1-RFP NCRF Floodplain Design.docx

DOCX document 154 KB Posted

Attached to
Floodplain Restoration Design to Reduce Flood Risk and Enhance Habitat in the Lower Darby Creek Watershed
Solicitation number
US.261969
Issued by
Delaware County, Pennsylvania

About this file

This Request for Proposal (RFP) is issued by The Nature Conservancy (TNC) for floodplain restoration design services in the Lower Darby Creek Watershed in Pennsylvania. TNC seeks a supplier to provide preliminary design for floodplain restoration at two sites within the US Fish & Wildlife Service John Heinz National Wildlife Refuge to reduce flood risk and enhance fish and wildlife habitat in southeast Pennsylvania. The project scope includes community engagement through a workshop to review design plans and gather input on recreational components such as trails and wildlife viewing areas; data collection and development of conceptual schematics using aerial imagery, soil data, wetland delineations, and hydrodynamic modeling; development of 30 percent designs for both the 84th Street Bridge and Woodland Loop Trail sites focused on reconnecting floodplains to Darby Creek; advancement of the Woodland Loop Trail site to 60 percent design with drone-based lidar data collection; identification of additional data needs; and a regulatory pre-application meeting to prepare for final design and permitting. The proposal submission deadline is December 14, 2026 at 11:59 PM ET, with clarification queries due by November 24, 2026 at 11:59 PM ET and TNC's response to queries due by December 1, 2026 at 11:59 PM ET. The negotiation phase is scheduled for December 14-18, 2026, with supplier selection for contract award by December 21, 2026 at 11:59 PM ET.

The RFP requires a firm fixed price proposal in USD with payment terms of net 30 calendar days. Suppliers must meet mandatory requirements including at least five years of experience in similar projects, all required state certifications, and a certificate of good standing in their state of operation. TNC will conduct a two-stage evaluation process: Stage 1 evaluates technical and financial proposals based on mandatory requirements, organizational experience, proposed methodology and work plan, key personnel qualifications, and pricing; Stage 2 involves negotiations on assignment requirements and financial proposals. The project is funded through a NOAA 2025 National Fish and Wildlife Foundation (NFWF) National Coastal Resilience Fund (NCRF) award and represents a continuation of a 2023 NCRF award. All proposals must include a signed Conflict Inquiry Form, certificate of insurance, three client references from nonprofit or government organizations, details of any current or prior TNC contracts within the last three years, complete subcontractor information with letters of intent and signed conflict of interest forms, and legal action summaries. Suppliers must also indicate acceptance or acceptance with revision of TNC Standard Clauses. The RFP is subject to U.S. Government Laws and Regulations including record retention requirements for three years, debarment and suspension compliance, trafficking in persons prohibitions, and applicable federal acts including the Davis-Bacon Act, Clean Air Act, and Federal Water Pollution Control Act. TNC reserves the right to reject any or all offers and pursue procurement in the organization's best interest.

View the file

Other files

File Type Posted
1-RFP NCRF Floodplain Design - PennBid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal for Floodplain Restoration Design

Floodplain Restoration Design to Reduce Flood Risk and Enhance Habitat in the Lower Darby Creek Watershed (PA)

REQUEST FOR PROPOSAL

1100 E. Hector Street Suite 305 Conshohocken, PA 19428

November 16th 2026

CONFIDENTIAL

Disclose and distribute solely to employees of The Nature Conservancy needing to know, and to potential Suppliers.

Table of Contents

1.0Introduction and Overview2
1.1Statement of Purpose2
1.2The Conservancy’s Procurement Process2
1.3Conservancy's Obligations2
1.4Supplier's Obligations2
1.5Proposal Pricing Structure3
1.6Supplier Submission Requirements3
1.7Evaluation Process5
1.8Supplier Notification of Evaluation Outcome6
1.9Certificate of Insurance6
1.10Key RFP Timelines6
2.0Project Background6
2.1Assignment Scope of Work7
2.2Required Experience and Qualifications9
3.0Proposal Format10
4.0RFP Appendices13
4.1Appendix A: Conflict Inquiry Form14
4.2Appendix B: US Government Laws and Regulations18

1.0 Introduction and Overview

1.1 Statement of Purpose

It is the intention of The Nature Conservancy (“Conservancy” or “TNC”) to solicit Proposals for the provision of Floodplain Restoration Design to Reduce Flood Risk and Enhance Habitat in the Lower Darby Creek Watershed (PA). Those receiving this Request for Proposal (“RFP”) are referred to as “Supplier”.

