1-RFQ HS Gym and Classroom Addition.pdf
PDF 3 MB Posted
- Attached to
- Architectual Services for Gym / 2 Classrooms
- Solicitation number
- VAAC2602
- Issued by
- Weber County, Utah
About this file
This is a Request for Qualifications (RFQ) issued by Venture Academy, a Utah-based high school located at 508 N 1500 W in Marriott-Slaterville, Utah, for architectural design services. The project encompasses the design of an approximately 12,500 square foot pre-fabricated steel gymnasium addition (100 feet by 125 feet) adjacent to the existing high school building and the remodel of approximately 35 feet by 55 feet of the existing gymnasium to create two stacked classrooms. The gymnasium will feature a full-size regulation basketball court with 6-8 rows of retractable bleachers, an entry vestibule with three restrooms, one custodial closet, and three large storage rooms. The existing gymnasium's remaining space (60 feet by 55 feet) will serve as an auxiliary gym. Statements of qualifications are due electronically in PDF format to the State Public Procurement Website by June 5, 2026, at 12:00 Noon MST. The firm will be selected on or before June 12, 2026, with programming beginning on or near June 22, 2026, and the bid set to be completed by September 15, 2026. The architectural team will be responsible for all phases from programming and concept development through schematic design, design finalization, construction document preparation, site visits, ASI and RFI processing, pay request review, and project close-out.
The RFQ requires separate submissions: qualifications documentation and a fee proposal, both as PDF files. Qualifications will be evaluated on a 100-point scale across three criteria: experience with similar projects and school-specific work (40 points, 32-point minimum threshold), schedule feasibility (30 points, 24-point minimum threshold), and reasonableness of the fee proposal (30 points, 24-point minimum threshold). Firms must achieve a combined minimum score of 80 points and meet minimum thresholds in each category to be considered. The submission must include a cover letter confirming understanding of all RFQ elements and the project schedule, architect firm information with main office and branch office details, team member assignments, a list of at least three client references from the past three years, and identification of likely engineering firms. Venture Academy reserves the right to interview finalist candidates and to select or reject any or all submissions based on its judgment of which firm best meets the school's needs. All inquiries must be directed solely to Mark Child at mchild@venturelearning.org or 801-393-3900; contacting other school staff or community members may result in disqualification.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications for Design Services
Gym and Classroom Addition
508 N 1500 W Marriott-Slaterville, UT 84404
June 1, 2026
Project: Venture Academy (hereafter “School”) is requesting proposals from qualified firms for design services for an approximately 12500 square foot Pre-Fab Steel Gym adjacent to the existing High School building as well as a remodel that takes aprox. 35’x55’ of the existing gym to create 2 classrooms one on top of the other (the current gym is cmu construction).
The following contains information to enable interested firms to produce a statement of qualifications to do the work. Questions about the project should be directed to:
Contact:
Mark Child* Venture Academy 508 N 1500 W Marriott-Slaterville UT 84404 Office: 801-393-3900 Email: mchild@venturelearning.org (preferred)
*No other members of the school staff or community should be contacted concerning this RFQ during the selection process. Failure to comply with this requirement may result in disqualification.
Due Date: Proposals are due no later than 12:00 Noon, MST June 5, 2026.
Selection: Upon review of submissions by the School, the firm best meeting the needs of the School will be selected for the services. The School may interview finalist candidates at its discretion. The School reserves the right to accept or reject any or all firms if it is deemed to be in the best interest of the School to do so.
mailto:mchild@venturelearning.org
I. Project Description A. Location: Construction will take place on the existing property at 508 N 1500 W
Marriott-Slaterville, UT 84404.
B. Gym: The Gym addition will be approximately 12,500 sq ft (100x125). It will consist of a full size regulation basketball court with 6-8 row, retractable bleachers on one side. An additional lower ceiling height space connected directly to the west of the new gym will include an entry way on the west side of the building with roughly 3 restrooms, one custodial closet, and 3 large storage rooms. (see light blue box in the image below)
C. The 2 new classrooms will be constructed inside the existing gym using aprox.
35ft x 55ft on the south end of the gym. The remaining north side of the gym (60’ x 55’) will remain untouched and will serve as a small gym for auxiliary purposes. The 2nd classroom will be built on top of the 1st with access from existing 2nd floor walkways and a new egress staircase on the west side. (see light blue box in the image below).
