This is an Invitation to Bid (ITB) issued by the City of Temple, Texas for the construction of the Pepper Creek Drainage Channel and Wastewater North of the Outer Loop project located in the North Industrial Park. The project encompasses three main components: Part A involves construction of a drainage channel with associated site preparation, stormwater pollution prevention, barricading, trench safety, record drawings, and site restoration work; Part B includes the installation of an 8-inch diameter water line with approximately 310 linear feet of piping, testing, and connection work; and Part C requires installation of approximately 1,975 linear feet of 10-inch diameter wastewater line with associated manholes, testing, and utility connections. The bid documents were released on April 27, 2026, with a non-mandatory virtual pre-bid conference scheduled for May 5, 2026 at 1:00 p.m. CST. The deadline for written questions is May 12, 2026 at 12:00 p.m. CST. Sealed bids are due on May 19, 2026 at 2:00 p.m. CST with virtual bid opening to follow immediately thereafter. Contract award is expected in June 2026. The selected contractor must complete all work within 300 consecutive calendar days from the issuance of the Notice to Proceed, with no renewal options specified.
The engineer's estimate of probable cost for this project is $2,020,000. Bids may be submitted electronically through the Euna Procurement online portal or as hard copies to the City of Temple Purchasing Department. All bids must include a Bidder Information Form, Pricing Sheets, a bid bond of not less than 5 percent of the total bid amount, Bond Requirement Affidavit, and a Conflict of Interest Questionnaire if applicable. Upon award, the contractor must furnish performance and payment bonds each equal to 100 percent of the contract price in accordance with Texas Government Code Chapter 2253, Subchapter B. The contractor is required to comply with prevailing wage requirements established by the City of Temple, with wage rates varying by classification and ranging from $7.25 to $34.15 per hour depending on work type. No state or local sales and use tax is applicable as the City qualifies for tax exemption. The City reserves the right to reject any or all bids and to waive any formalities in the bidding process. Contract administration will be overseen by Don Bond, Director of Public Works, with the City Manager authorized to execute the contract on behalf of the City of Temple.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
BID #92-01-26
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER
NORTH OF THE OUTER LOOP
CITY COUNCIL
Timothy Davis Mayor Jessica Walker Mayor Pro Tem Zoe Grant Councilmember Mike Pilkington Councilmember Karl Kuykendall Councilmember
STAFF
Brynn Myers City Manager David A. Olson, P.E., CFM Assistant City Manager Don Bond, P.E. Director of Public Works James Billeck, P.E. City Engineer
Prepared by:
Kasberg, Patrick & Associates, LP Consulting Engineers
Temple, Texas Firm No. F-510 254-773-3731
April 2026
04/16/2026
TABLE OF CONTENTS
ADDENDA (if any)
NOTICE TO BIDDERS
GENERAL INSTRUCTIONS TO BIDDERS
BIDDER INFORMATION FORM
PRICING SHEETS
BID BOND
BOND REQUIREMENT AFFIDAVIT
CONFLICT OF INTEREST QUESTIONNAIRE
GENERAL PROVISIONS
SPECIAL CONDITIONS
WAGE RATES
STANDARD FORM OF AGREEMENT
PERFORMANCE BOND
PAYMENT BOND
CERTIFICATE OF INSURANCE
GUIDELINES FOR CONSTRUCTION OF CONTRACT PREPARATION
TECHNICAL SPECIFICATIONS AND DRAWINGS
NOTICE TO BIDDERS
1. GENERAL
Download and submit competitive sealed bid (Bid) documents online at https://templetx.bonfirehub.com
OR
Submit sealed paper bids to:
Purchasing Department City of Temple 3210 E Avenue H, Building C Temple, Texas 76501
2. PROJECT SUMMARY
Bid submittals will be received to furnish all labor and materials and perform all work for the construction of the following described project:
PEPPER CREEK DRAINAGE CHANNEL & WASTEWATER
Construction of drainage channel and wastewater line in the North Industrial Park.
3. BUDGET
The engineer’s estimate of probable cost associated with this project is $2,020,000.
4. CONTRACT TERM
The selected Contractor shall complete the work within 300 consecutive calendar days from Notice to Proceed.
https://templetx.bonfirehub.com/
5. BID TIMELINE
Date Event
Monday, April 27, 2026 Release of Bid Documents
Tuesday, May 5, 2026 1:00 p.m. CST
Non-Mandatory Virtual Pre-Bid Conference
Click here for MICROSOFT TEAMS MEETING For audio participation only, call 1-979-307-6962 Conference ID: 770 212 130#
Tuesday, May 12, 2026 12:00 p.m. (noon) CST
Deadline for Questions related to Bid
Submit questions in writing to the engineer of record Brian Wright, PE, Kasberg, Patrick & Associates at bwright@kpaengineers.com.
Tuesday, May 19, 2026 2:00 p.m. CST
Bids Due
Submit in Euna Procurement (formerly Bonfire) online bidding portal or sealed paper copies to the Purchasing Department.
