This is a Notice of Intent (NOI) for stormwater discharge authorization issued by the Kansas Department of Health and Environment (KDHE) under the National Pollutant Discharge Elimination System (NPDES) for construction activities in the City of Wichita, Kansas. The document authorizes Artistic Builders, owned and operated by Eric Gilbert, to discharge stormwater runoff from the COW - Swaney Farm Addition project located at South Clifton Avenue & 63rd Street South in Wichita. The construction project involves grading, paving, drainage improvements, sanitary sewer installation, stormwater management, and waterline installation across 48.50 disturbed acres of a 50.50-acre total site. The project anticipates a start date of July 15, 2024, with an estimated completion date of July 1, 2029. The NOI was submitted on June 18, 2024, and was authorized on October 17, 2024, with permit coverage expiring on July 31, 2027.
The authorization includes erosion and sediment control requirements, including the installation of perimeter silt fence barriers, temporary sediment storage basins, permanent drainage structures, and temporary and permanent seeding in disturbed areas. A Stormwater Pollution Prevention Plan (SWPZP) has been developed by engineer Kevin Graham (License No. 27806) and must be implemented throughout construction. The stormwater runoff from the site drains through the Wichita Municipal Separate Storm Sewer System (MS4) to the Arkansas River, which is designated as a Critical Water Quality Management Area located within one mile of the facility boundary. An annual permit fee of $60.00 is required, and the permittee is obligated to maintain compliance with all general permit terms and conditions, including timely payment of annual fees and submission of a Notice of Termination upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-BP 448-2024-007799.pdf | ||
| 3-250345 Bid Table.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 1 of 4
NOTICE OF INTENT (NOI)
For Authorization to Discharge Stormwater Runoff from Construction Activities In accordance with the Kansas Water Pollution Control General Permit Under the National Pollutant Discharge Elimination System (NPDES)
Submission of this Notice of Intent constitutes notice that the party identified in Section I of this form requests authorization for coverage under the Kansas Water Pollution Control general permit, or KDHE issued successor permits, issued for stormwater runoff from construction activities in the State of Kansas. Becoming a permittee obligates the discharger to comply with the terms and conditions of the general permit. A complete request for Authorization for coverage under the general permit must be submitted or the request will not be processed. KDHE will notify owners or operators whose Notice of Intent (NOI) and supporting documentation for Authorization of stormwater runoff associated with construction activities are incomplete, deficient, or denied.
I. OWNER OR OPERATOR ADDRESS, BILLING, CONTACT & RECORDS LOCATION INFORMATION
Owner/Operator Eric Gilbert Mailing Address: 11100 Fremont Circle Company Name: Artistic Builders City, State Zip: Mulvane, KS 67110 Phone: (316) 650-7536 Email: emgilbert13@gmail.com
Contact Name: Eric Gilbert Mailing Address: 11100 Fremont Circle Company Name: Artistic Builders City, State Zip: Mulvane, KS 67110 Phone: (316) 650-7536 E-mail: emgilbert13@gmail.com
PERMIT FEE BILLING INFORMATION
Billing Contact: Eric Gilbert Billing Address: 11100 Fremont Circle Mulvane, KS 67110
Phone: (316) 650-7536 E-mail: emgilbert13@gmail.com
II. SITE INFORMATION
Project Name: COW - Swaney Farm Addition Street Address: South Clifton Avenue & 63rd Street South
Wichita, KS 67037 County: Sedgwick
Legal Site Description:
Qtr: Qtr: NE Qtr: SW Section: 26 Township: 28S Range: 01E
Decimal Degrees Latitude: 37.581110 Decimal Degrees Longitude: -97.291380
AUTHORIZED:Submission Received: 6/18/2024 Submission Number:
HQ4-FNZW-4R8BQ YES X NO
Reviewer: Is Authorization Conditional
YES NO X
(if yes, see Section V for conditions)
Larry Hook Are there any Considerations
YES NO X
(if yes, see Section V for considerationsAuthorized By:
Secretary, Kansas Department of Health and Environment KS Permit No.: S-AR94-1904
Issued: October 17,2024 Federal Permit No.: KSR122464
KEIMS Watermark KSR122464 v1.0
Approved Issued On:10/17/2024
Expires On:07/31/2027
Project Name: COW - Swaney Farm Addition Notice of Intent (NOI)
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 2 of 4
B. Existing Conditions/Uses
1) Is any part of the project located on Indian Country Land?
No
2) If stormwater runoff drains to or through a Municipal Separate Storm sewer System (MS4): MS4 Name:
Wichita
3) Name of the first receiving water, stream, or lake Arkansas R (110300011), River Basin AR -
LOWER ARKANSAS
4) Are contaminated soils present on the site or is there groundwater contamination located within the site boundary?
No
5) Are there any contaminated soils that will be disturbed or any contaminated groundwater that will be pumped by the proposed construction activity?
No
6) Are there any surface water intakes for public drinking water supplies located within ½ mile of the site discharge points?
No
7) Are there any known historical or archeological sites present within the site boundary or any historic structures located within 1000 feet of the project site?
