1-Part 8 Exceptions Form USBE26005CT Amd 2 Avant Assessment Public Post.pdf

PDF 382 KB Posted

Attached to
USBE ACWESPP - Avant Assessment, Addition of Funds
Solicitation number
USBE-CC27320-ACW
Issued by
Utah

About this file

This is a Notice of Intent to Award a Contract Without Engaging in a Standard Procurement Process filed by the Utah State Board of Education (USBE) for an amendment to an existing contract with Avant Assessment for dual language immersion assessments. The procurement addresses a compliance issue with Utah Administrative Code R277-488-4, which requires that proficiency assessments evaluate listening, speaking, reading, and writing competencies in grades 3 through 9. The original contract provided all four assessment domains only to grade 9, while the amendment expands test coverage to ensure all grades 3-9 receive complete assessments across all four domains over the final three years of the contract. The contract number is USBE260005CT, originally solicited under RFP number USBE-JB25286-RFP. The notice includes a public challenge period during which other qualified vendors may submit documentation demonstrating they can provide comparable or equivalent assessment services that meet the specified requirements.

The original contract total was $1,724,751.00, with the current contract total at $1,824,751.00, and the proposed total after this amendment is $2,407,137.00, representing a 46.64 percent increase from the original contract amount. The amendment increases the contract value by $682,386.00 over the final three years due to the expansion of required test administrations. The amendment also adds language requiring destruction of all student data within 30 days at contract conclusion to comply with Student Data Privacy requirements. No set-asides are indicated for this procurement. The justification for the non-competitive award is that the quantity of products and services needed has increased to meet state policy compliance requirements, and because the current vendor is the established provider, continuity and compatibility considerations support the amendment without re-solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE OF INTENT TO AWARD A CONTRACT WITHOUT ENGAGING IN A STANDARD

PROCUREMENT PROCESS

The Utah State Board of Education (USBE) is publishing this notice in accordance with the Utah Procurement Code and intends to award a contract without engaging in a standard procurement process if it is determined by the procurement official, in writing, that:

1. There is only one source for the procurement item;

2. Transitional costs are a significant consideration in selecting a procurement item and the transitional costs are unreasonable or cost-prohibitive; or

3. The award of a contract is under circumstances, described in rules adopted by the board, that make awarding the contract through a standard procurement process impractical and not in the best interest of USBE.

USBE’s justification for awarding a contract without engaging in standard procurement process is set forth below.

Determination of Other Interested Vendors

The intent of this notice is to determine if there are any other interested and qualified vendors that meet the specifications included in this notice. Any such vendors wishing to challenge the proposed award of a contract must submit to the purchasing agent identified in this notice the following information:

• The name of the contesting person; and

• A detailed explanation of the challenge, including documentation showing that there are other competing sources for the procurement item.

In addition, a vendor should include, as applicable:

• Documentation that your firm can provide a comparable or better procurement item that meets or exceeds the specifications;

• Documentation that your firm can also provide the same proprietary procurement item or an equivalent procurement item; and

• If transitional costs are identified as the justification for this notice, a comparison of the transitional costs identified in this notice against your firm’s anticipated transitional costs.

Regardless of any prior communications with USBE, all vendors interested in responding to this notice must submit a response to this posting containing complete responses to all of the information requested above.

ALL CHALLENGES TO THE PROPOSED CONTRACT AWARD MUST BE SUBMITTED THROUGH THE UTAH

PUBLIC PROCUREMENT PLACE SUPPLIER PORTAL, and any questions regarding this notice, including requests for additional information, must be submitted through the Supplier Portal during the public notice period. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS, INVITATION FOR BIDS, OR REQUEST FOR QUOTES. No action is required if you have no objections to the proposed award.

If, after the public notice period has passed, the procurement official determines that there are other interested and qualified vendors that meet the specifications of this notice, USBE will not award a contract pursuant to this notice;

otherwise, if no valid challenges are received, then USBE may award a contract to the identified vendor without engaging in a standard procurement process.

Please read the entire form very carefully before responding to this notice.

Scope of the Proposed Contract

It is anticipated that this procurement will result in a:

RESULT ACTION

☐ USBE Contract The term of this contract (or extension) will be:

Renewal options:.

USBE may not make the procurement until the solicitation process is completed and a contract is written and signed by the vendor, and USBE.

☐ Purchase Order One-time purchase or ≤ 1 year USBE may not make the procurement until the solicitation process is completed, the purchase order is signed by USBE and delivered to the vendor.

Description of procurement item to be purchased:

Estimated value of the contract/purchase order/increase:

Freight Cost (F.O.B.

Destination, Freight Prepaid):

Vendor Name:

Detailed Description of Procurement Item (additional information included in attached Scope of Work):

Justification for Award (select ONE option):

☐ Sole Source - There is only one source for the procurement item. Complete Section A

Transitional Costs - Transitional costs are a significant consideration in selecting a procurement item and the results of a cost-benefit analysis demonstrate that transitional costs are unreasonable or cost-prohibitive, and that the award of a contract without engaging in a standard procurement process is in the best interest of the procurement unit.

