This is a Request for Quotation (RFQ #ANTHC 25-Q-394910) issued by the Alaska Native Tribal Health Consortium (ANTHC) Division of Environmental Health & Engineering (DEHE) for residential well and septic system installation services in Dillingham, Alaska. The project involves providing and installing a complete well and septic system at one selected residence, including well drilling (approximately 150 feet), well screen installation, test pumping, sanitary grout, water analysis, well appurtenances, water service line installation, heat trace, arctic boxes, bollards, conventional septic system, sewer service line, and site preparation work. Quotes are due by 10:00 a.m. Alaska Time on August 14, 2025, through the Bonfire portal system, with substantial completion required by June 30, 2026, and final completion by July 31, 2026. The solicitation includes detailed technical specifications, plan sets, and requires pre-construction meetings and periodic inspections throughout the project duration.
The anticipated project value ranges from $100,000 to $150,000, with payment structured through unit prices for specific work items and lump sum amounts for major system installations. The contract includes a 10% Alaska Native/American Indian bidder preference for contracts under $500,000, and contractors must comply with various federal requirements including background checks, insurance requirements, and environmental protections. Work requires a licensed Alaska residential electrician for electrical components, and the contractor is responsible for housing, transportation, and all project logistics. The project is federally funded and subject to applicable federal contracting requirements, with retainage held at 10% until substantial completion and extensive deliverable requirements including daily logs, photo documentation, well logs, water test results, and as-built drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Residential Well & Septic System Installation
DILLINGHAM, ALASKA
PROJECT MANUAL
Project # AKAC4N-134SSO
Plan set # AKA-22-DLG
July 2025
REQUEST FOR QUOTATIONS: ANTHC 25-Q-394910 Issue Date: 7/30/2025
Issued by: Submit Bids to:
Alaska Native Tribal Health Consortium Alaska Native Tribal Health Consortium DEHE Contracting Department Bonfire portal
4500 DIPLOMACY DRIVE
Anchorage, AK 99508
Project Title: Residential Septic System Installation - Dillingham, AK
QUOTE DUE DATE AND TIME: 10:00 a.m. Alaska Time, Thursday, August 14, 2025 Alaska Native Tribal Health Consortium
DEHE Contracting Department
Note: Quotes received for small procurement solicitations (RFQs) will not be publicly opened.
Bonfire
1. This solicitation will be managed through Bonfire. All solicitation documents and any issued amendments can be accessed at https://anthc.bonfirehub.com/login. This system will allow interested parties access to all relevant documents and allow them to upload bids to a secure site.
2. Parties interested in responding to this solicitation will need to register with Bonfire at https://anthc.bonfirehub.com/login. The site offers tutorials to assist with navigating the site to upload questions and bids.
NOTICE: If you received this solicitation from a source other than Bonfire, you must register with Bonfire to receive subsequent amendments. Failure to register with Bonfire may result in the rejection of your offer.
Electronic Updates:
Updates to the solicitation, if any, will be posted on Bonfire. If you download this document from a different site, please verify that all documents listed in the Table of Content are included.
SUBMITTING BIDS: Bids must be uploaded to Bonfire prior to the established deadline, Bids will not be accessed by the Contracting Officer until after the bidding deadline has passed.
Immediately following the deadline, the bids will be opened / reviewed. Once bids have been reviewed for compliance, bid results will be shared publicly through the Bonfire portal.