Virtual Bid Opening
Immediately following time due.
Click here for MICROSOFT TEAMS MEETING.
For audio participation only, call 1-979-307-6962, Conference ID: 668 056 930#
June 2026 Expected Award of Contract
The City and the selected Contractor will work to establish an acceptable calendar of work.
6. PRE-BID CONFERENCE
A voluntary pre-bid conference will be held virtually at 1:00 PM CST on Tuesday, May 5, 2026. Please use the ‘MICROSOFT TEAMS MEETING’ hyperlink provided in the Bid Timeline above. If your computer is not audio equipped, you may also join the meeting via phone by using the instructions provided in the Bid Timeline.
7. REQUESTS FOR ADDITIONAL INFORMATION
Requests for additional information shall be in writing and submitted through the Euna Procurement (formerly Bonfire) online bidding portal using the ‘VENDOR DISCUSSIONS’ or ‘ASK A QUESTION’ features. Alternatively, requests can be emailed to the engineer of record Brian Wright, PE, Kasberg, Patrick, & Associates at bwright@kpaengineers.com by the deadline stated in the Bid Timeline.
https://teams.microsoft.com/meet/251642402729559?p=4z7ZgkY0TvXAVKDBSh mailto:bwright@kpaengineers.com https://teams.microsoft.com/meet/21091177394916?p=qbs2ekzfwDZjkpJW9k mailto:bwright@kpaengineers.com
Any interpretations, corrections or changes to this bid will be made by addenda. All written/published addenda shall become part of this bid and shall be acknowledged by the bidder in its bid. All other communications are unofficial and non-binding. Addenda will be released in the Euna Procurement online bidding portal in the ‘Supporting Documentation’ section. It is the sole responsibility of the bidder to verify issuance of addenda and to ensure receipt thereof.
If another agenda or construction data website references this project, please also refer to the Euna Procurement online bidding portal mentioned above or contact the City of Temple Purchasing office at (254)298-5655 to verify completeness of the data.
8. BID SUBMITTAL INSTRUCTIONS
Sealed bids will be received until 2:00 PM CST on Tuesday, May 19, 2026 via the Euna Procurement portal or hard copy submitted to the City of Temple Purchasing Department. See ‘Electronic Submissions’ and ‘Paper Submissions’ below.
Late submittals will not be accepted or considered. Bidders should be mindful of any potential delays due to security screening procedures, weather, connectivity issues, or other delays whether foreseeable or unforeseeable. Failure to submit a response before the due date and time will result in disqualification of the bid.
All bid submissions shall include the following provided forms:
1. Bidder Information Form;
2. Pricing Sheet(s);
3. Bid Bond;
4. Bond Requirement Affidavit; and
5. Conflict of Interest Questionnaire (submit only if applicable).
The bidder is required to submit a bid bond from a reliable surety company, payable without recourse to the order of the City of Temple, in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract within ten (10) days and execute all necessary bonds (if required) within thirty (30) days after notice of award of the contract to him. Bidders are encouraged to use the City’s bid bond form. The City may reject bids which include bid bonds submitted on something other than the City’s form if it determines in its sole discretion that the bid bond does not provide the same level of protection as the City’s bid bond form provides.
9. ELECTRONIC SUBMISSIONS
Access the Euna Procurement online bidding portal at https://templetx.bonfirehub.com. The City will use Euna Procurement for communicating all bid documents, receive any questions or inquiries, issue any associated addenda, and post award notices.
Bidders can contact Euna Procurement at support.procurement@eunasolutions.com for technical questions related to the Euna Procurement portal. Bid submissions shall be prepared in the file formats listed under ‘Requested Information’ for this opportunity in Euna Procurement.
Bid submissions may be amended by the Bidder directly in Euna Procurement, but only before the submission deadline.
https://templetx.bonfirehub.com/ mailto:support.bonfire@eunasolutions.com
Minimum system requirements include Microsoft Edge, Google Chrome, Safari, or Mozilla Firefox. JavaScript and browser cookies must be enabled. Euna Procurement has built-in lockbox technology that will date stamp bids and will keep all bids locked until the bid opening date and time. The maximum upload file size is 1,000 MB. Documents should not be embedded within uploaded files, as the embedded files will not be accessible or evaluated.
10. PAPER SUBMISSIONS
Hardcopy bids can be delivered to the Purchasing Department located at 3210 E. Avenue H, Building C, Temple, TX 76501.
If a bid is delivered via hardcopy, the envelope or package containing the completed bid should be marked legibly on the outside with the bidder’s name and address along with the project number and title no later than the due date and time stated in the Project Timeline.
The bidder shall sign and date the bid where provided within the bid packet. The person signing the bid shall have the authority to bind the firm in a contract. Bids which are not signed and dated in this manner may be rejected.
All paper bids received in the Purchasing Department will be date and time stamped when received and will be considered to be the official time of receipt.
