1-Perrine Storm Sewer Separation - Bid Specs.pdf

PDF 12 MB Posted

Attached to
Perrine Storm Sewer Separation
Solicitation number
US.252770
Issued by
Allegheny County, Pennsylvania

About this file

This is a Bid Specifications document for the Perrine Storm Sewer Separation project issued by Crafton Borough in Allegheny County, Pennsylvania. The project involves the installation of new storm sewer pipe, inlets, and manholes along Perrine Street, encompassing clearing and grubbing, traffic control, resident notification, erosion and sedimentation control measures, existing utility protection, street reconstruction, and bituminous milling and overlay. Electronic bid submissions are required via PennBid (www.PennBid.net) no later than 10:30 a.m. prevailing time on October 15, 2026. A mandatory pre-bid meeting will be held on September 15, 2026, at 10:30 a.m. prevailing time at 100 Stotz Avenue, Pittsburgh, PA 15205. Contractors must attend the entire meeting for their bids to be considered responsive; signing in and immediately departing will not constitute compliance. Bidders must be PennDOT pre-qualified under the bidding entity's name for the majority of specified Work Class Codes including C, C1, E, F, F1, F2, F3, and G.

Pennsylvania Prevailing Wage rates are required to be paid on this project. All bid documents, drawings, specifications, instructions to bidders, general conditions, forms of proposals and agreement, and related solicitation materials are available at no cost on the PennBid website. No hard copy bids will be accepted. Unofficial bid summaries will be publicly displayed on PennBid at the time of bid opening.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-5667-0020

C O

N T

R A

C T

D O

C U

M E

N T

S

Mandatory Pre-Bid Meeting: September 15, 2026

Mandatory Pre-Bid Meeting Time: 10:30 A.M.

Mandatory Pre-Bid Meeting Location: 100 Stotz Avenue, Pittsburgh, PA 15205

Bid Opening Date: October 15, 2026 via PennBid

Bid Opening Time: 10:30 A.M.

P R E P A R E D F O R

Crafton Borough

100 Stotz Avenue

Pittsburgh, PA 15205

Base Bid – Perrine Street

The project includes, but is not limited to, the installation of new storm sewer pipe, inlets and manholes; clearing and grubbing; traffic control; resident notification; erosion and sedimentation control measures; existing utility protection; street reconstruction; existing concrete curb, gutter, sidewalk and handicap ramp replacement; bituminous milling and overlay; and miscellaneous site restoration, complete in place.

PERRINE STORM SEWER SEPARATION

P R E P A R E D B Y

The Gateway Engineers, Inc.

100 McMorris Road

Pittsburgh, PA 15205

412.921.4030 PHONE

www.gatewayengineers.com

Crafton Borough, Allegheny County, Pennsylvania http://www.gatewayengineers.com/

Project Directory Copyright © 2014 The Gateway Engineers, Inc. All rights reserved.

00002-1

Project Directory

OWNER: Crafton Borough

Mr. Jim Price, Borough Manager

100 Stotz Avenue

Phone: 412-921-0752

ENGINEER: The Gateway Engineers, Inc.

Mr. Scott Baker

100 McMorris Road

Phone: 412-409-2364

Table of Contents Copyright © 2014 The Gateway Engineers, Inc. All rights reserved.

00010-1

TABLE OF CONTENTS

DIVISION 0 – BIDDING AND CONTRACT DOCUMENTS

00001 – Project Title Page (Cover)

00002 – Project Directory

00010 – Table of Contents

00100 – Notice to Bidders

00110 – Bid Form and Proposal

00130 – Bid Bond

00180 – Non-Collusion Affidavit

00190 – Public Work Employment Verification Form

00200 – Instructions to Bidders

00490 – Bidding Addenda

00510 – Notice of Award

00520 – Agreement

00550 – Notice to Proceed

00605 – Certificate of Insurance

00610 – Performance Bond

00615 – Payment Bond

00620 – Application for Payment

00700 – General Conditions

00800 – Supplementary Conditions

00830 – Pennsylvania Prevailing Wage Determination

00940 – Work Change Directive

00941 – Change Order

00942 – Field Order

DIVISION 1 – GENERAL REQUIREMENTS

01100 – Summary

01110 – General Project Requirements

01210 – Allowances

01250 – Contract Modification Procedures

01270 – Unit Prices

01290 – Payment Procedures

01310 – Project Management and Coordination

01320 – Construction Progress Documentation

01322 – Photographic or Video Documentation

01330 – Submittal Procedures

01400 – Quality Requirements

01500 – Temporary Facilities and Controls

01524 – Construction Waste Management

01600 – Product Requirements

01700 – Execution Requirements

01770 – Closeout Procedures

Table of Contents Copyright © 2021 The Gateway Engineers, Inc. All rights reserved.