No
Note: Include documentation of project-specific coordination with the Kansas Historical Society in making this determination
8) Is any threatened or endangered species habitat located within the site boundary or in the receiving water body?
No
Note: Include documentation of project-specific coordination with the Kansas Department of Wildlife, Parks & Tourism in making this determination.
9) Will the project impact the line or grade of a stream or does it include dredge or fill of a potential jurisdictional water body or wetlands?
No
10) Are any Critical Water Quality Management Areas, Special Aquatic Life Use Waters, or Outstanding National Resource Waters located within ½ mile of the facility boundary?
Yes
List the names of all such areas and waters
Arkansas River
C. Project Description
1) Project Description:
Construction of Swaney Farm Addition including grading, paving, drainage, sanitary sewer, storm water and waterline.
Does this NOI include all proposed soil disturbing activities associated with the entire common plan of development? Yes
2) Anticipated project Start Date: July 15, 2024 and Completion Date: July 1, 2029
3) Estimated total area to be disturbed: 48.50 Acres
4) Total area of the site: 50.50 Acres
5) Do you plan to disturb ten or more acres that are within a common drainage area? Yes
Will a sedimentation basin be installed in that drainage area? Yes KEIMS Watermark
KSR122464 v1.0 Approved
Project Name: COW - Swaney Farm Addition Notice of Intent (NOI)
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 3 of 4
(Attach design calculations for each sedimentation basin.) If a sediment basin is not feasible, on a separate sheet describe similarly effective erosion and sediment control measures to be implemented in lieu of a sedimentation basin.
D. Maps
Include an area map showing the outline of the construction site and the topographic features of the area at least one mile beyond the project site.
E. Erosion Control Plan and Best Management Practices
1) Provide a summary of the sequence of major soil disturbing activities including installation of the corresponding stormwater management and pollution control features.
1) Install perimeter silt fence barrier. Sediment barriers will be installed at drainage ways and areas where water flows away from the site. All disturbed areas will have temporary seeding applied.
2) Install temporary sediment storage basin. Temporary sediment storage basin will be installed at outfall of detention area.
3) Install permanent drainage structures at locations specified in the plans with erosion control measures as indicated on plan sheets and erosion control plan (sediment barriers, inlet protection, etc.)
4) Construct utility improvements. Install erosion control measures as indicated on the Erosion Control plan. All disturbed areas will have either temporary or permanent seeding applied.
5) Construct pavement improvements. Install silt fence at locations indicated on the Erosion Control Plan and permanent seeding in easements, right-of-way, and all other areas disturbed by construction.
6) Record all deviations from initial Erosion Control Plan.
2) Provide one or more site plans covering the anticipated soil disturbing activities showing the limits of disturbance, the existing and proposed elevation contours, the types and locations of erosion/sediment control measures and stormwater management/pollution control features during each phase of construction and the locations where stormwater runoff leaves the construction site.
3) Provide a description of the best management practices to be utilized to control erosion and the discharge of sediment and other pollutants in stormwater runoff throughout construction and the design calculations for each sediment basin including total drainage area and storage capacity below the elevation of the mass volume flow outlet device.
See Drainage Calcs on 6 EC Plan & Sed Bain - Swaney Farm Addition_2 attachment
4) Provide the name and License or Certification Number of the engineer, geologist, architect, landscape architect, or Certified Professional in Erosion and Sediment Control (CPESC) under which the construction stormwater pollution prevention plan has been developed.
Kevin Graham 27806 Engineer Name License or Certification Number Profession or Field
III. ANNUAL FEES
The first year of the annual permit fee specified in K.A.R 28-16-56 et seq. as amended is currently $60.00 and can be paid through the KEIMS system at time of submittal. The fee must be paid before this NOI will be processed. An invoice for the annual permit fee will be sent to the contact person requesting a permit until such time as the permittee submits a Notice of Termination (NOT).
Failure to pay the annual fee timely may result in termination of the construction stormwater discharge Authorization.
IV. OWNER OR OPERATOR CERTIFICATIONS
I, the undersigned, certify that a Stormwater Pollution Prevention Plan (SWP2 Plan) will be or has been developed for the construction site described in this NOI and supporting documentation. I further certify that the plan will be implemented at the time construction begins, and, as required by the NPDES general permit for Stormwater Runoff from Construction Activity, will revise the SWP2 plan if necessary.
KEIMS Watermark KSR122464 v1.0
Approved
Project Name: COW - Swaney Farm Addition Notice of Intent (NOI)
Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 4 of 4
I understand that continued coverage under the NPDES general permit for Stormwater Runoff from Construction Activities is contingent upon maintaining eligibility as provided for in the requirements and conditions of the general permit, and paying the annual fee.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
Eric Gilbert 6/18/2024 11:48:03 AM Signature (owner or operator) Date
Official Title
V. CONDITIONS AND/OR CONSIDERATIONS OF APPROVAL
Conditions of Authorization - For Official Use Only:
When indicated, Conditions of Authorization are as follows:
NONE
Notes on Consideration – For Official Use Only:
NONE
KEIMS Watermark KSR122464 v1.0
Approved