This is a Notice to Bidders issued by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality, for the Sto842436B Nutrient Reduction Wetland Project located in Section 36, Township 84 North, Range 24 West, Story County, Iowa. The project involves constructing a wetland treatment system powered by a solar panel pump to treat water from an existing drainage district tile and ditch. Work includes selective clearing, excavation and grading, inlet and outlet concrete structures, solar-powered pump installation, pipe installation, riprap placement, and seeding. The project scope encompasses approximately 13,900 cubic yards of earthwork, 1,875 linear feet of pipe installation, 20 tons of riprap, concrete structures (Modified SW-513 inlet and outlet structures and modified SW-401 concrete manhole and pump basin), a solar pump system, and 27.3 acres of seeding. Sealed bids are due by 3:00 PM local time on Wednesday, December 30, 2026, via the Iowa Management of Procurement and Contracts System (IMPACS), with public bid opening at the same time. A pre-bid meeting is scheduled for 10:00 AM on December 1, 2026, at Bolton & Menk in Ames, Iowa, with virtual attendance also available. Construction must commence within 7 days of the preconstruction meeting, with a construction deadline of November 1, 2027, and seeding deadlines of December 15, 2027. Prospective bidders are strongly encouraged to attend the pre-bid conference.
The estimated construction cost range is $175,000 to $275,000. Bids must include a bid bond in the amount of ten percent (10%) of the bid, and the successful bidder must furnish a Performance/Payment Bond equal to one hundred percent (100%) of the contract price. Bidders must be registered with the Iowa Department of Inspections, Appeals & Licensing. Contract documents, including plans and construction specifications prepared by Brandon Short, P.E., of Bolton & Menk, are available through the SciQuest website. Written questions regarding plans and specifications must be submitted by 3:00 PM on December 12, 2026, to be included in a final addendum. The Division reserves the right to reject any or all proposals and to waive technicalities and irregularities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2 BID BOOK.pdf | ||
| 6 Design Report.pdf | ||
| 9 Bid Bond.pdf | ||
| 8 Proposal - Acknowledgement - Affidavit.pdf | ||
| 3 Bid Book.pdf | ||
| 5 Plans.pdf | ||
| 7 Schedule of Prices.pdf | ||
| 4 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sto842436B Nutrient Reduction Wetland Project DOCUMENT AA Bid No. 26-18 NOTICE-TO-BIDDERS
AA
NOTICE-TO-BIDDERS
Sto842436B Nutrient Reduction Wetland Project Section 36, Township 84 North, Range 24 West
Story County, Iowa
Sealed bids will be received by the Iowa Department of Agriculture & Land Stewardship, Division of Soil Conservation and Water Quality (Division), via the Iowa Management of Procurement and Contracts System (IMPACS), until 3:00 PM local time, Wednesday, 12/30/2026. The bid opening, open to the public, will be held through IMPACS beginning at 3:00 PM local time, on Wednesday, 12/30/2026, when bids will be read aloud. Interested parties may call in to hear the bid opening using the Microsoft Teams call-in number and code: +1 469-998-7627,,147759330#. Bids must be submitted on the appropriate bid forms provided and shall include a bid bond in the amount of ten percent (10%). Bidders must also be registered with the Iowa Department of Inspections, Appeals & Licensing.
In general, the work includes constructing a wetland that will treat the water from an existing drainage district tile and ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, inlet and outlet concrete structures, solar-powered pump installation, installation of pipe, riprap placement, and seeding. This project includes around 13,900 total cubic yards of earthwork, 1,875 linear feet of pipe installation, 20 tons of riprap, Modified SW-513 concrete inlet structure, Modified SW-513 concrete outlet structure, modified SW401 concrete manhole, modified SW401 pump basin, solar pump system and 27.3 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.
Construction will commence within 7 days of the preconstruction meeting, unless otherwise mutually agreed upon.