RFQ #ANTHC 25-Q-394910 Residential Well & Septic System Installation –
Dillingham, Alaska
TABLE OF CONTENTS
DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONTRACT PROVISIONS
SECTION FORM
1. Bidding 00 11 00 Advertisement for Bids C111 00 21 00 Instructions to Bidders for Construction Contracts C200 00 24 13 Scope of Work 00 41 00 Bid Form C410 00 43 36 Subcontractor Form 00 43 93 Required Documents
2. Contract Forms (Examples) 00 51 00 Notice of Award C510 00 52 00 Contract for Construction of Small Project C522 00 55 00 Notice to Proceed C550 00 62 76 Application for Payment C620
3. Contract Provisions 00 80 00 Federal Requirements/Supplementary Conditions ANTHC Policies Related to Contracts and Contractor Personnel Form A: Certification Regarding Debarment, Suspension, Ineligibility & Voluntary Exclusion Form B: Certification Regarding Lobbying
MISCELLANEOUS REQUIRED DOCUMENTS
00 93 00 ANTHC Representations and Certifications
SPECIFICATIONS and PLANS Scattered Sites, Plans and Specifications Plan Set #: AKA-22-DLG - Issued for Construction (IFC), 27 pages Technical Specifications IFC – Planset AKA-22-DLG, 172 Pages Submittal Register
ADVERTISEMENT FOR QUOTES
Alaska Native Tribal Health Consortium (ANTHC)
Division of Environmental Health & Engineering (DEHE) Anchorage, Alaska
RFQ #ANTHC 25-Q-394910
RESIDENTIAL WELL & SEPTIC SYSTEM INSTALLATION
DILLINGHAM, ALASKA
The Issuing Office for the Solicitation Documents is:
Division of Environmental Health and Engineering (DEHE) Contracting Department 4500 Diplomacy Drive Anchorage, Alaska 99508
General Notice ANTHC / DEHE (Owner) is requesting Quotes for the above named Project.
Quotes for the Project are due not later than 10:00a.m. local time, Thursday, August 14, 2025.
The Project includes the following Work:
Provide and install a well & septic system in a selected residence in Dillingham, Alaska. Work shall be completed as stated in the Scope of Work. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all work required by these specifications and as shown on the drawings.
Owner anticipates that the Project’s total bid price will be approximately $100,000 – $150,000.
The Project has an anticipated substantial completion date of June 30, 2026 and a final completion date of July 31, 2026.
Award will be based on the total of all items listed on the Bid Form. All qualified and interested parties are asked to respond.
Bonfire
1. This solicitation will be managed through Bonfire. All solicitation documents and any issued amendments can be accessed at https://anthc.bonfirehub.com/login. This system will allow interested parties access to all relevant documents and allow them to upload bids to a secure site.
2. Parties interested in responding to this solicitation will need to register with Bonfire at https://anthc.bonfirehub.com/login. The site offers tutorials to assist with navigating the site to upload questions and bids.
Obtaining the Solicitation Documents Information and Solicitation Documents for the Project can be accessed from the Bonfire website.
Solicitation Documents may be downloaded from the Bonfire website. Prospective Bidders must register as a vendor with Bonfire to submit a bid and are urged to register as a plan holder with the Contracting Officer, even if Solicitation Documents are obtained from a plan room or source other than the Bonfire website. The Bonfire website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Quote for the Project. All official notifications, Request for Quotations #: ANTHC 25-Q-394910 Residential Well & Septic System Installation – Dillingham, AK
00 11 00 - 2 This document is a MODIFIED version of EJCDC® C-111, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.”
addenda, and other Solicitation Documents will be offered only through the Bonfire website. Neither Owner nor Engineer will be responsible for Solicitation Documents, including addenda, if any, obtained from sources other than the Bonfire website.
Instructions to Bidders.
For all further requirements regarding quote submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Solicitation Documents.
This Advertisement is issued by:
Owner: ANTHC / DEHE By: Kristina Vnuk Title: Contracting Officer Email: kavnuk@anthc.org Date: 7/30/2025
Request for Quotation# ANTHC 25-Q-394910 Residential Well & Septic System Installation-Dillingham, AK
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION
CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Solicitation Documents
Article 3— Pre-Bid Conference
Article 4— Bidder’s Representations and Certifications
Article 5— Interpretations and Addenda
Article 6— Bid Security
Article 7— Contract Times
Article 8— Substitute and “Or Equal” Items
Article 9— Subcontractors, Suppliers, and Others
Article 10— Preparation of Bid
Article 11— Basis of Bid
Article 12— Submittal of Bid
Article 13— Modification and Withdrawal of Bid
Article 14— Opening of Bids
Article 15— Bids to Remain Subject to Acceptance
Article 16— Evaluation of Bids and Award of Contract
Article 17— Bonds and Insurance
Article 18— Signing of Agreement
Article 19— Sales and Use Taxes
Article 20— Alaska Native/American Indian Preference
Article 21— Service of Protest
Article 22— Background Checks of Contractor’s Workforce and Indian Child Protection and Family Violence Prevention Act (P.L. 101-630)
Article 23— Local Hire
Article 24— COVID-19
Article 25— Moral Clause
Article 26— Federal Requirements
00 21 00 - 1 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.”