The Conservancy has offices in over 80 countries globally. Our mission is to conserve the lands and waters on which all life depends. Please visit www.nature.org for more information on the Conservancy activities and where we work.

1.2 The Conservancy’s Procurement Process

Procurement activities will be carried out without discrimination, with Suppliers treated in an open, fair, and transparent way.

The Conservancy reserves the right to reject any or all offers for any reason, waive technicalities, and pursue purchasing in a manner that is in the organization’s best interest.

1.3 Conservancy's Obligations

The Conservancy has no obligation or liability arising from the issuance of this RFP or any actions taken in connection with it.

1.4 Supplier's Obligations

The Supplier must respond to all sections of this RFP and provide sufficient information to allow the Conservancy to evaluate the Proposal. By submitting its proposal, the Supplier agrees that any costs incurred by them in responding to this RFP are the Supplier’s responsibility and may not be billed to the Conservancy.

If the Conservancy has any confusion or difficulty retrieving information from a Supplier’s proposal, the Conservancy may seek written clarification from the Supplier. Unless requested by the Conservancy, the Supplier will not be allowed to resubmit their proposal to the Conservancy.

The Supplier shall not use the names, logos, images, or any data or results arising from the anticipated contract for advertising without the Conservancy's prior written consent.

1.5 Proposal Pricing Structure

The Conservancy requests a firm fixed price for this assignment. If a Supplier is selected for contract award and additional costs are presented during the contract negotiations or implementation, the Conservancy has the right to reject that Supplier.

1.6 Supplier Submission Requirements

All proposal responses will follow the instructions indicated in Section 3. Suppliers may include hyperlinks to their websites or online documentation in their responses to reduce proposal size.

NOTE: Such hyperlinks must go directly to the required information, and Suppliers must include the section on their website where it can be found.

1.6.1 Supplier Confirmation of Intent to Participate

Upon receiving the RFP packet, Suppliers must submit their confirmation of intent to participate in this procurement process through the email address, kim.hachadoorian@tnc.org before the date and time indicated in Section 1.10.

1.6.2 Nature of Proposals

All material submitted in response to this RFP will become the property of the Conservancy and may be returned only at the option of the Conservancy and at the expense of the Supplier.

1.6.3 Contractual Commitment of Proposal

The contents of the submitted Proposals will be considered obligations of the successful Supplier. Suppliers should ensure that their proposals are valid throughout the RFP process and, if selected for contract award, valid until the contract is executed. Suppliers should not submit information that will not be incorporated into the Proposal and any contract that may result from such Proposal.

If there is any inconsistency between the terms herein and any other Conservancy contract documents, the other Conservancy contract document terms shall prevail.

1.6.4 Submission of Supplier’s Queries on the RFP

All Supplier queries must be submitted through the email address kim.hachadoorian@tnc.org. It is the Supplier’s responsibility to seek clarification if they do not fully understand or if it may be interpreted in more than one way.

It is the Conservancy’s policy to avoid situations that:

· Place it in a position where its judgment may be biased;

· Create an appearance of conflict of interest concerning rendering an impartial, fair, technically sound, and objective decision before selection; or

· Give an unfair competitive advantage to competing Suppliers.

Therefore, to ensure an ethical and transparent procurement process, all inquiries or other communications regarding this RFP shall exclusively be directed to the TNC’s local BU Procurement Contact. Responses to Supplier queries received will be shared by email with all Suppliers. However, the Conservancy is not required to answer all questions that are not pertinent to the RFP or considered to be the Conservancy’s proprietary information.

If the Supplier or its affiliates, officers, employees, agents, consultants, or subcontractors violate these restrictions, they will be disqualified from the RFP and their proposal will be rejected.

