Heat Pump Replacement Project Summary
This is a comprehensive set of technical drawings and specifications for a heat pump replacement project issued by the Board of Education of School District U-46 in Kane County, Illinois for Fox Meadow Elementary School located at 1275 Jenna Drive, South Elgin, Illinois 60177. The project, designated as Project No. 728-26, involves the complete replacement of the existing heat pump systems and all associated mechanical, electrical, and fire protection work throughout the facility. The scope includes disconnection and removal of existing equipment, installation of new roof-top units, fan-powered boxes with hot water reheat coils, condensing units, boiler systems, circulation pumps, cabinet heaters, ductwork, piping, electrical circuits, lighting controls, and fire alarm components. The drawings are dated February 2, 2026 and include 100% design documents prepared by MSA (Mechanical Systems Associates) with office located at 111 S. Virginia Street, Crystal Lake, Illinois 60014. The project encompasses mechanical demolition across two floors, installation of new ventilation systems with variable air volume capabilities, multiple roof-top units (RT-1 through RT-5), and comprehensive electrical and controls integration with the existing building management system.
The drawings indicate that roof-top units, curbs, and vision screens are being pre-purchased by the owner, with the mechanical contractor responsible for receiving, unloading, inspecting, craning into place, making modifications, and completing all final connections. The project requires coordination with an approved roofing contractor (Elens & Maichin Roofing and Sheet Metal, Inc., 815-727-2689) to maintain existing roof warranties. All work must comply with the 2021 International Energy Conservation Code, 2023 National Electrical Code, and Illinois Building Code requirements. The contractor is responsible for all permitting, fees, licenses, and approvals at its own expense. Submittals required include equipment specifications, operation and maintenance manuals, shop drawings, flushing and disinfection reports, as-built drawings, training schedules, and itemized deficiency lists prior to final inspection. The contractor must guarantee all work and materials for two years after final acceptance and provide manufacturer-certified operating technician instruction within 90 days of certificate of occupancy issuance. No specific bid due date, contract award date, or pricing information is included in these technical design documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
COVER SHEET
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
FEBRUARY 2, 2026
AutoCAD SHX Text
%%UDRAWINGS INDEX:
AutoCAD SHX Text EFO-MD1.1 - FIRST FLOOR PLAN - AREA A - MECHANICAL DEMOLITION EFO-MD1.2 - FIRST FLOOR PLAN - AREA B - MECHANICAL DEMOLITION EFO-MD1.3 - ENLARGED BOILER ROOM PLAN - MECHANICAL DEMOLITION EFO-MD2.1 - SECOND FLOOR PLAN - MECHANICAL DEMOLITION EF0-M0.0 - MECHANICAL NOTES EFO-MV1.1 - FIRST FLOOR PLAN - AREA A - MECH. VENTILATION NEW WORK EFO-MV1.2 - FIRST FLOOR PLAN - AREA B - MECH. VENTILATION NEW WORK EFO-MV2.1 - SECOND FLOOR PLAN - MECH. VENTILATION NEW WORK EFO-MH1.1 - FIRST FLOOR PLAN - AREA A - MECH. PIPING NEW WORK EFO-MH1.2 - FIRST FLOOR PLAN - AREA B - MECH. PIPING NEW WORK EFO-MH1.3 - ENLARGED BOILER ROOM PLAN - MECHANICAL NEW WORK EFO-MH2.1 - SECOND FLOOR PLAN - MECH. PIPING NEW WORK EFO-M2.2 - MECHANICAL ROOF PLAN EFO-M3.0 - MECHANICAL EQUIPMENT SCHEDULES EFO-M3.1 - MECHANICAL EQUIPMENT SCHEDULES EFO-M4.0 - MECHANICAL DETAILS & SYMBOLS LIST EFO-M4.1 - MECHANICAL DETAILS EFO-FP1.1 - FIRST FLOOR PLAN - AREA A - FIRE PROTECTION EFO-FP1.2 - FIRST FLOOR PLAN - AREA B - FIRE PROTECTION EFO-FP2.1 - SECOND FLOOR PLAN - FIRE PROTECTION EFO-ED1.0 - ELECTRICAL DEMOLITION NOTES EFO-ED1.1 - FIRST FLOOR PLAN - AREA A - ELECTRICAL DEMOLITION EFO-ED1.2 - FIRST FLOOR PLAN - AREA B - ELECTRICAL DEMOLITION EFO-ED2.1 - SECOND FLOOR PLAN - ELECTRICAL DEMOLITION EFO-ED4.1 - FIRST FLOOR PLAN - AREA A - LIGHTING DEMOLITION EFO-ED4.2 - FIRST FLOOR PLAN - AREA B - LIGHTING DEMOLITION EFO-ED4.3 - SECOND FLOOR PLAN - ELECTRICAL DEMOLITION EFO-E1.0 - ELECTRICAL SYMBOLS, GENERAL, AND NEW WORK NOTES EFO-E1.1 - FIRST FLOOR PLAN - AREA A - ELECTRICAL NEW WORK EFO-E1.2 - FIRST FLOOR PLAN - AREA B - ELECTRICAL NEW WORK EFO-E2.1 - SECOND FLOOR PLAN - ELECTRICAL NEW WORK EFO-E3.1 - ROOF PLAN - AREA A - ELECTRICAL NEW WORK EFO-E3.2 - ROOF PLAN - AREA B - ELECTRICAL NEW WORK EFO-E3.3 - ELECTRICAL DETAILS EFO-E4.1 - FIRST FLOOR PLAN - AREA A - LIGHTING NEW WORK EFO-E4.2 - FIRST FLOOR PLAN - AREA B - LIGHTING NEW WORK EFO-E4.3 - SECOND FLOOR PLAN - LIGHTING NEW WORK EFO-E5.0 - FIRE ALARM SYSTEM NOTES AND DETAILS EFO-E5.1 - FIRE ALARM SYSTEM RISER DIAGRAM EFO-E6.0 - ELECTRICAL RISER DIAGRAM EFO-E6.1 - ELECTRICAL SCHEDULES EFO-E6.2 - FIRST FLOOR PLAN - AREA A - CORRIDOR LIGHT ZONING PLAN EFO-E6.3 - SECOND FLOOR PLAN - CORRIDOR LIGHT ZONING PLAN EFO-E6.4 - LIGHTING CONTROL SCHEDULE AND NOTES EFO-A0.0 - GENERAL TRADE PLAN NOTES & SITE PLAN EFO-A1.1 - FIRST FLOOR PLAN - AREA A EFO-A1.2 - FIRST FLOOR PLAN - AREA B EFO-A2.1 - SECOND FLOOR PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
LOCATION MAPS
AutoCAD SHX Text
FOX MEADOW ELEMENTARY SCHOOL - U-46 728-26
AutoCAD SHX Text
HEAT PUMP REPLACEMENT
AutoCAD SHX Text
EFO- G0.1
AutoCAD SHX Text
FOX MEADOW ELEMENTARY SCHOOL 1275 JENNA DR. SOUTH ELGIN, IL 60177
AutoCAD SHX Text
SCHOOL DISTRICT U46 355 EAST CHICAGO STREET ELGIN, IL 60120
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
FIRST FLOOR PLAN -
AREA A - MECHANICAL
DEMOLITION
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
J.C.