11. BID OPENING, WITHDRAWALS, AND REJECTIONS
After the expiration of the time and date above, sealed bids will be opened by the Assistant Director of General Services or her representative in the Purchasing Department offices located at 3210 E. Avenue H, Building C, Temple, TX and publicly read aloud.
The bid opening will be held virtually via Microsoft Teams. Please use the ‘MICROSOFT TEAMS MEETING’ hyperlink provided in the Bid Timeline. If your computer is not audio equipped, you may also join the meeting via phone by using the instructions provided in the Bid Timeline.
It is the sole responsibility of the bidder to ensure that their bid is properly submitted electronically in the Euna Procurement online bidding portal or submitted via hard copy in the Purchasing Department at the City of Temple prior to the bid opening date and time. Late submissions will not be allowed.
No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof or after award of the contract by the City Council of the City of Temple. Withdrawal of bid before the end of the sixty (60) days or after award of the contract by the City Council of the City of Temple will be penalized with the forfeiture of the bidder’s bid bond, if applicable.
The City reserves the right to reject any or all bids and to waive any formality in the bidding.
The City Council will consider the bids at their next regularly scheduled meeting at the Municipal Building in Temple, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond and payment bond in accordance with Texas Government Code Chapter 2253, Subchapter B, §2253.021 in the amount of 100% of the total contract price.
12. BIDDER ACKNOWLEDGEMENTS
It shall be each bidder's sole responsibility to inspect the site of the work and to inform themselves regarding all local conditions under which the work is to be done as well as carefully examine the plans, specifications, and contract documents pertaining to the work covered by this bid. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted.
The bidder hereby agrees to furnish all labor, materials and supplies required to construct this project in accordance with the plans, specifications, and contract documents within the time set forth therein and at the prices stated on the Pricing Sheet (Bid Schedule/Bid Form). Prices provided shall include all labor, materials, overhead, profit, insurance, etc. to cover the finished work of the project.
The bidder hereby agrees to commence work on the project on or before a date to be specified by a written “Notice to Proceed” provided by the City and to fully complete the work within 300 consecutive calendar days thereafter as stipulated in the specifications and related contract documents. The bidder hereby further agrees to pay to the City liquidated damages as outlined in Paragraph 1.36.1 of the General Conditions of the contract documents for time in excess of the timeline set forth hereinabove for completion of this project.
By submitting a bid for this project, the bidder is acknowledging the insurance requirements as outlined in the General Conditions of the contract documents and the bidder is asserting that, if awarded this contract, they can comply with all insurance requirements as specified within 30 days of award of the contract.
Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents and on file in the Purchasing Department for the City of Temple, Texas. Each bidder's attention is further directed to provisions of Chapter 2258 of the Texas Government Code, and the requirements contained therein concerning the above wage scale and payment by the Contractor of the prevailing rates of wages as heretofore established by the Owner in said wage scale.
The Contractor shall be solely responsible for and shall be in complete compliance with the Immigration Reform and Control Act of 1986, concerning the control of unlawful employment of aliens, the requirements for compliance to which statute are contained in section 274A (8 U.S.C.
1324) (Public Law 99-603), and to which statute reference shall be made by the Contractor to ensure compliance.
GENERAL INSTRUCTIONS TO BIDDERS
1. SCOPE OF WORK
The Contractor shall furnish all labor, superintendence, machinery, equipment, and all materials necessary to complete this project in accordance with contract documents for said project.
2. CONTRACT DOCUMENTS
All work covered by this contract shall be done in accordance with contract documents described in the General Conditions.
All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by the contract documents.
All vendors are required to carefully review the contract included in this solicitation packet.
Submission of a bid in response to this solicitation shall serve as acknowledgment that the vendor has reviewed the contract in full and understands the terms and conditions therein. By submitting a response, the vendor affirms its intent and ability to comply with all provisions of the contract, without modification, unless otherwise explicitly stated in their bid submission.
Vendors who seek to take exception to any provision of the contract must clearly identify each exception, providing a detailed explanation and, if applicable, suggested alternative language.
Failure to identify exceptions shall be interpreted as the vendor’s full acceptance of the contract as written.
Please Note: The City reserves the right to reject any exceptions or negotiate alternative terms prior to contract award. Material deviations from the contract may render the bid non-responsive.
3. PLANS FOR USE BY BIDDERS
It is the intent of the City of Temple that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge. The contract documents may be examined without charge as noted in the Notice to Bidders.
4. TIME AND ORDER FOR COMPLETION
The construction covered by the contract documents shall be fully complete within the time frame provided in the Notice to Bidders and from the date specified in the Notice to Proceed issued by the City of Temple to the successful bidder.
The Contractor will be permitted to perform the work in the order of his own choosing, provided however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to ensure completion of the project within the time specified.
5. PAYMENT
All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents.
6. AFFIDAVITS OF BILLS PAID
The City of Temple, Texas, reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified.
7. MATERIALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the construction site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality which the Owner believes necessary to procure a satisfactory project.
