1-RFP 550670 Attachment C Price Proposal -Huber.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
CDD Huber St. Roof Replacement
Solicitation number
550670
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a price proposal attachment for a roof replacement project submitted to the City of Detroit Office of Contracting and Procurement on behalf of the Construction and Demolition Department for the CDD Huber Street facility located at 6333 Huber Street, Detroit, Michigan. The project involves installation of a Duro-Last Roof System by an authorized Duro-Last installer, with proposals due October 30, 2026. The price proposal document is structured in two phases: Phase 1 covers design services and includes line items for design and permit drawings or documentation with associated costs and an awardee mark-up fee if applicable; Phase 2 encompasses construction items including mark-up fees, general conditions such as dumpsters, management fees, superintendent costs, and equipment rental, insurance and bonding, and alternate pricing.

The price proposal template requires fully burdened hourly labor rates for construction manager project personnel including project director, project manager, project superintendent, project engineer, project estimator, accounting, clerical, journeyman for general contractor, and other specified positions. All fields in Column B are calculated automatically and should not be edited. The template provides designated spaces for cost entries related to general conditions with an estimated construction cost of approximately $800,000.00, allowing the contractor to detail superintendency duration and all associated project management and labor costs in a standardized format for competitive evaluation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

6333 Huber CDD's Roof Replacement Price Proposal - Attachment C
DO NOT EDIT ANY OF THE B COLUMNS - THESE ARE CALCULATED FIELDS
Phase 1:
Design Services FeeAnticipated Duration/HoursComments
A. Design and Permit Drawings and/or documentation$ - 0- 0Include permit costs
Awardee Mark up Fee for Phase 1 if applicalbe and/or not included in A$ - 0
Phase 1 Sub Total:$ - 0
Phase 2: Construction
ItemsValue - CostsComments
1. Mark Up Fee$ - 0if construction cost is approx. $800,000.00
2. General Conditions - specify duration$ - 0This includes, dumpsters, management fees, superintendant, clean up costs and equipment rental fees, etc
3. Insurance and Bond$ - 0
3. Alternate pricing #1$ - 0
Construction Manager's Project Personnel*Hourly Rate**Provide Fully Burdened Labor Rates*
Project Director$ - 0
Project Manager$ - 0
Project Superintendent$ - 0
Project Engineer$ - 0
Project Estimator$ - 0
Accounting$ - 0
Clerical$ - 0
Journeyman for General Contractor$ - 0
Others:$ - 0
Others:$ - 0
Others:$ - 0
Others:$ - 0
Others:$ - 0