1-MRWSSD Prequalification Package ADA Tagged.pdf
PDF 20 MB Posted
- Attached to
- GJ27-2 MRWSSD Signal Hill Water Treatment Plant Optimization Contractor Prequalification
- Solicitation number
- GJ27-2
- Issued by
- Utah
About this file
This is a Request for Statement of Qualifications (SOQ) document issued by Mountain Regional Water Special Service District for the Signal Hill Water Treatment Plant Optimization Project, seeking to prequalify General Contractors and Electrical Contractors for subsequent competitive bidding. The project encompasses construction of a water treatment plant expansion including rerouted raw water piping, a pumped flash mix system, vertical flocculators, dry-pit membrane feed pumps, replacement of membrane filtration skids, a granular activated carbon (GAC) building extension with additional contactors, solids handling improvements (equalization basin conversion, new solids holding tank, belt filter press, and belt conveyor), and a new chemical building for storage and feed systems. A temporary membrane filtration system will maintain potable water production during construction. Prospective contractors must submit electronic SOQs in searchable PDF format via the Utah Public Procurement Place (U3P) website with a deadline of August 14, 2026, at 3:00 p.m. Mountain Standard Time. Questions regarding the solicitation must be submitted by August 7, 2026, at 5:00 p.m. MST. The District will notify pre-qualified contractors by August 21, 2026, with a pre-bid meeting and site visit scheduled for September 23, 2026, and bid opening anticipated for October 16, 2026, with contract award and notice to proceed in November 2026.
General Contractors must demonstrate successful completion of at least three municipal water or wastewater treatment projects within the past ten years, each with a minimum value of $30 million and self-performed work of at least 40 percent, with experience in keeping plants operational during construction, membrane filtration systems, chemical feed systems, and GAC or media filters. General Contractors must possess bonding capacity of at least $100 million and maintain a current E-100 license in good standing from the State of Utah. Proposed Project Managers must have minimum ten years of construction experience including cold weather construction, with at least five years in the Project Manager role on three municipal water or wastewater treatment projects. Proposed Superintendents must have minimum ten years of construction experience with at least five years in the Superintendent role on three municipal water or wastewater treatment projects with cumulative value of at least $50 million, demonstrated cold weather construction experience, and at least two projects constructed in areas with consistent winter snow and freezing temperatures. Electrical Contractors must demonstrate successful completion of at least three comparable municipal water or wastewater treatment projects in the past ten years, possess a current E-100 license in good standing from the State of Utah, and designate a Project Manager and Superintendent with minimum ten years of construction experience and significant roles on three similar projects. Prequalification scoring requires a minimum of 70 points on a 100-point scale evaluating general qualifications (10 points), relevant experience and performance (55 points), project team qualifications (25 points), and financial condition (10 points). All SOQs must include company background information, completed prequalification questionnaires, key personnel resumes, three project references demonstrating successful completion without liquidated damages or litigation, certified financial statements, and surety bonding capacity documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1265 E. Fort Union Blvd, Suite 200 7090 S UNION PARK AVENUE, SUITE 600 • MIDVALE, UTAH 84047 • P. 801.233.2500 pw://Carollo/Documents/UT/Mountain Regional Water SSD/203230-000000/04 Design/02 Deliverables/02 Intermediate Deliverables/Contractor Prequalification/MRWSSD Prequalification Package.docx
MOUNTAIN REGIONAL WATER SPECIAL
SERVICE DISTRICT
SIGNAL HILL WATER TREATMENT PLANT
OPTIMIZATION PROJECT
GENERAL CONTRACTOR
AND
ELECTRICAL CONTRACTOR
REQUEST FOR
STATEMENT OF QUALIFICATIONS
July 16, 2026
MOUNTAIN REGIONAL DISTRICT SPECIAL SERVICE DISTRICT
SIGNAL HILL WATER TREATMENT PLANT OPTIMIZATION PROJECT
REQUEST FOR STATEMENT OF QUALIFICATIONS
TABLE OF CONTENTS
1) Notice Inviting Statements of Qualification…………………………………………... 1
2) Instructions for Contractors……………………………………………………………. 2
3) Schedule A - Key Personnel…………………………………………………………… 9
LIST OF APPENDICES
APPENDIX A General Contractor's Prequalification Questionnaire
APPENDIX B Electrical Contractor's Prequalification Questionnaire
APPENDIX C Preliminary Drawings
APPENDIX D Project Reference Forms
July 2026 1 203230
NOTICE INVITING STATEMENTS OF QUALIFICATION
Statements of Qualification (SOQ) may be received on behalf of Mountain Regional Water Special Service District for the Signal Hill Water Treatment Plant Optimization (“Project”)
SOQs shall be submitted electronically (searchable pdf format with bookmarks) via the Utah Public Procurement Place (U3P) website.
SOQs will be accepted until 3:00 p.m. local time on the 14th day of August 2026, after which time additional SOQs will not be accepted.
Prospective General Contractors and Prospective Electrical Contractors may download the Request for Qualifications (RFQ) documents from the Utah Public Procurement Place (U3P) website.
The Project includes the following Work:
1. Rerouted raw water pipe between Signal Hill raw water pond (onsite) and the treatment plant.
2. New pumped flash mix system.
3. Vertical flocculators in existing basins.
4. Dry-pit membrane feed pumps.
5. Removal of existing membrane filtration skids and installation of new skids.
6. New granular activated carbon (GAC) building extension and additional GAC contactors.
7. Solids improvements including conversion of an existing basin into an equalization basin, a new solids holding tank, a new belt filter press, and a new belt conveyor.