1.6.5 Proposals Submission

Suppliers must submit their proposals through kim.hachadoorian@tnc.org on or before the submission due date and time indicated in Section 1.10. Any proposal received after the specified date and time will be disqualified from proceeding to the evaluation stage.

If the Supplier experiences any issues sending their proposals, they should contact kim.hachadoorian@tnc.org.

TNC will not accept hardcopy proposals.

1.7 Evaluation Process

The Conservancy’s evaluation process is based on a confidential scoring method involving ratings and weighted scores that will not be shared with the Suppliers. In general, the Proposals will be evaluated based on the following evaluation criteria:

Mandatory requirements Organization’s experience in similar assignments Proposed methodology and work plan Proposed key personnel experience and qualifications Proposed assignment pricing The Conservancy will evaluate Supplier proposals in two stages:

1.7.1 Stage 1: Technical and Financial Proposal Evaluation

A Technical Proposal refers to a Supplier’s proposed resolution to a problem or assignment that includes a detailed description of the proposed approach, the requirements, and the resources needed to implement the proposed solution, among others.

The Conservancy will evaluate and compare all Suppliers' Technical and Financial proposals against Sections 2–4 of this RFP, using the evaluation criteria set above, and shortlist Suppliers to proceed to Stage 2.

1.7.2 Stage 2: Negotiations Stage

The Conservancy will clarify any additional assignment requirements and may allow the Supplier to revise their Financial Proposal based on the negotiated terms. The Conservancy reserves the right to review and negotiate further pricing before selecting a Supplier for contract award.

Note: A contract award is not finalized until both parties mutually accept and sign the contract in writing. Suppose neither the Conservancy nor the Supplier reaches an agreement, the Conservancy reserves the right to rescind the award notification and either begin discussions with the second-ranked qualifying Supplier, restart the RFP process, or terminate the project.

1.8 Supplier Notification of Evaluation Outcome

Successful and unsuccessful Suppliers will be notified of the evaluation outcome in writing via email. The Conservancy shall not be obligated to provide specific details of any of the scores or results of the evaluation.

1.9 Certificate of Insurance

The Supplier shall provide a copy of its current certificate of insurance showing the types and limits of insurance in effect as of the Proposal submission date. If selected for contract award, the Supplier will then be required to add the Conservancy to its certificate of insurance before signing the contract.

1.10 Key RFP Timelines

The dates for each RFP requirement are as follows:

Event
Date
Time and Zone
Supplier submits any clarification queries
11/24/2026
11:59PM ET
The Conservancy’s Response to Supplier’s Queries
12/01/2026
11:59PM ET
Proposal Due Date (with signed Conflict Inquiry Form)
12/14/2026
11:59PM ET
Negotiation Phase
12/14-12/18
11:59PM ET
Selection of Supplier for contract award
12/21/2026
11:59PM ET

2.0 Project Background

The Nature Conservancy in Pennsylvania and is seeking to contract a Supplier to provide services on floodplain restoration design to reduce flood risk and enhance habitat in the lower Darby Creek watershed in PA. This project would result in preliminary design for floodplain restoration at two sites in our watershed study area to mitigate flood risk from storms and enhance habitat for fish and wildlife in a densely populated watershed in southeast Pennsylvania.

This project is funded through a NOAA 2025 National Fish and Wildlife Foundation (NFWF) National Coastal Resilience Fund (NCRF) award and is a continuation of a 2023 NCRF award to conduct a nature-based solutions (NbS) feasibility study for flood and habitat resilience. This project will result in the preliminary design of two floodplain restoration projects that have been identified in the NbS feasibility study as effective flood risk mitigation strategies and that align with community values and priorities.

The two proposed project sites are located within the US Fish & Wildlife Service (USFWS) John Heinz National Wildlife Refuge and include floodplain restoration and tidal wetland creation to restore floodplain function; increase storage and infiltration of stormwater; and enhance habitat for fish and wildlife. Site assessment and preliminary design for these projects will provide the necessary data and tools needed for decision-making leading to final design and successful implementation to maximize flood reduction and habitat benefits.

2.1 Assignment Scope of Work

The Supplier shall respond to the scope of work outlined in this RFP. The Supplier may deviate from this scope; however, they should clearly note and explain the reasons for the deviation. The final scope of work may be adjusted based on the selected Supplier's proposal.