8. GUARANTEES
All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work and pay for any and all damages of any nature whatsoever resulting in such defects that are a result of defective materials or workmanship at no cost to the Owner (City of Temple, Texas).
9. PLANS FOR THE CONTRACTOR
The Contractor will be furnished five (5) sets of drawings, specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors, or others, as required for proper prosecution of the work contemplated by the Contractor.
10. PROTECTION OF THE WORK
The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work, whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of final acceptance to Contractor.
11. TEXAS STATE SALES TAX
This contract is issued by an organization which qualifies for exemption provisions pursuant to Provisions of the Texas Tax Code, Sections 151.301, 151.307, 151.309 and 151.311. The
Contractor should obtain a limited sales, excise and use tax permit or exemption certificate which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase.
12. PROTECTION OF SUBSURFACE LINES AND STRUCTURES
It shall be the Contractor's responsibility to perform the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Temple, Texas agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately to the satisfaction of the City of Temple, Texas, and/or other utilities at Contractor's expense. Contractor may be required to work twenty-four (24) hours per day to repair damage.
13. BARRICADES AND SAFETY MEASURES
The Contractor shall, at his own expense, furnish and erect such barricades, fences, lights, and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary.
The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project.
14. EXPLOSIVES
The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms or corporations engaged in similar type of construction activity.
Explosive materials shall not be stored or kept at the construction site by the Contractor.
In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work, of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury.
Such notices, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations.
15. CONTRACTOR'S REPRESENTATIVE
The Contractor shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The Contractor shall be required to furnish the name, address, and telephone number where such local representatives may be reached during the time that the work contemplated by this contract is in progress.
16. INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Provisions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City, or in a form approved by the City Attorney’s Office. Proof of coverage shall be furnished to the City and written notice of cancellation, non-renewal or reduction in coverage will be provided thirty (30) days in advance of cancellation or change. All "endeavor to" language must be stricken. All language similar to "but failure to mail such notice shall impose no obligations or liability of any kind upon the company," must be stricken. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The insurance certificates furnished shall name the City as an additional insured. All workers must be covered by worker’s compensation insurance. Proof must be provided for all persons working for general or subcontractors, regardless of status as employee or independent contractor. No one may work on the project without such proof.
17. LABOR AND WORKING HOURS
Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate which must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Chapter 2258 of the Texas Government Code providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in these contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist:
1. The project being constructed is essential to the City of Temple's ability to provide the necessary service to its citizens.
2. Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract, and Contractor can show he has made a diligent effort to complete the contract within the allotted time.
Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from Owner's Representative to do such work. The final decision on whether to allow construction work, requiring an inspector on weekends or holidays will be made by the Owner's Representative.
In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life.
18. PAYMENT OF EMPLOYEES
The Contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week.
The Contractor shall forfeit as a penalty to the City of Temple on whose behalf this contract is made, sixty ($60) dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents.
19. SUBMISSION OF BIDS
The bidder should submit his bid on forms furnished by the City. The City may reject bids submitted on something other than the City’s forms if the City determines in its sole discretion that the form(s) does not provide the same level of protection or information as the City’s form(s).
All blank spaces in the forms shall be correctly filled in distinctly and legibly.
If the bid is submitted by an individual, his name must be signed by him. If the bid is submitted by a partnership or association, the name and address of each member must be given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and business address must be given, and the bid shall be signed by an official or duly authorized agent.
Powers of attorney authorizing agents or others to sign bids must be properly certified and must be in writing and submitted with the bid.
The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information:
a. The experience record of the bidder showing completed jobs of a similar nature to the one covered by the proposed contract and all work in progress with bond amounts and percentage completed.
b. A sworn statement of the current financial condition of the bidder.
c. Equipment schedule.
d. Project completion schedule and cash flow diagram.
All bid submissions shall include the following electronic submissions through the Euna Procurement online bidding portal:
1. Bidder Information Form;
2. Pricing Sheet(s);
3. Bid Bond;
4. Bond Requirement Affidavit; and
5. Conflict of Interest Questionnaire (submit only if applicable).
20. AMOUNT OF CONTRACT
This project is supported by a unit price contract as identified in the Pricing Sheet (Bid Schedule/Bid Form), and payments will be made at the unit price and quantity of items constructed and/or installed. The unit prices stated in the Pricing Sheet (Bid Schedule/Bid Form) will also be used for situations where quantities increase or decrease through a properly executed change order. The Contractor will not be compensated for work performed before they have a change order executed by the City in their possession.
The prices as recorded by the bidder on the Pricing Sheet (Bid Schedule/Bid Form) shall include all labor, materials, overhead, profit, insurance, etc., to cover the finished work of the project as defined herein.
21. LENGTH OF CONTRACT
Any time extension request must be submitted within seven (7) days of the underlying cause for delay.