8. A new Chemical Building to house chemical storage and feed systems.
9. Temporary membrane filtration system, including temporary process piping, to maintain potable water production during construction.
All questions regarding this SOQ, Project, or further information contact on the U3P site only.
The Owner reserves the right to reject any or all SOQs not conforming to the intent and purpose of the pre-qualification documents.
July 2026 2 203230
GENERAL AND ELECTRICAL CONTRACTOR'S QUALIFICATION STATEMENTS
INSTRUCTIONS FOR CONTRACTORS
ARTICLE 1 - INTENT OF SOLICITATION
1.01 The Mountain Regional Water Special Service District (District) will accept Statements of Qualification (SOQ) from qualified and licensed General Contractors and Electrical Contractors interested in bidding on the Signal Hill Water Treatment Plant Optimization Project. Project construction bids will only be accepted from those Contractors who have been pre-qualified by the District. No other General Contractors or Electrical Contractors will be eligible to bid on this Project. The intent of this solicitation is to obtain SOQs from General and Electrical Contractors and to pre-qualify bidders for this work. The District intends to pre-qualify electrical subcontractors or electricians who will also be required to prepare and submit a similar SOQ to the District. This document sets forth the minimum acceptable requirements for SOQs from General Contractors and Electrical Contractors, hereafter referred to as Contractors.
ARTICLE 2 - PROJECT DESCRIPTION
2.01 General Description of the Project Work is as follows:
A. The Work consists of construction of an expansion of the Signal Hill Water Treatment Plant, including rerouted raw water pipe, pumped flash mix, installation of vertical flocculators, dry-pit submersible membrane feed pumps, replacement of membrane filtration skids, GAC building extension and additional GAC contactors, converting an existing basin into an equalization basin, new solids holding tank, replace belt filter press, new belt conveyor, and a new chemical building.
2.02 Preliminary drawings describing portions of the Project Work are provided in Appendix C.
2.03 Tentative Project Schedule is as follows:
July 20, 2026
August 7, 2026
August 14, 2026
August 21, 2026
September 7, 2026
September 23, 2026
October 16, 2026
October 26, 2026
A. Advertise for Contractor Pre-qualification
B. Deadline for Contractor Questions
C. Pre-Qualification Proposals Due
D. Notice of Pre-Qualified Contractors
E. Final Drawings and Specifications Available to Contractors
F. Pre-Bid Meeting and Contractor Site Visit
G. Bid Opening
H. Award
I. Notice to Proceed November 2026
This schedule is preliminary and is subject to change.
July 2026 3 203230
ARTICLE 3 - SUBMITTAL PROCEDURE
3.01 All SOQs will be received electronically on the U3P website.
A. The SOQ shall be in searchable pdf format and contain bookmarks.
B. Any SOQ failing to clearly present all the requested information, or failing to be in the requested format, may be considered unresponsive and rejected. Reasonable precautions will be taken to ensure the security of the documents. All SOQs will become and remain the property of the District.
1. If desired, Contractors may submit a letter with the SOQ to document any claims of business confidentiality for any protected information. The information claimed for business confidentiality must be clearly identified.
C. General Contractors and Electrical Contractors shall submit separate SOQs and will be evaluated separately.
3.02 The following is a schedule for Contractor pre-qualification and opening of SOQs:
A. Deadline for Contractor questions: August 7, 2026 (by 5:00pm MST).
B. Pre-qualification SOQ Submittal Due Date: August 14, 2026 (by 3:00 p.m. MST).
C. Notice of Pre-qualification to Contractors (anticipated): by August 21, 2026.
3.03 The District reserves the right to request a Contractor to clarify any part of the submitted SOQ.
Response to such requests must be made in writing and will become part of the SOQ.
Unsolicited supplementary information and materials received after the deadline will not be considered in the evaluation.
ARTICLE 4 - DEFINITIONS
4.01 Definitions
A. Contractor: General Contractor or Electrical Sub-Contractor (Electrician).
B. Project: Signal Hill Water Treatment Plant Optimization Project.
C. Work: Construction, including labor, materials, and other incidentals associated with completion of Project.
D. Owner or District: Mountain Regional Water Special Service District.
E. Engineer: Carollo Engineers, Inc., Primary Contact: Brad Buswell, P.E.
F. Bidding Documents: Plans, Specifications, and Contract Documents for the construction of the Project.
G. Qualification Statement/Qualification Submittal: Qualifications submitted by Prospective Contractors in response to this notice inviting Statements of Qualification.
July 2026 4 203230
H. Successful Completion: On-time completion of Project without liquidated damages or litigation, meeting the self-performance criteria, and an acceptable level of recommendation from project references.
I. Self-Performance: The value of construction completed by the Contractor's own employees.
J. Responsive Bidder: Means a Bidder who has submitted a Bid which conforms in all material respects to the Bidding Documents.
K. Responsible Bidder: Means a Bidder who has the capacity and capability in all respects to perform fully the contract requirements and who has the integrity and reliability to assure good faith performance. Among factors to be considered in determining whether the Bidder meets these standards are:
1. Financial, material, equipment, facility, and personnel resources and expertise necessary to meet contractual requirements.
