1-NOI 448-2021-016517.pdf
PDF 1 MB Posted
- Solicitation number
- 250357
- Issued by
- Sedgwick County, Kansas
About this file
This is a Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activities submitted to the City of Wichita, Kansas for the Abilene Place Addition residential subdivision project. The project involves the construction of a new residential subdivision with related utility features on a 35.7-acre site, with the entire disturbed area also encompassing 35.7 acres. The anticipated project start date is April 1, 2021, with a completion date of April 1, 2026. Stormwater runoff from the project will drain through the Wichita Municipal Separate Storm Sewer System (MS4) to private subdivision ponds in the Lower Arkansas River Basin. The NOI confirms that no contaminated soils, threatened or endangered species habitat, historical or archeological sites, or critical water quality management areas are present on or adjacent to the project site. A sedimentation basin will be installed in the drainage area to manage erosion and sediment control during construction activities.
The applicant has indicated that the project disturbs ten or more acres within a common drainage area and commits to implementing erosion and sediment control measures and stormwater management features throughout all phases of construction. The NOI requires submission of site plans showing the limits of disturbance, existing and proposed elevation contours, erosion and sediment control measure locations, and stormwater management features. No specific pricing information, set-aside provisions, incumbent contractor details, or funding sources are detailed in this NOI document, as it functions as an environmental compliance filing rather than a procurement instrument. This document establishes the regulatory framework for stormwater management associated with the Abilene Place Addition development project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-BP 448-2021-016517.pdf | ||
| 3-250357 Bid Table.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: ________________________________________________________________ Notice of Intent (NOI)
Effective August 1, 2017 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activities Page 2 of 3
C. EXISTING CONDITIONS/USES
1) Is any part of the project located on Indian Country land?
If yes: Contact EPA regarding discharging stormwater runoff from industrial activities on Indian Country land.
□ Y; □ N
2) If stormwater runoff drains to or through a Municipal Separate Storm Sewer System (MS4): MS4 Name: _____________________________
3) Name of the first receiving water, stream, or lake: _________________________________, River Basin: _____________________________
4) Are contaminated soils present on the site or is there groundwater contamination located within the site boundary?
If yes: On separate paper describe in detail the locations and concentrations of the contaminants.
□ Y; □ N
5) Are there any contaminated soils that will be disturbed or any contaminated groundwater that will be pumped by the proposed construction activity?
If yes: On separate paper describe the special procedures and erosion and sediment control measures to be implemented to eliminate or minimize the potential to discharge the soil and/or groundwater contaminants.
□ Y; □ N
6) Are there any surface water intakes for public drinking water supplies located within ½ mile of the site discharge points? □ Y; □ N
7) Are there any known historical or archeological sites present within the site boundary or any historic structures located within
1000 feet of the project site?
Note: Include documentation of project-specific coordination with the Kansas Historical Society in making this determination.
□ Y; □ N
8) Is any threatened or endangered species habitat located within the site boundary or in the receiving water body?
Note: Include documentation of project-specific coordination with the Kansas Department of Wildlife, Parks & Tourism in making this determination.
□ Y; □ N
9) Will the project impact the line or grade of a stream or does it include dredge or fill of a potential jurisdictional water body or wetlands?
If yes: Include documentation of project-specific coordination with the US Army Corps of Engineers and/or the Kansas
Department of Agriculture, Division of Water Resources in making this determination.
□ Y; □ N
10) Are any Critical Water Quality Management Areas, Special Aquatic Life Use Waters, or Outstanding National Resource Waters located within ½ mile of the facility boundary?
If yes: List the names of all such areas and waters: _______________________________________________________________
□ Y; □ N
D. PROJECT DESCRIPTION
1) Project Description: __________________________________________________________________________________________________
2) Does this NOI include all proposed soil disturbing activities associated with the entire common plan of development?
If no: Explain what development areas of the site are not included in this NOI and provide contact information, if available, for the party or parties that own or have operational control of these areas:
□ Y; □ N
3) Anticipated project Start Date: _____________________, and Completion Date: _____________________
4) Estimated total area to be disturbed: __________ Acres Total area of the site: __________ Acres
5) Do you plan to disturb ten or more acres that are within a common drainage area? □ Y; □ N If yes: Will a sedimentation basin be installed in that drainage area? (Attach design calculations for each sedimentation basin.)
If a sediment basin is not feasible, on a separate sheet describe similarly effective erosion and sediment control measures to be implemented in lieu of a sedimentation basin.
□ Y; □ N
E. Maps
Include an area map showing the outline of the construction site and the topographic features of the area at least one mile beyond the project site.
F. EROSION CONTROL PLAN AND BEST MANAGEMENT PRACTICES
1) Provide a summary of the sequence of major soil disturbing activities including installation of the corresponding stormwater management and pollution control features.
2) Provide one or more site plans covering the anticipated soil disturbing activities showing the limits of disturbance, the existing and proposed elevation contours, the types and locations of erosion/sediment control measures and stormwater management/pollution control features during each phase of construction and the locations where stormwater runoff leaves the construction site.
| Project Name_2: Abilene Place Addition |
| Y_3: Off |
| N_3: On |
| If stormwater runoff drains to or through a Municipal Separate Storm Sewer System MS4 MS4 Name: Wichita |
| Name of the first receiving water stream or lake: Private Subdivision Ponds |
| River Basin: Lower Arkansas |
| Y_4: Off |
| Y_5: Off |
| Y_6: Off |
| Y_7: Off |
| Y_8: Off |
| Y_9: Off |
| Y_10: Off |
| N_4: On |
| N_5: On |
| N_6: On |
| N_7: On |
| N_8: On |
| N_9: On |
| N_10: On |
| If yes List the names of all such areas and waters: |
| Project Description 1: Construction of a New Residential Subdivision |
| Project Description 2: with Related Features like Utilities |
| Y_11: On |
| N_11: Off |
| for the party or parties that own or have operational control of these areas 1: |
| for the party or parties that own or have operational control of these areas 2: |
| Anticipated project Start Date: Apr 1, 2021 |
| and Completion Date: Apr 1, 2026 |
| Estimated total area to be disturbed: 35.7 |
| Total area of the site: 35.7 |
| Y_12: On |
| Y_13: On |
| N_12: Off |
| N_13: Off |
File details come from the government source that posted it. Updated .