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Solicitation Documents are to be issued, and which registers plan holders.
B. ANTHC (Owner) – Alaska Native Tribal Health Consortium
C. Amendment – Amendment is defined as changes to solicitation and used interchangeably with Addendum.
D. Bid – Bid is used interchangeably with Quote.
E. Small Procurement - A small procurement is one that is between $50,000 and $250,000, as defined in the ANTHC Purchasing and Procurement Policy 01-2053, Article 5.1.
ARTICLE 2—SOLICITATION DOCUMENTS
2.01 Bidder shall obtain a complete set of Solicitation Requirements and proposed Contract Documents (together, the Solicitation Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Quote. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Solicitation Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Solicitation Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bonfire Website (https://anthc.bonfirehub.com/login) as indicated in the Advertisement or Request for Quotations (RFQ). Owner recommends that Bidder register as a plan holder with the Issuing Office by contacting the Contracting Officer, and obtain a complete set of the Solicitation Documents from the Bonfire website.
Bidders may rely that sets of Solicitation Documents obtained from the Bonfire Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Bonfire.
2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Solicitation Documents, or make them available for examination. Those prospective bidders that obtain an electronic (digital) copy of the Solicitation Documents from a plan room are encouraged to register as plan holders from the Bonfire Website or Issuing Office. Owner is not responsible for omissions in Solicitation
00 21 00 - 2 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.
2.05 Electronic Documents
A. When the Solicitation Requirements indicate that electronic (digital) copies of the Solicitation Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Solicitation Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Solicitation Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Solicitation Documents, described in Paragraph 2.05.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Solicitation Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—PRE-BID CONFERENCE
3.01 A pre-bid conference is not planned for this project.
ARTICLE 4—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
4.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid.
Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
C. It is the responsibility of each Bidder before submitting a Bid to become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
00 21 00 - 3 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
D. This section does not replace Form # 00 93 00, which is used to determine Bidder’s eligibility for Alaska Native / American Indian Bidder’s preference.
ARTICLE 5—INTERPRETATIONS AND ADDENDA
5.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Solicitation Documents.
5.02 Bidder shall submit all questions about the meaning or intent of the Solicitation Documents to Contracting Officer in writing through the Bonfire portal. Contact information and submittal procedures for such questions are as follows:
A. Questions must be submitted five calendar days before the bid opening date.
Inquiries received after this time frame may not receive a response.
5.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
5.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 6—BID SECURITY
6.01 A Bid that exceeds $250,000 must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Solicitation Documents.
6.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 10 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
ARTICLE 7—CONTRACT TIMES
7.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
7.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
00 21 00 - 4 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
ARTICLE 8—SUBSTITUTE AND “OR EQUAL” ITEMS
8.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Solicitation Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
8.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Solicitation Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 9—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
9.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the first tier Subcontractors or Suppliers proposed for the portion of the Work they are completing within five days after notification of apparent low bidder.
ARTICLE 10—PREPARATION OF BID
10.01 The Bid Form is included with the Solicitation Documents.
A. Completed and signed Bid Form shall be submitted to the Contracting Officer in PDF format.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder shall enter the words “No Bid”, “Zero Dollar”, or “Not Applicable.”
10.02 If Bidder has obtained the Solicitation Documents as Electronic Documents, then Bidder shall prepare its Bid on a copy of the Bid Form printed from the Electronic Documents version of the Solicitation Documents. The completed Bid Form shall be uploaded to the Bonfire portal established for this solicitation. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
A. Bidders will also be required to complete the Bonfire Bid Table with the same numbers provided on the Bid Form.
10.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
00 21 00 - 5 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
10.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
10.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
10.06 A Bid by an individual must show the Bidder’s name and official address.
10.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
10.08 Bids submitted in response to this solicitation shall be in English and in U.S. dollars, unless otherwise permitted by the solicitation.
10.09 All names must be printed in ink below the signatures.
10.10 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
10.11 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
10.12 The Bid must contain evidence of Bidder’s authority to do business in the state (State of Alaska Business License) where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
10.13 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 11—BASIS OF BID
11.01 Lump Sum Bid and Unit Price line items
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any
00 21 00 - 6 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in column of figures and the correct sum thereof will be resolved in favor of the correct sum.
