10-1H0204 Curb Ramp_ CRCP_ JPCP_ HMA_ Electrical_ Erosion Control_ and Planting.pdf
PDF 940 KB Posted
- Solicitation number
- 10-1H0204, Fed #ST-X047(016)
- Issued by
- Merced County, California
About this file
This is a Notice to Bidders and Special Provisions document issued by the California Department of Transportation (Caltrans) District 10 for construction work in Merced County. The project involves curb ramp installation, continuously reinforced concrete pavement (CRCP), jointed plain concrete pavement (JPCP), hot mix asphalt (HMA), electrical systems, erosion control, and planting work on State Routes 140 and 165 near Stevinson. The work spans Route 140 from 0.3 miles east of Rosa Road to 0.2 miles west of Nelander Road and Route 165 from 0.5 miles north of 6th Avenue to 0.3 miles south of 4th Avenue. Contract No. 10-1H0204 is identified as a federal-aid project (ST-X047(016)) with an estimated cost of $8,300,000. Bids open on Tuesday, November 17, 2026, at 2:00 p.m. via the Bid Express website. The contractor must possess either a Class A license or a combination of Class C licenses (C-12, C-8, C-10) constituting a majority of the work. Completion of work excluding plant establishment is required within 260 working days, with plant establishment work completed within 250 working days, for a total project duration of 510 working days. The project includes 119 bid items ranging from mobilization and traffic control to pavement work, drainage infrastructure, signage, and electrical systems.
Prevailing wage requirements apply, with rates determined by the California Director of Industrial Relations and supplemented by federal minimum wage rates from the U.S. Secretary of Labor, whichever is higher. Bidders must submit security equal to at least 10 percent of their bid. The contract includes provisions for dispute resolution advisor (DRA) and dispute resolution board (DRB) services with specified hourly rates ($250/hour for off-site tasks, $2,500 per day for on-site meetings). Environmental product declarations are required for hot mix asphalt and concrete materials from plants providing specified minimum quantities. Buy America requirements apply to iron, steel, manufactured products, and construction materials, with a De Minimis Costs waiver available for non-compliant materials not exceeding the lesser of $1,000,000 or 5 percent of total applicable project costs. The project involves seven trainees or apprentices under the federal training program. Caltrans has identified a coincident contract (10-0Y1304) in the Gustine and Merced areas requiring coordination of lane closures and traffic handling. Lane closure restrictions apply during designated holidays and special days with specific requirements for conventional highway lane configurations shown in provided charts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids open Tuesday, November 17, 2026
Dated September 28, 2026
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
AND
SPECIAL PROVISIONS
FOR CONSTRUCTION ON STATE HIGHWAY IN MERCED COUNTY AT
STEVINSON ON ROUTE 140 FROM 0.3 MILE EAST OF ROSA ROAD TO 0.2
MILE WEST OF NELANDER ROAD AND ON ROUTE 165 FROM 0.5 MILE
NORTH OF 6TH AVENUE TO 0.3 MILE SOUTH OF 4TH AVENUE
In District 10 On Route 140, 165
Under
Bid book dated September 28, 2026 Standard Specifications dated 2025
Project plans approved January 26, 2026 Standard Plans dated 2025
Identified by
Contract No. 10-1H0204
10-Mer-140, 165-16.0/16.3, 26.8/27.0
Project ID 1017000175
Federal-Aid Project
ST-X047(016)
SPECIAL NOTICES
See sections 2 and 3 for contractors' registration requirements.
The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.
See section 2 for submittal requirements for DVBE quotes and Non–Small Business
Subcontractor Preference.
The contract award period has been extended for this project. See section 3-1.04.
For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).
See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy
America/Build America for manufactured products.
See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.
See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.
The flagging and temporary traffic control requirements have been revised. See sections 7-
1.03, 7-1.04, and 12.
See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.
See section 14-11.14 for changes to the management of treated wood waste.