Specific Tasks Community engagement A community workshop will be held to review the StoryMap webpage and discuss plans for the preliminary design process for the two proposed sites. However, we will continue to discuss plans for moving forward with the other NbS projects on the final list that was co-developed during the feasibility study, emphasizing that these projects remain as priorities as we begin to advance two of them to the design phase. Both projects proposed for design, at the 84th Street Bridge and Woodland Loop Trail sites, include opportunities for recreational components including trails and wildlife viewing. Community members will provide input on those design elements that include these recreational opportunities in advance of the start of design work. A rubric will be developed for evaluating preliminary design elements based on community priorities and values.

Data collection and development of conceptual schematic A base map including property lines and existing features will be developed using aerial imagery and existing publicly available data including data on soils, wetlands and topography. Collaboration with the regulators and surrounding resource managers would help to focus the needed data collection and assessments. The data collection is expected to include elevation (lidar), soil borings with sediment analysis, wetland delineations, and hydrodynamic/hydraulic modeling. A conceptual schematic will be created and used for sharing design concepts during meetings and moving towards community consensus on design elements.

30% design for 84th Street Bridge and Woodland Loop Trail sites Develop preliminary 30% designs for the 84th Street Bridge site and the Woodland Loop Trail site to evaluate methods for reconnecting existing floodplains which are currently disconnected from Darby Creek, in order to increase their ability to retain and infiltrate water and slow down stormwater flows. During highwater events such as lunar high tides and large storms, the floodplains are not inundated due to historic fill placement that has artificially raised the floodplain and incision of the creek caused by the large area of upstream impervious surface delivering large volumes of stormwater runoff into the creek.

Preliminary design of floodplain restoration at the 84th Street Bridge site would consist of removal of sediment to lower the floodplain elevation and create channels to allow higher water events to flood the restored wetlands. The Woodland Loop Trail parcel is also currently elevated above the level of Darby Creek and cut off from the natural tidal marsh hydrology. Preliminary Design for this site would evaluate methods for improving the hydrologic connectivity to the creek to allow for free interchange of tidal and creek flows.

60% design for Woodland Loop Trail site and community event This project site will also include trail infrastructure for recreational access. Because this site is under the jurisdiction of the USFWS, we are proposing to further advance the preliminary design to 60%. Drone based lidar would be flown by USFWS to collect data for this site. This lidar would be integrated with tidal data and historic storm levels to restore appropriate hydrology and modify elevations in the area. The main goal of this project would be to restore tidal connection to Darby Creek.

A field trip to visit the Woodland Trail Loop site will allow community members to gain a visual hands-on understanding of the design needs for the site and the benefits that tidal reconnection to Darby Creek would provide in terms of flood mitigation. This will also provide an opportunity for community members to provide feedback on desired design elements including the placement and design of a recreation trail.

Identify data needs and regulatory pre-application meeting Identify additional data needed to take projects to final design. We will hold a regulatory pre-application meeting to prepare for final design and permitting phase. Previous similar projects at the Refuge provide guidance on the permitting process and an understanding of the regulatory context.

2.2 Required Experience and Qualifications

2.2.1 Mandatory Requirements for the Supplier

The Supplier will be required to demonstrate the following mandatory requirements. Failure to do so will result in the organization's disqualification from the RFP process.

· At least 5 years of experience in similar projects

· All required state certifications

· Certificate of good standing in your state of operation

2.2.2 Proposed Personnel Qualifications and Experience

· Project Manager and staff with at least 5 years of experience in similar projects

· Valid professional certifications for Project Manager and staff

3.0 Proposal Format

The Supplier’s proposal will be submitted as either a PDF or Word document in line with the two-part submission below:

i. Technical Proposal

ii. Financial Proposal NOTE: Please omit all pricing information from the Technical & Functional Proposal. Include pricing information only in the Financial Proposal.

Please consult the guidance in the table below for formatting your Technical and Financial proposals.