CLASSROOM
CLASSROOM
T7
BOY'S
T8
GIRL'S
133B
CONFERENCE
KITCHEN
OFFICE
133A
PRINCIPAL
KINDERGARTEN
KINDERGARTEN
OUTDOOR
STORAGE
GYMNASIUM
OFFICE
STORAGE STORAGE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
T1
WOMEN'S
T2
MEN'S
102A
TOILET
103A
TOILET
133E
TOILET
TOILET
T5
BOY'S
T6
GIRL'S
T3
BOY'S
T4
GIRL'S
STAIR
BOILER
ELEC.
PLANNING AREA
PLANNING AREA
PLANNING AREA
115B
STORAGE B
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
VESTIBULE
VESTIBULE
D
STORAGE
102B
STORAGE
103B
STORAGE
115A
STORAGE
LOBBY
133C
ASSISTANT
PRINCIPAL
133D
ASSISTANT
PRINCIPAL
120C
GYM
STORAGE
120B
GYM
OFFICE
120A
REC.
OFFICE
120D
SPRINKLER
115D
ELEV.
EQUIP.
MAIL/CLERICAL
C
GENERAL
STORAGE
COMMONS
A
DATA/
STORAGE
OFFICE
OFFICE
SPEECH
THERAPY
103C
PLANNING AREA
DISCONNECT & REMOVE EXISTING HEAT PUMP, CONTROLS, T-STAT, CONDENSATE DRAIN PIPING, CONDENSATE RECEIVER & RELATED APPURTENANCES COMPLETE. REMOVE ALL SWS & SWR PIPING, VALVES & HANGERS. CUT & REMOVE DISCHARGE DUCTWORK AT RECONNECTION POINT. DUCTWORK DOWNSTREAM TO DIFFUSERS TO
REMAIN.
SEE ENLARGED BOILER
ROOM PLAN.
UP
U
UP
DISCONNECT & REMOVE ALL EXISTING SUPPLY AIR DIFFUSERS AND RETURN AIR GRILLES. DISCONNECT & REMOVE EXISTING FLEX DUCTWORK AND PORTION OF DUCTWORK BACK TO RECONNECTION POINT.
VERIFY EXISTING DUCTWORK ROUTING & SIZES IN FIELD. THOROUGHLY CLEAN DUCTWORK AND MODIFY FOR RECONNECTION TO NEW DIFFUSERS. ANY PORTION OF INSULATION DAMAGED SHALL BE REPLACED WITH NEW
PER SPECIFICATION.
DISCONNECT & REMOVE EXISTING SUPPLY AIR DUCTWORK FROM DEMO ROOF TOP UNIT, DAMPERS & RELATED APPURTENANCES COMPLETE. SAW-CUT CHASE AS REQUIRED. SEAL, PATCH & PAINT WALLS TO MATCH
EXISTING.
DISCONNECT & REMOVE ALL EXISTING SWS & SWR PIPING IN THE ENTIRE BUILDING, VALVES, HANGERS, RISERS UP TO FLOOR ABOVE & RELATED APPURTENANCES COMPLETE. VERIFY ALL PIPING ROUTING IN FIELD.
DISCONNECT & REMOVE ALL EXISTING SUPPLY AIR DIFFUSERS, RETURN AIR GRILLES AND ALL EXISTING
DUCTWORK IN THIS ROOM COMPLETE.
DISCONNECT & REMOVE EXISTING CABINET HEATER, CONTROLS, T-STAT, WIRING, ALL BRANCH HOT WATER SUPPLY & RETURN PIPING, VALVES & RELATED APPURTENANCES COMPLETE. REMOVE BRANCH PIPING BACK TO
MAINS AND CAP. SEAL, PATCH & PAINT WALLS TO MATCH EXISTING.
AutoCAD SHX Text
%%UFIRST FLOOR PLAN - AREA A - MECHANICAL DEMOLITION
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
EFO- MD1.1
AutoCAD SHX Text
%%UKEY PLAN
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
%%UMECHANICAL DEMOLITION PLAN NOTES
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text 1"
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
SWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
SWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text 4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text T
AutoCAD SHX Text 1"
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1"
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 4"
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text T
AutoCAD SHX Text 2"
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AREA B - MECHANICAL
DEMOLITION
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
121A
TOILET
122A
TOILET
T10
GIRL'S
T9
BOY'S
STAIR
STAIR
PLANNING
AREA
PLANNING
AREA
CLASSROOM
CLASSROOM
CLASSROOM
MECH.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
VESTIBULE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
STOR.
STOR.
J.C.
CLASSROOM
COURTYARD
UP
UP
DISCONNECT & REMOVE EXISTING HEAT PUMP, CONTROLS, T-STAT, CONDENSATE DRAIN PIPING, CONDENSATE RECEIVER & RELATED APPURTENANCES COMPLETE. REMOVE ALL SWS & SWR PIPING, VALVES & HANGERS. CUT & REMOVE DISCHARGE DUCTWORK AT RECONNECTION POINT. DUCTWORK DOWNSTREAM TO DIFFUSERS TO
REMAIN. DISCONNECT & REMOVE SUPPLY INLET FROM MAKE-UP AIR UNIT & RETURN DUCT.
DISCONNECT & REMOVE ALL EXISTING SUPPLY AIR DIFFUSERS AND RETURN AIR GRILLES. DISCONNECT & REMOVE EXISTING FLEX DUCTWORK AND PORTION OF DUCTWORK BACK TO RECONNECTION POINT.
VERIFY EXISTING DUCTWORK ROUTING & SIZES IN FIELD. THOROUGHLY CLEAN DUCTWORK AND MODIFY FOR RECONNECTION TO NEW DIFFUSERS. ANY PORTION OF INSULATION DAMAGED SHALL BE REPLACED WITH NEW
PER SPECIFICATION.
DISCONNECT & REMOVE EXISTING SUPPLY AIR DUCTWORK FROM DEMO ROOF TOP UNIT, DAMPERS & RELATED APPURTENANCES COMPLETE. SAW-CUT CHASE AS REQUIRED. SEAL, PATCH & PAINT WALLS TO MATCH
EXISTING.
DISCONNECT & REMOVE ALL EXISTING SWS & SWR PIPING IN THE ENTIRE BUILDING, VALVES, HANGERS, RISERS UP TO FLOOR ABOVE & RELATED APPURTENANCES COMPLETE. VERIFY ALL PIPING ROUTING IN FIELD.
DISCONNECT & REMOVE ALL EXISTING SUPPLY AIR DIFFUSERS, RETURN AIR GRILLES AND ALL EXISTING
DUCTWORK IN THIS ROOM COMPLETE.
DISCONNECT & REMOVE EXISTING MAKE-UP AIR UNIT, CONTROLS, HANGERS, ALL DUCTWORK, GOOSENECK ON ROOF, ROOF CURB, DAMPERS & RELATED APPURTENANCES COMPLETE. SEAL & PATCH OPENINGS WEATHER TIGHT TO MATCH EXISTING. ALL ROOFING WORK MUST BE PERFORMED BY CERTIFIED ROOFING CONTRACTOR
APPROVED BY THE OWNER.
