1-Phase 3 - Engineering and Design.docx
DOCX document 189 KB Posted
- Attached to
- NS27-140 Washington County Solid Waste District - Phase 3 Professional Engineering Design Services
- Solicitation number
- NS27-140
- Issued by
- Washington County, Utah
About this file
This is a Request for Statements of Qualifications (RFQ) issued by Washington County Solid Waste District for professional engineering design services. The District seeks qualified engineering firms to provide design and related services for Phase 3 improvements consisting of two components: Phase 3 West—Public Convenience Center (PCC) improvements and Phase 3 East—Maintenance Yard Update. The scope includes evaluating existing conditions, developing improvements to operations, circulation, grading, drainage, pavement, utilities, and site infrastructure for both components, coordinating specialty services (survey, geotechnical, structural, electrical, environmental), preparing coordinated design deliverables (plans, specifications, cost estimates, permitting materials, bid packages), and providing bidding, procurement, and construction administration support as authorized. The RFQ was issued November 25, 2026, with written questions due December 11, 2026, at 2:00 PM MST, responses and addenda issued December 14, 2026, and SOQs due December 18, 2026, at 2:00 PM MST via the U3P Portal. Evaluation and potential interviews will occur December 18, 2026, through January 15, 2027, with anticipated selection and negotiations from January 15 through January 29, 2027, and anticipated board action on February 8, 2027. The District will select a firm through a qualifications-based process, rank firms using published criteria, and negotiate scope and compensation with the highest-ranked firm.
Professional fees and pricing shall not be included in the Statement of Qualifications; compensation will be negotiated following firm selection in accordance with applicable law. Respondents must demonstrate legal authorization to offer professional engineering services in Utah with appropriate licensure, designate a Utah-licensed professional engineer as engineer of record, provide documented experience with civil engineering design for public infrastructure or comparable complexity, name a qualified project manager and key personnel, and demonstrate capability to provide required design disciplines and construction-phase support directly or through identified subconsultants. SOQ submissions must not exceed 20 pages (excluding cover letter, resumes, and certifications) and must include firm profile, comparable project experience, proposed project team, project understanding, local service plan, management and quality control procedures, and at least three relevant client references. Evaluation criteria assign maximum points as follows: relevant engineering and infrastructure experience (20 points), local presence and responsiveness (30 points), project manager and key personnel qualifications (15 points), project understanding and technical approach (20 points), past performance and references (10 points), and quality assurance/quality control (5 points), for a total of 100 points. Firms achieving a minimum score of 75 points may be invited to participate in interviews using consistent questions and criteria. The District makes no commitment to award a contract or reimburse proposal preparation costs, and the final contract award is subject to District approval and execution of a written professional services agreement with appropriate insurance, indemnification, and other standard provisions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Washington County Solid Waste District Request for Statements of Qualifications
Phase 3 West PCC Public Convenience Center & November 2026 Phase 3 East Maintenance Yard Improvements — Professional Engineering Design Services
RFQ
| Issue date |
| November 25th 2026 |
| Questions due |
| December 11th 2026, at 2:00 PM MST |
| SOQ deadline |
| December 18th 2026, at 2:00 PM MST |
| Submission method |
| U3P Portal https://utah.bonfirehub.com/ |
| District contact |
| Lacey O’Hara, District Manager |
| Project / facilities |
| WCSW District Phase 3 |
1. Invitation and Purpose Washington County Solid Waste District (District) invites Statements of Qualifications (SOQs) from qualified professional engineering firms to provide engineering design and related professional services for the Washington County Solid Waste Phase 3 improvements, consisting of Phase 3 West — Public Convenience Center (PCC) and Phase 3 East — Maintenance Yard Update. The District intends to select a firm through a qualifications-based process and negotiate scope and compensation after ranking firms.
The anticipated assignment includes coordinated design for both Phase 3 components, with potential bidding and construction-phase services as authorized in the final agreement. Respondents should demonstrate capacity to address both areas and coordinate design packages and construction sequencing as needed.