Complete Section B

Impracticality - The award of a contract is under circumstances, described in rules adopted by the board, that make awarding the contract through a standard procurement process impractical and not in the best interest of USBE.

Complete Section C

Trial use contract for a new or innovative procurement item, or for a procurement item with a novel or unproven use or application.

Complete Section D

Extension of a contract without engaging in a standard procurement process. If extension will result in a request to increase the contract total, complete Section F below as well.

Complete Section E

☐ Request to increase total contract amount. Complete Section F

SECTION A: ONLY ONE SOURCE

1. What is unique about this procurement item to justify an award of contract without engaging in a standard procurement process? (Explain in detail why the service or product is only available from a single supplier.)

2. Could the procurement item be reasonably modified to allow for competition? (Explain why or why not.)

3. Detailed description of the market research performed to identify similar or alternate procurement items.

List term(s) and results used in searching the Internet and other research conducted to complete market search.

4. Is the requested procurement item available on an existing state cooperative contract? List search term(s) and results of a state cooperative contract search (https://statecontracts.utah.gov/Home/Search).

5. If there is only one source for the procurement item, list the names of other similar vendors contacted, contact person, and a summary of their response, SECTION B: SIGNIFICANT TRANSITIONAL COSTS

1. Describe the existing equipment, technology, software, accessories, replacement parts, or service, hereafter referred to as equipment; include the original purchase price and date of purchase for the existing equipment.

Method of procuring the existing procurement item:

Solicitation number: Existing contract number:

Original purchase date: Original purchase price: $

2. Attach the cost-benefit analysis, as required by Utah Code Section 63G-6a-802, that demonstrates that transitional costs are unreasonable or cost-prohibitive.

SECTION C: STANDARD PROCUREMENT PROCESS IMPRACTICAL

1. Circumstances that make awarding a contract through a standard procurement process impractical and not in the best interest of USBE. Choose ONE that best describes the circumstances:

☐ A contract award to a specific supplier, service provider, or contractor is a condition of a donation or grant that will fund the full cost of the supply, service, or construction item

☐ Public utility services, when only one public utility service is available in an area ☐ An item where compatibility is the overriding consideration ☐ A used procurement item that presents a unique, specialized, or time-limited buying opportunity ☐ Other circumstances determined by the procurement official to make awarding a contract through a standard procurement process impractical and not in the best interest of USBE

2. Review R33-108-101c and provide supporting justification why awarding the contract through a standard procurement process is impractical and not in the best interest of USBE under the circumstances;

including any supporting documentation.

3. Supply the following, if applicable:

Method of procuring the existing procurement item:

Solicitation number: Existing contract number:

Original purchase date: Original purchase price: $

SECTION D: TRIAL USE CONTRACT

1. Describe how this trial use contract for the new or novel procurement item will benefit USBE.

2. Describe how the procurement item is new or innovative, or how the procurement item has a proposed use/application that is novel or unproven.

3. Describe why a trial use contract exception is necessary for this procurement item at this time as opposed to conducting a standard procurement process to procure the procurement item.

4. What research have you conducted to ensure the requested procurement item is not available on an existing state cooperative contract?

5. How long does the agency need to test the procurement item and what quantities of the procurement item (if applicable) will be necessary to test this procurement item? Note trial use contracts generally cannot exceed a period of 24 months.

SECTION E: EXTENSION OF CONTRACT WITHOUT ENGAGING IN A STANDARD

PROCUREMENT PROCESS

The procurement official may extend a contract up to 120 days. For extensions beyond 120 days, the procurement official may extend the contract after consulting with legal counsel.

Contract Start Date: Current End Date:

Proposed End Date: Contract Number:

1. Has this contract previously been extended?

☐ No ☐ Yes, this contract was previously extended for ________ days.

2. Is this request for a contract extension the result of a protest, appeal, or court action? If yes, items 3-5 below do not need to be completed. Provide the solicitation number that resulted in a protest and date of the protest, appeal, or court action.

3. Is USBE currently engaged in a standard procurement process for the procurement item that is the subject of the contract extension request?

☐ Yes ☐ No, USBE is letting the contract expire and will not be re-soliciting for a procurement item that is the subject of the contract extension request.

4. Describe why extending this contract without engaging in a standard procurement process is necessary to avoid a lapse in a critical government service, OR to mitigate a circumstance that is likely to have a negative impact on public health, safety, welfare, or property.

5. Justification for Extension (check all that apply):

☐ The standard procurement process is delayed due to an unintentional error.

☐ A change in an industry standard requires one or more significant changes to specifications for the procurement item.

☐ To prevent the loss of federal funds ☐ To mitigate the effects of a delay of a state or federal appropriation.