Contract No. 10-1H0204 i ii
TABLE OF CONTENTS
NOTICE TO BIDDERS
BID ITEM LIST
SPECIAL PROVISIONS
ORGANIZATION
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
12 TEMPORARY TRAFFIC CONTROL
13 WATER POLLUTION CONTROL
14 ENVIRONMENTAL STEWARDSHIP
15 EXISTING FACILITIES
DIVISION III EARTHWORK AND LANDSCAPE
17 GENERAL
20 LANDSCAPE
21 EROSION CONTROL
DIVISION V SURFACINGS AND PAVEMENTS
36 GENERAL
39 ASPHALT CONCRETE
40 CONCRETE PAVEMENT
41 EXISTING CONCRETE PAVEMENT
DIVISION VI STRUCTURES
49 PILING
55 STEEL STRUCTURES
DIVISION VII DRAINAGE FACILITIES
61 GENERAL
62 STORMWATER TREATMENT
DIVISION VIII MISCELLANEOUS CONSTRUCTION
73 CONCRETE CURBS AND SIDEWALKS
80 FENCES
DIVISION IX TRAFFIC CONTROL DEVICES
82 SIGNS AND MARKERS
iii
84 MARKINGS
DIVISION X ELECTRICAL WORK
86 GENERAL
87 ELECTRICAL SYSTEMS
iv
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.
RSP A3A Abbreviations (Sheet 1 of 3)
RSP A3B Abbreviations (Sheet 2 of 3)
RSP A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
A20A Pavement Markers and Traffic Lines - Typical Details
A20B Pavement Markers and Traffic Lines - Typical Details
A20D Pavement Markers and Traffic Lines - Typical Details
A20E Traffic Lines - Typical Details for Contrast Striping
A24A Pavement Markings - Arrows
A24D Pavement Markings - Words
A24F Pavement Markings - Crosswalks
A24G Pavement Markings - Yield Lines, Limit Lines, and Wrong Way Details
A24H Pavement Markings - Arrows
A62A Excavation and Backfill - Miscellaneous Details
A62D Excavation and Backfill - Concrete Pipe Culverts
A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method
A73A Object Markers
A73B Markers
A73C Delineators, Channelizers and Barricades
A86A Barbed Wire and Wire Mesh Fence Detail on Sharp Break in Grade
A86B Barbed Wire and Wire Mesh Fence Details
A86C Barbed Wire and Wire Mesh Fence Details at Ditch Crossing
A86D Barbed Wire and Wire Mesh Fence - Miscellaneous Details
A87A Curbs and Driveways
A87B Hot Mix Asphalt Dikes
RSP A88A Curb Ramp Details
A88B Curb Ramp and Island Passageway Details v
P1 Jointed Plain Concrete Pavement - New Construction
P3A Jointed Plain Concrete Pavement - Lane and Shoulder Addition or Replacement
P4 Continuously Reinforced Concrete Pavement
P7 Dowel Bar Retrofit
P10 Concrete Pavement - Dowel Bar Details
P15 Concrete Pavement - Tie Bar Details
P18 Concrete Pavement - Lane Schematics and Isolation Joint Detail
P20 Joint Seals
P30 Concrete Pavement - End Panel Pavement Transitions
P32 Continuously Reinforced Concrete Pavement - Expansion Terminal Joint System
P33 Concrete Pavement - Lane Drop Paving Details No. 1
P34 Concrete Pavement - Lane Drop Paving Details No. 2
P46 Concrete Pavement - Drainage Inlet Details No. 2
P70 Hot Mix Asphalt Paving (Longitudinal Tapered Notched Wedge Joint)
P74 Pavement Edge Treatments
P75 Pavement Edge Treatments - Overlays
P76 Pavement Edge Treatments - New Construction
D71 Drainage Inlet Markers
D72A CIP Drainage Inlets - Types OS, OL and GOL
D72B CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D72C CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D73B Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D73C Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D75B Concrete Pipe Inlets
D79 Precast Reinforced Concrete Pipe - Direct Design Method
D88 Construction Loads on Culverts
D88A Strut Details for Structural Steel Pipes, Arches and Vehicular Undercrossing
D94B Concrete Flared End Sections
D97H Reinforced Concrete Pipe or Non-Reinforced Concrete Pipe - Standard and Positive Joints
H1 Landscape and Erosion Control Symbols
H2 Landscape Details
RSP H8 Landscape Details
T1A Temporary Crash Cushion - Sand Filled (Unidirectional)
T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional) vi
T1B Temporary Crash Cushion - Sand Filled (Bidirectional)
T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)
RSP T3A Temporary Railing (Type K)
T3B Temporary Railing (Type K)
T3C Temporary Barrier System (Cross Bolt)
T3D Temporary Barrier System (Cross Bolt)
T3E Temporary Barrier System (Cross Bolt)
T3F Temporary Barrier System (Cal F-23)
T3F2 Temporary Barrier System (Cal F-23)
T3G Temporary Barrier System (Staking or Anchoring)