TO DO SO AT THE OWNER'S CONVENIENCE DURING OFF HOURS. CONTRACTOR
SHALL EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL SUPPORTING
EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE INSTALLED AND
CONTRACTOR SHALL INSPECT THE PREMISES AND MAKE A DETAILED
CONTRACTOR SHALL ADAPT HIS WORK TO MEET ALL ACTUAL CONDITIONS ON
EXISTING DUCTS, PIPES, CONDUITS AND BEAMS NOT SHOWN ON PLANS.
AS POSSIBLE, CONTRACTOR SHALL ADJUST HIS WORK AS REQUIRED TO AVOID
EXISTING BUILDING HAS BEEN INDICATED ON THE DRAWINGS AS ACCURATELY
WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN THE
MIGHT HAVE BEEN REASONABLY FORESEEN BY AN INSPECTION OF THESE
PRIOR TO BIDDING. NO EXTRAS WILL BE ALLOWED FOR WORK WHICH
SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH ACTUAL JOB CONDITIONS
THE CONTRACTORS SHALL VISIT AND INSPECT THE EXISTING BUILDING AND
INTERFERED WITH, CONTRACTOR SHALL REROUTE AND RECONNECT ALL SUCH
MECHANICAL EQUIPMENT IN AREA OF EXISTING BUILDING NOT BE ALTERED IS
WHERE THE EXISTING PIPING, CONDUIT OR DUCTWORK SERVING ANY EXISTING
ALL CUTTING AND PATCHING AS REQUIRED FOR WORK TO BE BY THE CONTRACTOR.
COORDINATE WORK WITH OTHER TRADES TO AVOID CONFLICTS AND DELAYS.
THE EXISTING PREMISES.
BEAMS, ETC.
PREMISES.
3.
2.
NOTES RE: INSPECTING EXISTING BUILDING
PIPES OR DUCTWORK WITH PRIOR APPROVAL FROM ENGINEER.
SHALL PROVIDE OWNER ADVANCE NOTICE IN WRITING MINIMUM 3 BUSINESS DAYS
1.
8.
REFER TO SPECIFICATIONS.
6.
7.
VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE EXISTING
RECONNECT SUCH ITEMS IN PROPER OPERATING CONDITION AT NEW LOCATIONS.
INTERFERED WITH, OBSTRUCT OR ARE OBSTRUCTED BY THESE ALTERATIONS.
MATERIALS, AND ALL OTHER MECHANICAL ITEMS WHICH INTERFERE OR ARE
DISCONNECT, REMOVE OR RELOCATE EXISTING MECHANICAL EQUIPMENT,
OBSOLETE BY THESE ALTERATIONS AND ADDITIONS. THESE ARE THE PROPERTY
EQUIPMENT AND ALL OTHER MECHANICAL ITEMS WHICH ARE RENDERED
DISCONNECT AT SOURCE AND REMOVE EXISTING ELECTRICAL MATERIALS AND
AND ELECTRICAL ITEMS AND EQUIPMENT, BOTH NEW AND EXISTING, AS MAY
MAKE NECESSARY MODIFICATIONS AND ADJUSTMENTS TO ALL MECHANICAL
FROM PERFORMING THE WORK REQUIRED UNDER THIS CONTRACT.
BIDDING. FAILURE TO DO SO SHALL NOT RELIEVE CONTRACTOR
THE CONTRACTOR SHALL CONSULT WITH THE OWNER AND MAKE ARRANGEMENTS
IF IT IS ABSOLUTELY NECESSARY TO SHUT DOWN THE FACILITY AT ANY TIME,
BUILDING IN MECHANICAL OPERATION AT ALL TIMES DURING OCCUPIED PERIOD.
NOTES RE: EXISTING CONDITIONS
BE REQUIRED BY THESE ALTERATIONS AND ADDITIONS.
5.
4.
2.
3.
1.
PRIOR TO SHUT DOWN.
INDICATES EXISTING TO REMAIN.
INDICATES EXISTING TO BE DISCONNECTED
AND REMOVED.
EXISTING TO REMAIN.E.T.R.
IN WORKING CONDITION TO THE OWNER'S STOCK AT THE DISCRETION OF THE
OF THE OWNER AND SHALL EITHER BE REMOVED FROM THE SITE OR RETURNED
OWNER.
WITH OWNER.
OF ALL SYSTEMS REQUIRED FOR EXECUTION OF WORK. COORDINATE PROCEDURES
CONTRACTOR IS RESPONSIBLE FOR ISOLATING, DRAINING, REFILLING & VENTING 9.
CLEARANCE REQUIRED PRIOR TO BIDDING. CONTRACTOR SHALL BE RESPONSIBLE
TO THE ATTENTION OF THE ARCHITECT ANY LACK OF ANY NECESSARY SPACE OR
CONTRACTOR AFTER INSPECTING THE PREMISES AND THE DRAWINGS SHALL CALL
FOR ALL NECESSARY CHANGES IF HE NEGLECTS TO DO SO.
4.
DISCONNECT & REMOVE EXISTING RELIEF AIR HOOD, DAMPERS, CONTROLS, ALL DUCTWORK, ROOF CURB & RELATED APPURTENANCES COMPLETE. SEAL & PATCH OPENINGS WEATHER TIGHT TO MATCH EXISTING.
ALL ROOFING WORK MUST BE PERFORMED BY CERTIFIED ROOFING CONTRACTOR APPROVED BY THE OWNER.
DISCONNECT & REMOVE EXISTING CABINET HEATER, CONTROLS, T-STAT, WIRING, ALL BRANCH HOT WATER SUPPLY & RETURN PIPING, VALVES & RELATED APPURTENANCES COMPLETE. REMOVE BRANCH PIPING BACK TO
MAINS AND CAP. SEAL, PATCH & PAINT WALLS TO MATCH EXISTING.
AutoCAD SHX Text
%%UFIRST FLOOR PLAN - AREA B - MECHANICAL DEMOLITION
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
EFO- MD1.2
AutoCAD SHX Text
%%UKEY PLAN
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text T
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text T
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 4"
AutoCAD SHX Text 1"
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1"
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 2"
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text 1"
AutoCAD SHX Text T
AutoCAD SHX Text 1"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 1"
AutoCAD SHX Text T
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text 2"
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
%%UMECHANICAL DEMOLITION PLAN NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL MECHANICAL
AutoCAD SHX Text
%%UDEMOLITION NOTES:
AutoCAD SHX Text
%%ULEGENDS:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1"
4"
4"
1-1/4"
1" HWS & HWR UP
TO UNIT HEATER
ON FLOOR ABOVE
TO REMAIN.
VERIFY IN FIELD.
OUTDOOR
STORAGE
BOILER
ELEC.
CORRIDOR
ENLARGED BOILER
ROOM PLAN - MECH.
DEMOLITION
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
DISCONNECT & REMOVE EXISTING GAS FIRED, HOT WATER BOILER COMPLETE INCLUDING ALL CONTROLS, PANELS AND PIPING. BREAK UP
AND REMOVE ALL EXISTING CONCRETE PADS. PATCH AND LEVEL FLOOR TO MATCH EXISTING.
DISCONNECT & REMOVE ALL EXISTING GAS PIPING, VALVES, HANGERS FROM BOILERS BACK TO MAIN PIPING AND CAP. REMOVE RELATED GAS VENT OUT TO EXTERIOR COMPLETE. SEAL & PATCH OPENINGS WEATHER TIGHT TO MATCH EXISTING.