00010-2

DIVISION 2 – SITE CONSTRUCTION

02051 – Abandonment of Storm Sewers

02080 – Piped Utilities Materials and Methods

02220 – Traffic Control and Notifications

02225 – Temporary Tree and Plant Protection

02230 – Site Clearing and Preparation

02235 – Selective Demolition

02240 – Dewatering

02300 – Earthwork

02310 – Trench Excavation and Backfill For Sewers and Utilities

02315 – Excavation Support and Protection

02530 – Sanitary Sewage

02531 – CCTV Inspections

02620 – Subdrainage

02630 – Storm Drainage

02741 – Asphalt Paving

02742 – Pavement Markings

02743 – Driveway Restoration Requirements

02751 – Cement Concrete Pavement

02764 – Pavement Joint Sealants

02850 – Incidental Restoration Requirements

02920 – Site Restoration

ISSUED FOR BID DRAWINGS (IFB: 09-03-2026)

BASE BID: PERRINE STREET

Sheet Number Sheet Title

CS Cover Sheet

C050 Overall Existing Conditions Plan

C060 Demolition Plan

C300 Utility Plan

C400 Erosion and Sediment Control Plan

C401 Erosion and Sediment Control Details

C402 Erosion and Sediment Control Details

C500

C501

C600

C601

Storm Sewer Profiles

Storm Sewer Profiles

Construction Details

Construction Details

C700 Site Restoration Plan

Notice to Bidders Copyright © 2020 The Gateway Engineers, Inc. All rights reserved.

00100 - 1

NOTICE TO BIDDERS

CRAFTON BOROUGH

ALLEGHENY COUNTY, PENNSYLVANIA

Proposals will be received by Crafton Borough via PennBid until 10:30 a.m. prevailing time on

October 15, 2026, for the following project:

PERRINE STORM SEWER SEPARATION

The project includes, but is not limited to, the installation of new storm sewer pipe, inlets and manholes; clearing and grubbing; traffic control; resident notification; erosion and sedimentation control measures; existing utility protection; street reconstruction; existing concrete curb, gutter, sidewalk and handicap ramp replacement; bituminous milling and overlay; and miscellaneous site restoration, complete in place.

All Proposals must be submitted electronically via PennBid (www.PennBid.net), before 10:30 a.m.

prevailing time, on October 15, 2026. At that time, Bids will be opened with an unofficial

Bid Summary Table publicly displayed on PennBid. No hard copy Bids will be accepted.

Copies of Drawings, Specifications, Instructions to Bidders, General Conditions, Forms of Proposals and Agreement and all other information relating to this Solicitation will be available at no cost on the

PennBid site (www.PennBid.net).

Pennsylvania Prevailing Wage rates are required to be paid on this Project.

There will be a Mandatory Pre-Bid Meeting on September 15, 2026, at 10:30 a.m. prevailing time at

100 Stotz Avenue, Pittsburgh, PA 15205. Contractors who intend to bid MUST attend for their bids to be considered as responsive. “Attendance” for the purposes of this Paragraph shall mean being present for the entirety of the Meeting. Signing the Register at the beginning of the Meeting and leaving immediately thereafter will not constitute attendance. Note that the Meeting start time will be strictly enforced unless there were circumstances that affected most of the prospective bidders.

Bidders must be PennDOT pre-qualified under the name of the bidding entity for the majority of the following Work Class Codes: C; C1; E; F; F1; F2; F3; G; H; H2; and K. Evidence of compliance must be submitted with the Bid for the Bid to be considered as responsive. Subcontractors shall also be required to be PennDOT pre-qualified for the following work categories: J, M, M1, M2, M3, O, Q, and Q1.