T3G2 Temporary Barrier System (Staking or Anchoring)
T4B Temporary Traffic Screen (Cal F-23)
T9 Traffic Control System Tables for Lane and Ramp Closures
RSP T13 Traffic Control System with Reversible Control on Two Lane Conventional Highways
T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)
T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)
T58 Temporary Water Pollution Control Details (Temporary Construction Entrance)
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)
T60 Temporary Water Pollution Control Details (Temporary Reinforced Silt Fence)
T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
RS4 Roadside Signs - Typical Installation Details No. 4
S89 Roadside Sign - Formed Single Sheet Aluminum Panel
S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape
S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape
S95 Roadside Single Sheet Aluminum Signs, Diamond Shape
ES-1A Electrical Systems (Legend)
ES-1B Electrical Systems (Legend)
ES-1C Electrical Systems (Legend)
ES-2A Electrical Systems (Service Equipment)
ES-2F Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - C Series)
ES-3C Electrical Systems (Controller Cabinet Foundation and Pad Details)
ES-4A Electrical Systems (Signal Head Mounting) vii
ES-4C Electrical Systems (Signal Heads and Mountings)
ES-4D Electrical Systems (Signal Head Mounting)
ES-5A Electrical Systems (Loop Detectors)
ES-5B Electrical Systems (Detectors)
ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)
ES-6A Electrical Systems (Lighting Standard, Types 15 and 21)
ES-6B Electrical Systems (Electrolier Anchorage and Grouting for Type 15 and Type 21, Barrier Rail Mounted)
ES-6F Electrical Systems (Lighting Standard, Slip Base Plate)
ES-7J Electrical Systems (Flashing Beacon on a Type 1, Type 15-FBS, and Type 40 Standard)
ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)
ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)
RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)
ES-8B Electrical Systems (Traffic Pull Box)
ES-11 Electrical Systems (Foundation Installations)
ES-13A Electrical Systems (Splice Insulation Methods Details)
ES-13B Electrical Systems (Kinking and Banding Detail)
ES-14B Electrical Systems (EMS and FBE Wiring Diagrams)
CANCELED STANDARD PLANS LIST
The 2025 standard plan sheets listed below are canceled and not applicable to this contract.
Plan No.
Date
Canceled Plan No.
Date Canceled
Plan No.
Date
Canceled
P8 04-20-26
NOTICE TO BIDDERS
Bids open Tuesday, November 17, 2026
Dated September 28, 2026
General work description: Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.
The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON
STATE HIGHWAY IN MERCED COUNTY AT STEVINSON ON ROUTE 140 FROM 0.3 MILE EAST OF
ROSA ROAD TO 0.2 MILE WEST OF NELANDER ROAD AND ON ROUTE 165 FROM 0.5 MILE
NORTH OF 6TH AVENUE TO 0.3 MILE SOUTH OF 4TH AVENUE.
District-County-Route-Post Mile: 10-Mer-140, 165-16.0/16.3, 26.8/27.0
Contract No. 10-1H0204
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-12, C-8, C-10.
Federal-aid project no.:
ST-X047(016)
For the Federal training program, the number of trainees or apprentices is 7.
Bids must be on a unit price basis.
Complete the work, excluding plant establishment work, within 260 working days.
Complete the work, including plant establishment work, within 510 working days.
Complete the plant establishment work within 250 working days.
The estimated cost of the project is $8,300,000.
The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.
The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.
For bid results go to:
https://ppmoe.dot.ca.gov/cc
Select Electronic Bidding under the Bidding tab.
District office addresses are provided in the Standard Specifications.
Present bidders' inquiries to the Department and view the Department's responses at:
https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Submit your bid with bidder's security equal to at least 10 percent of the bid.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.
The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.
Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.
Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.