Proposal
Requirement
Content
Technical Proposal
Executive Summary
· Provide an overview of the organization and, if applicable, details of the parent and subsidiary organizations.
Supplier’s Response to the Scope of Work
· Detailed, thorough solutions (proposed methodology and techniques) to the requirements listed in Section 2 and/or attached in Section 4; and

· Workplan/implementation plan including number and roles of proposed staff, considered contract and project deadlines

References
· The names of at least three client organizations (preferably other nonprofit or government organizations besides TNC) to whom similar services were provided. This should include:

· Telephone numbers, e-mail addresses, name, and designation of the point of contact; and

· Dollar value, type of contract, duration, and description of similar goods and/or services provided.

List of Current or Prior TNC Contracts within the last 3 years
· A brief description of the services provided includes:

· The dollar value and duration;

· The TNC employee contact person (name, designation, telephone number, and e-mail address); and

· Whether the contract was terminated before the end of the term specified in the original contract, including whether any available renewal option was not exercised.

Subcontractors
· Provide a complete list of all subcontractors that will work on the Contract if the Supplier is selected for contract award;

· A Letter of Intent describing a complete description of the duties each subcontractor will perform and why/how each subcontractor was deemed the most qualified for this project; and

· Signed Conflict Interest Forms and Non-Disclosure Agreements from all participating subcontractors. These should be submitted together with the Proposal submissions.

Legal Action Summary
· A statement as to whether there are any outstanding legal actions or potential claims against the Supplier and a brief description of any action taken;

· A brief description of any settled or closed legal actions or claims against the Supplier over the past five (5) years. This should include the court, case name, complaint number, and a brief description of the final ruling or determination; and

· In instances where litigation is ongoing and the Supplier has been directed not to disclose information by the court, provide the name of the judge, court, and the location of the court.

Required Forms and Certifications
· Finalist Supplier(s) may be required to complete the Supplier Engagement Questionnaire Tool. This will be shared in a separate email;

· Where applicable, contracting with small businesses is preferred; and

· Signed and completed forms whose links are provided under Section 4.

TNC Standard Clauses
· TNC requires a set of clauses to be incorporated into any agreement we execute with Suppliers. The clauses are attached under Section 4; and

· Suppliers shall review the clauses and indicate in their proposal whether they “accept” or “accept with revision”. If any are “Accepted with Revision”, Suppliers are required to send those revisions in a red-line format as part of their proposal submission

Financial Proposal
Costs Breakdown
· The Proposal shall contain all costs associated with this assignment, including remuneration of Key and Non-Key Personnel and any reimbursable costs
Payment Terms
· TNC’s applicable payment terms are net 30 (calendar days)
Currency
· The Financial proposal shall be in USD
Taxes
· The Supplier, its sub-consultants, and Experts are responsible for identifying the applicable taxes for this assignment as well as meeting all tax liabilities arising from this assignment; and

· The Supplier shall break down all the applicable taxes related to the assignment.

4.0 RFP Attachments

4.1 Attachment A: Conflict Inquiry Form

4.2 Attachment B: US Government Laws and Regulations

Attachment A: Conflict Inquiry Form

FOR-PROFIT CONFLICT INQUIRY FORM

STEP 1: DESCRIPTION OF PARTIES & TRANSACTION

Name of for-profit organization entering into transaction with TNC:

Type of Transaction (select one):
☐ Contract for Services

☐ Grant Agreement ☐ Purchase Order ☐ Licensing Agreement ☐ Real Estate Transaction ☐ Other

*“Organization” includes a for-profit corporation, partnership, trust, estate, joint venture, limited liability corporation, professional corporation, an unincorporated entity, a foundation, public board, or commission.

If you selected “Other” or “Real Estate,” include description here (for real estate, describe property, size, fair market value and type of deal (sale, gift, lease, etc.)). Note: The purchase or sale of any interest in real property or water rights to or from any Related Party is a prohibited transaction and requires review by the Conflicts Committee and the TNC Global Board of Directors. A donation of a conservation easement by a Covered Person or Controlled Entity also requires review by the Conflicts Committee.

Total Amount of Proposed Contract:

STEP 2: DEFINITIONS & QUESTIONS

(1) TNC Key Employees and Board of Directors: Please refer to the attached list of Key Employees and members of Board of Directors (includes individuals who have left relevant TNC positions within the past five (5) years).