ARTICLE 12—SUBMITTAL OF BID
12.01 The Solicitation Documents include one electronic PDF Bid Form, and, if required, the electronic PDF Bid Bond Form. The Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
12.02 A Bid must be received no later than the date and time prescribed and uploaded to the Bonfire website indicated in the Advertisement or Request for Quotation and must be accompanied by any other required documents.
12.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted.
ARTICLE 13—MODIFICATION AND WITHDRAWAL OF BID
13.01 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must remove their bid from the Bonfire portal and upload a new version prior to the bid opening. The Bid Form must indicate that it is a modification.
13.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner (through the Bonfire portal) and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned.
Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 14—OPENING OF BIDS
14.01 Bids received for small procurement solicitations will not be publicly opened. A Bid abstract will be posted shortly after the Bids are reviewed.
ARTICLE 15—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
15.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form.
ARTICLE 16—EVALUATION OF BIDS AND AWARD OF CONTRACT
16.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
16.02 Bids expiring less than sixty (60) calendar days after the date bids are due may not be considered and may be rejected.
16.03 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
00 21 00 - 7 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
16.04 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Solicitation Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
16.05 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
16.06 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates, if any, will be applied in the same order of priority as listed in the Bid Form. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
16.07 In evaluating whether a Bidder is responsible, Owner may consider the qualifications of the Bidder.
16.08 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders.
16.09 In order to verify that the Bidder has adequately incorporated all elements of the Work and the requirements of the Contract Documents in its bid prices, the Bidder shall, upon request of the Owner, promptly make available for the Owner’s review a complete itemization and breakdown of its total bid amount (Schedule of Values), a description of the Bidder’s understanding of the Work, and a proposed construction schedule. In the event the Bidder refuses to provide the requested information or attend the pre-award meeting (if scheduled), the Owner may reject the bid as non-responsive.
ARTICLE 17—BONDS AND INSURANCE
17.01 Article 6, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
17.02 Article 6 of the Contract for Construction of a Small Construction Project (Form 00 52 2) (Agreement), sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
00 21 00 - 8 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
ARTICLE 18—SIGNING OF AGREEMENT
18.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 10 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with electronic copies of the Contract Documents.
ARTICLE 19—SALES AND USE TAXES
19.01 Owner is exempt from Alaska state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes must not be included in the Bid.
ARTICLE 20—ALASKA NATIVE/AMERICAN INDIAN PREFERENCE
20.01 In accordance with Section 7(b) of the Indian Self Determination and Education Assistance Act (ISDA), 25 U.S.C., 450e(b), an Alaska Native/American Indian bidder’s preference will be applied in the amount of:
A. 10% if the anticipated aggregate amount is less than $500,000.00, including all option years.
For preference to be applied, Bidder must complete form 00 93 00 Representations and Certifications of Bidder/Offeror (Reps & Certs) and return with bid. Preference will not be applied if this form is missing. Neglecting to submit the Reps and Certs will not be considered a minor informality and bidder will not be allowed to submit the form after the deadline for submitting bids has passed.
This is different from the Bidder’s Representations and Certification on Bid Form 00 41 00, Article 6.
Proof of preference eligibility may be required prior to award of any contract.
ARTICLE 21—SERVICE OF PROTEST
21.01 Protests, as defined in ANTHC’s Procurement Policy, shall be served on the Procurement Director and may be served by electronic means.
21.02 A bid protestor must file a written statement, describing the protest, with the Procurement Director. The Procurement Director will consider all protests whether submitted before or after award. Protests based on alleged improprieties in any type of solicitation which are apparent before bid opening or the closing date for receipt of proposals must be filed before bid opening or before the closing date for receipt of proposals. In all other cases, protests must be filed no later than ten (10) calendar days after the basis of the protest is known or should have been known, whichever is earlier.
00 21 00 - 9 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
ARTICLE 22—BACKGROUND CHECKS OF CONTRACTOR’S WORKFORCE AND INDIAN
CHILD PROTECTION AND FAMILY VIOLENCE PREVENTION ACT (P.L. 101-630)
22.01 (a) The Contractor shall comply and assure compliance by all subcontractors at any tier under this contract, with the Indian Child Protection and Family Violence Prevention Act (P.L. 101-630). The Act requires that Minimum Standards of Character be established for certain positions covered by the Act to ensure that none of the individuals in these positions have been found guilty of, or entered a plea of no contest or guilty to, any felony offenses of murder, manslaughter, or sex crimes or two or more misdemeanors under Federal, State, or tribal law involving crimes of violence, sexual assault, molestation, exploitation, contact or prostitution; or crimes against persons.