Department of Transportation
BID ITEM LIST
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM
0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM
0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 260
0004 090200 DISPUTE RESOLUTION ADVISOR ON-SITE
MEETING
EA 4
0005 090207 HOURLY OFF-SITE DISPUTE-RESOLUTION-
ADVISOR-RELATED TASKS
HR 10
0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM
0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM
0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM
0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 53
0010 120151 TEMPORARY TRAFFIC STRIPE (TAPE) LF 8,650
0011 120152 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 530
0012 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 17,900
0013 120165 CHANNELIZER (SURFACE MOUNTED) EA 620
0014 017772 PORTABLE LIGHTING SYSTEMS (LS) LS LUMP SUM
0015 120300 TEMPORARY PAVEMENT MARKER EA 490
0016 120320 TEMPORARY BARRIER SYSTEM LF 5,140
0017 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM
0018 129100 TEMPORARY CRASH CUSHION MODULE EA 42
0019 129108 TEMPORARY CRASH CUSHION TL-3 EA 4
0020 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN
SYSTEM
EA 4
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0021 130100 JOB SITE MANAGEMENT LS LUMP SUM
0022 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM
0023 130312 PRE-STORM EVENT INSPECTION REPORT EA 20
0024 130323 DURING-AND POST-STORM EVENT INSPECTION
REPORT
DAY 20
0025 130331 STORMWATER ANNUAL REPORT EA 1
0026 130500 TEMPORARY EROSION CONTROL BLANKET SQYD 1,490
0027 130520 TEMPORARY HYDRAULIC MULCH SQYD 1,750
0028 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 13
0029 130640 TEMPORARY FIBER ROLL LF 3,810
0030 130670 TEMPORARY REINFORCED SILT FENCE LF 1,560
0031 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 1
0032 130730 STREET SWEEPING LS LUMP SUM
0033 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM
0034 141120 TREATED WOOD WASTE LB 380
0035 153123 REMOVE CONCRETE (SQYD) SQYD 870
0036 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM
0037 190101 ROADWAY EXCAVATION CY 4,580
0038 200114 ROCK BLANKET SQFT 9,090
0039 202038 PACKET FERTILIZER EA 130
0040 204035 PLANT (GROUP A) EA 120
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0041 204036 PLANT (GROUP B) EA 1
0042 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM
0043 205033 GRAVEL MULCH SQFT 1,440
0044 205035 WOOD MULCH CY 7
0045 206300 TEMPORARY IRRIGATION SYSTEM LS LUMP SUM
0046 208598 (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY
LINE)
LF 73
0047 208738 8" CORRUGATED HIGH DENSITY
POLYETHYLENE PIPE CONDUIT
LF 73
0048 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 3
0049 210110 IMPORTED TOPSOIL (CY) CY 52
0050 210252 BONDED FIBER MATRIX (SQFT) SQFT 13,100
0051 210300 HYDROMULCH SQFT 86,800
0052 210430 HYDROSEED SQFT 99,800
0053 210610 COMPOST (CY) CY 620
0054 210630 INCORPORATE MATERIALS SQFT 99,800
0055 260203 CLASS 2 AGGREGATE BASE (CY) CY 1,900
0056 390100 PRIME COAT TON 18
0057 390132 HOT MIX ASPHALT (TYPE A) TON 2,310
0058 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 50
0059 397005 TACK COAT TON 23
0060 398001 REMOVE ASPHALT CONCRETE PAVEMENT
(SQFT)
SQFT 280
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0061 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5,430
0062 018279 CONTINUOUSLY REINFORCED CONCRETE
PAVEMENT (TEXTURED AND COLORED)
CY 240
0063 401050 JOINTED PLAIN CONCRETE PAVEMENT CY 970
0064 420201 GRIND EXISTING CONCRETE PAVEMENT SQYD 65
0065 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE
INLET
CY 28
0066 600001 PUBLIC SAFETY PLAN LS LUMP SUM
0067 610300 (F) - CONCRETE BACKFILL (PIPE TRENCH) CY 19
0068 018451 INFILTRATION BASIN CY 1,400
0069 650014 18" REINFORCED CONCRETE PIPE LF 510
0070 705204 18" CONCRETE FLARED END SECTION EA 6
0071 723080 ROCK SLOPE PROTECTION (60 LB, CLASS II,
METHOD B) (CY)
CY 19
0072 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 33
0073 730020 MINOR CONCRETE (CURB) (CY) CY 76
0074 730070 DETECTABLE WARNING SURFACE SQFT 480
0075 731504 MINOR CONCRETE (CURB AND GUTTER) CY 96
0076 731516 MINOR CONCRETE (DRIVEWAY) CY 17
0077 731521 MINOR CONCRETE (SIDEWALK) CY 150