DISCONNECT & REMOVE EXISTING BREACHING AND FLUE FROM BOILERS UP THRU ROOF COMPLETE. SEAL & PATCH FLOOR AND ROOF OPENINGS WEATHER TIGHT TO MATCH EXISTING. ALL ROOFING WORK MUST BE PERFORMED BY CERTIFIED ROOFING CONTRACTOR
APPROVED BY THE OWNER.
DISCONNECT & REMOVE EXISTING BASE MOUNTED CIRCULATION PUMPS COMPLETE, INCLUDING CONCRETE PADS AND INERTIA BASE, PIPING SPECIALTIES, VALVES AND CONTROLS COMPLETE.
DISCONNECT & REMOVE EXISTING AIR SEPARATOR COMPLETE INCLUDING HANGERS, VALVE AND PIPING COMPLETE.
DISCONNECT & REMOVE EXISTING EXPANSION TANKS, VALVES, AND PIPING COMPLETE.
DISCONNECT & REMOVE ALL EXISTING SWS & SWR PIPING, VALVES, HANGERS, RISERS UP TO FLOOR ABOVE & RELATED APPURTENANCES
COMPLETE. VERIFY ALL PIPING ROUTING IN FIELD.
DISCONNECT & REMOVE EXISTING BOILER FEED WATER PIPING, VALVES, CHEMICAL FILTRATION AND SPECIALTIES COMPLETE BACK TO POINT
OF RECONNECTION.
EXISTING COMBUSTION AIR LOUVER TO REMAIN. DISCONNECT & REMOVE EXISTING DUCT, DAMPERS, CONTROLS AND ALL RELATED
APPURTENANCES COMPLETE.
DISCONNECT & REMOVE EXISTING HEAT EXCHANGER, ALL PIPING, VALVES, HANGERS & RELATED APPURTENANCES COMPLETE.
DISCONNECT & REMOVE EXISTING HWS & HWR PIPING, VALVES, HANGERS FROM BOILERS & RELATED APPURTENANCES COMPLETE BACK TO
RECONNECTION POINTS. VERIFY ALL PIPING ROUTING, SIZES & TYPES IN FIELD.
DISCONNECT & REMOVE ALL EXISTING PIPING, VALVES, HANGERS SERVING DEMO COOLING TOWER, PUMPS, MAKE-UP WATER, METER, DRAIN & RELATED APPURTENANCES COMPLETE. VERIFY ALL PIPING ROUTING, SIZES & TYPES IN FIELD. SEAL & PATCH FLOOR AND ROOF OPENINGS WEATHER TIGHT TO MATCH EXISTING. ALL ROOFING WORK MUST BE PERFORMED BY CERTIFIED ROOFING CONTRACTOR APPROVED BY THE
OWNER.
E.T.R.
E.T.R.
E.T.R.
E.T.R.
E.T.R. E.T.R.
EXISTING INCOMING
GAS SERVICE TO
REMAIN.
EXISTING GAS UP TO
EMERGENCY
GENERATOR & DOM.
HOT WATER HEATER
ON FLOOR ABOVE TO
REMAIN.
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
%%UENLARGED BOILER ROOM PLAN - MECHANICAL DEMOLITION
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text
EFO- MD1.3
AutoCAD SHX Text
%%UKEY PLAN
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
%%UMECHANICAL DEMOLITION PLAN NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
SECOND FLOOR PLAN -
MECHANICAL
DEMOLITION
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
OPEN TO
GYMNASIUM
BELOW
STAIR
STAIR
STAIR
LEARNING CENTER
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
T14
BOY'S
T13
GIRL'S
T12
TOILET
e
STORAGE
F
DATA/
STORAGE
T16
BOY'S
T15
GIRL'S
T17
BOY'S
T18
GIRL'S
J.C. T19
TOILET
PLANNING
AREA
PLANNING
AREA
ART
MUSIC BAND
TEACHER'S LOUNGE
215B
TOILET
202A
ART
OFFICE
202B
ART
STORAGE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
MECH.
COOLING
TOWER
STORAGE STORAGE
217A
STORAGE
G
DATA/
STORAGE
217B
DATA/
STORAGE
PLANNING
AREA
READING
ROOM
COMPUTER LAB
217C
OFFICE
214A
MUSIC
OFFICE
ORCHESTRA
215A
TEL.
DN.
DN.
DN.
DISCONNECT & REMOVE EXISTING HEAT PUMP, CONTROLS, T-STAT, CONDENSATE DRAIN PIPING, CONDENSATE RECEIVER & RELATED APPURTENANCES COMPLETE. REMOVE ALL SWS & SWR PIPING, VALVES & HANGERS. CUT & REMOVE DISCHARGE DUCTWORK AT RECONNECTION POINT. DUCTWORK DOWNSTREAM TO DIFFUSERS TO
REMAIN.
DISCONNECT & REMOVE ALL EXISTING SUPPLY AIR DIFFUSERS AND RETURN AIR GRILLES. DISCONNECT & REMOVE EXISTING FLEX DUCTWORK AND PORTION OF DUCTWORK BACK TO RECONNECTION POINT.
VERIFY EXISTING DUCTWORK ROUTING & SIZES IN FIELD. THOROUGHLY CLEAN DUCTWORK AND MODIFY FOR RECONNECTION TO NEW DIFFUSERS. ANY PORTION OF INSULATION DAMAGED SHALL BE REPLACED WITH NEW
PER SPECIFICATION.
DISCONNECT & REMOVE EXISTING ROOF TOP UNIT, CONTROLS, ROOF CURB, ALL AIR DUCTWORK, DAMPERS & RELATED APPURTENANCES COMPLETE. SAW-CUT CHASE AS REQUIRED. SEAL & PATCH ROOF OPENINGS WITH STEEL DECK AND INSULATION WEATHER TIGHT AND PAINT WALLS TO MATCH EXISTING. ALL ROOFING WORK
MUST BE PERFORMED BY CERTIFIED ROOFING CONTRACTOR APPROVED BY THE OWNER.
DISCONNECT & REMOVE ALL EXISTING SWS & SWR PIPING IN THE ENTIRE BUILDING, VALVES, HANGERS, RISERS UP FROM FLOOR BELOW & RELATED APPURTENANCES COMPLETE. VERIFY ALL PIPING ROUTING IN FIELD. SEAL &
PATCH OPENINGS TO MATCH EXISTING.
DISCONNECT & REMOVE ALL EXISTING SUPPLY AIR DIFFUSERS, RETURN AIR GRILLES AND ALL EXISTING
DUCTWORK IN THIS ROOM COMPLETE.
DISCONNECT & REMOVE EXISTING COOLING TOWER, SUPPORTING FRAMES, ALL EXISTING PIPING, VALVES, HANGERS, PUMPS, MAKE-UP WATER, METER, DRAIN & RELATED APPURTENANCES COMPLETE. VERIFY ALL PIPING ROUTING, SIZES & TYPES IN FIELD. SEAL & PATCH FLOOR AND ROOF OPENINGS WEATHER TIGHT TO MATCH EXISTING. ALL ROOFING WORK MUST BE PERFORMED BY CERTIFIED ROOFING CONTRACTOR APPROVED BY THE
OWNER.
DISCONNECT & REMOVE EXISTING BOILERS FLUE UP FROM FLOOR BELOW COMPLETE. SEAL & PATCH OPENING
TO MATCH EXISTING.