(b) Where Contractor employees are to perform services at ANTHC facilities, Contractor shall comply with, and shall cause its personnel to comply with all applicable ANTHC on-site policies and procedures and all reasonable instructions or directions issued by ANTHC. Contractor, in compliance with applicable law, shall conduct background investigations of all employees performing services under this contract prior to entering ANTHC premises or receiving access to any ANTHC Confidential Information. Such checks shall include, without limitation, employment history, education history, governmental agencies, consumer reporting agencies, and other companies, agencies, and organizations and other information in conformance with Contractor’s standard policy.
In addition, Contractor will ensure that its background investigation of all Personnel providing Services on site at ANTHC premises complies with the Indian Child Protection and Family Violence Prevention Act, 25 USC §3201 et. seq. The contractor will make representation to ANTHC that its employees and agents that are providing services at ANTHC’s medical facilities are not individuals with criminal felony convictions for murder, manslaughter, or sex crimes or crimes against children or vulnerable adults in accordance with the Indian Child Protection and Family Violence Prevention Act (Public Law 101-630).
Upon request by ANTHC, Contractor will provide copies of Contractor’s policy for background checks/screening of its workforce.
(c) While Contractor alone shall determine who of its personnel will be assigned to perform Services, Contractor shall promptly remove any individual whom ANTHC, in its sole opinion and in accordance with applicable law, considers to be: unqualified to perform services as required, disruptive to the progress of work being performed, detrimental to ANTHC’s operations, in violation of ANTHC policies or failing to meet ANTHC’s standards for physical or other access to ANTHC property, ANTHC premises or any ANTHC computers, computer systems or networks. In any such case, Contractor shall promptly replace such personnel with a person who meets the requirements of this Agreement.
ARTICLE 23—LOCAL HIRE
23.01 ANTHC strongly encourages the use of local hire for construction awarded under the contract established by this solicitation. At a minimum, the contractor shall advertise or post notices in the community with the intent to hire qualified individuals when available and provide evidence of notice posting prior to mobilizing into the community.
00 21 00 - 10 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
ARTICLE 24—COVID-19
24.01 Avoid the Workplace When Sick
A. Contractors (and their local hires) who are symptomatic, have suspected illness, or test positive for COVID-19, must:
1. Remain home or in established housing (or leave the workplace);
2. Notify their supervisor; and
3. Follow current CDC guidance before and after returning to work.
24.02 Travel
A. Contractors should not travel if they are under isolation and must follow current CDC guidance prior to and during travel.
ARTICLE 25—MORAL CLAUSE
25.01 Compliance with Laws and Regulations
The Contractor shall comply with all applicable laws, regulations, and standards governing their services, supplies, or construction activities. This includes but is not limited to laws related to labor, health and safety, environmental protection, and anti-corruption.
a. All parties shall comply with applicable laws, regulations, and industry standards related to construction activities, safety, environmental protection, and labor practices.
b. Engaging in any illegal activities, including fraud, bribery, corruption, or other criminal acts, is strictly prohibited.
25.02 Conflict of Interest
The Parties involved in the construction project shall avoid conflicts of interest that could compromise fair competition, impartial decision-making, or the best interests of the project.
Disclosing any actual or potential conflicts of interest promptly and taking appropriate steps to mitigate such conflicts is required.
25.03 Ethical Conduct
The Contractor shall conduct its business in an ethical manner, demonstrating integrity, honesty, and transparency throughout the duration of this contract. The Contractor shall not engage in any practices that are illegal, unethical, or harmful to society.
a. All parties shall engage in fair and ethical business practices, including transparent financial transactions, accurate representation of capabilities and qualifications, and fair treatment of subcontractors, suppliers, and workers.
b. Engaging in unethical practices, such as bid rigging, price fixing, collusion, or unfair labor practices, is strictly prohibited.
25.04 Social and Environmental Responsibility
The Contractor shall demonstrate a commitment to social and environmental responsibility. This includes promoting fair labor practices, respecting human rights, supporting diversity and inclusion, and minimizing the negative impact on the environment.