Proposals must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of Crafton Borough in an amount equal to ten (10%) percent of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within fifteen (15) days after Notice of the Award of the Contract.

Proposals must be made to Crafton Borough, Allegheny County, Pennsylvania, and shall remain firm for a period of sixty (60) days. No Bidder may withdraw their Proposal during the sixty (60) day period without forfeiting his Bid guarantee.

http://www.pennbid.net/

Notice to Bidders

00100 - 2

The Borough retains the right to award Contracts to the lowest responsive, PennDOT pre-qualified, and responsible Bidder based on consideration of quality of previous work, record of completing projects on time, history of payments to subcontractors and suppliers, maintenance of a permanent place of business, adequacy of equipment and plant to do the work, technical experience, a solid financial base to guarantee contract completion and all other factors deemed relative by the Borough.

Bidders are also advised that the Borough specifically reserves the right to award to the lowest responsible, responsive and PennDOT pre-qualified Bidder a contract for all or any portions of the work listed in the Proposal, and in awarding a contract for less than the total work listed, or less than all portions of the work listed, the contract price will be determined from the total quantities for each item listed and the unit price bid for each item listed.

Performance, Maintenance, and Labor and Material Payment Bonds, along with Public Liability and

Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of

Workman's Compensation must be filed with the executed Agreement upon acceptance of the

Proposal from the successful Bidder.

Crafton Borough also reserves the right to reject any or all Proposals, or any part thereof, for any reason, and reserves the right to waive any informality therein.

Dates of Publication BY: Jim Price

Borough Manager

September 3, 2026

September 10, 2026

00110 BID FORM AND PROPOSAL

00110 – 1

C-5667-0020 Proposal From__________________________________

BID FORM AND PROPOSAL

ARTICLE 1 – BID RECIPIENT

This Bid is submitted to: Crafton Borough (Via PennBid)

Attn: Mr. Jim Price, Borough Manager

100 Stotz Avenue

Pittsburgh, PA 15205

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with

Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – PROPOSAL FOR:

PERRINE STREET SEWER SEPARATION

The project includes, but is not limited to, the installation of new storm sewer pipe, inlets and manholes;

clearing and grubbing; traffic control; resident notification; erosion and sedimentation control measures;

existing utility protection; street reconstruction; existing concrete curb, gutter, sidewalk and handicap ramp replacement; bituminous milling and overlay; and miscellaneous site restoration, complete in place.

ARTICLE 3 – TIME OF COMPLETION:

Base Bid – Perrine Street

Bidder agrees that the Work will be substantially complete within one hundred forty-five

(145) calendar days after the date when the Contract Times commence to run as provided in Article 4 of the General Conditions and will be completed and ready for final payment in accordance with Article 15 of the General Conditions within one hundred seventy-five (175) calendar days after the date when the

Contract Times commence to run or liquidated damages in the amount of Five Hundred ($500.00) dollars per calendar day will be charged. As actual damages for any delay in completion are impossible to compute and ascertain with certainty as a basis of recovery by Crafton Borough of actual damages, the

Contractor and its Surety shall be liable to Crafton Borough the sum of Five Hundred ($500.00) dollars as fixed and agreed for each calendar day of delay until the Work is complete and accepted. Such liquidated damages are intended to represent actual damages and are not intended as a penalty. The Contractor shall pay liquidated damages to Crafton Borough without limiting Crafton Borough’s right to terminate this

Agreement for default as provided elsewhere herein.

Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times.

00110 – 2

ARTICLE 4 – BASIS OF BID

Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

Base Bid Schedule – Perrine Street

Item

No.