22. COPY OF CONTRACT DOCUMENTS
Bidder understands and agrees that the contract to be executed by bidder shall include the following:
a. Addenda (if any)
b. Notice to Bidders
c. General Instruction to Bidders
d. Bidder Information Form
e. Pricing Sheet(s)
f. Bid Bond
g. Bond Requirement Affidavit
h. Conflict of Interest Questionnaire, if applicable
i. General Provisions
j. Special Conditions
k. Wage Rates
l. Standard Form of Agreement
m. Performance Bond
n. Payment Bond
o. Certificate of Insurance
p. Guidelines for Construction of Contract Preparation
q. Technical Specifications and Drawings
23. PERMITS
The Contractor will be required to file for the appropriate permits as required by City Ordinance.
However, the City will waive the permit application fees associated with obtaining the permits.
24. CONFLICT OF INTEREST
Section 176.006 of the Texas Local Government Code, as amended through HB 23, requires a vendor of the City of Temple to file a completed conflict of interest questionnaire if the vendor has a business relationship with the City and:
a. has an employment or other business relationship with a City of Temple local government officer or a family member of the City of Temple local government officer that results in that person receiving taxable income, other than investment income, that is more than $2,500 in the preceding twelve months;
b. has given a City of Temple local government officer or an officer’s family member, one or more gifts totaling more than $100 in the preceding twelve months, excluding a political contribution as defined by Title 15 of the Election Code or food accepted as a guest; or
c. has a family relationship with a City of Temple local government officer.
A vendor is required to file a completed questionnaire with the City Secretary’s office not later than the seventh business day after the later of the following:
a. the date the vendor begins discussions or negotiations to enter into a contract with the City of Temple or submits an application or response to a bid proposal; or
b. the date the vendor becomes aware of any business relationship as outlined in the preceding paragraph.
“Local Government Officer” means:
a. a member of the governing body (i.e., mayor or council member);
b. a director, superintendent, administrator, or other person designated as an executive officer of the City of Temple; or
c. an agent of the City of Temple who exercise discretion in the planning, recommending, selecting, or contracting of a vendor.
State law requires that a vendor file an updated completed questionnaire with the City Secretary’s office not later than the 7th business day after the date on which the vendor becomes aware of an event that would make a statement in the questionnaire incomplete or inaccurate.
Compliance with this law is the responsibility of each bidder/vendor.
The Conflict of Interest Questionnaire (Form CIQ) is provided under Questionnaires Section, Required Forms.
25. CERTIFICATE OF INTERESTED PARTIES
The City is required to comply with Texas Government Code 2252.908 Disclosure of Interested Parties for contracts that:
a. require an action or vote by the City Council before the resulting contract can be signed;
b. have a value of at least $1 million; or
c. require registration as a lobbyist under Texas Government Code Chapter 305.
If the resulting contract, if any, meets one of the criteria above, a Certificate of Interested Parties (Form 1295) will be required before the contract is executed. See the Texas Ethics Commission website: https://www.ethics.state.tx.us/filinginfo/1295/.
http://www.ethics.state.tx.us/filinginfo/1295/
COMPLETE & UPLOAD TO EUNA PROCUREMENT
OR SUBMIT VIA HARD COPY
BIDDER INFORMATION FORM
1. Company Information
Company Name: ____________________________________________________________
Business Address: ___________________________________________________________
Remit-to Address, if different: ___________________________________________________
Tax Identification Number: _____________________________________________________
Contact Person: _____________________________________________________________
Phone: ____________________________________________________________________
Email: _____________________________________________________________________
2. Addenda Our company has reviewed and formally acknowledges receipt of all addenda, if any, provided in the Euna Procurement e-procurement portal. Please record the number of addenda acknowledged here:
____________ (number of addenda acknowledged)
3. Credit Check Authorization The City is required to determine whether a Bidder who may be awarded a contract is financially responsible. The City may run a credit check on the potential contractor before award of the contract. By signing this Bidder Information Form, I hereby authorize the City of Temple, credit bureau, or other investigative agency employed by the City of Temple to investigate my credit history and financial responsibility.
____________ (initial to confirm)
BIDDER INFORMATION FORM
continued
4. References
Name Phone Email
5. Authorization*
Authorized Signature: _________________________________________________________
Print Name: ________________________________________________________________
Title: ___________________________________ Date: ____________________________
*By signing this Bidder Information Form, you are asserting you have reviewed the plans, specifications, and contract documents associated with this bid, have the ability to perform and comply with the contract terms as stated herein, and are an authorized representative with the authority to bind your company in a legally binding contract.
PRICING SHEET(S)
Access to the most recent version of the Excel Pricing Sheets can be located under the ‘Supporting Documentation’ section in the Euna Procurement ebidding portal.
1. Electronic Submission:
a. Proposers shall submit the downloaded Pricing Sheet(s) in Excel format in the ‘Requested Information/Required Forms’ section of Euna Procurement online bidding portal.
b. A summary of subtotal/total pricing shall also be manually entered into the ‘Requested Information/Pricing Summary’ section in Euna Procurement. This manual entry does not replace the required pricing sheet noted above but is in addition to.
1. Paper Submission:
Proposers shall complete the Pricing Sheet(s) in the Excel format and print the sheets to include in the paper submission.
2024-123
PART A: PEPPER CREEK CHANNEL
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
1 100% Lump
Sum
Mobilization, Bonds and Insurance, not-to-exceed
5% of the Base Bid Amount, Complete For $ $
2 15.0 Acre Provide Labor, Equipment, Tools & Supervision to
Complete Preparation of Right-of-Way, Complete
For $ $
3 100% Lump
Sum
Implement and Administer Stormwater Pollution
Prevention Plan, Including Submission to and
Receiving Permits from Texas Commission on
Environmental Quality (TCEQ) including Notice of
Intent (NOI) and Notice of Termination (NOT), Complete For $ $
4 100% Lump
Sum
Implement and Administer Barricade, Signing and
Traffic Safety Plan (Vehicular and Pedestrian), Complete For $ $
5 100% Lump
Sum
Submit Trench Safety Plan Prepared and Signed by a P.E, in Conformance with State Laws and OSHA, Complete For $ $
6 170 Linear
Foot
Implement and Follow Trench Safety Plan (Pipes), Complete For $ $
7 100% Lump
Sum
Provide Record Drawings (As-Builts), Complete
For $ $
8 100% Lump
Sum
Provide DVD of ROW Pre-Construction and Post-
Construction Site Conditions for Total Project, Complete For $ $
9 100% Lump
Sum
Provide All Material, Labor, Equipment, Tools and
Supervision Necessary to Adjust Manholes, Water
Valves, Fire Hydrants, etc. to Finish Grade, Complete For $ $
10 5,600 Linear
Foot
Furnish, Install, Maintain and Remove Silt Fence, Complete For $ $
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
PRICING SHEET
FOR
TEMPLE, TEXAS
PART A Page 1 of 8 04/15/2026
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
PRICING SHEET
FOR
TEMPLE, TEXAS
11 150 Linear
Foot
Furnish, Install, Maintain and Remove Rock Berm, Complete For $ $
12 1 Each Furnish, Install, Maintain and Remove Stabilized
Construction Entrance, Complete For $ $
13 17,250 Cubic
Yard
Unclassified Channel Excavation, Complete For
14 17,500 Cubic
Yard
Unclassified Channel Fill, Complete For
15 2,550 Square
Yard
Furnish & Install Two Course Surface Treatment per Sheet G-05, Complete For $ $
16 2,600 Square
Yard
Furnish & Install 8" Crushed Limestone Base
(TxDOT Item 247 Type A Grade 1-2), Complete
For $ $
17 7,750 Square
Yard
Furnish & Install 6" Moisture Conditioned
Subgrade, Complete For $ $
18 75 Linear
Foot
Furnish & Install Concrete Curb and Gutter, Complete For $ $
19 25 Square
Yard
Furnish & Install Concrete Radius Unit, Complete
For $ $
20 15 Square
Yard
Furnish & Install Concrete Valley Gutter, Complete
For $ $
21 1 Each Furnish & Install Capital Improvement Sign, Complete For $ $
22 2 Each Furnish & Install Roadway Sign (R5-11) Including
Post, Base and Mounting Apparatuses, Complete
For $ $
PART A Page 2 of 8 04/15/2026
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
PRICING SHEET
FOR
TEMPLE, TEXAS
23 1 Each Furnish & Install Roadway Sign (R6-1) Including
Post, Base and Mounting Apparatuses, Complete
For $ $
24 170 Linear
Foot
Furnish & Install 60" RCP, Complete For
25 5,300 Square
Yard
Furnish & Install 6" Concrete Riprap, Complete For
26 100 Cubic
Yard
Furnish & Install Class A Concrete, Complete For
27 64,000 Square
Yard
Furnish & Install Bermuda Hydromulch with
Flexterra Flexible Growth Medium, Including
Watering, Fertilizing and Mowing to Promote and
Establish Growth, Complete For $ $
28 120 Square
Yard
Furnish & Install 12" Diameter Rock Riprap, Complete For $ $
29 35 Square
Yard
Furnish & Install 18" Diameter Rock Riprap, Complete For $ $
30 2 Each Furnish & Install Safety End Treatment, (TY II)
(3:1)(C), for 2-60" RCP, Including Pipe Runner
Assembly, Complete For $ $
PART A: BID AMOUNT (ITEMS 1 to 30)
BID AMOUNT:
PART A Page 3 of 8 04/15/2026
2024-123PRICING SHEET
PART B: PEPPER CREEK (PWSC) WATER
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
1 100% Lump
Sum
Submit Trench Safety Plan prepared and signed by
P.E., in Conformance with State Law and OSHA, Complete For $ $
2 310 Linear
Foot
Implement and Follow Trench Safety Plan (Pipes), Complete For $ $
3 100% Lump
Sum
