This is a Bid Proposal document issued by the Granger Hunter Improvement District (GHID) in West Valley City, Utah, for the replacement of the roof at Well Site #1 located at 1311 West 3300 South. The project involves the complete removal of the existing asphalt shingle roof and installation of a new metal roofing system on a single-story structure with approximately 1,200 square feet of roof area. The scope of work includes mobilization and site preparation, removal of existing asphalt shingles and underlayment, installation of synthetic underlayment and 26- or 24-gauge metal roofing panels (with color and profile to be selected by the owner), installation of trim, flashing, and edging, flashing of existing vents with replacement of damaged vent boots as needed, and final cleanup and debris removal. The estimated project duration is 6 to 7 working days from mobilization, weather permitting. Bids are valid for 30 days from the proposal date of March 17, 2026. The contact for the project is Dee Smolka, Supervisor of Water Facilities Maintenance, at d.smolka@ghid.gov.

The bid submission should include a total bid amount covering all labor, materials, equipment, and disposal costs, with taxes to be specified separately if applicable. Payment terms and warranty information are to be provided by the bidder. Any additional work required due to unforeseen structural issues will be quoted separately and is not included in the base bid. Work is to be performed according to industry standards and applicable safety regulations. The document indicates that inspections will be performed during the project, with the owner to be notified of any required deck repairs that fall outside the included scope of work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2888 South 3600 West • P.O. Box 701110 • West Valley City, Utah 84170-1110 • Phone (801) 968-3551 • Fax (801) 968-5467 • www.ghid.gov

Bid Proposal – Roof Replacement at Well Site # 1 Project: Replacement of existing shingle roof with new metal roofing Location: Well #1 / 1311 West 3300 South Date: March 17, 2026 Contact: Dee Smolka, Supervisor – Water Facilities Maintenance

1. Scope of Work This bid covers the complete removal of the existing asphalt shingle roof and installation of a new metal roofing system at the designated well site. The structure is a single-story building with an approximate roof area of 1,200 square feet. The layout is simple and includes only a few roof penetrations (e.g., ventilation stacks).

Included Work:

1. Mobilization & Site Preparation o Deliver equipment, materials, and safety gear.

o Protect surrounding equipment and work areas.

2. Removal of Existing Roof o Strip and dispose of existing asphalt shingles.

o Remove underlayment as needed.

o Inspect decking for damage; notify owner of any repairs required (repairs not included unless specified).

3. Installation of New Metal Roofing o Install synthetic underlayment suitable for metal roofing.

o Install 26- or 24-gauge metal roofing panels (owner to select color and profile).

o Install all required trim, flashing, and edging.

o Seal and flash all penetrations, including existing vents.

4. Vents & Penetrations o Properly flash around the existing vents.

o Replace damaged vent boots as needed.

5. Cleanup & Disposal o Remove all job-related debris from site.

o Final walk-through and inspection.

2. Materials

• Metal roof panels (gauge to be selected)

• Synthetic underlayment

• Fasteners rated for metal roofing

• Trim, ridge caps, drip edges, and flashing

• Sealants and accessories

3. Schedule Work is estimated to take 6-7 working days from mobilization, weather permitting.

4. Pricing Total Bid Amount: $__________ (This includes labor, materials, equipment, and disposal. Tax not included unless specified.)

Any additional work required due to unforeseen structural issues will be quoted separately.

5. Terms & Conditions

• Bid valid for 30 days.

• Payment terms: _________

• Work performed according to industry standards and applicable safety regulations.

• Warranty information: __________

Authorized By:

Dee Smolka / Granger Hunter Improvement District d.smolka@ghid.gov mailto:d.smolka@ghid.gov