0078 731540 MINOR CONCRETE (ROCK SALT TEXTURED
CONCRETE)
SQFT 4,820
0079 731623 MINOR CONCRETE (CURB RAMP) CY 40
0080 733000 PRE/POST CONSTRUCTION SURVEYS EA 12
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0081 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 3,912
0082 782200 OBLITERATE SURFACING SQYD 360
0083 800001 FENCE (TYPE BW, METAL POST) LF 600
0084 800002 FENCE (TYPE BW, WOOD POST) LF 980
0085 801364 16' METAL GATE EA 3
0086 803020 REMOVE FENCE LF 1,820
0087 803060 REMOVE GATE EA 2
0088 810120 REMOVE PAVEMENT MARKER EA 550
0089 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 240
0090 820112 MARKER (CULVERT) EA 6
0091 820113 TREATMENT BEST MANAGEMENT PRACTICE
MARKER
EA 6
0092 820131 OBJECT MARKER (TYPE K) EA 8
0093 820134 OBJECT MARKER (TYPE P) EA 7
0094 820220 REMOVE MARKER EA 1
0095 820250 REMOVE ROADSIDE SIGN EA 15
0096 820300 REMOVE ROADSIDE SIGN (STRAP AND SADDLE
BRACKET METHOD)
EA 4
0097 820610 RELOCATE ROADSIDE SIGN EA 1
0098 820720 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 630
0099 820750 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-UNFRAMED)
SQFT 360
0100 820760 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.080"-UNFRAMED)
SQFT 110
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0101 820780 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-FRAMED)
SQFT 9
0102 820840 ROADSIDE SIGN - ONE POST EA 28
0103 820850 ROADSIDE SIGN - TWO POST EA 12
0104 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET
METHOD)
EA 21
0105 840516 THERMOPLASTIC PAVEMENT MARKING
(ENHANCED WET NIGHT VISIBILITY)
SQFT 1,320
0106 018455 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(WARRANTY) (BROKEN 8-4)
LF 930
0107 017463 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(WARRANTY)
LF 10,700
0108 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 30,400
0109 846035 REMOVE THERMOPLASTIC PAVEMENT
MARKING
SQFT 1,100
0110 018452 8" TRAFFIC STRIPE TAPE WITH CONTRAST
(WARRANTY) (BROKEN 4-2)
LF 190
0111 847198 CONTRAST STRIPE THERMOPLASTIC LF 5,530
0112 847219 6" TRAFFIC STRIPE TAPE WITH CONTRAST
(WARRANTY) (BROKEN 18-12)
LF 180
0113 847224 8" TRAFFIC STRIPE TAPE WITH CONTRAST
(WARRANTY)
LF 130
0114 870200 LIGHTING SYSTEM LS LUMP SUM
0115 870600 TRAFFIC MONITORING STATION SYSTEM LS LUMP SUM
0116 870700 FLASHING BEACON SYSTEM LS LUMP SUM
0117 037568 RECTANGULAR RAPID FLASHING BEACON
SYSTEMS
LS LUMP SUM
0118 872141 REMOVING LIGHTING SYSTEMS LS LUMP SUM
0119 999990 MOBILIZATION LS LUMP SUM
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to section 1-1.01:
Bid Items and Applicable Sections
Item code
Item description Applicable section
090200 DISPUTE RESOLUTION ADVISOR ON-SITE MEETING 5
090207 HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED
TASKS
017772 PORTABLE LIGHTING SYSTEMS (LS) 12
018279
CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (TEXTURED
AND COLORED) 40
037568 RECTANGULAR RAPID FLASHING BEACON SYSTEMS 87
2 BIDDING
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information
Means Description Included in the Information Handout 1. Existing Traffic Management System Elements
Table
2. Warranty Bond Form
3. Department Furnished Materials and Expenses
(DFME) items subject to Buy America Available as specified in the Standard Specifications
1. Cross section in 2D pdf format
2. Cross section in 2D dgn format
3. Original ground data in 3D dgn format
4. Alignment data in LandXML format
Delete section 2-1.20.
Delete section 2-1.33B(2)(b).
5 CONTROL OF WORK
Replace the 2nd and 3rd paragraphs of section 5-1.09A with:
Professionally facilitated project partnering is required.
Delete section 5-1.13B.
Replace section 5-1.13E with:
5-1.13E Prompt Payment
Section 5-1.13E applies to all contracts.
Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.
Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:
1. Subcontractor’s or entity’s business name
2. Description of work performed
2.1. Bid item numbers or change order numbers
2.2. Written narrative of work performed
3. Value of work performed
4. Amount paid to subcontractor or entity
5. Withhold amount, if applicable
6. Explanation of withhold reasoning, if applicable
Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.