(2) Covered Person: A Global Board Member, Key Employee, Trustee/Advisor, Staff Member, Substantial Contributor, Close Relative/Family Member or persons who have the ability to influence the decisions of TNC because of their relationship with TNC or their access to material information about TNC’s work.

(3) Controlled Entity:

· For-profit entity of any kind where a Covered Person, individually or collectively with other Covered Persons:

a. owns more than 5% of the stock or value of an organization (directly or indirectly); or

b. has a controlling influence over the organization’s management or policies (ex. key management or board member).

· Nonprofit entity where a Covered Person, individually or collectively with other Covered Persons, is a board member, officer, director or key employee of the entity and has the ability to influence management of the entity.

(4) Related Party: Any individual who is, or was at any time during the 12-month period ending on the date of the purchase or sale, a member of the Board of Directors, a Trustee (or comparable volunteer advisor, such as a Regional Council member), or an employee of TNC; any individual who is a close relative of such an individual; and/or an entity in which the individual (or their close relatives) directly or indirectly own(s) more than 5% of the equity interest therein.

(5) TNC Trustee: Individuals serving as a Trustee or Advisor to TNC.

(6) Substantial Contributors: Individuals or organizations who have made total aggregate contributions to TNC of (i) ≥ US $5 million during the current fiscal year or (ii) ≥ US $25 million within the last five (5) fiscal years. Fiscal years run from July 1st through June 30th.

(7) Family Members and Close Relatives: Family members of any individual listed above, such as spouse, domestic partner, parent, sibling, child, dependent, other progeny, and ancestors.

STEP 2. SECTION 1. FOR-PROFIT ORGANIZATIONS (explain any “yes” answers in Step 3):

Yes
No

a. Is your organization a Substantial Contributor to TNC?

b. Now, or at the time of the proposed transaction, to the best of your knowledge, do any of the following (individually or collectively with other persons) (i) own more than 5% of the stock or value of your organization (directly or indirectly) and/or (ii) have a controlling influence over the organization’s management or policies (e.g., key management or board member):

· TNC employee (or former employee who left within the last twelve (12) months);

· TNC Key Employee;

· TNC Board Member;

· Substantial Contributor to TNC;

· TNC Chapter Trustee or Advisory Council Member for TNC or TNC’s related entities (or former trustees/members who left within the last twelve (12) months); and/or

· Family members or close relatives of the above individuals.

c. Now, or at the time of the proposed transaction, have or will any TNC Key Employees or members of the Board of Directors serve in the following positions of your organization?

· Officer, director, trustee, key employee, or partner;

· Member (if your organization is a limited liability corporation); and/or

· Shareholder (if your organization is a professional corporation).

STEP 3: COMMENTS (Explain any “yes” answers checked above. Attach additional pages as necessary.)

STEP 4: NOTICE OF TNC CODE OF CONDUCT & SIGNATURES

TNC expects itself and everyone with whom it does business to conduct themselves in ways that are consistent with TNC’s Code of Conduct found at www.nature.org/codeofconduct. Anyone (whether a part of TNC or not) may contact the TNC Helpline (anonymously, if desired) with questions, concerns, or suspected violations at https://www.nature.org/tnchelpline.

The undersigned certifies the information in the inquiry form is true and correct to the best of their knowledge.

Signature:

Printed Name:

Title (if for an organization):

Address:

Date of Signature:

TNC COVERED PERSONS

The following are individuals who are currently or have been, during the preceding five (5) fiscal years, a TNC “Key Employee” or a member of the Board of Directors of TNC or one of its U.S. Related Entities.

List Current as of September 23, 2026

Current Key Employees/ Officers
Former Key Employees/ Officers
Current Board of Directors
Prior Board Members

Nathalie Augustin David Banks James Bond Neel Broker Matt Brown Jan Glendening Jeff Mindlin Tom Neises Asha Shah

James Asp Hans Birle William Ginn Wisla Heneghan Brian McPeek Bola Olusanya Hugh Possingham Michael Sweeney Leonard Williams

James Attwood, Jr.