Item Unit Quantity Unit Price Amount

15” SLCPP WT JT Storm Pipe, all depths, all backfill conditions, complete in place

L.F. 475 $_________ $_________

18” SLCPP WT JT Storm Pipe, all depths, all backfill conditions, complete in place

L.F. 95 $_________ $_________

24” SLCPP WT JT Storm Pipe, all depths, all backfill conditions, complete in place

L.F. 160 $_________ $_________

24” Concrete Endwall with Rip

Rap Apron, complete in place

EA. 1 $_________ $_________

48” Storm Sewer Manhole, all conditions, 0’-8’in depth, complete in place

EA. 2 $_________ $_________

48” Storm Sewer Manhole Riser over 8’ Depth, all conditions, complete in place

V.F. 2 $_________ $_________

60” Storm Sewer Manhole, all conditions, 0’-8’ in depth, complete in place

EA. 2 $_________ $_________

60” Storm Sewer Manhole over 8’

Depth, all conditions, complete in place

V.F. 7 $_________ $_________

PennDOT Standard Inlet with

Type ‘M’ Frame / Vane Grate, all conditions, all depths, complete in place

EA. 4 $_________ $_________

Plug and Abandon Existing Storm

Sewer (All Diameters), complete in place

EA. 4 $_________ $_________

NASSCO Post-installation CCTV of Storm Sewer (All Diameters), complete in place

L.F. 730 $_________ $_________

Municipal Bituminous Roadway

Trench Restoration, complete in place

S.Y. 290 $_________ $_________

3.5” Municipal Mill and Overlay

Bituminous Roadway, complete in place

S.Y. 810 $_________ $_________

00110 – 3

Item

No.

Item Unit Quantity Unit Price Amount

Bituminous Wedge Curb, complete in place L.F. 400 $_________ $_________

Full Depth Removal of Pavement

Surface and Subbase, complete in place

S.Y. 240 $_________ $_________

Class IV, Type A Geotextile

Material, complete in place S.Y. 240 $_________ $_________

6” compacted depth AASHTO #1 with 2” PennDOT 2A Choke

Subbase, complete in place

S.Y. 240 $_________ $_________

19.0 mm Superpave Binder

Course, PG 64S-22 0.0 to 0.3 million ESAL’s – 4” compacted depth, complete in place

S.Y. 240 $_________ $_________

9.5mm Superpave FG Wearing

Course, PG 64S-22 0.0-0.3 million

ESAL’s – 1.5” compacted depth, SRL “H” or better, complete in place

S.Y. 240 $_________ $_________

Replacement of Unsuitable Areas with AASHTO #1 Limestone, complete in place

C.Y. 50 $_________ $_________

Removal and Replacement of

Existing Concrete Sidewalk, complete in place

S.F. 260 $_________ $_________

Storm and/or Sanitary Lateral

Repairs (All Sizes, Conditions and

Depths), complete in place

L.F. 50 $_________ $_________

Removal and Replacement of

Existing Concrete Curb, including

Underdrain, complete in place

L.F. 65 $_________ $_________

Removal and Replacement of

Handicap Ramps, complete in place

EA. 3 $_________ $_________

Concrete Header, complete in place

EA. 2 $_________ $_________

Site Clearing and Site Preparation, complete in place L.S. 1 $_________ $_________

Site Cleanup, Plantings, and Site

Restoration, complete in place L.S. 1 $_________ $_________

00110 – 4

Item

No.

Item Unit Quantity Unit Price Amount

Erosion and Sedimentation

Control, complete in place L.S. 1 $_________ $_________

Concrete Encasement of Sewers and Other Utilities (Any

Diameter), complete in place

L.F. 60 $_________ $_________

Construction Documentation, complete in place L.S. 1 $_________ $_________

Traffic Control; Site Protection;

Resident and Business

Notification; GPR Survey; Utility

Notification, Coordination, and

Removal and Utility Shoring, complete in place

L.S. 1 $_________ $_________

Exploratory Excavation, complete in place C.Y. 50 $_________ $_________

Hydroexcavation, complete in place

HR. 10 $_________ $_________

34 As-Built Plan, complete in place L.S. 1 $_________ $_________

35 Crew Time, complete in place HR. 20 $_________ $_________

Removal and Replacement of

Existing Brick Driveways, complete in place

S.F. 100 $_________ $_________

Remove and Replacement of

Existing Aggregate Driveway, complete in place

S.Y. 110 $_________ $_________

Base Bid Total (Numeric) $__________________________________________________________

00110 – 5

The Borough retains the right to award the Contract to the lowest responsive, PennDOT pre-qualified and responsible Bidder based on consideration of quality of previous work, record of completing projects on time, history of payments to subcontractors and suppliers, maintenance of a permanent place of business, adequacy of equipment and plant to do the work, technical experience, a solid financial base to guarantee contract completion and all other factors deemed relative by the Borough.