00 21 00 - 11 This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional
Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in
The Contractor shall strive to engage in sustainable practices, waste reduction, and energy conservation whenever feasible.
a. Parties shall prioritize environmental sustainability, responsible resource management, and social welfare considerations during construction activities.
b. Taking appropriate measures to minimize environmental impacts, protect natural resources, and respect the rights and well-being of local communities is required.
25.05 Supplier Compliance
In the case of supply contracts, the Contractor shall ensure that their suppliers and sub- Contractors adhere to the same moral standards set forth in this clause. The Contractor shall exercise due diligence in selecting suppliers who share similar ethical values and practices.
25.06 Reporting Ethical Concerns
Both Parties encourage the reporting of any ethical concerns or violations related to this contract. The Contractor shall establish appropriate channels for reporting such concerns and provide protection to individuals who report in good faith.
25.07 Termination for Ethical Violations
In the event of a substantial violation of this moral clause, the non-breaching party reserves the right to terminate this contract with immediate effect. The non-breaching party may also pursue legal remedies and seek damages as permitted by applicable law.
25.08 Dispute Resolution
In case of disputes arising from alleged violations of the moral clause, the parties shall engage in good faith negotiations and, if necessary, utilize appropriate dispute resolution mechanisms specified in the contract.
25.09 Continual Improvement
Both parties shall actively work towards continual improvement in their ethical practices.
They shall collaborate in identifying opportunities for enhancement and implementing measures to ensure ongoing compliance with moral principles.
25.10 This moral clause shall be binding upon the Contractor, its employees, agents, and sub- Contractors throughout the duration of this contract.
ARTICLE 26—FEDERAL REQUIREMENTS
26.01 If the contract price is in excess of $100,000, provisions of the Contract Work Hours and Safety Standards Act at 29 CFR 5.5(b) apply.
26.02 Federal requirements at Form C-800 Supplementary Conditions of the Construction Contract apply to this Contract. (19.11 does not apply to residential projects
00 24 13 - Page 1 of 8
RFQ #ANTHC 25-Q-394910
00 24 13 - SCOPE OF WORK
Residential Well and Septic System Installations Dillingham, Alaska
PURPOSE
The purpose of this project is to provide well & septic services to an individual residence in DIllingham, Alaska under the Scattered Site Program.
Task Description
1. All work for the following tasks shall be performed in accordance with the attached plan sets and specifications.
2. Price shall include all costs associated with the project-based installation requirements.
3. Plan Set /site plans may not reflect the actual quantities (depths/lengths, etc.) that will be needed to complete the project. Quantities referenced are estimates only.
4. ANTHC does not guarantee a minimum or maximum quantity for any of these items. If the actual quantities (depth or length, etc.) do not meet or exceed the contract amount, the contract will be modified to the actual amount.
Well System Installation Services
W1. Well Drilling
a. CONTRACTOR is to drill and develop an insulated residential water well.
Approximate well depth for site #1 is 150 feet.
Should well depth exceed this depth, the CONTRACTOR must contact the Project Officer/Project Manager in writing (via email) to obtain written approval, prior to any additional drilling.
b. Compensation may include payment for labor, drilling, steel casing, PVC liners, well logging, alignment test, drive shoes, sanitary well cap and marking, well development (items not included under test pumping) and other necessary items required for well drilling.
c. Payment for well drilling as specified shall be made at the unit price bid based on the actual number of linear feet drilled and steel casing installed.
d. No payment shall be made for well drilling not authorized by the Project Officer/Project Manager. No payment made for well(s) that need to be abandon due to CONTRACTOR errors.
W2. Well Screen
a. CONTRACTOR is to provide well screen sizing, sizing methodology and install well screen on developed well.
1. The size of the slot based on the sieve analysis of the water bearing formation. Well screens not to be installed without proper sizing.
2. Minimum specified screen length is 5 feet. The length of the screen shall be dependent upon the length and type of aquifer encountered and minimum specified production rate.
00 24 13 - Page 2 of 8
b. Compensation may include payment for labor, packers, seals, couplings, blank risers as bottom and top sections, fittings, and all other necessary items require for a complete and operational installation.
c. Payment for well screen as specified shall be made at the unit price bid based on the number of linear feet of open slot screen installed.