Construction deadline: 11/01/2027 Seeding deadline-buffer: 12/15/2027 (MUST BE COMPLETED WITHIN THE BUFFER SEEDING PERIOD.)
Seeding deadline-structure: 12/15/2027 (MUST BE COMPLETED WITHIN THE STRUCTURE SEEDING PERIOD.)
Given the number of projects being bid and the meetings involved, we believe we can be more strategic in determining when in-person attendance is necessary. To improve efficiency while maintaining appropriate participation and communication, a virtual attendance option is being added for pre-bid meetings. This option is intended to provide flexibility and is not a replacement for attendance or participation when in-person attendance is necessary.
If you plan to attend the pre-bid meeting in person, you MUST email Tracy.Blocker@iowaagriculture.gov by 3:00 PM the business day prior to the pre-bid meeting to confirm your in-person attendance.
If no one has indicated that they will attend in person by the deadline, the pre-bid meeting will be held virtually only. No in-person meeting will be held in that circumstance.
Attendance at the pre-bid conference by prospective bidders is not mandatory but is strongly encouraged.
In-Person Pre-Bid Meeting Option: RSVP Required by 3:00 PM the BUSINESS Day Prior Time: 10:00 AM Date: 12/01/2026 Location: Bolton & Menk, Bolton & Menk, Ames, IA 50010 Phone: 515-344-6279
Virtual Pre-Bid Meeting Option: This will be the only option if no one has indicated they will attend in person Pre-bid TEAMS Link: https://teams.microsoft.com/meet/2632385097994105?p=0oboj5mSdm1KJgnBj2
(Audio & Video) Pre-bid Call-in number & code: +1 469-998-7627,,48546067# (Audio only) mailto:Tracy.Blocker@Iowa.agriculture.gov
Sto842436B Nutrient Reduction Wetland Project DOCUMENT AA Bid No. 26-18 NOTICE-TO-BIDDERS
AA
The Plans and Construction Specifications governing the construction of the proposed improvements have been prepared by Brandon Short, P.E., Bolton & Menk, and are hereby made a part of this notice by reference, and the proposed contract shall be executed in compliance therewith. Copies of the Contract Documents, including Plans, Construction Specifications, and Bid Package, are available through the website link:
Accessing the posting:
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa
1. Keyword: Wetland, search
2. View PDF page 6: Bid tabs can also be found here following bid opening.
In order to be included on the plan holders list, which is required to receive meeting minutes, addenda, and an updated plan holders list, interested parties must make a written email request to Tracy Blocker, Division, at Tracy.Blocker@iowaagriculture.gov, or make a verbal request to the Division by telephone at 515-344-6279. Bidders who attend and sign in to the pre-bid conference will be added to the plan holders list.
A printed copy of the Plans and Construction Specifications can be viewed by appointment by contacting Tracy Blocker, Division, at Tracy.Blocker@iowaagriculture.gov or 515-344-6279. Printed copies of the Specifications and Plans will be provided to the successful bidder.
The successful bidder shall be required to furnish a Performance/Payment Bond in an amount equal to one hundred percent (100%) of the contract price.
Questions concerning the Plans and Construction Specifications should be submitted in writing and addressed to Brandon Short, P.E., Bolton & Menk, with a copy to Tracy Blocker, Division, at Tracy.Blocker@iowaagriculture.gov.
All other questions concerning the Contract Documents should be addressed to Tracy Blocker, Division, at Tracy.Blocker@iowaagriculture.gov or 515-344-6279.
To be considered for inclusion in a final addendum, written questions must be received by 3:00 PM on 12/08/2026.
The Division reserves the right to reject any or all proposals and to waive technicalities and irregularities.
BIDDER LOGIN – https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
END OF DOCUMENT AA
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa mailto:Tracy.Blocker@Iowa.agriculture.gov mailto:Tracy.Blocker@Iowa.agriculture.gov https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
File details come from the government source that posted it. Updated .