Bids will only be accepted from Bidders who attended the Mandatory Pre-Bid Meeting on

September 15, 2026, in addition to being PennDOT Pre-qualified for the type of work contemplated.

“Attendance” for the purposes of this Paragraph shall mean being present for the entirety of the Meeting.

Signing the Register at the beginning of the Meeting and leaving immediately thereafter will not constitute attendance.

Bidders acknowledge that the name of the bidding entity shown on the Mandatory Pre-bid Meeting

Sign-In Sheet must match the corporate name shown on the PennDOT Pre-qualification Certificate for the

Bid to be considered as responsive.

Bidders are advised that the Borough expressly reserves the right to reject all bids, and specifically reserves the right to award to the lowest responsive, PennDOT pre-qualified and responsible Bidder a contract for all or any portions of the work listed in the Proposal, and in awarding a contract for less than the total work listed, or less than all the portions of the work listed, the Contract price will be determined from the total quantities for each item listed and the unit price for each item listed.

Bidders acknowledge that each Bid Unit Price shown on the Bid Form and Proposal includes an amount considered by the Bidder to be adequate to cover the overhead and profit for each separately identified item. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for comparison of

Bids, and final payment for all Bid Items will be based on actual installed quantities, determined as provided in the Contract Documents.

In addition, Bidders acknowledge that the Borough reserves the right to increase or decrease listed Bid

Form and Proposal quantities (including elimination of quantities in their entirety) with applicable changes to the final contract price without consideration for recovery of any or all direct or indirect costs associated with the adjusted or eliminated quantity subject to all applicable Sections of this Document.

Bidders also acknowledge the elimination of quantity will not be a basis for a change to the

Bid Unit Price or an adjustment to the final Contract Value as determined from actual installed quantities.

A price adjustment for any material will not be permitted. Contractors shall include all costs necessary to complete the project in accordance with the Contract Documents by the listed date of Final Completion in their total bid price. A time adjustment due to material availability may be considered by the Owner upon submittal of acceptable documentation by the Contractor. Contractors shall note the material submittals shall be made no later than fifteen (15) days after Notice of Award (NOA). Material shall be ordered no later than ten (10) days after submittal approval.

Payments for “stored materials” including deposits, conditional payments and/or pre-payments required by Suppliers will not be considered for payment. All work must be “complete in place” for payment consideration.

The Surety for the apparent Low Bidder shall supply a signed and notarized statement that they will provide the required bonding for the project in the event the apparent low bidder is more than fifteen percent (15%) lower than the second apparent Low Bidder prior to project award.

00110 – 6

The Borough retains the right to reject any or all Bids, including without limitation, non-conforming, non-responsive, unbalanced, or conditional Bids. All Bidders shall note applicable language regarding unbalanced Bids elsewhere in these Specifications.

ARTICLE 5 – BIDDER'S ACKNOWLEDGEMENTS

The Bidder acknowledges all the terms and conditions of the Instructions to Bidders without limitation including those dealing with the disposition of Bid security. The Bidder acknowledges that this Bid will remain subject to acceptance for sixty (60) calendar days after the Bid opening, or for such longer period that the Bidder may agree to in writing upon the request of the Borough.

The Bidder acknowledges that estimated quantities are not guaranteed, are solely for the comparison of

Bids and that final payment for all Unit Price Bid items will be based on actual installed quantities.

Bidder acknowledges that each Bid Unit Price includes an amount considered by the Bidder to be adequate to cover the overhead and profit for each separately identified item. No additional compensation, including claims for loss of overhead and profit, or an adjustment to the final Contract Value, will be considered for the reduction and/or elimination in any listed quantity during construction.

The Bidder acknowledges that all Unit Prices have been computed in accordance with Article 13 of the

General Conditions.

The Bidder acknowledges that this project is partially funded by an ALCOSAN GROW Grant and, as such, all requirements of the GROW Grant program shall be strictly followed at no additional cost to the

Owner.

ARTICLE 6 – BIDDER'S REPRESENTATIONS

In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.