John Bernstein Stuart Brown Dan Chung Suzan Craig Dunand Michelle DePass William Frist Harry Hagey Margaret Hamburg Fred Hu Sally Jewell Nancy Knowlton Edwin Macharia Jennifer Morris Roshni Nadar Malhotra Douglas Petno Sergio Rial Fawn Sharp Anna Skoglund Rashid Sumaila Kent J. Thiry Kevin Weil Margaret C. Whitman

Amy Batchelor Shona L. Brown Laurence Fink Joseph H. Gleberman Shirley Ann Jackson Andrew Liveris Jack Ma Claudia Madrazo Craig McCaw Ana M. Parma Vincent Ryan Rajiv Shah Brenda Shapiro Thomas J. Tierney Moses Tsang Frances A. Ulmer Ying Wu

TNC Related Entity Covered Persons (If applicable)

Key Employees (members of Related Entity leadership team):
Current Fiduciary Board Members, if applicable:

Attachment B: US Government Laws and Regulations

U.S. Government Laws and Regulations Attachment

U.S. GOVERNMENT LAWS AND REGULATIONS. Contractor understands that this Contract will be funded by U.S. Government funding and that Contractor shall be responsible for ensuring that all work/travel is carried out in compliance with any pertinent regulations and laws including but not limited to those listed below.

A. RECORD RETENTION. Financial records, supporting documents, statistical records, and all other records pertinent to this Contract shall be retained by Contractor for a period of three years from the date of submission of the final expenditure report. If any litigation, claim, or audit is started before the expiration of the three-year period, the records shall be retained until all litigation, claims, or audit findings involving the records have been resolved.

B. ACCESS TO RECORDS. TNC, the U.S. Federal entity providing the funding from which this Contract will be paid, the Comptroller General of the United States, or any of their duly authorized representatives, shall have the right of timely and unrestricted access to any books, documents, papers, and other records of Contractor that are pertinent to the Contract for the purpose of making audits, examinations, excerpts, copies, and transcriptions. The rights of access in this paragraph are not limited to the required retention period, but shall last as long as records are retained.

C. DEBARMENT AND SUSPENSION. No contract shall be made to parties listed on the governmentwide Excluded Parties List System in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR Part 1986 Comp., p. 189) and 12689 (3 CFR Part 1989 Comp., p. 235), “Debarment and Suspension.” The Excluded Parties List System in SAM contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549.

D. CONTRACTOR LIABILITY. Contractor assumes sole responsibility for reimbursement to the Conservancy or the U.S. Federal Government, whichever is appropriate, of a sum of money equivalent to the amount of any expenditures disallowed should TNC, the U.S. Federal entity providing funding, or any authorized agency rule, through audit exception or some other appropriate means, that expenditures from funds allocated to Contractor were not made in compliance with the provisions of this Contract.

E. TRAFFICKING IN PERSONS.

(a) Contractor (including its officers, directors, employees and agents must not -

(i) Engage in severe forms of trafficking in persons during the Contract Term;

(ii) Procure a commercial sex act during the Contract Term; or

(iii) Use forced labor in the performance of the Contract or in any subcontracts.

(b) TNC may unilaterally terminate this Contract, without penalty, if Contractor is determined by TNC to have violated this provision through:

(i) Conduct that is either associated with performance under this Contract;

(ii) Conduct imputed to Contractor or his subcontractor.

(c) Other Requirements:

(i) Contractor shall inform TNC immediately of any information received from any source alleging a violation of a prohibition in paragraph (a)(i) of this provision.

(ii) Contractor shall include the requirements of this provision in any subcontract made under this Contract.

(d) Definitions. For purposes of this provision:

(i) “Employee” means either:

A. An individual employed by Contractor or a subcontractor who is engaged in the performance of the project or program under this Contract; or B. Another person engaged in the performance of the project or program under this Contract and not compensated by Contractor, including, but not limited to, a volunteer or individual whose services are contributed by a third party.

(ii) “Forced labor” means labor obtained by any of the following methods: the recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.

(iii) “Severe forms of trafficking in persons” means (a) sex trafficking in which a commercial sex act is induced by force, fraud, or coercion, or in which the person induced to perform such act has not attained 18 years of age; or (b) the recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.