☐ To enable the procurement unit to continue to receive a procurement item during a delay in the implementation of a contract awarded pursuant to a procurement that has already been conducted.

☐ To enable the procurement unit to continue to receive a procurement item during a period of time during which negotiations with a vendor under a new contract for the procurement item are being conducted.

5. For the selection(s) above, provide any additional details regarding the circumstances justifying a contract extension.

SECTION F: REQUEST TO INCREASE TOTAL CONTRACT AMOUNT

Public notice not normally required, UNLESS: If the original solicitation type was an ACWESPP (e.g., sole source) and the additional amount will make the contract total go above $50,000, then a public notice is required to increase the contract total. This public notice is not necessary if the procurement official waives the public notice requirement in accordance with R33-108-101e.

Contractor Name: Contract Number:

Original Contract Total: Current Contract Total:

Proposed Contract Total: % Increase from Original:

Solicitation Number: Solicitation Type:

Product or Service Description:

1. Why is the contract total being increased? Check all that apply.

☐ The term of the contract is being extended (also complete Section E above if extending).

☐ The quantity of products or services needed has increased.

☐ The price, rate, or fee for a product or service has increased.

☐ A new or upgraded product or service is needed.

2. Provide details for the answer that was selected in the previous question that justify an increase in the total contract amount.

Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 4.pdf
Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 5.pdf
Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 6.pdf
Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 7.pdf
Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 8.pdf
Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 9.pdf
Part 8 Exceptions Form AVANT Contract Amendment-SR CM Signed 10.pdf
Description of procurement item to be purchased:
Estimated value of the contractpurchase orderincrease:
Freight Cost FOB Destination Freight Prepaid:
Vendor Name: Avant Assessment
Detailed Description of Procurement Item additional information included in attached Scope of Work: The amendment is to correct an issue with the original contract where the number of tests required by policy were not met by the contract. R277-488-4 dictates that the assessment must assess listening, speaking, reading, and writing in grades 3-9. The current contract only assesses half of those domains in grades 3-8. The procurement item will fix the contract to match the requirement in policy by doubling the number of tests in grades 3-8 for the last 3 years of the contract. It also corrects language about the destruction of data at the end of the contract to match the requirements for other assessment vendors and meet the requirements from the Student Data Privacy section. The scope of work contains the budget which has an increase of $682,386.00 over the last three years of the contract.
Check Box9: Off
Check Box10: Off
Text11:
Text12:
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Yes
What is unique:
Allow for competition:
Market Research:
State Coop Contract:
Similar vendors:
Describe:
Method of procuring:
Solicitation number:
Existing contract number:
Original purchase date:
Original Purchase Price:
A contract award to a specific supplier service provider or contractor is a condition of a donation or grant that: Off
Public utility services when only one public utility service is available in an area: Off
An item where compatibility is the overriding consideration: Off
A used procurement item that presents a unique specialized or timelimited buying opportunity: Off
Other circumstances determined by the procurement official to make awarding a contract through a standard: Off
Justification:
Method of procuring the existing procurement item_3:
Solicitation number_2:
Existing contract number_2:
Original purchase date_2:
Orig Purch Price:
1_7:
useapplication that is novel or unproven:
opposed to conducting a standard procurement process to procure the procurement item:
existing state cooperative contract:
cannot exceed a period of 24 months:
Contract Start Date:
Current End Date:
Proposed End Date:
Contract Number:
#:
of the protest appeal or court action:
to have a negative impact on public health safety welfare or property:
contract extension:
Check Box19: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Contractor Name: Avant Assessment
Contract Number_2: USBE260005CT
Original Contract Total: 1,724,751.00
Current Contract Total: 1,824,751.00
Proposed Contract Total: 2,407,137.00
Increase from Original: 46.64%
Solicitation Number: USBE-JB25286-RFP
Solicitation Type: RFP
Description: Dual language immersion assessments provided to grades 3-9 per R277-488
The term of the contract is being extended also complete Section E above if extending: Off
The quantity of products or services needed has increased: On
The price rate or fee for a product or service has increased: Off
A new or upgraded product or service is needed: Off
Provide details: The original contract did not cover the required tests listed in R277-488-4 which reads,

2"R277-488-4. Proficiency Assessment Requirements.

(1) The Superintendent shall select a proficiency assessment through an appropriate procurement process.

(2) The proficiency assessment described in Subsection (1) shall assess the following areas of proficiency:

(a) listening;

(b) speaking;

(c) reading; and

(d) writing.

(3) An LEA DLI program shall administer the proficiency assessment selected by the Superintendent as described in Subsection (1) at each grade level starting at Grade 3 and through Grade 9."

The current contract only gives all four tests to grade 9. This amendment will fix that issue, making sure that all the grades get all four tests, as the policy states. Additionally, language that specifies the requirement to destroy all student data within 30 days, per Student Data Privacy has been added.

File details come from the government source that posted it. Updated .