Addendum No. Addendum Date

B. Bidder has visited the site, conducted a thorough, alert visual examination of the site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Federal, State and Local Laws and

Regulations that may affect cost, progress and performance of the Work.

D. Bidder has considered the information known to Bidder itself; information commonly known to Contractors doing business in the locality of the site; information and observations obtained from visits to the site; the Bidding Documents; and any site-related logs, reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by

Bidder; and (3) Bidder’s safety precautions and programs.

00110 – 7

E. Bidder agrees, based on the information and observations referred to in the preceding

Paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the

Bidding Documents.

F. Bidder is aware of the general nature of work to be performed by Owner and others at the site that relates to the Work as indicated in the Bidding Documents.

G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the

Bidding Documents.

H. Bidder has given the Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding and Contract Documents and any attached reports and certifies the written resolution thereof by Engineer is acceptable to

Bidder unless further clarification is requested. In addition, the Bidder acknowledges that all structures can be constructed per Plan and that no additional charges will be accepted for changes to any structure.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work for which this Bid is submitted.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article, and that without exception the

Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

K. Bidder will submit written evidence of its authority to do business in the state where the project is located not later than the date of its execution of the Agreement.

L. All notices, demands, requests, instructions, approvals, proposals, and claims must be in writing.

ARTICLE 7 – FURTHER REPRESENTATIONS

Bidder further represents that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

00110 – 8

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. The following meanings apply for the purposes of this Paragraph:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.

ARTICLE 8 – ATTACHMENTS TO THIS BID

The following documents are attached to and made a condition of this Bid:

A. Required Bid security in the form of a Certified Check or Surety Company Bond in the amount of ten (10%) percent in favor of Crafton Borough, as a proposal deposit which, it is understood, will be forfeited in case of failure to comply with the requirements and provisions of this proposal.

B. List of Proposed Subcontractors (if known)

C. List of Proposed Suppliers (if known)

D. Non-Collusion Affidavit

E. Public Works Employment Verification Form

F. Evidence of PennDOT Pre-Qualification for majority of required categories

G. List of three (3) projects with verifiable references of a similar nature and size to the work proposed performed within the past five (5) years.

H. All required ALCOSAN GROW Grant paperwork

ARTICLE 9 – DEFINED TERMS

The terms used in this Bid with initial capital letters have meanings stated in the Instruction to Bidders, the General Conditions, and the Supplementary Conditions.

00110 – 9

ARTICLE 10 – BID SUBMITTAL

This Bid submitted by: _________________________________________________________________

If Bidder is:

An Individual

Name (typed or printed): _____________________________________________________

By: ______________________________________________________________ (SEAL)

(Individual’s signature)

Doing business as: __________________________________________________________

A Partnership

Partnership Name: __________________________________________________ (SEAL)

By: ______________________________________________________________________

(Signature of general partner)

Name (typed or printed): _____________________________________________________

A Corporation

Corporation Name: __________________________________________________ (SEAL)

State of Incorporation: _________________________________

Type (General Business, Professional, Service, Limited Liability): _____________________

By: _______________________________________________

(Signature )

Name (typed or printed): ______________________________

Title: _____________________________________________ (CORPORATE SEAL)

Attest _____________________________________________

Date of Authorization to do business in _________________________ is ____/____/____.

Bidder's Business Address _________________________________________________________

Phone No. _________________________ Fax No. _____________________________

SUBMITTED on ________________________, 20____.

PENAL SUM FORM

Bid Bond EJCDC C-430 (2013 Edition)

000130-1

BID BOND

Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name, and Address of Principal Place of Business):

OWNER (Name and Address):

BID

Bid Due Date:

Description (Project Name— Include Location):

BOND

Bond Number:

Date:

Penal sum $

(Words) (Figures)

Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this

Bid Bond to be duly executed by an authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal)

Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal

By: By:

Signature Signature (Attach Power of Attorney)

Print Name Print Name

Title Title

Attest: Attest:

Signature Signature

Title Title

Note: Addresses are to be used for giving any required notice.

Provide execution by any additional parties, such as joint venturers, if necessary.