If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:
1. Value of the disputed work
2. Amount of the withhold being taken
3. Bid item numbers or change order numbers associated with the disputed work
4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated
5. Corrective actions to be taken for release of withheld amount
The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.
The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:
1. Withhold was not applied in good faith
2. Requested additional withhold documentation records were not provided
3. Payment information was not submitted through the prompt payment monitoring system
4. Required withhold notification was not provided
The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.
Replace section 5-1.15 with:
5-1.15 SAFETY REPRESENTATIVE
5-1.15A General
Designate an on-site safety representative to superintend project safety for the duration of this Contract.
The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.
The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.
Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.
5-1.15B Submittals
Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.
Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:
1. Name of the entity providing certification
2. Name of the individual receiving certification
3. Date when the certification was provided
4. Expiration date, if applicable
Submit a copy of the SSSP as an informational submittal:
1. At least 15 days before starting work
2. At least 48 hours before starting work whenever a revision is made to the SSSP
5-1.15C Certifications
The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.
The safety representative must have one of the following certifications:
1. Certified Safety Professional from the Board of Certified Safety Professionals
2. Construction Health and Safety Technician from the Board of Certified Safety Professionals
3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals
4. Safety Trained Supervisor from the Board of Certified Safety Professionals
5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals
6. Associate Safety Professional from the Board of Certified Safety Professionals
7. Master Safety Professional from the National Association of Safety Professionals
8. Certified Safety Director from the National Association of Safety Professionals
5-1.15D Qualifications
The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:
1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry
2. Knowledge in the area of safety procedure for all types of work being performed on this project
3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA
Code of Regs safety requirements
The safety representative must have completed safety training and maintain valid certifications for:
1. First aid
2. Cardiopulmonary resuscitation
5-1.15E Duties and Responsibilities
The safety representative must be available by:
1. Cellular telephone
2. Two-way radio
3. Mobile internet access
The safety representative must:
1. Develop the SSSP
2. Conduct the on-site new project orientation for each worker assigned to the project
3. Review the construction work plans for each subcontractor before starting work
4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring
5. Conduct weekly job site safety meetings
6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues
7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards
8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures
9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs
10. Report all incidents to the Engineer immediately, including the investigation of any close calls
When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.
If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.
You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.
Add to the end of section 5-1.20A:
During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
Contract no. County–Route–Post Mile Location Type of work 10-0Y1304 Mer-140-2.3/49 In and near the cities of Gustine and Merced from outside Canal Bridge to west of Mariposa County line
Replace Bridge Approach
Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.
Replace section 5-1.24 with:
5-1.24 CONSTRUCTION SURVEYS
5-1.24A General
The Department places stakes and marks under the chapter, "Construction Surveys," of the Department's Surveys Manual.
Submit construction staking request for Department-furnished stakes and ensure:
1. Area is cleared and prepared for stakes
2. Request For Construction Staking form is complete with project and contact information, reference alignment, offset and priorities listed, and completion dates
After submittal, the Department starts staking within 2 business days.
The Department will complete the requested staking. The Contractor must plan for the time required by Department surveyors to complete the staking.
Preserve stakes and marks placed by the Department. If the stakes or marks are destroyed the Department replaces them at their earliest convenience and deducts the cost.
5-1.24B Department Construction Surveys for Automated Machine Guidance
The Department will provide a project control referenced to the State Plane Coordinate System compatible with the project datum. These physical points must be used by all positioning system users on the site.
The Department may provide grid coordinates for control points, at acceptable locations provided by the Contractor, where the Contractor can install the Contractor’s global navigation satellite system reference station receiver.
For slope stakes and rough grade stakes, the Department sets 6 survey control points or 2 per mile, whichever is greater.