DISCONNECT & REMOVE EXISTING HEAT PUMP, CONTROLS, T-STAT, CONDENSATE DRAIN PIPING, CONDENSATE RECEIVE, ALL SWS & SWR PIPING, VALVES & HANGERS, ALL SUPPLY DUCTWORK, DIFFUSERS AND RELATED
APPURTENANCES COMPLETE. EXISTING RETURN AIR GRILLES TO REMAIN FOR RECONNECTION.
DISCONNECT & REMOVE EXISTING CABINET HEATER, CONTROLS, T-STAT, WIRING, ALL BRANCH HOT WATER SUPPLY & RETURN PIPING, VALVES & RELATED APPURTENANCES COMPLETE. REMOVE BRANCH PIPING BACK TO
MAINS AND CAP. SEAL, PATCH & PAINT WALLS TO MATCH EXISTING.
AutoCAD SHX Text
%%USECOND FLOOR PLAN - MECHANICAL DEMOLITION
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
EFO- MD2.1
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
AutoCAD SHX Text N
AutoCAD SHX Text
%%UKEY PLAN
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text
ROOF
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text 3"
AutoCAD SHX Text
SWS
AutoCAD SHX Text 6"
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWR
AutoCAD SHX Text
SWS
AutoCAD SHX Text T
AutoCAD SHX Text
%%UMECHANICAL DEMOLITION PLAN NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTES
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
1. CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND VERIFYING ALL EXISTING FIELD
CONDITIONS PRIOR TO SUBMISSION OF HIS BID.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING PIPING CONDITIONS, LOCATIONS, ROUTING & SIZES.
NO EXTRA COMPENSATION WILL BE ALLOWED FOR THE CONTRACTOR FAILING TO DO SO.
B. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH PROCESS FOR ACCESSING SITE, ROOF, FLOOR AND CEILING SPACE. CONTRACTOR SHALL NOT CUT ANY OPENINGS, IN FAÇADE, ROOF, FLOORS, ETC
UNLESS COMPLETELY NECESSARY AND WITH PRIOR APPROVAL FROM THE OWNER AND ENGINEER.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCLUDING PATCHING AND REPAIR TO RETURN
TO ORIGINAL CONDITION.
2. THE CONTRACT DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND INDICATE APPROXIMATE LOCATION OF EXISTING FIXTURES, PIPING AND EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING
THE ACTUAL LOCATIONS, SIZES AND ROUTING OF THE EXISTING, PIPING, ETC.
A. CONTRACTOR SHALL REMOVE EXISTING FIXTURES, EQUIPMENT, PIPING AND MATERIALS PERTAINING TO HIS CONTRACT AS SPECIFIED OR AS REQUIRED WHETHER SHOWN ON THE DRAWINGS OR NOT, TO
PREPARE FOR THE NEW WORK. OWNER TO BE PROVIDED WITH RIGHT OF REFUSAL FOR SALVAGE
VALUE OR ATTIC STOCK. IF OWNER REFUSES CONTRACTOR SHALL REMOVE ALL DEMOLISHED
MATERIALS FROM THE SITE AND PROPERLY DISPOSE.
B. CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND EQUIPMENT AND INSTALL SAME AS REQUIRED TO
ACCOMPLISH WORK AND PROVIDE COMPLETE AND FULLY FUNCTIONING SYSTEMS.
3. CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK WITH THE WORK OF ALL OTHER TRADES AND MAKING ANY NECESSARY MODIFICATIONS TO HIS WORK AT NO ADDITIONAL COST, INCLUDING ALL OFFSETS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION OF ANY EXISTING MINOR INTERFERENCES, INCLUDING CONDUIT, HANGERS, ETC., AT NO ADDITIONAL COST.
5. CEILING SPACE IS USED AS A RETURN AIR PLENUM. ALL MATERIALS IN CEILING SPACE SHALL BE RATED FOR
RETURN AIR PLENUM PER THE ILLINOIS BUILDING CODE. COORDINATE WITH ALL TRADES.
PVC PIPING IS NOT PERMITTED IN THE CEILING SPACE.
6. ALL EQUIPMENT, MATERIALS, ETC. SHALL COMPLY WITH THE 2021 INTERNATIONAL ENERGY CONSERVATION
CODE (IECC).
7. ALL PERMITS, FEES, LICENSES, APPROVALS AND OTHER ARRANGEMENTS FOR WORK SHALL BE OBTAINED BY
THE CONTRACTOR AT HIS OWN EXPENSE.
8. SUBMITTALS
A. SUBMITTAL FIXTURES AND EQUIPMENT SPECIFICATIONS AND CUTS FOR REVIEW AND APPROVAL.
B. SUBMIT ASSEMBLED PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM
INSTALLED ALONG WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS.
C. SUBMIT ASSEMBLED PRINTED OPERATION AND MAINTENANCE MANUALS FOR DOMESTIC WATER
HEATING SYSTEMS, SUB-SYSTEMS AND EQUIPMENT INSTALLED ALONG WITH EQUIPMENT CUTS AND
CONTROL WIRING DIAGRAMS IN ACCORDANCE WITH SECTION C408.1.1 OF THE 2015 IECC.
D. SUBMIT COORDINATED SHOP DRAWINGS FOR REVIEW. THE SHOP DRAWINGS SHALL INDICATE PIPING
AND FIXTURE LOCATIONS AND MUST BE SUBMITTED PRIOR TO INSTALLATION.
E. CONTRACTOR SHALL SUBMIT FLUSHING AND DISINFECTION REPORTS REQUIRED BY OWNER FOR
APPROVAL.
F. CONTRACTOR TO SUBMIT AS-BUILT DRAWINGS FOR PIPING, INCLUDING FIXTURE LOCATIONS.
G. SUBMIT ITEMIZED DEFICIENCIES LIST PRIOR TO FINAL INSPECTION.
H. SUBMIT SCHEDULE FOR ALL REQUIRED TRAINING PRIOR TO FINAL INSPECTION.
I. SUBMIT EQUIPMENT AND CONTROL OPERATIONS AND MAINTENANCE MANUALS TO OWNER WITHIN 90
DAYS OF ISSUANCE OF CERTIFICATE OF OCCUPANCY.
11. CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIAL FOR TWO YEARS AFTER FINAL ACCEPTANCE
AGAINST ALL DEFECTS OF MATERIAL, EQUIPMENT AND WORKMANSHIP.
12. PROVIDE COMPETENT MANUFACTURER CERTIFIED OPERATING TECHNICIAN TO INSTRUCT THE OWNER IN THE OPERATION AND MAINTENANCE OF ALL INSTALLED EQUIPMENT AND TEMPERATURE CONTROLS.
TRAINING MUST BE COMPLETED WITHIN 90 DAYS OF THE ISSUANCE OF CERTIFICATE OF OCCUPANCY.
SUBMIT SCHEDULE OF TRAINING SESSIONS PRIOR TO FINAL INSPECTION.
13. PROVIDE ACCESS PANELS FOR ALL VALVES OR ANY PIECE OF EQUIPMENT WHEN NECESSARY TO LOCATE ABOVE NON-ACCESSIBLE CEILINGS. SUBJECT TO THE APPROVAL OF THE ENGINEER. NO EQUIPMENT SHALL
BE LOCATED DIRECTLY ABOVE WALLS.