Bid Bond EJCDC C-430 (2013 Edition)

000130-2

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be

Owner’s sole and exclusive remedy upon default of Bidder.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding

Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding

Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding

Documents and any performance and payment bonds required by the Bidding Documents, or

3.2 All Bids are rejected by Owner, or

3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by

Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States

Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.

Non Collusion Affidavit Copyright © 2013 The Gateway Engineers, Inc. All rights reserved.

000180-1

NON_COLLUSION AFFIDAVIT

Contract/Bid No._______________

State of_________________________________:

:s.s.

County of_______________________________:

I state that I am_____________________________________________________________

(Title) of________________________________________________________________________

(Name of my firm) and that I am authorized to make this affidavit on behalf of my firm, and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.

I state that:

(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other contractor, bidder or potential bidder.

(2) Neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid, have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.

(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid higher than this bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.

(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.

(5) _______________________________________, its affiliate’s subsidiaries, (Name of my firm) officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows:

Non Collusion Affidavit

000180-2

I state that ________________________________understands and acknowledges

(Name of my firm) that the above representations are material important, and will be relied on by

(Name of public entity) in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from ____________________________________of the true facts relating

(Name of public entity) to the submission of bids for this contract.

(Name)

(Title)

SWORN TO AND SUBSCRIBED

BEFORE ME THIS________DAY

OF____________________20____.

Notary Public My Commission Expires:

(Seal)

Public Works Employment Verification Form Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.

000190-1

COMMONWEALTH OF PENNSYLVANIA

PUBLIC WORKS EMPLOYMENT VERIFICATION FORM

Date _______________________

Business or Organization Name (Employer)_______________________________________ Address ____________________________________________________________________ City _____________________________________ State___________ Zip Code __________

___Contractor ___ Subcontractor (check one)

Contracting Public Body ______________________________________________________ Contract/Project No __________________________________________________________ Project Description ___________________________________________________________ Project Location _____________________________________________________________

As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired post January 1, 2013 are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature

Public Works Employment Verification Form Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.

000190-2

Instructions to Bidders

000200 – 1

INSTRUCTIONS TO BIDDERS

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General

Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued.

B. Successful Bidder – The lowest, qualified, responsible bidder to whom the Owner (on the basis of Owner’s evaluation as hereinafter provided) makes an award.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the

Notice to Bidders may be obtained from the Issuing Office. The deposit is non-refundable.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor

Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

2.04 During the bidding period, Bidders may be furnished with Addenda for additions to or alterations of the plans or specifications which shall be included in the work covered by the Proposal and become part of the Contract Documents. Such Addenda shall be signed by the Bidder and submitted with the Bid.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. Evidence of Bidder’s authority to do business in the state where the Project is located.

B. Bidder’s state or other contractor license number, if applicable.

C. Subcontractor and Supplier qualification information; coordinate with provisions of Article

12 of these Instructions, “Subcontractors, Suppliers, and Others.”

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

3.05 If the Owner requires pre-qualification for the Project, the Bidder shall include the pre-qualification documentation for himself/herself/theirselves and his/her/their subcontractors and suppliers in the Bid documents.

000200 – 2

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION

OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to Owner relating to Hazardous Environmental

Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any

Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the

Supplementary Conditions. Bidder is responsible for any interpretation or conclusion

Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and

Engineer by owners of such Underground Facilities, including Owner, or others.

C. No claims for additional compensation will be allowed because of obstructions or conditions on the location of the work which may add to the difficulties or costs of construction, even though such obstructions or conditions are not shown on the Contract Plans. The bidder shall make his own investigation to determine all underground structures and utility lines.

D. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and

Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the

Site, if any, and possible changes in the Contract Documents due to any Hazardous

Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

000200 – 3

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the

Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the

General Conditions indicate, if an Owner safety program exists, it will be noted in the

Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the

Site by Owner or others (such as utilities and other prime contractors) and relates to the

Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given

Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

000200 – 4

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to

Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by

Bidder; and (3) Bidder’s safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the

Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

J. agree that the submission of a Bid will constitute an incontrovertible representation by

Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the

Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 A pre-Bid conference may be held in accordance with the requirements of the Bidding Documents and the Notice to Bidders. Representatives of Owner and Engineer will be present to discuss the

Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference.

This is the start of the file's text. The full file is on GovTribe.