II. Scope of Work
The architectural team will work closely with the School in both the design and project management phases, including the permitting process.
Basic services required are listed below:
A. Programming: Meet with members of the Venture Academy project team to clarify needs.
B. Concept Development: Develop concepts and assist in narrowing to the best option.
C. Schematic design: Refine best concept with input from School.
D. Finalize Design Phase.
E. Prepare construction documents including drawings and specifications for sub-contractor bidding.
F. Conduct regular site visits to ensure fidelity between plans and construction.
G. Timely processing of ASI’s and RFI’s with written responses.
H. Review and approve pay requests.
I. Assist with the punch-list and close-out items.
III. Schedule
RFQ Due: June 5, 2026 by 12:00 Noon MST Award: On or before June 12, 2026 Programming Begins: At or near June 22, 2026 Bid Set Complete: At or before September 15, 2026
IV. Qualification Content and Submission
The body of the RFQ shall include the following.
A. Cover Letter. The cover letter shall:
1. Confirm that all elements of this RFQ have been reviewed and understood, including schedule dates.
2. Include a statement of intent to perform the services as outlined.
3. Summary statement of the firm’s qualifications.
4. The name of a single person for contact during the qualifications review process.
B. Architect’s Information - This section shall include:
1. The name, address, and telephone number of the firm's main office and any branch offices that will be participating in this project.
2. Members of the architect's professional team who are likely to be assigned to this project.
3. Experience with similar projects. The firm shall provide:
a) a list of related or similar projects completed or in progress including the client name, location, size (gross square feet), project cost.
b) Contact information for at least three (3) clients for whom services have been performed within the past three (3) years.
C. Fee Proposal (this will be a separate submission, see below): Please provide a basic description of all fees proposed by the firm for performing services as outlined in Section II above. List likely engineering firms who will be providing services.
D. Submissions. Submissions are to consist of two separately submitted items:
1. Statements of qualifications for items IV. A and B are to be submitted electronically in PDF format to the State Public Procurement Website.
Statements must be signed by an official of the company.
2. Fee Proposals are to be submitted in PDF format to the state public procurement website as a separate document.
3. Submissions are due by Friday, June 5th by 12:00 PM.
Evaluation of Design Services RFQ: Gym / Classroom Addition
Qualifications will be evaluated based on the following criteria. There are 100 points possible.
Minimum thresholds for each criterion must be met. At any time in the evaluation, an interview of the firm may be performed in order to better assess the criteria.
Qualification Evaluation Criteria Total Possible Points
Minimum Thresholds
1. Experience - Evidence that the firm is specifically specialized and competent in providing design services needed in the project. Including, but not limited to, relevant experience with similar projects and school specific experience.
40 32
2. Schedule - How does the firm plan to get the design work done on a reasonable timeline so that bidding and construction can proceed in a timely manner and reach project goals?
30 24
3. Fee Proposal - A description of all fees proposed by the firm for performing services as outlined are present, reasonable, and competitive.
30 24
Total 100 80
Qualification and fee proposal criteria have a total of 100 points possible. In order to be considered for the project, the prospective firm must have a combined total of 80 or more points and not be under the minimum threshold for any category. The proposal with the highest points becomes the top candidate.
The above criteria serve to assist in the evaluation process. Venture Academy reserves the right to select the firm--or none of the firms--that in its judgment best meets the needs of the school.
| Request for Qualifications for Design Services |
| Gym and Classroom Addition |
| Contact: |
| I.Project Description |
| II.Scope of Work |
| Basic services required are listed below: |
| D.Finalize Design Phase. |
| III.Schedule |
| IV.Qualification Content and Submission |
Evaluation of Design Services RFQ: Gym / Classroom Addition