2. Project Background and Anticipated Scope — Phase 3 West and Phase 3 East The project includes two components: (1) Phase 3 West — PCC Public Convenience Center improvements; and (2) Phase 3 East — Maintenance Yard Update. The site locations, boundaries, existing facilities and improvements to remain, specific work elements, anticipated construction budget, funding, schedule, and whether separate bid packages are desired.
Phase 3 West — Public Convenience Center: evaluate existing conditions and develop improvements to the PCC operations, circulation, public access, grading, drainage, pavement, utilities, and associated site infrastructure, as directed by the District.
Phase 3 East — Maintenance Yard Update: evaluate existing maintenance yard conditions and develop improvements to operational layout, vehicle and equipment circulation, surfacing, grading, drainage, utilities, and supporting site infrastructure, as directed by the District.
Coordinate survey, geotechnical, structural, electrical, environmental, and other specialty services as needed for the confirmed Phase 3 West and Phase 3 East scopes.
Prepare coordinated design deliverables for both components, including plans, technical specifications, construction cost estimates, permitting materials, and any separate bid packages required by the District.
Provide bidding and procurement-phase assistance, including responding to contractor questions and supporting addenda, as authorized.
Provide construction administration, site observation, submittal review, change documentation, and closeout assistance for each Phase 3 component, as authorized.
The District may refine the scope before contract execution. No work is authorized until a written agreement and notice to proceed are issued.
3. Procurement Method and Important Conditions This solicitation requests qualifications, not price proposals. Do NOT include fee schedules, hourly rates, or project pricing in the SOQ. The District will evaluate SOQs using the published criteria, rank firms, and negotiate compensation with the highest-ranked firm in accordance with applicable law.
The District may issue written addenda, request clarifications, and conduct interviews under a consistent process disclosed to respondents. All material communications must go through the designated procurement contact. The District may reject nonresponsive submissions or cancel the solicitation only as permitted by applicable law.
4. Minimum Qualifications Respondents shall demonstrate the following minimum qualifications:
Legal authorization to offer professional engineering services in Utah, including appropriate firm and individual licensure.
A Utah-licensed professional engineer designated as engineer of record for applicable design work.
Documented experience with civil engineering design for public infrastructure, industrial facilities, solid waste facilities, or projects of comparable complexity.
Relevant experience may be demonstrated through a description of the firm’s past work, technical capabilities, and experience of proposed personnel. No minimum number of comparable projects is required.
A named project manager and qualified key personnel with defined responsibilities.
Capability to provide the required design disciplines and construction-phase support, directly or through identified subconsultants.
Ability to maintain insurance limits to be established in the final agreement and to meet the District’s anticipated schedule.
5. Statement of Qualifications Contents Submit one searchable PDF, suggested maximum 20 pages excluding cover, resumes, and required certifications. Use the following organization:
A. Cover letter Authorized representative, contact details, and acknowledgment of addenda.
B. Firm profile Legal name, office locations, Utah licensing, services, and relevant capabilities.
C. Comparable Project Experience Provide a summary of the firm’s relevant experience with civil engineering design and related infrastructure improvements. Experience with public convenience centers, solid waste facilities, maintenance yards, or similar public works and industrial facilities is preferred. Firms may include examples of previous projects that demonstrate their qualifications and ability to perform the proposed services.
D. Proposed project team Organization chart, key resumes, licenses, roles, subconsultants, and estimated availability.
E. Project understanding Key challenges, technical approach, coordination, and proposed deliverables.
F. Local service plan Where assigned staff are based; meeting/site-visit availability; response-time commitments; familiarity with local conditions and agencies.
G. Management and quality control Schedule management, QA/QC reviews, cost control, and communication procedures.
H. References Provide at least three relevant client references for projects of comparable scope or complexity. Include the client organization, project description, contact name, telephone number, and email address.
