1-Subcontractors Fillable.pdf
PDF 45 KB Posted
- Attached to
- SB-FP-06-2526 Herbicide Weed Management Bid
- Solicitation number
- SB-FP-06-2526 Herbicide Weed Management Bid
- Issued by
- Kane County, Illinois
About this file
This document is a Sub-Contractors form from Kane County Forest Preserve District, located at 1996 South Kirk Road, Suite 320, Geneva, Illinois. The form is designed for contractors to list potential sub-contractors and their respective work assignments for a project. The organization is currently celebrating 100 years of service (1925-2025) with a mission to preserve and restore the nature of Kane County. The form provides space for listing up to three sub-contractors, with fields for the sub-contractor's name and the specific work they will perform, and also includes an option to indicate that no sub-contractors will be used for the project.
The document includes contact information for Bill Lenert (President) and Benjamin Haberthur (Executive Director), with phone (630) 232-5980 and fax (630) 232-5924, and website www.kaneforest.com. The form requires a signature and date to certify the accuracy of the information provided. There are no specific project details, pricing terms, or funding sources outlined in this particular document, which appears to be a standard administrative form for capturing sub-contractor information for a potential project or contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To preserve and restore the nature of Kane County
1996 South Kirk Road, Suite 320, Geneva, Illinois 60134
Bill Lenert, President Benjamin Haberthur, Executive Director
(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com
SUB-CONTRACTORS
The listed Sub-contractors will perform the work indicated herein:
1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________ http://www.kaneforest.com/
| 1 SubContractor: |
| Work Performed: |
| 2 SubContractor: |
| Work Performed_2: |
| 3 SubContractor: |
| Work Performed_3: |
| No SubContractors will be used for this project: Off |
| Date: |
| Printed Name: |
File details come from the government source that posted it. Updated .