JANUARY 2022 SOW

GAOA LITTLE SAHARA RESTROOM DEMOLITION

STATEMENT OF WORK

for

U.S. Bureau of Land Management

West Desert District

1/14/2022

JANUARY 2022 SOW

The Bureau of Land Management, West Desert District, is soliciting Requests for Proposals on the demolition of flush restroom buildings and construction of ADA accessible concrete aprons at Oasis Campground at the Little Sahara Recreation Area.

There are a total of eight flush restroom buildings to be demolished. Each building is 237 square feet and is a wood framed structure with masonry exterior. Demolition shall consist of capping and abandoning utilities, and removal of the entire structure including floor slab and foundation.

Contractor shall be responsible for having asbestos and lead inspections performed by a certified individual or company in the State of Utah. Any hazardous materials encountered will be addresses through the differing conditions clause of the contract.

There are a total of eight ADA aprons to be constructed which will provide access to existing

CXT vault toilet buildings. Work shall consist of materials, labor and site supervision to perform required excavation and fill, compaction, concrete forming and placement, testing, and backfilling.

The locations of restrooms to be demolished and concrete aprons to be constructed are indicated on the drawings attached to this RFQ.

The Contractor shall be responsible for adhering to all contract drawings and specifications as well as complying with all Federal, State, and Local codes for structure demolition, waste hauling, and disposal. All disposal fees, including landfill expenses shall be included in the contract price and shall be the responsibility of the Contractor.