14. PROVIDE ALL CORES/HOLES, OPENINGS, SLEEVES AND CAULKING FOR INSTALLATION OF THIS WORK.
CAULKING TO CONFORM TO FIRE RATING OF WALLS.
15. PROVIDE ISOLATION VALVES FOR ALL PIPING TAKE-OFFS FROM MAINS. FOR PIPING 3” AND SMALLER USE BRONZE 2-PIECE BALL VALVES. FOR PIPING 4” AND LARGER USE DUCTILE IRON BUTTERFLY VALVES.
16. PROVIDE ALL PATCHING OF FLOOR AND WALLS AND PAINTING OF WALLS TO MEET REQUIREMENTS IN
ARCHITECTURAL DRAWINGS AND SPECIFICATIONS.
17. PIPING SHALL RUN ABOVE CEILING AND CLEAR ANY EXISTING PIPING, LIGHTING FIXTURES, DUCTS, EQUIPMENT, ETC.
18. DISRUPTION OF ANY EXISTING SERVICE SHALL BE COORDINATED WITH THE OWNER AND SHALL BE PERFORMED AT A TIME AND MANNER SO AS TO CAUSE THE OWNER A MINIMUM OF INCONVENIENCE. NOTIFY
OWNER IN WRITING 5 BUSINESS DAYS PRIOR TO DISRUPTION OF SERVICE.
19. IN ALL CASES WHERE COPPER PIPE CONNECTIONS ARE MADE TO PIPING OR ANY ITEMS OF EQUIPMENT OF
DISSIMILAR METAL, PROVIDE DIELECTRIC FITTINGS.
20. PROVIDE AND INSTALL VALVE TAGS AND PIPE LABELS. SUBMIT PROPOSED VALVE TAG AND LABELING NOMENCLATURE FOR REVIEW. PROVIDE OWNER WITH VALVE SCHEDULE IN FORMAT DETERMINED BY
OWNER.
21. COORDINATE ALL ROOFING WORK AND ROOF PENETRATIONS WITH CERTIFIED ROOFING CONTRACTOR APPROVED BY OWNER. SEAL & PATCH ROOF WATERTIGHT TO MATCH EXISTING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
22. ALL PIPING PENETRATIONS THROUGH WALLS SHALL BE CORED AND SLEEVED TO ALLOW INSULATION TO
CONTINUE THROUGH WALL.
FURNISH & INSTALL FAN POWERED BOX AND CONNECT TO EXISTING SUPPLY AIR DUCTWORK FEEDING NEW DIFFUSERS. PROVIDE WITH TRANSITION. ALL EXISTING DUCTWORK SHALL BE THOROUGHLY CLEANED PRIOR TO CONNECTING TO FPB. REINSULATE ANY PART OF EXISTING DUCTWORK MISSING INSULATION. VERIFY EXACT FAN POWERED BOX LOCATION IN FIELD. SUPPORT BOX FROM TOP CHORD OF STRUCTURE WITH ISOLATED HANGERS. BOX SHALL HAVE SOUND ATTENUATOR ON R.A. OPENING. RUN NEW 3/4" HWS & HWR BRANCH PIPING TO CONNECT TO EACH FPB. SEE VALVES & DUCTWORK DETAILS IN
EFO-M4.0 AND M4.1. CORE WALLS FOR NEW PENETRATIONS.
REPLACE EXISTING SUPPLY DIFFUSERS AND RETURN AIR REGISTERS WITH NEW. BALANCE AIR
FLOW AT EACH SUPPLY AIR DIFFUSER & RETURN REGISTER TO AIR VOLUMES INDICATED. PROVIDE
BALANCING DAMPERS AT EACH DUCT TAKE-OFF. PROVIDE WITH NEW DUCT CONNECTION TO NEW
DIFFUSERS AND NEW RETURN/RELIEF AIR DUCT PER DETAIL ON EFO-M4.0.
FURNISH & INSTALL NEW WIRELESS SPACE THERMOSTAT, FPB CONTROLLER AND INCORPORATE INTO
EXISTING BMS SYSTEM. PROVIDE ALL REQUIRED INFRASTRUCTURE FOR SYSTEM INTEGRATION.
T-STAT TO BE INSTALLED AT LOCATION WHERE EXISTING WAS REMOVED. SAW-CUT WALL. PATCH &
PAINT TO MATCH ADJACENT SURFACES.
SAW-CUT EXISTING WALL/CHASE AND CORE FLOOR TO ACCOMMODATE NEW DUCTWORK. REBUILD
WALL & FLOOR. SEE EFO-M0.0 FOR NOTES. PROVIDE WITH FIRE DAMPER AT WALL AND FLOOR
PENETRATIONS .
FURNISH & INSTALL NEW MAIN DUCTWORK ABOVE CORRIDOR CEILING AS SHOWN. VERIFY EXACT DUCTWORK ROUTING IN FIELD. REROUTE & MODIFY EXISTING SUPPLY AIR DUCTWORK SUPPLYING
SPACE/ROOM DIFFUSERS.
NEW RETURN AIR DUCT DOWN INTO BUILDING FROM RT-3 TO RUN ABOVE CEILING OUT INTO OFFICE.
TERMINATE OPENING WITH WIREMESH. PROVIDE WITH FIRE DAMPER AT WALL PENETRATIONS. SAW-CUT
WALL/CHASE. PATCH & PAINT WALLS TO MATCH ADJACENT SURFACES.PROVIDE WITH LINTELS.
SUPPLY AIR AND RETURN AIR DUCT UP TO CONNECT TO ROOF TOP UNIT OPENINGS. CONFIRM SIZES WITH RTU MANUFACTURER. SAW-CUT ROOF. VERIFY EXACT LOCATION IN FIELD. SEAL & PATCH ROOF WEATHER TIGHT TO MATCH EXISTING CONSTRUCTION. PROVIDE WITH 4'-0" LONG SOUND ATTENUATOR ON SUPPLY & RETURN AIR DUCTWORK HORIZONTAL RUN. UNIT WITH RETURN AIR PLENUM SHALL COVER RETURN AIR
DUCT OPENING WITH WIREMESH.
FURNISH & INSTALL NEW HWS & HWR PIPING ABOVE CEILING TO FEED NEW FPBs. CONNECT TO EXISTING HWS & HWR MAINS. VERIFY EXACT CONNECTION INFIELD. PIPE INSULATION PER SPECIFICATION ON ALL NEW AND EXISTING PIPING. CORE WALLS AND FLOOR FOR NEW PENETRATIONS. VERIFY ALL ROUTING & PENETRATIONS IN FIELD. SEAL & PATCH WALLS AND PAINT TO MATCH EXISTING CONSTRUCTION AND
ADJACENT SURFACE.
FURNISH & INSTALL NEW CABINET HEATER & T-STAT AT LOCATIONS WHERE EXISTING WERE REMOVED.
SAW-CUT WALL AND MODIFY OPENING FOR NEW CABINET HEATER & CONNECTIONS TO EXISTING HWS & HWR PIPING. FURNISH & INSTALL NEW BALL VALVE & BALANCING VALVE ABOVE CEILING. SEAL, PATCH
& PAINT WALLS TO MATCH EXISTING CONSTRUCTION AND ADJACENT SURFACE.