Furnish All Materials, Equipment, Tools, Labor &
Supervision Necessary for Microbiological Testing in Accordance with AWWA C-651, Complete For
4 100% Lump
Sum
Furnish All Materials, Equipment, Tools, Labor &
Supervision Necessary for Pressure Testing of All
Proposed Water Pipe, Including Any Necessary
Repairs, Complete For $ $
5 100% Lump
Sum
Furnish All Materials, Equipment, Tools, Labor &
Supervision Necessary for Flushing All Proposed
Water Pipe, Complete For $ $
6 2 Each Furnish All Materials, Equipment, Tools, Labor &
Supervision for Connecting to Existing 8"
Waterline, Complete For $ $
7 2 Each Furnish All Materials, Equipment, Tools, Labor &
Supervision Required to Cut and Cap Existing 8"
Waterline, Complete For $ $
8 155 Linear
Foot
Furnish and Install 16" Diameter Steel Encasement by Open Cut, Complete For $ $
9 310 Linear
Foot
Furnish and Install 8" Diameter DR18 C900 PVC
Waterline, Including Thrust Restraints, Complete
For $ $
10 5 Each Furnish and Install Ductile Iron Fitting (90°, 45°, 22.5°, 11.25° Bend), 8-inch Diameter, Complete
For $ $
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
PART B Page 4 of 8 04/15/2026
PART B: PEPPER CREEK (PWSC) WATER
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
TEMPLE, TEXAS
11 1 Each Furnish and Install 8" x 8" Tee, Including All
Required Appurtenances, Complete For $ $
12 1 Each Furnish and Install 8" Gate Valve and Valve Box, Complete For $ $
13 1 Each Furnish and Install 8" Cap, Complete For $ $
PART B: BID AMOUNT (ITEMS 1 to 13)
PART B Page 5 of 8 04/15/2026
PART C: PEPPER CREEK WASTEWATER
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
1 100% Lump
Sum
Submit Trench Safety Plan prepared and signed by
P.E., in Conformance with State Law and OSHA, Complete For $ $
2 1,975 Linear
Foot
Implement and Follow Trench Safety Plan (Pipes), Complete For $ $
3 6,800 Square
Foot
Implement and Follow Trench Safety Plan
(Manholes/Bore Pits), Complete For $ $
4 430 Linear
Foot
Provide All Material, Equipment, Tools, Labor &
Supervision Necessary to Perform Clean-up and
Final Grading Along Final Pipeline Route, Complete For $ $
5 100% Lump
Sum
Furnish All Materials, Equipment, Tools, Labor &
Supervision Necessary for Deflection Testing of All
Proposed Wastewater Lines, Including Any
Necessary Repairs, Complete For $ $
6 100% Lump
Sum
Furnish All Materials, Equipment, Tools, Labor &
Supervision Necessary for Vacuum Testing of All
Proposed Wastewater Manholes, Including Any
Necessary Repairs, Complete For $ $
7 100% Lump
Sum
Furnish All Materials, Equipment, Tools, Labor &
Supervision Necessary for Air Testing of All
Proposed Wastewater Lines, Including Any
Necessary Repairs, Complete For $ $
8 1 Each Provide All Materials, Equipment, Tools, Labor &
Supervision Necessary to Connect Proposed
Wastewater Line to Existing Manhole, Complete
For $ $
9 1,975 Linear
Foot
Furnish and Install 10" Diameter PVC SDR-26
D3034 Wastewater Line, Complete For $ $
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
PART C Page 6 of 8 04/15/2026
PART C: PEPPER CREEK WASTEWATER
Total
Item Final Unit Amount
No. Quantity Unit Description Price (in numerals)
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
TEMPLE, TEXAS
10 90 Linear
Foot
Furnish & Install 18" Steel Encasement By Open
Cut, Complete For $ $
11 6 Each Furnish and Install 4' Diameter Manhole, Complete
For $ $
12 30 Linear
Foot
Remove and Replace Concrete Driveway, Complete
For $ $
PART C: BID AMOUNT (ITEMS 1 to 12)
PART C Page 7 of 8 04/15/2026
BID SUMMARY
TOTAL BID (PART A): $
TOTAL BID (PART B): $
TOTAL BID (PART C): $
TOTAL BASE BID: $
PEPPER CREEK DRAINAGE CHANNEL AND WASTEWATER NORTH OF THE OUTER LOOP
TEMPLE, TEXAS
SUMMARY SHEET Page 8 of 8 04/15/2026
BID BOND
Bidders must submit a 5% bid bond with their bid. Bidders are encouraged to use the City’s attached bid bond form for this purpose. The City may reject bids which include bid bonds submitted on something other than the City’s form if it determines in its sole discretion that the bid bond does not provide the same level of protection as the City’s bid bond form provides.
BID BOND
THE STATE OF TEXAS § SURETY'S NO. ___________
COUNTY OF §
KNOW ALL MEN BY THESE PRESENTS, THAT
(hereinafter called the Principal), as Principal, and
(hereinafter called the Surety), as Surety, are bound unto the City of Temple, Texas, a home rule municipal corporation of Bell County, Texas (hereinafter called Obligee) in the amount
DOLLARS ($ ), for the payment whereof said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a Bid to enter into a certain written Contract with the
City of Temple for the construction of the following:
PEPPER CREEK DRAINAGE CHANNEL & WASTEWATER
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully, enter into such written Contract, then this obligation shall be void;
otherwise, to remain in full force and effect.
IT IS EXPRESSLY UNDERSTOOD AND AGREED that if said Principal should withdraw its
Bid any time after such Bid is opened and before official rejection of such Bid or, if successful in securing the award thereof, said Principal should fail to enter into the Contract and furnish satisfactory Performance Bond and Payment Bond, the Obligee, in either of such events, shall be entitled and is hereby given the right to collect the full amount of this Bid Bond as liquidated damages.
PROVIDED, further that if any legal action be filed upon this Bond, venue shall lie in Bell
County, Texas.
IN WITNESS WHEREOF, the said Principal and Surety do sign and seal this instrument, this day of , 2026.
Principal/Contractor Surety
By
Address
By ________
Address ________
NOTE: Attach Power of Attorney
BOND REQUIREMENT AFFIDAVIT
PLEASE HAVE YOUR BOND AGENT COMPLETE THE FOLLOWING BOND
REQUIREMENT AFFIDAVIT FORM AND RETURN IT WITH YOUR BID
CITY OF TEMPLE, TEXAS
BOND REQUIREMENT AFFIDAVIT
I, the undersigned Agent/Broker, certify that the bond requirements contained in this bid document have been reviewed by me with the below identified Contractor. If the below identified Contractor is awarded this contract by the City of Temple, I will be able to, within thirty (30) days after being notified of such award, furnish valid bonds and appropriate “power of attorney” to the City meeting all of the requirements defined in this bid.
Agent (Signature) Agent (Print)
Name of Agency/Broker:
Address of Agent/Broker:
City/State/Zip:
Agent/Broker Telephone Number:
CONTRACTOR’S NAME:
(Print or Type)
To Be Completed by Appropriate Insurance Agent
NOTE TO AGENT/BROKER
If this requirement is not met, the City has the right to reject this bid and award the contract to another contractor meeting the specifications. If you have any questions concerning these bond requirements, please contact the Risk Manager for the City of Temple at (254) 298-5674. If you have questions concerning the bid, please contact the Director of Purchasing for the City of Temple at (254) 298-5655.
CONFLICT OF INTEREST QUESTIONNAIRE
See General Instructions to Bidders, Item 24, for information regarding when it is necessary to complete and submit this form.
For vendor doing business with local governmental entity
FORM CIQ
OFFICE USE ONLY
Date Received
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session.
This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the vendor meets requirements under Section 176.006(a).
By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7th business day after the date the vendor becomes aware of facts that require the statement to be filed. See Section 176.006(a-1), Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this section is a misdemeanor.
1 Name of vendor who has a business relationship with local governmental entity.
Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which you became aware that the originally filed questionnaire was incomplete or inaccurate.)
3 Name of local government officer about whom the information is being disclosed.
Name of Officer
4 Describe each employment or other business relationship with the local government officer, or a family member of the officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer.
Complete subparts A and B for each employment or business relationship described. Attach additional pages to this Form CIQ as necessary.
A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income, other than investment income, from the vendor?
Yes No
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer or a family member of the officer AND the taxable income is not received from the local governmental entity?
Yes No
5 Describe each employment or business relationship that the vendor named in Section 1 maintains with a corporation or other business entity with respect to which the local government officer serves as an officer or director, or holds an
Check this box if the vendor has given the local government officer or a family member of the officer one or more gifts as described in Section 176.003(a)(2)(B), excluding gifts described in Section 176.003(a-1).
Signature of vendor doing business with the governmental entity Date ownership interest of one percent or more.
Form provided by Texas Ethics Commission www.ethics.state.tx.us Revised 1/1/2021
Revised 1/1/2021Form provided by Texas Ethics Commission www.ethics.state.tx.us
For vendor doing business with local governmental entity
A complete copy of Chapter 176 of the Local Government Code may be found at http://www.statutes.legis.state.tx.us/ Docs/LG/htm/LG.176.htm. For easy reference, below are some of the sections cited on this form.
Local Government Code § 176.001(1-a): "Business relationship" means a connection between two or more parties based on commercial activity of one of the parties. The term does not include a connection based on:
(A) a transaction that is subject to rate or fee regulation by a federal, state, or local governmental entity or an agency of a federal, state, or local governmental entity;
(B) a transaction conducted at a price and subject to terms available to the public; or
(C) a purchase or lease of goods or services from a person that is chartered by a state or federal agency and that is subject to regular examination by, and reporting to, that agency.
Local Government Code § 176.003(a)(2)(A) and (B):
(a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if:
(2) the vendor:
(A)…