The Department sets slope stakes and rough grade stakes at:
1. Conform stations
2. Beginning and end of each alignment
3. Midpoint or every 200 feet, whichever results in a greater number of stakes, on a curve of less than 1,500 feet
4. Every 500 feet on tangents and curves of 1,500 feet or more
For final grade, the Department sets stakes under the section, "Final Grade Stakes," of the Department's Surveys Manual, or at your request the Department sets survey control points under the sections, "Automated Machine Guidance (AMG)" and "Supplemental Project Control," of the chapter, "Construction Surveys," of the Department's Surveys Manual at:
1. Conform stations
2. Beginning and end of each alignment
3. Midpoint or every 100 feet, whichever results in the greater number of stakes, on a curve with a radius of 1,200 feet or less
4. Midpoint or every 200 feet, whichever results in the greater number of stakes, on a curve with a radius of more than 1,200 feet
5. Every 200 feet on a tangent
At your request and under the chapter, "Construction Surveys," of the Department's Surveys Manual, the Department provides (1) staking for intersections, clearing, fencing, drainage, curbs, structures, abutment fill, walls, and miscellaneous areas and (2) additional survey control or staking for earthwork in areas where global navigation satellite system coverage is inadequate for AMG.
Add to the end of section 5-1.32:
Personal vehicles of your employees must not be parked on the traveled way or shoulders, including sections closed to traffic.
Add between the 2nd and 3rd paragraphs of section 5-1.36C(3):
The utility owner will relocate a utility shown in the following table before the corresponding date shown:
Utility Relocation and Date of the Relocation Utility Location Date
PG&E Northernly leg of intersection along route 140
06/10/2026
AT&T Northern leg of intersection TBD Merquin Water Southerly leg of intersection and
Easterly leg of intersection End of October, 2026
Add between the 6th and 7th paragraph of section 5-1.43E(1)(a):
DRA and DRB meetings may be held either virtually or on-site at the job location upon mutual agreement by the Contractor, the Department, and the DRA or DRB.
DRA and DRB meetings include:
1. Initial project meeting
2. Progress meetings
3. Dispute meetings
On-site meetings are held at a physical location and include on-site time, travel time, transportation, lodging, and incidentals for each day or portion thereof.
Virtual meeting includes virtual meeting time, equipment, and incidentals for each hour or portion thereof, either all or part of the DRA and DRB members, with the following requirements:
1. Obtain authorization for virtual meeting 14 days before the meeting
2. Use of Webex, Zoom or MS Teams virtual platforms
Obtain authorization for DRA or DRB members before spending any time on DRA- or DRB- related tasks.
Hourly off-site DRA and DRB related tasks include reviewing the plans, specifications, evaluating positions, preparing recommendations, completing forms, or performing any other off-site DRA- or DRB-related tasks.
Replace section 5-1.43E(1)(i) with:
5-1.43E(1)(i) Payment
Pay the DRA or each DRB member for meeting participation as follows:
1. $250 per hour for agreed hourly off-site DRA- or DRB-related tasks
2. For attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or
DRB-related tasks rate
3. $2,500 per day for each on-site meeting
Department does not pay for (1) DRA- or DRB-work performed after Contract acceptance or (2) cost of preparing for or attending ADR meetings.
The Department pays:
1. $250 per hour for agreed off-site DRA- or DRB-related tasks
2. For each DRA or DRB member attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or DRB-related tasks rate
3. $2,500 per DRA on-site meeting
4. Up to $7,500 per DRB on-site meeting
Payment is full compensation for each meeting and off-site DRA- or DRB-related tasks.
The Department does not adjust the unit price for an increase or decrease in the quantity of:
1. DRA on site meeting
2. DRB on site meeting
3. Hourly off-site DRA- or DRB-related task
Within 60 days of receipt of Department's payment, submit copies of associated invoices and supporting documents in the form of a canceled check or bank statement for DRA- or DRB-payment verification.
6 CONTROL OF MATERIALS
Add to end of section 6-1.01:
If you fail to submit the form for materials subject to Buy America, the Department may
1. Withhold from the next progress payment
2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products
Add to the beginning of section 6-1.02:
The Department furnishes you with:
1. Loop detector sensor units
2. Model 2070LX controller units
Replace section 6-1.03B with:
6-1.03B Submittals
6-1.03B(1) General
Not Used
6-1.03B(2) Work Plan
For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:
1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).
2. Land use history of the local material location and surrounding property
3. Sampling protocol
4. Number of samples per volume of local material
5. QA and QC requirements and procedures
6. Qualifications of sampling personnel
7. Stockpile history
8. Name and address of the analytical laboratory that will perform the chemical analyses
9. Analyses that will be performed for lead and pH
10. Other analyses that will be performed for possible hazardous constituents based on:
10.1. Source property history
10.2. Land use adjacent to source property
10.3. Constituents of concern in the ground water basin where the job site is located
The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.
If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.
6-1.03B(3) Analytical Test Results
At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:
1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.