(iv) “Commercial sex act” means any sex act on account of which anything of value is given to or received by any person.

(v) “Coercion” means (a) threats of serious harm to or physical restraint against any person; (b) any scheme, plan, or pattern intended to cause a person to believe that failure to perform an act would result in serious harm to or physical restraint against any person; or (c) the abuse or threatened abuse of the legal process.

F. CONSTRUCTION, REPAIR and FACILITIES IMPROVEMENTS. If the activities funded by this contract involve construction, repair or facilities improvements, the following provisions may apply:

1. Davis-Bacon Act. If the value of this contract exceeds $2,000, and if required by the U.S. Federal funding agency, Contractor shall comply with the Davis-Bacon Act (40 U.S.C. 3141 – 3144 and 3146 - 3148) and as supplemented by Department of Labor regulations (29 C.F.R. Part 5, "Labor Standards Provisions Applicable to Contracts Governing Federally Financed and Assisted Construction").

2. Federal Contractor Minimum Wage Requirement. If this contract is subject to the Davis-Bacon Act, the Service Contract Act, or is otherwise in connection with Federal property, land, or services to federal employees, Executive Order 13658 applies and all hourly/nonexempt employees directly working on this contract or performing support services must be paid the Federal Contractor Minimum Wage rate as established by the Department of Labor each year. This minimum wage requirement is subject to change, and Contractor must ensure that staff and any subcontractors are paid the minimum wage that is in effect.

3. Copeland Anti-Kickback Act. In any construction or repair contract, Contractor shall comply with the Copeland Anti-Kickback Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 C.F.R. Part 3, "Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States").

4. For construction or facility improvement contracts not exceeding $250,000, Contractor shall follow its own bid guarantee, performance bond, and payment bond requirements. For those contracts exceeding $250,000, in situations where the Conservancy does not examine Contractor's bid guarantee and bonding requirements and has not notified Contractor that the U.S. Federal Government's interest is adequately protected, Contractor shall comply with 2 CFR 200.326.

5. Equal Opportunity. If this Contract meets the definition of a “federally assisted construction contract” as described in 41 CFR Part 60-1.3, Contractor must comply with E.O. 11246, "Equal Employment Opportunity," as amended by E.O. 11375, "Amending Executive Order 11246 Relating to Equal Employment Opportunity" and as supplemented by regulations at 41 C.F.R. Part 60, "Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor."

G. Domestic Preferences for Procurements. Contractor should, to the greatest extent practicable and consistent with law, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards, contracts, and purchase orders under Federal awards.

(a) For purposes of this section:

(i) “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

(ii) “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.

H. BYRD RULE ANTI-LOBBYING AMENDMENT. If the value of this agreement exceeds $100,000, Contractor shall certify, to the best of Contractor’s knowledge and belief, that:

1. No U.S. Federal appropriated funds have been paid or will be paid, by Contractor or on behalf of Contractor, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any U.S. Federal contract, the making of any U.S. Federal grant, the making of any U.S. Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any U.S. Federal contract, grant, loan, or cooperative agreement.

2. If any funds other than U.S. Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection the underlying U.S. Federal award, Contractor shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.

3. Contractor shall require that the language of this certification be included in the award documents for all subcontracts under this Contract and that all subrecipients shall certify and disclose accordingly.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

I. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT. If the value of this agreement exceeds $100,000 and the activities require the employment of mechanics or laborers, Contractor shall comply the Contract Work Hours and Safety Standards Act (40 U.S.C. 3702 and 3704.), as supplemented by Department of Labor regulations (29 C.F.R. Part 5).

J. CLEAN AIR ACT. If the value of this agreement exceeds $150,000, the Contractor shall comply with all applicable standards, orders, or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401 et seq.) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251 et seq.). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).

K. INVENTIONS. If the work to be done under this contract involves the performance of experimental, developmental, or research work, Contractor shall comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

[End of U.S. Government Laws and Regulations Attachment]

The Nature Conservancy 27 11/16/2026 image1.png image2.jpeg

File details come from the government source that posted it. Updated .