The District may contact references to evaluate the firm's past performance, communication, responsiveness, ability to meet schedules and budgets, quality of work, and overall satisfaction. Reference evaluations will be scored based on the information provided in the SOQ and feedback received from references, if contacted.
| Evaluation |
| Points |
| Quality of completed work and overall satisfaction |
| 2 |
| Communication and responsiveness |
| 2 |
| Accuracy of original project budget and management of cost overruns/change orders |
| 3 |
| Ability to resolve problems and work collaboratively |
| 2 |
| Ability to meet schedule |
| 1 |
| Total |
| 10 |
6. Evaluation Criteria Responsive SOQs will be evaluated using the following weighted criteria.
| Criterion |
| Maximum points |
| Relevant engineering and solid waste / public infrastructure experience |
| 20 |
| Local presence, availability, and responsiveness |
| 30 |
| Project manager and key personnel qualifications |
| 15 |
| Project understanding and technical approach |
| 20 |
| Past performance and references |
| 10 |
| Quality assurance / quality control |
| 5 |
| TOTAL |
| 100 |
6.1 Local Presence, Availability, and Responsiveness — 30 points The District places a high priority on local presence, timely in-person coordination, prompt field response, continuity of assigned staff, and familiarity with Washington County facilities and construction conditions. Firms should describe their local staffing, availability, response commitments, and experience supporting similar facilities.
| Evaluation element |
| Points |
| Availability of assigned staff for routine meetings and site visits |
| 8 |
| Documented response plan for urgent field issues (target: within 12 hours when needed) |
| 8 |
| Relevant experience with local agencies, utilities and infrastructure |
| 6 |
| Understanding of local soils, drainage, permitting and construction conditions |
| 4 |
| Continuity of assigned personnel and staffing coverage |
| 4 |
| TOTAL |
| 30 |
7. Evaluation and Selection Process The District will evaluate Statements of Qualifications using the criteria and point values established in this RFQ. Firms will be ranked based on their qualifications, experience, proposed project team, project understanding, and ability to meet the District's project needs.
The District may conduct interviews with firms that achieve a minimum score of 75 points out of 100 during the initial evaluation. If interviews are conducted, all firms meeting the minimum score will be invited to interview. Interviews will be conducted using consistent questions and evaluation criteria for all interviewed firms.
Interview scores, if applicable, will be incorporated into the final evaluation and ranking. The District will determine the final ranking based on the published evaluation criteria and any interview scoring.
Following evaluation, the District will negotiate the scope of services and professional fee with the highest-ranked firm. If an agreement cannot be reached, the District will formally terminate negotiations with that firm and proceed to the next highest-ranked firm, in ranking order. Professional fees shall not be included in the Statement of Qualifications. Final contract award is subject to District approval.
8. Solicitation Schedule
| Milestone |
| Date |
| RFQ issued / public notice |
| November 25th, 2026 |
| Last day for written questions |
| December 11th, 2026, at 2:00 PM MST |
| Responses / addenda issued |
| December 14th, 2026 |
| SOQs due |
| December 18th, 2026, at 2:00 PM MST |
| Evaluation and potential interviews |
| December 18th, 2026, to January 15th, 2027 |
| Anticipated selection / negotiations |
| January 15th, 2027, to January 29th, 2027 |
| Anticipated board action |
| February 8th, 2027 |
The District anticipates the following solicitation schedule. Dates will be finalized before publication, and any changes will be communicated by written addendum.
9. Questions, Addenda, and Submission Instructions All questions must be submitted in writing to Lacey@washcosolidwasteut.gov by the questions deadline. Only written addenda issued by the District modify the solicitation. Respondents are responsible for reviewing all issued addenda.
Submit SOQs to U3P Portal https://utah.bonfirehub.com/ by [DECEMBER 18TH 2026, 2:00 PM MOUNTAIN TIME]. Late submissions will be handled under applicable procurement rules. Include “WCSW Phase 3 Engineering RFQ” in the submission subject or title.
10. General Terms and Conditions The District makes no commitment to award a contract or reimburse proposal preparation costs.
Respondents shall disclose actual or potential organizational conflicts of interest and relevant relationships with District decision-makers.
SOQs may be subject to disclosure under the Utah Government Records Access and Management Act (GRAMA); confidentiality claims must be specifically identified and will be evaluated under law.
The selected firm will be required to execute a written professional services agreement with appropriate insurance, indemnification, ownership of documents, and termination provisions.
The District may verify references, licensing, and representations made in an SOQ.
The selection of professional engineering services will be conducted in accordance with the Utah Procurement Code (Utah Code Title 63G, Chapter 6a) and other applicable laws and regulations.
2 | Page WCSW – Engineering RFQ image1.png