EXISTING HWS & HWR PIPING TO REMAIN FOR EXTENSION & RECONNECTION. ALL PIPING SHALL BE INSULATED FOLLOWING COMPLETION OF WORK. ANY DAMAGED INSULATION SHALL BE REPLACED WITH
NEW.
EXISTING TRANSFER AIR OPENING TO REMAIN. VERIFY & CONFIRM SIZE IN FIELD. MODIFY OPENING TO ACCOMMODATE NEW DUCTWORK FROM FAN POWERED BOXES AND/OR NEW CONNECTION TO NEW RETURN
AIR REGISTER. NEW FIRE DAMPER SHALL BE INSTALLED AT ALL OPENINGS.
NEW 36" X 8" TRANSFER AIR OPENING ABOVE CEILING WITH WIREMESH AT BOTH OPENING ENDS.
PROVIDE WITH FIRE DAMPER AND LINTEL. SAW-CUT WALL. VERIFY EXACT LOCATION IN FIELD.
NEW 16" X 8" TRANSFER AIR OPENING ABOVE CEILING WITH WIREMESH AT BOTH OPENING ENDS.
PROVIDE WITH FIRE DAMPER AND LINTEL. SAW-CUT WALL. VERIFY EXACT LOCATION IN FIELD.
FURNISH & INSTALL NEW WALL MOUNTED AC UNIT. RUN REFRIGERANT PIPING FROM CU-1 ON ROOF
DOWN THRU FLOOR TO UNIT. RUN 1" CONDENSATE PIPING ABOVE CEILING TO SLOPE DOWN TO
JANITOR CLOSET & TERMINATE 6" ABOVE MOP SINK. VERIFY ALL PIPING ROUTING IN FIELD. CORE
WALLS & FLOOR. SEAL, PATCH & PAINT WALLS TO MATCH ADJACENT SURFACES.
DUE TO THE NATURE OF THIS PROJECT AND THE LONG LEAD TIMES FOR SPECIFIC
EQUIPMENT, THE OWNER HAS DECIDED TO CREATE A PRE-PURCHASE PACKAGE FOR THE NEW
ROOF TOP UNITS, CURBS AND VISION SCREENS. ALL ROOF TOP UNITS, CURBS AND VISION
SCREENS WILL BE DELIVERED TO THE CONSTRUCTION SITE UNDER THE PRE-PURCHASE
AGREEMENT. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR RECEIVING, UNLOADING,
INSPECTING FOR DAMAGE, CRANED INTO PLACE AND INSTALLING EQUIPMENT, MAKING
MODIFICATIONS FOR THE INSTALLATION AND MAKING ALL FINAL CONNECTIONS INTO THE
REQUIRED SYSTEMS PER THESE SPECIFICATIONS. ALL EQUIPMENT RELATED WARRANTIES ARE
INCLUDED IN THE PRE-PURCHASE AGREEMENT; HOWEVER, THE MECHANICAL CONTRACTOR
SHALL CARRY ALL INSTALLATION RELATED WARRANTIES AS SPECIFIED. THE MECHANICAL
CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING ALL START UP AND TESTING OF
THE EQUIPMENT WITH THE APPROPRIATE PARTIES, PROVIDE INSTALLATION SHOP
DRAWINGS, ALL REQUIRED CLOSE OUT DOCUMENTS/AS-BUILT DRAWINGS, AND TRAINING
ON EQUIPMENT INSTALLED PER THESE SPECIFICATIONS.
· COVER AND PROTECT ALL OWNER FURNITURE AND ELECTRONICS FROM
DEBRIS DURING CONSTRUCTION PROJECT. PROTECT AND COVER ALL
FLOORING AS REQUIRED TO AVOID DAMAGE DUE TO USE OF LADDERS, LIFTS,
ETC. PROVIDE MASONITE TO COVER FLOORING IN ALL AREAS INCLUDING
GYMNASIUMS, MULTI-PURPOSE ROOMS, CAFETERIAS, ETC., TO PREVENT
DAMAGE/SCRATCHES TO SPECIAL SURFACES. THOROUGHLY CLEAN AND
VACUUM ALL AREAS THAT WORK HAS BEEN COMPLETED IN.
· PROTECT THE MATERIALS AND WORK OF OTHER TRADES FROM DAMAGE
DURING INSTALLATION OF THE WORK PROVIDED UNDER DIVISIONS 26, 27
AND 28.
· PAY PARTICULAR ATTENTION TO THE LIMITED SPACE AVAILABLE IN CERTAIN
LOCATIONS OF THE PROJECT SO THAT EQUIPMENT MAY BE INSTALLED
WITHOUT ANY INTERFERENCE.
· CONTRACTOR SHALL CLEANUP SITE ON A DAILY BASIS. REMOVE ALL
RUBBISH, DEBRIS, ETC. ACCUMULATED FROM THIS OPERATION DURING THE
COURSE OF THE WORK. LEGALLY DISPOSE OF SAME OFF-THE-SITE.
· CONTRACTOR RESPONSIBLE FOR MOVING OWNER'S FURNITURE AS NEEDED
TO ACCOMPLISH WORK.
· WHEN WORKING AFTER-SCHOOL HOURS, CONTRACTOR SHALL PROTECT ALL
OWNER'S FURNITURE, ELECTRONICS, ETC., IN CLASSROOMS AND OFFICES,
AND RETURN THESE LOCATIONS TO THE SAME CONDITION AS ORIGINALLY
FOUND SO AS TO PREPARE BUILDING FOR THE FOLLOWING SCHOOL DAY.
· AFTER THE COMPLETION OF INSTALLATION, ALL SYSTEMS SHALL BE
THOROUGHLY CLEANED. CLEAN ALL FOREIGN MATTER FROM ALL FIXTURES,
EQUIPMENT, AND EXTERIOR OF CONDUITS.
AutoCAD SHX Text
EFO- M0.0
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
AutoCAD SHX Text
%%UGENERAL MECHANICAL NOTES:
AutoCAD SHX Text
(SEE BOOK SPECIFICATION FOR ADDITIONAL INFORMATION)
AutoCAD SHX Text
%%UMECHANICAL NEW WORK PLAN NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UDAILY CLEANING OF JOB SITE:
PROTECTION AND
VENTILATION NEW
WORK
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
SEE ENLARGED BOILER
ROOM PLAN EFO-M1.3
150-S
8"Ø NK.
CFM
200-S EA
8"Ø NK.
(TYP. OF 2)
340-S EA
10"Ø NK.
(TYP. OF 5)
CFM
CFM
340-S EA
10"Ø NK.
(TYP. OF 5)
150-S
8"Ø NK.
CFM
150-S
8"Ø NK.
150-S
8"Ø NK.
CFM
14/
CFM
14/
CFM
14/14
150-S
8"Ø NK.
CFM
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
CFM 1250
CFM
CFM
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
CFM
CFM
CFM600
CFM
CFM
CFM
CFM
10"Ø
10"Ø
6"Ø
10/8
10/8
8"Ø
8"Ø
8"Ø
8"Ø
/1
20/12
20/1216/12
10/12
8/10
6/10
12/10
12/10
12/10 8/108/10
6/
6/
200-S EA
10"Ø NK, 2-SLOTS
1" WIDE, 2' LONG
(TYP. OF 2)
180-S EA
8"Ø NK, 2-SLOTS
1-1/2" WIDE, 2' LONG
(TYP. OF 7)
10"Ø
180-S EA
8"Ø NK, 2-SLOTS
1-1/2" WIDE, 2' LONG
(TYP. OF 6)
180-S EA
8"Ø NK, 2-SLOTS
1-1/2" WIDE, 2' LONG
(TYP. OF 6)
150-S EA
8"Ø NK, 2-SLOTS
1-1/2" WIDE, 2' LONG
(TYP. OF 4)
300-S
10"Ø NK.