2. Chain of custody of samples
3. Analytical results no older than 1 year
4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit
5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location
6-1.03B(4) Sample and Analysis
Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:
1. Before bringing the local material to the job site
2. As described in the local material plan
3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)
The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.
Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:
Minimum Number of Samples and Analytical Tests for Local Material
Maximum volume of imported borrow (cu yd)
Minimum number of samples and analytical tests
< 5,000 8
5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof
10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof
20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof
40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof
> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof
Do not collect composite samples or mix individual samples to form a composite sample.
Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).
The analytical test results must demonstrate that the local material:
1. Is not a hazardous waste
2. Has a pH above 5.0
3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg
4. Is free of possible contaminants identified in the local material plan
5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location
6-1.03C Local Material Management
Do not place local material until authorized.
If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).
Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.
Replace section 6-1.04 with:
6-1.04 BUY AMERICA
6-1.04A General
Buy America requirements do not apply to the following:
1. Tools and construction equipment used in performing the work.
2. Temporary work that is not incorporated into the finished project.
An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:
1. Iron or steel products
2. Manufactured products
3. Construction materials
4. Excluded materials
Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
6-1.04B Crumb Rubber (Pub Res Code § 42703(d))
Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:
1. Produced in the United States
2. Derived from waste tires taken from vehicles owned and operated in the United States
6-1.04C Iron or Steel Products
Iron or steel products must be melted and manufactured in the United States except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials
2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized
Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.
All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
6-1.04D Manufactured Products
Manufactured products mean articles, materials, or supplies that have been:
1. Processed into a specific form and shape; or
2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies
Per 23 CFR 635.410, these products must be manufactured in the United States.
Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.
If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.
Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.
Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.
Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.
6-1.04E Construction Materials
The following construction materials must be produced in the United States under standards in 2 CFR 184.6:
1. Non-ferrous metals
2. Plastic and polymer-based products such as:
2.1. Polyvinylchloride
2.2. Composite building materials
3. Glass
4. Fiber optic cable including drop cable
5. Optical fiber
6. Lumber
7. Engineered wood
8. Drywall
All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.
Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.
Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.
6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials
A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total applicable costs for the project.
The percentage threshold is calculated based on the following formula:
X = NC / TA
where:
X = percent threshold NC = total cost of non-compliant construction materials and manufactured products TA = total applicable project costs (steel, iron, construction materials and manufactured products;
does not include excluded materials)
This threshold is based on the actual cost of the steel, iron, construction materials, and manufactured products, not the anticipated cost of those materials. The contractor must account for compliant and non-compliant Department-Furnished Materials for the project in the De Minimis Costs Waiver Worksheet calculation if provided by the Department as supplemental project information.
See further instructions for the De Minimis Costs waiver request in the Notice of Materials to be Used form.
Add to section 6-1:
6-1.08 ENVIRONMENTAL PRODUCT DECLARATIONS FOR HOT MIX ASPHALT AND CONCRETE
Section 6-1.08 includes specifications for environmental product declarations for hot mix asphalt and concrete materials and products.
See section 6-1.06B for definitions.
For projects with bid opening dates after February 1, 2025, with a total bid over $1 million and 175 or more original working days, materials or products specified in the following table require facility-specific, product stage, environmental product declarations as informational submittals:
Material or product Material specifications
Hot mix asphalta Section 39-2, "Hot Mix Asphalt" Excludes RHMA, OGFC, and BWC materials.
Concreteb Section 28-2, "Lean Concrete Bases," Section 28-3, "Rapid Strength Concrete Base," Section 28-4, "Lean Concrete Base Rapid Setting," Section 28-5, "Concrete Base," Section 40, "Concrete Pavement," Section 47-5, "Type 6 Retaining Walls," Section 49-3, "Cast-In-Place Concrete Piling," Section 49-4, "Steel Soldier Piling," Section 51, "Concrete Structures," Section 58-2, "Masonry Block," Section 73, "Concrete Curbs and Sidewalks," Section 83, "Railings and Barriers," and Section 99, "Building Construction."
Excludes volumetric-proportioned rapid strength concrete and Section 90-4 PC concrete members.
aFor each hot mix asphalt plant providing 2,250 tons or more on the project by job mix formula.
bFor each concrete plant providing 250 cubic yards or more on the project by mix design.
The requirements in section 6-1.08 do not apply to seasonal plants operating fewer than 6 months per year.
The requirements in…
This is the start of the file's text. The full file is on GovTribe.