W3. Test Pumping
a. CONTRACTOR is to perform test pumping on the well. Well test pumping will be a minimum of 4 hours per well and shall be recorded on the well test pump form. (Three hours of drawdown testing and one hour of recovery.)
b. No payment shall be made for time setting and removing the test pump, or for an incomplete pump test because of equipment failure.
c. Compensation may include payment for temporary power, if required, labor, pump, piping, water level and flow measuring equipment, and all other necessary items required for complete test pumping of a well. Well test pumping will be as specified in the plan set and standard details and shall be recorded on the well test pump form.
W4. Sanitary Grout
a. CONTRACTOR is to provide and install sanitary grout on the well. Grout shall be installed 10’ below pit-less adaptor, per ADEC regulations.
b. Payment for sanitary grout as specified shall be made at the unit price bid based on the number of linear feet of grout envelope installed per well.
c. Compensation may include payment for labor, temporary casing, placement of grout, and all other necessary items required to install a sanitary grout envelope in a well.
W5. Disinfection and Chemical and Bacteriological Analysis (Water Analysis)
a. CONTRACTOR is to perform disinfection and chemical and bacterial analysis of well water on the wells.
b. Payment for the chemical and bacteriological analysis will be at the lump sum price bid for all analysis and/or disinfection required. Only one chemical and bacterial analysis and disinfection testing will be paid per well, unless the tests were inaccurate due to incorrect sampling methods and a retest is requested by ANTHC. Subsequent testing shall be at the contractor’s expense. Analysis report for the site tested will be provided to ANTHC within 30 days of final drilling of the well.
W6. Well and Pressure System Appurtenances
a. CONTRACTOR is to provide and install well appurtenances as stated in the specifications and as shown in the plan set, to include a minimum water well yield of 10 gallons per minute.
00 24 13 - Page 3 of 8
b. Submersible pump (including power cable) sized and selected based on well depth, pipe length, total head, and flow rate characteristics. A flow reducer may be required for low producing wells.
c. Controls shall include well control box, (located in the house), inclusive of all electrical wiring, additional breakers, disconnects (if required), including conduit and the main breaker box.
d. Drop pipe, safety cable, check valve, torque arrestor, pit-less adapter.
e. Pressure tank system to include pressure tank in accordance with the technical specifications and all other associated appurtenances necessary for a complete system connected to the interior house plumbing.
f. All piping and appurtenances will be installed to meet current plumbing code; required clearances with the electrical components will be maintained.
g. Compensation may include payment for labor, submersible pump, well controls including all electrical components, drop pipe, safety cable, check valve, torque arrestor, pit-less adapter, pressure tank and, all materials necessary to wholly complete appurtenances.
h. Payment for well appurtenances as specified shall be paid for at the lump sum (lot) price bid.
W7. Water Service Line
a. CONTRACTOR is to trench and install a water service line (WSL) between the developed well and property residence. The water service line must be connected at the pit-less adapter and tied into the interior plumbing stub-out, after receipt of water quality testing and the determination of filtration system requirements.
Note: The Project Officer/Project Manager will authorize the connection upon receipt of the water quality analysis.
b. Compensation may include payment for labor, pipe, arctic carrier, installation of pit-less adapter, connection of service line to existing house plumbing or stubbed out for pressure tank, fittings, rigid board insulation, excavation, backfill and other necessary items required for the installation of the water service line.
c. Payment for water service line as specified shall be made at the unit price bid for the length and type of water service line installed.
W8. Heat Trace
a. The CONTRACTOR shall install heat trace and timers between the individual well and property residences. The heat trace shall be installed as specified in the plans. The heat trace shall run from the well to the house and powered at the house.
b. Compensation may include payment for labor and other necessary items required for the installation of the heat trace.
c. Payment for heat trace as specified shall be made at the unit price bid for the length of heat trace installed.
00 24 13 - Page 4 of 8
W9. Arctic Box
a. CONTRACTOR is to provide and install arctic boxes at the locations specified in the plan set.
b. Compensation may include labor, materials, and other necessary items required for the provision and installation of the arctic box.
c. Payment for the arctic box provided and installed as specified shall be made at the unit price bid for the site.
W10. Bollards
a. Contractor shall provide and install two Bollards
b. Payment for each bollard and installed as specified shall be made at the unit price bid for the site.
c. Compensation shall include payment for labor, materials, and other necessary items required for the installation of…
This is the start of the file's text. The full file is on GovTribe.