2. A record of integrity.
3. A record of Successful Completion as defined above.
4. Qualified legally to contract with the Owner.
5. Has not failed to supply any necessary information in connection with the inquiry concerning responsibility.
ARTICLE 5 - SOQ CONTENT
5.01 The SOQ shall include the information requested below and the organization of the SOQ shall generally follow the outline below:
A. Title Page.
B. Contractor General Information.
C. Contractor Pre-Qualification Questionnaire.
D. Personnel and Firm Qualifications.
E. Financial Information.
5.02 Title Page. The title page shall identify the document as a pre-qualification SOQ and shall include the name of the District, the name of the Project and the name of the Contractor submitting the SOQ.
5.03 Contractor General Information. The Contractor shall provide general background information, including firm background, size, etc. Clearly indicate any teaming partners, if applicable.
5.04 Contractor Pre-Qualification Questionnaire. The Contractor shall complete and sign the attached Contractor Pre-Qualification Questionnaire and include it with the proposal.
Questionnaires are included in the following appendices:
A. Appendix A - General Contractor’s Pre-qualification Questionnaire.
B. Appendix B - Electrical Contractor’s Pre-qualification Questionnaire.
July 2026 5 203230
5.05 Personnel and Firm Qualifications. Present information that will identify key personnel who will be assigned to the Project, such as Project Manager, on site Project Superintendent, Project Manager and others. Complete and include the following schedules and forms:
A. Schedule A – General Contractor and Electrical Contractor Key Personnel. Contractor shall list proposed project team members in Schedule A and attach resumes for each member demonstrating that minimum qualifications required herein are met. Proposed team members shall be dedicated to the Project and shall not be substituted without written approval from the Owner.
B. Appendix D - General Contractor and Electrical Contractor’s Reference Forms.
1. List the three projects most similar in scope and size to Project, completed by your company in the past 10 years. Use the three project reference forms included in the packet. Preference will be given to projects with the same superintendent and project manager as proposed for this project.
5.06 Financial Information: Submit a certified financial statement for the Contractor’s most recent accounting period. Submit a letter from Contractor’s surety company specifying Contractor’s total bonding capacity and current unused bonding capacity. Submit additional references and information sufficiently comprehensive to permit an appraisal of Contractor’s current financial condition.
5.07 Prospective Contractors desiring to be pre-qualified are hereby informed that they will be subject to and must fully comply with all the requirements of the Bidding Documents.
ARTICLE 6 - WRITTEN NOTIFICATION
6.01 All Contractors submitting pre-qualification SOQs will be notified in writing if they did or did not pre-qualify. The Owner’s decision is final. Contractors who are notified in writing that they have been pre-qualified to bid on the Project shall be obligated to comply with all terms, conditions, and provisions set forth in the Plans, Specifications, and Contract Documents for the project.
A. Only those pre-qualified contractors will be invited to the bidding phase of this project, and that phase will award the contract to the lowest cost responsive and responsible bidder.
6.02 A protest to the District’s decision regarding prequalification must be filed in writing with the District’s manager within seven days after the date of the written justification statement, and must contain a concise statement for the grounds upon which the protest is made.
ARTICLE 7 - EVALUATION AND BASIS OF PRE-QUALIFICATION
7.01 Contractor pre-qualification will be determined by the application of a pre-established rating system against information submitted in SOQ by prospective Contractors. General Contractors that plan to self-perform electrical construction for the proposed project must complete two sets of documents as outlined below to demonstrate both General and Electrical Contractor qualifications.
7.02 The District reserves the right to reject any or all responses to this request for qualifications, and to waive any irregularities in any response received.
July 2026 6 203230
7.03 The following criteria will be used to prequalify responsive and responsible potential Contractors who will later be invited to bid on the Project.
7.04 The Engineer will evaluate the completed qualification submittals and make recommendations to the District. The District will determine and identify the highest qualified General Contractors and Electrical Contractors.
7.05 Ranking System: Contractor SOQs will be ranked in accordance with the following system.
Each statement will be reviewed and ranked based on the criteria and numerical values shown below. A minimum score of 70 points shall be required.
A. General (10 points):
1. Qualification Statement Clarity (1-5).
2. Qualification Statement Completeness (1-5).
B. Relevant Experience/Performance (55 points):
1. Past Project Experience of Similar Work (1-25).
2. Timely Completion of Past Work (1-10).
3. Owner Feedback and Recommendations (1-20).
C. Project Team (25 points):
1. Key Personnel Qualifications (1-10).
2. Key Personnel Experience (1-10).
3. Key Personnel Availability (1-5).
D. Financial Condition (1-10 points).
E. Total = 100.
ARTICLE 8 - MINIMUM QUALIFICATIONS
8.01 Prospective General Contractor Minimum Qualifications.
A. Contractor authorizes Owner's representative to verify any and all information contained in the Qualification Statement from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they provide.
B. General Contractor must demonstrate successful completion during the past 10 years of at least three municipal water or wastewater treatment projects similar in scope to this project with a minimum dollar value of $30 million each, and have self-performed at least 40 percent of the work. Project experience must include:
1. Keeping a plant in service during construction.
2. Membrane filtration, either reverse osmosis or microfiltration/ultrafiltration (MF/UF).
3. Chemical feed systems.
4. GAC or media filters.
C. General Contractor must demonstrate ability to bond for a project with the value of at least $100 million. Contractor must submit evidence of sufficient bonding capacity.