300-S
10"Ø NK.
CFM
CFM
CFM8/10
150-S
8"Ø NK.
200-S EA
8"Ø NK.
(TYP. OF 12) 300
CFM
300-S
10"Ø NK.
310-S EA
10"Ø NK.
(TYP. OF 2)250-S EA
10"Ø NK.
(TYP. OF 2)
260-S
10"Ø NK.
CFM
CFM
CFM
CFM
CFM
CFM
CFM8/10
CFM
CFM
150-S
8"Ø NK.
150-S
8"Ø NK.
150-S
8"Ø NK.
150-S
8"Ø NK.
CFM
8/10
8/10
14/14 14/14
14/14 14/14
CFM
300-S
10"Ø NK.
300-S
10"Ø NK.
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
150-S
8"Ø NK.
150-S
8"Ø NK.
300-S EA
10"Ø NK.
(TYP. OF 2)
8"Ø
10"Ø 30/12
20/12
16/12
20/12
14/12
CFM
16/10
12/8
12/6
200-S EA
8"Ø NK.
(TYP. OF 4)
10"Ø
8"Ø 14"Ø
56/14
36/18 RA UP.
UP
U
U
24/20
/2
/2
24/20
12"Ø
12"Ø
8"Ø
12"Ø
12"Ø
8"Ø
/2
8"Ø
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
/2
24/20
/2
12"Ø
12"Ø
8"Ø
14"Ø
36/24 RA UP.
24/20 SA UP.
24/20 SA UP.
24/20 RA UP.
24/20 SA UP.
FD
FD
/2
U
P
FD
24/20 RA UP.
/2
24/20
24/20
FD
200-S
8"Ø NK.
200-S
8"Ø NK.
8"Ø
8/10
8/10
/2
FD
FD
FD
FD
FD
FD
J.C.
CLASSROOM
CLASSROOM
T7
BOY'S
T8
GIRL'S
133B
CONFERENCE
KITCHEN
OFFICE
133A
PRINCIPAL
KINDERGARTEN
KINDERGARTEN
OUTDOOR
STORAGE
GYMNASIUM
OFFICE
STORAGE STORAGE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
T1
WOMEN'S
T2
MEN'S
102A
TOILET
103A
TOILET
133E
TOILET
TOILET
T5
BOY'S
T6
GIRL'S
T3
BOY'S
T4
GIRL'S
STAIR
BOILER
ELEC.
PLANNING AREA
PLANNING AREA
PLANNING AREA
115B
STORAGE B
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
VESTIBULE
VESTIBULE
D
STORAGE
102B
STORAGE
103B
STORAGE
115A
STORAGE
LOBBY
133C
ASSISTANT
PRINCIPAL
133D
ASSISTANT
PRINCIPAL
120C
GYM
STORAGE
120B
GYM
OFFICE
120A
REC.
OFFICE
120D
SPRINKLER
115D
ELEV.
EQUIP.
MAIL/CLERICAL
C
GENERAL
STORAGE
COMMONS
A
DATA/
STORAGE
OFFICE
OFFICE
SPEECH
THERAPY
103C
PLANNING AREA
REFER TO EFO-M0.0
FOR NOTES
AutoCAD SHX Text
%%UFIRST FLOOR PLAN - AREA A - MECHANICAL VENTILATION NEW WORK
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
EFO- MV1.1
AutoCAD SHX Text
%%UKEY PLAN
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
HEAT PUMP REPLACEMENT AT:
AutoCAD SHX Text
FOX MEADOW ELEM. SCHOOL 1275 JENNA DR., SOUTH ELGIN, IL. 60177
AutoCAD SHX Text
ELGIN, ILLINOIS 60120
AutoCAD SHX Text
SCHOOL DISTRICT U-46
AutoCAD SHX Text
355 EAST CHICAGO STREET
AutoCAD SHX Text U-46 P.N. 728-26
AutoCAD SHX Text Revisions:
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
FPB
AutoCAD SHX Text A10
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A58
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A9
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A8
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
FPB
AutoCAD SHX Text B1
AutoCAD SHX Text B2
AutoCAD SHX Text
FPB
AutoCAD SHX Text B4
AutoCAD SHX Text
FPB
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
FPB
AutoCAD SHX Text A22
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A23
AutoCAD SHX Text
FPB
AutoCAD SHX Text A25
AutoCAD SHX Text
FPB
AutoCAD SHX Text A27
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A3
AutoCAD SHX Text
FPB
AutoCAD SHX Text A7
AutoCAD SHX Text
FPB
AutoCAD SHX Text A6
AutoCAD SHX Text
FPB
AutoCAD SHX Text A4
AutoCAD SHX Text
FPB
AutoCAD SHX Text A5
AutoCAD SHX Text
FPB
AutoCAD SHX Text A2
AutoCAD SHX Text
FPB
AutoCAD SHX Text A1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
FPB
AutoCAD SHX Text A11
AutoCAD SHX Text
FPB
AutoCAD SHX Text A12
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
FPB
AutoCAD SHX Text A15
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text B3
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A14
AutoCAD SHX Text
FPB
AutoCAD SHX Text A16
AutoCAD SHX Text
FPB
AutoCAD SHX Text A13
AutoCAD SHX Text
FPB
AutoCAD SHX Text A17
AutoCAD SHX Text
FPB
AutoCAD SHX Text A19
AutoCAD SHX Text
FPB
AutoCAD SHX Text A21
AutoCAD SHX Text
FPB
AutoCAD SHX Text A26
AutoCAD SHX Text
FPB
AutoCAD SHX Text A18
AutoCAD SHX Text
FPB
AutoCAD SHX Text A28
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
FPB
AutoCAD SHX Text A20
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A24
AutoCAD SHX Text A
AutoCAD SHX Text
FPB
AutoCAD SHX Text A57
AutoCAD SHX Text A
AutoCAD SHX Text
RT
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text
CH
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VENTILATION NEW
WORK
Sheet No.:
U46 Project No.:
728-26
Date:
February 2, 2026
Sheet Title:
M
SA
P ro j.
N o.
S.
V irg in ia S tre et
C ry st al L ak e, Il lin oi s
O ffi ce
-7
-8
Fa x
5-
8-w w w
.m sa
-c e.
co m
40-S EA
0"Ø NK.
TYP. OF 5)
425-S EA
12"Ø NK.
(TYP. OF 2)
400-S EA
12"Ø NK.
(TYP. OF 2)
CFM
CFM
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
CFM
CFM
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
CFM
16/10
10/10
10/10
10/10
425-S EA
12"Ø NK.
(TYP. OF 2)
400-S EA
12"Ø NK.
(TYP. OF 2)
CFM
CFM
200-S
8"Ø NK.
K.
150-S
8"Ø NK.
CFM
200-S
8"Ø NK.
300-S EA
10"Ø NK.
(TYP. OF 2)
325-S EA
10"Ø NK.
(TYP. OF 2)
CFM
14/14
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .