

T O

R Y

R E S I D

E N

T I A

L

F O

U N

D A

T I O

N

C O

N C

R E

T E

S

T O

R Y

R E S I D

E N

T I A

L

C O

N C

R E

T E

F

O U

N D

A T I O

N

S

T O

R Y

T1

T1

C 2, E

E1

E2

E

E2

E2

T1

E2

E2

T1

T1, E1

T

T1

T1

E

E4E3

C1,T

C1

C1,T

E1

E1 E1

E1

E1

S H

E D

S H

E D

S H

E D

18" PIPE

15" PIPE

" P

I P

E

SIGN

SIGN

.1

P C

.7

.5

C

.8

P O

B

.0

M A

T C

H L

IN

E

S

-108.00'

+27.00

-89.93'

+93.00

85.60'

+80.67

90.81'

+24.00

74.81'

+25.19

64.00'

+25.00

54.32'

+25.00

-79.25'

+37.26

-36.00'

+70.67

-36.00'

+37.79

-36.00'

+75.00

-24.00'

+25.00

-24.00'

+62.12

-91.21'

+00.00

97.05'

+74.39 65.17'

+80.00

38.77'

+90.00

55.00'

+93.00

-103.13'

+23.00 -108.00'

+75.00

-67.00'

+56.00

SLOPE CONST.

TEMP. ESMT. FOR

ESMT.

DRAINAGE

PERMANENT

CONST.

SLOPE AND ENTR.

TEMP. ESMT. FOR

K Y

11/

K Y

R=25'

R=25'

-83.00'

50+44.08

R

-126.00'

53+62.07

R

R

T O

S T A

N T O

N

T O

C

LA

Y

C

IT

Y

1'

1' 7 SQYD

SIZE/TYPE

CHANNEL LINING

QUANTITYTYPE TD

DITCH CONSTRUCTION

SURF 'V'

STA TO STA

RT

LT/

RT

RT 58 SQYDTRM 1

RT SURF 'V' TRM 1 1' - 64 SQYD

51+30.50 - 51+39.25 TRM 1

51+95 - 52+77

53+20 - 53+94 SURF 'V'

RT 50+40 - 50+89.50 SURF 'V' TRM 1 1' 50 SQYD-

CONST. LIMITS

CONST. LIMITS

5' CONC. SIDEWALK

-46.00'

+70.67

-91.21'

+36.13

74.85'

+09.96

72.00'

+88.00

52.65'

+94.08

A

N 57°39'19" E - 12.02'A

R=37.00'; ARC=53.10'; CHORD=N 16°32'33" E - 48.66'B

B

C

N 65°25'47" E - 10.00'C

N 16°52'59" E37.21'

N

°2 '4 " E

.4

N 16°52'59" E37.12'

N 8°33'40" E 68.72'

S 6°05'13" E

62.97'

N

°1

'0

W .4

N 20 °38'2

8" W

38.6 3'

CONST.

FOR ENTR.

TEMP. ESMT.

CONST.

SLOPE AND ENTR.

TEMP. ESMT. FOR

PROP. R/W

PROP. R/W

N

°2

'4

E

.3

D

R=990.00'; ARC=52.86'; CHORD=S 56°20'58" W - 52.86'D

'99.

- W"73'0

5°3N=DROHC ;'71.391=CRA ;'00.762=R

S 3°19'49" W - 511.58' N 3°19'49" E

90.13'

E

R=977.21'; ARC=65.85'; CHORD=S 61°54'29" W - 65.84'E

CIDER HILL LLC

GRAHAM'S

P

P

GRAHAM'S CIDER HILL LLC

P

BROWN

KELLY JEAN

P

DONALD BLOCK

P

COOPERATIVE

CLARK ENERGY

P

OF EDUCATION

POWELL CO. BOARD

KY 11 / KY 15 =

HALLS LANE STA. 49+79.81

-38.72'

+06.18

9.03'

+08.64

BEGIN CONSTRUCTION

STA. 49+91.77

BEGIN RIGHT OF WAY

STA. 50+00.00

R=20'

R=20'

R=20'

71.00'

50+51.84 72.75'

+48.60

59.27'

+45.00

26.36'

+81.58

40.27'

+82.85

60.56'

+26.06

LT. CONST. 324 SY SODDING

STD. CURB & GUTTER CONSTRUCTION

LT/

RT

STA. TO STA. LENGTH

458'

HALLS LANE

49+87 - 54+00LT

RT 49+94 - 50+89.50 125'

STD. HEADER CURB TYPE 2

LT/

RT

STA. TO STA. LENGTH

17'

HALLS LANE

50+16 - 50+26RT

P

RAMP TY. 4

SIDEWALK

RAMP TY. 1

SIDEWALK

CURB TY.2

HEADER

STD.

HDWL. TY.4

PERF. PIPE

PIPE

4" PERF.

PERF. PIPE

4" NON-

PIPE

4" PERF.

ENTRANCE CONSTRUCTION

LT/

RT

STATION

LOCATION

WIDTH

SQYD

ASPHALT

ENTRANCE

PIPE

19'

9' 76

155 42'-15" ENTR. PIPE

44'-15" ENTR. PIPE52+92.00

51+60.00RT

RT

RT 51+12.00 12' 104 32'-15" ENTR. PIPE

TYPE

COMM.

RES.

RES.

SIDEWALK

5' CONC.

LT

SIDEWALK 4" CONCRETE CONSTRUCTION

WIDTH

50+11 - 54+00

STA. TO STA.

5' 247

LT/

RT

SQYD

HALLS LANE

RT 49+94 - 50+25 5' 31

DET.

WARNING

SQFT

BEFORE YOU DIG

utility companies have facilities in the area.

may be necessary for the contractor to contact the County Court Clerk to determine what excavation with the utility owners, including those whom do not subscribe to KY 811. It members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate contractor should be aware that owners of underground facilities are not required to be a minimum of two (2) and no more than ten (10) business days prior to excavation. The for information on the location of existing underground utilities. The call is to be placed

The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system

WARNING

CAUTION WHEN WORKING NEAR GASLINES.

THE CONTRACTOR SHALL EXERCISE EXTREME

DBI TY.13G (MOD.)

T.G. 686.96

FL. 682.29

STORM SEWER INFORMATION

PI STA. 51+49.46

(X)= 5463606.4571 (Y)= 3937393.0349

D= 43^49'15" RT

C= 24^49'12.12" T= 92.91' L= 176.67' R= 231.00' E= 17.98' e= 7.00% Runoff= 120' Runout= 34'

HALLS LANE

PI STA. 54+06.95

(X)= 5463682.6120 (Y)= 3837643.9573

D= 12^54'04" LT

C= 17^15'27.95" T= 37.54' L= 74.75' R= 332.00' E= 2.12' e= NC

HALLS LANE

EDGE KEY

CONST. 144 LF

DISTURB

DO NOT

N 2 6°5

6'1 6"

W

36.

13'

15" ENTR. PIPE

15" ENTR. PIPE

15" ENTR. PIPE

DRAWING TITLE:PLAN - HALLS LANEY

K

C U

T

NE

K F

O HTLAE

W

N O

M M

O C

D

N

ATS

EW DE

TI

N

U

L L

A

F EW DE

DI

VI

D

TO STA 54+00.00 STA 49+91.77

DEPARTMENT OF HIGHWAYS

COMMONWEALTH OF KENTUCKY

SHEET NO.

CABINET

TRANSPORTATION

KENTUCKY SCALE: 1" = 20'

HORIZONTAL SCALE

0' 40' 80'20'

OpenRoads Designer v10.16.2.267

COUNTY OFITEM NO.

Powell10-9019.00 abakerUSER: G:\ENGR\HD1355.06 POWELL COUNTY\PHASE II\10-9019 HALLS LANE\CAD\PLAN PRODUCTION\PLAN\PLAN SHEET 1.DGNFILE NAME: 9/7/2005 7:08:02 PMDATE PLOTTED:

R3

Logan Hembree Polygon

TC 62-218 solicitation.pdf
Before Improvement Photographs Log Updated
google earth image Halls Lane
10-9019.00 Plan Update_Full Size
Plan Sheet 1
Cost Estimate Memo-10-9019