July 2026 7 203230
D. General Contractor must designate a Project Manager in Schedule A who will be dedicated to the project for the duration of the project. The proposed Project Manager must meet the following minimum qualifications:
1. At least 10 years of construction experience, including cold weather construction experience. Experience must include at least 5 years in the role of Project Manager.
2. Significant role on at least three municipal water or wastewater treatment projects, at least one of which in the role of Project Manager.
E. General Contractor must designate a Superintendent in Schedule A who will be dedicated to the project for the duration of the project. The proposed Superintendent must meet the following minimum qualifications:
1. At least 10 years of construction experience, with at least 5 years in the role of Superintendent.
2. Significant role on at least three municipal water or wastewater treatment projects with a cumulative value of at least $50 million.
3. Superintendent must have demonstrated cold weather construction experience. At least two water or wastewater treatment projects included on their resume must have been constructed in an area with consistent winter snow and freezing temperatures.
F. General Contractor must have a current E-100 license in good standing issued by the State of Utah.
8.02 Prospective Electrical Contractor Minimum Qualifications.
A. Electrical Contractor authorizes Owner's representative to verify any and all information contained in the Qualification Statement from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they provide.
B. Electrical Contractor must demonstrate successful completion of at least three municipal water or wastewater treatment projects in the last 10 years comparable in nature and scope to this project.
C. Electrical Contractor must confirm ability to comply with minimum insurance requirements as indicated in Appendix B.
D. Electrical Contractor must designate a Project Manager and Superintendent in Schedule A with the following minimum qualifications:
1. At least 10 years of construction experience.
2. Significant role on at least three municipal water or wastewater treatment projects similar in size and shape.
E. Electrical Contractor must have a current E-200 license in good standing issued by the State of Utah.
July 2026 8 203230
ARTICLE 9 - MISCELLANEOUS
9.01 The pre-qualification process is a closed-ended pre-qualification process. The list of pre-qualified potential Contractors will remain in effect after the list of pre-qualified Contractors is made available to the public until award of contract or 12 months, whichever occurs first.
July 2026 9 203230
SCHEDULE A
KEY PERSONNEL FOR THE SIGNAL HILL WATER TREATMENT PLANT PROJECT
Note: Required for General Contractor and Electrical Contractor Submissions
Name Position Date Started with this
Organization
Years of Experience in Municipal Construction
Prior Positions and Experience in Construction
Project Manager
Project Superintendent
Scheduler (General Contractor
Only)
Safety Coordinator
Cost Estimator
Note: Include additional pages as necessary and attach resumes of key personnel.
END OF DOCUMENT
Contractor Prequalification Package
APPENDIX A - GENERAL CONTRACTOR'S
PREQUALIFICATION QUESTIONNAIRE
July 2026 A-1 203230 pw://Carollo/Documents/UT/Mountain Regional Water SSD/203230-000000/04 Design/02 Deliverables/02 Intermediate Deliverables/Contractor Prequalification/Appendix A.docx
Appendix A
GENERAL CONTRACTOR PREQUALIFICATION QUESTIONNAIRE
The Undersigned declares under penalty of perjury that all of the prequalification information submitted with this form is true and correct and that this Declaration was executed in Weber County, Utah, on _____________________________.
For partnership only:
List all General Partners
(Signature and Title)
(Typed Name and Title)
(Firm Name)
(Address)
(City and State)
(Telephone Number)
All information submitted for prequalification evaluation will be considered official information acquired in confidence and the District will maintain its confidentiality to the extent permitted by law. This includes the Contractor's Statement of Experience and Financial Condition to be submitted with this Questionnaire.
References contained in this Qualification Statement are an intricate part of Contractor's qualifications. References must be accurate. Contractor authorizes the District and Engineer, Carollo Engineers Inc., to verify any and all information contained in the Qualification Statement from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they provide.
July 2026 A-2 203230
1. Company Name
Address:
Phone: ________________________ Email: _______________________________
Contact Name:
Contact Email: Phone:
2. Contractor License Classification(s)
3. Contractor Utah License Number(s)
4. Bonding Capacity
5. Location of Headquarters
6. Office Responsible for Project
7. Years your company has been in business on a continuous basis under the same name
8. List gross annual revenue amounts for the years indicated.
2025 2021
2024 2020
2023 2019
2022 2018
9. Indicate value of current uncompleted work $
10. Pending Litigation? Yes_____ No_____
If yes, please describe
11. Has there been any litigation against your company under this or any name in the past five years? Yes_____ No_____
July 2026 A-3 203230
12. Has the Contractor, or any of its parents or subsidiaries, ever had a bankruptcy petition filed in its name, voluntarily or involuntarily? If yes, specify date, circumstances, resolution and other details on a separate page.
13. Has the Contractor ever failed to complete any work that it was awarded? If yes, give
Owner’s name and details on a separate page.
14. Does the Contractor maintain a permanent safety program? If yes, provide a brief summary or outline of the program on a separate page.
15. Does the Contractor have a formal quality control program? If yes, provide a brief summary or outline of the program on a separate page.
16. Bonding Information
Bonding Company:
Address:
Bonding Agent:
Address:
Contact Name:
Phone:
Aggregate Bonding Capacity:
Aggregate Bonding Capacity as of date of this submittal:
17. Contractor’s Insurance Company (name, address, telephone number and contact person):
18. Minimum Insurance Requirements
A. Workers' Compensation and Employers' Liability Insurance: The liability limits, as required by state law, shall be not less than:
1. Workers' compensation:
a. Statutory.
b. Employers' liability: $2,000,000 each occurrence.
B. Comprehensive Automobile Liability Insurance: The liability limits shall be not less than:
1. Bodily injury and property damage:
a. $1,000,000 combined single limit for each occurrence.
July 2026 A-4 203230
C. Commercial General Liability Insurance: The liability limits shall be not less than:
1. Bodily injury and property damage:
a. $1,000,000 combined single limit for each occurrence.
b. $1,000,000 general aggregate.
D. Umbrella Liability Insurance: The liability limits shall be not less than:
1. Bodily injury and property damage:
a. $10,000,000 combined single limit for each occurrence.
b. $10,000,000 general aggregate.
E. Property Insurance: Contractor shall purchase and maintain property insurance coverage for the Work at the site in the amount of the full replacement cost thereof.
This insurance shall be written on a Builder's Risk "all-risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, falsework, Work in transit including ocean transit, and Work in storage at the project site or at another location acceptable to District, and shall insure against at least the following perils: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, and damage caused by frost and freezing.
F. Does your organization meet these minimum insurance requirements?
[ ] Yes [ ] No
19. Compliance with Federal/State Laws
A. Has your organization been assessed any penalties for noncompliance violations of the Federal or State labor laws and/or regulations within the past 10 years?
[ ] Yes [ ] No
1. If Yes, give details, including dates.
B. Does your organization have any ongoing investigations by any agency regarding violations of the State Labor Code, Utah Professional Corporation Act, or State licensing laws?
[ ] Yes [ ] No
1. If Yes, give details, including dates.
C. Has your organization been cited for violations of OSHA Standards and Requirements within the past 10 years?
[ ] Yes [ ] No
1. If Yes, give details, including dates.
D. Please provide an explanation for any question answered "yes" on a separate sheet of paper along with this document.
APPENDIX B - ELECTRICAL CONTRACTOR'S
PREQUALIFICATION QUESTIONNAIRE
July 2026 B-1 203230 pw://Carollo/Documents/UT/Mountain Regional Water SSD/203230-000000/04 Design/02 Deliverables/02 Intermediate Deliverables/Contractor Prequalification/Appendix B.docx
Appendix B
ELECTRICAL CONTRACTOR PREQUALIFICATION QUESTIONNAIRE
The Undersigned declares under penalty of perjury that all of the prequalification information submitted with this form is true and correct and that this Declaration was executed in Weber County, Utah, on _____________________________.
For partnership only:
List all General Partners
(Signature and Title)
(Typed Name and Title)
(Firm Name)
(Address)
(City and State)
(Telephone Number)
All information submitted for prequalification evaluation will be considered official information acquired in confidence and District will maintain its confidentiality to the extent permitted by law.
This includes the Contractor’s Statement of Experience and Financial Condition to be submitted with this Questionnaire.
References contained in this Qualification Statement are an intricate part of Bidder’s qualifications. References must be accurate. Bidder authorizes the District and its Engineer, Carollo Engineers, Inc., to verify any and all information contained in the Qualification Statement from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they provide.
July 2026 B-2 203230
1. Company Name
Phone: _________________________ Email: ______________________________
Contact Name:
Contact Email: Phone:
2. Contractor License Classification(s)
3. Contractor Utah License Number(s)
4. Bonding Capacity
5. Location of Headquarters
6. Office Responsible for Project
7. Years your company has been in business on a continuous basis under the same name:
8. List gross annual revenue amounts for the years indicated.
2025 2021
2024 2020
2023 2019
2022 2018
9. Indicate value of current uncompleted work $
10. Pending Litigation? Yes_____ No_____
11. Has there been any litigation against your company under this or any name in the past five years? Yes_____ No_____
July 2026 B-3 203230
12. Has the Contractor, or any of its parents or subsidiaries, ever had a bankruptcy petition filed in its name, voluntarily or involuntarily? If yes, specify date, circumstances, resolution and other details on a separate page.
13. Has the Contractor ever failed to complete any work that it was awarded? If yes, give
Owner’s name and details on a separate page.
14. Does the Contractor maintain a permanent safety program? If yes, provide a brief summary or outline of the program on a separate page.
15. Does the Contractor have a formal quality control program? If yes, provide a brief summary or outline of the program on a separate page.
16. Bonding Information
Bonding Company:
Bonding Agent:
Address:
Contact Name:
Phone:
Aggregate Bonding Capacity:
Aggregate Bonding Capacity as of date of this submittal:
17. Contractor’s Insurance Company (name, address, telephone number and contact person):
18. Minimum Insurance Requirements
A. Workers' Compensation and Employers' Liability Insurance: The liability limits, as required by state law, shall be not less than:
1. Workers' compensation:
a. Statutory.
b. Employers' liability: $1,000,000 each occurrence.
B. Comprehensive Automobile Liability Insurance: The liability limits shall be not less than:
1. Bodily injury and property damage:
a. $500,000 combined single limit for each occurrence.
July 2026 B-4 203230
C. Commercial General Liability Insurance: The liability limits shall be not less than:
1. Bodily injury and property damage:
a. $1,000,000 combined single limit for each occurrence.
b. $1,000,000 general aggregate.
D. Umbrella Liability Insurance: The liability limits shall be not less than:
1. Bodily injury and property damage:
a. $1,000,000 combined single limit for each occurrence.
b. $1,000,000 general aggregate.
E. Property Insurance: Contractor shall purchase and maintain property insurance coverage for the Work at the site in the amount of the full replacement cost thereof.
This insurance shall be written on a Builder's Risk "all-risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, falsework, Work in transit including ocean transit, and Work in storage at the project site or at another location acceptable to District, and shall insure against at least the following perils: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, and damage caused by frost and freezing.
F. Does your organization meet these minimum insurance requirements?
[ ] Yes [ ] No
14. Compliance with Federal/State Laws
A. Has your organization been assessed any penalties for noncompliance violations of the Federal or State labor laws and/or regulations within the past 10 years?
[ ] Yes [ ] No
3. If Yes, give details, including dates.
B. Does your organization have any ongoing investigations by any agency regarding violations of the State Labor Code, Utah Professional Corporation Act, or State licensing laws?
[ ] Yes [ ] No
1. If Yes, give details, including dates.
C. Has your organization been cited for violations of OSHA Standards and Requirements within the past 10 years?
[ ] Yes [ ] No
1. If Yes, give details, including dates.
D. Please provide an explanation for any question answered "yes" on a separate sheet of paper along with this document.
APPENDIX C - PRELIMINARY DRAWINGS
00G01 - Cover Sheet
00G06 - Process Flow Diagram
00C02 - Overall Site Plan, Facilities Index, and Staging Plan
30A05 - GAC Elevations
70A05 - Chemical Building North and East Elevations
70A06 - Chemical Building South and West Elevations
00M01 - Main Treatment Building Overall Mechanical Plan
70M01 - Chemical Building Overall Mechanical Plan
1 2 3 4 5 6 7 8 9 10 11 12 13
LA
ST
S
AV
ED
B
Y:
A A
B B
C C
D D
E E
F F
MOUNTAIN REGIONAL WATER SSD
INTERMEDIATE DESIGN SUBMITTAL 90% - NOT FOR CONSTRUCTION
JUNE 2026
SIGNAL HILL WTP OPTIMIZATION
MOUNTAIN REGIONAL WATER SIGNAL HILL WTP
SILVER CREEK FACILITY 7563 N PROMONTORY RANCH RD.
7955 SILVER GATE DR. PARK CITY, UTAH, 84098
PARK CITY, UTAH, 84098
(1.3 ACRES AVAILABLE FOR
ADDITIONAL CONTRACTOR STAGING)
PROJECT
LOCATION
PROMONTORY CLUB
COMMERCIAL GATE WEST
(CONTRACTOR ACCESS TO
PROMONTORY DEVELOPMENT)
VICINITY MAP LOCATION MAP
VOLUME # OF #
G G
1 2 3 4 5 6 7 8 9 10 11 12 13 PROJECT NO. 11599A10 FILE NAME: ProjNum_00G01.dwg
JOB NO.
203230
DRAWING NO.
00G01
SHEET NO.
OF
A A
B
C
D
E
F
N
AC
L
PC
SA PC
SFW
BW
BSH
CA BSH
CS SBS
SA
PC
SA
MM
MM
M
M M
M M
MM
M M
M
M M
MM
RW
MFS
BWS
MFF
MFF CE
R W
C W
W R
MFS
FLOCCULATION BYPASS
IRR
MF SKID
TYP OF 4)
BW
TANK
MF SCREEN GAC FEED
EQ TANK
GACSIGNAL HILL
TRAINPOND MF
TYP OF 3)
TO GARDEN SIGNAL HILL
POND FINISHEDFLASH MIX FLOCCULATION MF FEED
WATER TANKBASINS PUMPS
IRRIGATION
VALVE
VAULT
GAC FEED
PUMP
IRRIGATION RECYCLE WET GAC
PUMP STATION WELL BACKWASHCIP TANK PUMP
CHEMICAL BUILDING
CIP WATER
SOFTENER
SOLIDSBRINE TANK BW TANK
THICKENING
CAKE SOLIDSBASIN
TO HAULING
BWW
EQUALIZATION
BASIN
CA TOTE BSH TANKS SOLIDS BELT FILTER
HOLDING TANK PRESS
CS TANK SBS TANK
TO SEWER
PROCESS FLOOR DRAINSSA TANK PC TANK AND GALLEY SUMP
DRAINFUTURE CHLORINE DIOXIDE GENERATION
WET WELL
SC TOTE CLO2
GEN
HCL TOTE
SC
BSH CLO2
HCL
BS
H BS
H
BS
H
C S
C A
SB
S
SA SF
W
M
C
IP
R
C
IP
W C
IP
S
BW
W
XR
GCS
GCE
CIPF
BWS
BWW
M
CWW
CWW
PROCESS FLOW ABBREVIATIONS:
BWS - BACKWASH SUPPLY
BWW - BACKWASH WASTE
CE - COMBINED EFFLUENT
CIPF - CLEAN-IN-PLACE FILTRATE
CIPR - CLEAN-IN-PLACE RETURN
CIPS - CLEAN-IN-PLACE SUPPLY
CIPW - CLEAN-IN-PLACE WASTE
CWW - CLARIFIED WASHWATER
CWWR - CLARIFIED WASHWATER RECYCLE
D - DRAIN
FW - FINISHED WATER
GCE - GAC CONTACTOR SUPPLY
GCS - GAC CONTACTOR SUPPLY
IRR - IRRIGATION
MFF - MEMBRANE FILTRATION FILTRATE
MFS - MEMBRANE FILTRATION SUPPLY
RW - RAW WATER
SL - SLUDGE
XR - EXCESS RECIRCULATION
BW
M M
M M
BWW
BWW
SL
CHEMICAL ABBREVIATIONS:
BSH - BULK SODIUM HYPOCHLORITE (12.5%)
BW - BRINE WASTE
CA - CITRIC ACID
CLO2 - CHLORINE DIOXIDE
CS - CAUSTIC SODA
HCL - HYDROCHLORIC ACID
NACL - SODIUM CHLORIDE (SALT)
PC - PRIMARY COAGULANT
POLY - POLYMER
SA - SULFURIC ACID
SBS - SODIUM BISULFITE
SFW - SOFTENED WATER
SC - SODIUM CHLORITE
OF
SL
LEGEND:
EXISTING MAIN PROCESS FLOW
EXISTING SECONDARY PROCESS FLOW
NEW MAIN PROCESS FLOW
NEW SECONDARY PROCESS FLOW
POLY
SL
D
SL
B
C
D
E
F
LA
ST
S
AV
ED
B
Y:
KM
ar sh al l
MOUNTAIN REGIONAL WATER SSD
SIGNAL HILL WTP OPTIMIZATION
G GCE
CE
00G06GENERAL
CE PROCESS FLOW DIAGRAM
PROJECT NO. FILE NAME: ProjNum_Sheet.dwg 1 2 3 4 5 6 7 8 9 10 11 12 13
FINAL REVIEW SUBMITTAL 90%
NOT FOR CONSTRUCTION
DESIGNED
DRAWN
VERIFY SCALES
BAR IS ONE INCH ON
ORIGINAL DRAWING
JOB NO.
203230
DRAWING NO.
CHECKED 0 1"
REV DATE BY DESCRIPTION
DATE
JUNE 2026
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
SHEET NO.
OF
1 2 3 4 5 6 7 8 9 10 11 12 13
A A
B
C
D
E
F
N
AC
L N
AC
L
PCPC
SASA PCPC
SFWSFW
BWBW
BSHBSH
CACA BSHBSH
CSCS SBSSBS
SASA
PCPC
SASA
MM
MM
M
M M
M M
MM
M M
M
M M
MM
RW
MFS
BWS
MFF
MFF CE
R W
C W
W R
MFS
FLOCCULATION BYPASS
IRR
MF SKID
TYP OF 4)
BW
TANK
MF SCREEN GAC FEED
EQ TANK
GACSIGNAL HILL
TRAINPOND MF
TYP OF 3)
TO GARDEN SIGNAL HILL
POND FINISHEDFLASH MIX FLOCCULATION MF FEED
WATER TANKBASINS PUMPS
IRRIGATION
VALVE
VAULT
GAC FEED
PUMP
IRRIGATION RECYCLE WET GAC
PUMP STATION WELL BACKWASHCIP TANK PUMP
CHEMICAL BUILDING
CIP WATER
SOFTENER
SOLIDSBRINE TANK BW TANK
THICKENING
CAKE SOLIDSBASIN
TO HAULING
BWW
EQUALIZATION
BASIN
CA TOTE BSH TANKS SOLIDS BELT FILTER
HOLDING TANK PRESS
CS TANK SBS TANK
TO SEWER
PROCESS FLOOR DRAINSSA TANK PC TANK AND GALLEY SUMP
DRAINFUTURE CHLORINE DIOXIDE GENERATION
WET WELL
SC TOTE CLO2
GEN
HCL TOTE
SCSC
BSHBSH CLO2CLO2
HCLHCL
BS
H
BS
H BS
H
BS
H
BS
H
BS
H
C S
C S
C A
C A
SB
S
SB
S
SASA SF
W
SF
W
M
C
IP
R
C
IP
W C
IP
S
BW
W
XR
GCS
GCE
CIPF
BWS
BWW
M
CWW
CWW
PROCESS FLOW ABBREVIATIONS:
BWS - BACKWASH SUPPLY
BWW - BACKWASH WASTE
CE - COMBINED EFFLUENT
CIPF - CLEAN-IN-PLACE FILTRATE
CIPR - CLEAN-IN-PLACE RETURN
CIPS - CLEAN-IN-PLACE SUPPLY
CIPW - CLEAN-IN-PLACE WASTE
CWW - CLARIFIED WASHWATER
CWWR - CLARIFIED WASHWATER RECYCLE
D - DRAIN
FW - FINISHED WATER
GCE - GAC CONTACTOR SUPPLY
GCS - GAC CONTACTOR SUPPLY
IRR - IRRIGATION
MFF - MEMBRANE FILTRATION FILTRATE
MFS - MEMBRANE FILTRATION SUPPLY
RW - RAW WATER
SL - SLUDGE
XR - EXCESS RECIRCULATION
BWBW
M M
M M
BWW
BWW
SL
CHEMICAL ABBREVIATIONS:
BSH - BULK SODIUM HYPOCHLORITE (12.5%)
BW - BRINE WASTE
CA - CITRIC ACID
CLO2 - CHLORINE DIOXIDE
CS - CAUSTIC SODA
HCL - HYDROCHLORIC ACID
NACL - SODIUM CHLORIDE (SALT)
PC - PRIMARY COAGULANT
POLY - POLYMER
SA - SULFURIC ACID
SBS - SODIUM BISULFITE
SFW - SOFTENED WATER
SC - SODIUM CHLORITE
OF
SL
LEGEND:
EXISTING MAIN PROCESS FLOW
EXISTING SECONDARY PROCESS FLOW
NEW MAIN PROCESS FLOW
NEW SECONDARY PROCESS FLOW
POLY
SL
D
SL
B
C
D
E
F
LA
ST
S
AV
ED
B
Y:
KM
ar sh al l
MOUNTAIN REGIONAL WATER SSD
SIGNAL HILL WTP OPTIMIZATION
G GCE
CE
00G06GENERAL
CE PROCESS FLOW DIAGRAM
PROJECT NO FILE NAME: ProjNum Sheet dwg 1 2 3 4 5 6 7 8 9 10 11 12 13
FINAL REVIEW SUBMITTAL 90%
NOT FOR CONSTRUCTION
DESIGNED
DRAWN
VERIFY SCALES
BAR IS ONE INCH ON
ORIGINAL DRAWING
JOB NO.
203230
DRAWING NO.
CHECKED 0 1"
REV DATE BY DESCRIPTION
DATE
JUNE 2026
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
SHEET NO.
OF
DATE
CHECKED
DRAWN
DESIGNED JOB NO.
DRAWING NO.
SHEET NO.
FINISHED
WATER TANK
1 EXISTING
CHEMICAL
GAC
BUILDING
BUILDING
EXISTING MAIN
TREATMENT BUILDING
30'
N PROMONTORY RANCH RD
Pl ot
D at e:
/1 7/
:0
4:
P M
GENERAL NOTES:
1. COORDINATE WITH OWNER ON STAGING IN
AREAS OF VAULTS AND MANHOLES TO PROVIDE
ACCESS. SITE STAGING IS LIMITED. ACCESS ROAD
AROUND RAW WATER RESERVOIR MUST STAY
OPEN.
2. FOR ARCHITECTURAL, STRUCTURAL,
MECHANICAL, HVAC, AND PLUMBING DRAWINGS
REFERENCED ON THIS SHEET, SEE THE
FOLLOWING:
GAC BUILDING
ARCHITECTURAL: 30A01-30A069
STRUCTURAL: 40S01-40S09
MECHANICAL: 40M01-40M02
HVAC: 00GH01-00GH02, 40H01, 70H01-70H04
PLUMBING: 40P01-40P03
CONTRACTOR
STAGING AREA
CHEMICAL BUILDING
ARCHITECTURAL: 70A01–70A06
STRUCTURAL: 70S01–70S09
MECHANICAL: 70M01–70M10
HVAC: 70H01–70H04
PLUMBING: 70P01–70P05
SOLIDS HOLDING TANK
STRUCTURAL: 60S01–60S02
MECHANICAL: 60M01–60M02
MAIN TREATMENT BUILDING
STRUCTURAL: 00GS01, 30S01–30S02
MECHANICAL: 00GM01, 20M01–20M04,
30M01–30M05
C KEY NOTES:
1. CONTRACTOR TO MAINTAIN ACCESS TO VALVES
AND STRUCTURES DURING CONSTRUCTION.
2. OWNER WILL CONDUCT PIGGING OF LOST
CANYON TRANSMISSION PIPELINE ANNUALLY
DURING THE MONTH OF MAY. CONTRACTOR TO
MAINTAIN OWNER ACCESS TO PIG RECEIVING
BASIN THROUGHOUT MAY.
1 2 3 4 5 6 7 8 9 10 11 12 13
A A
B B
C
D D
E E
F F
X X
X
X X
X X
X X
X X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X
X
X
X
X
X X
X X
IRRIGATION
ISOLATION
VALVE VAULT
NEW GAC BUILDING
SOLIDS
HOLDING TANK IRRIGATION
PUMP STATION
CONTRACTOR
STAGING AREA
EX. 30' NPW
TRANSMISSION
EASEMENT #
usanorth811.org
SCALE
0 25' 50' 100'
SCALE: 1" = 50'
LA
ST
S
AV
ED
B
Y:
E
H ar ris
JB
NY
BY
CIVIL
OVERALL SITE PLAN, FACILITIES INDEX,
AND STAGING PLAN
00C02
X
PROJECT NO. 203230 FILE NAME: 203230_00C02.dwg
MOUNTAIN REGIONAL WATER SSD
SIGNAL HILL WTP OPTIMIZATION
G G
1 2 3 4 5 6 7 8 9 10 11 12 13
FINAL REVIEW SUBMITTAL 90%
VERIFY SCALES
BAR IS ONE INCH ON
203230
NOT FOR CONSTRUCTION ORIGINAL DRAWING
0 1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
REV DATE BY DESCRIPTION JUNE 2026 SCALES ACCORDINGLY OF
1. FOR BUILDING CODE AND DOOR AND HARDWARE INFORMATION,
REFERENCE DRAWING 30A01.
2. REFERENCE STRUCTURAL DRAWINGS FOR CONCRETE DIMENSIONS,
TOP OF FINISH FLOOR AND TOP OF WALL ELEVATIONS, AND
ADDITIONAL STRUCTURAL INFORMATION.
A A3. REFERENCE MECHANICAL DRAWINGS FOR MECHANICAL
INFORMATION.
H
- 4. REFERENCE CIVIL DRAWINGS FOR EXTERIOR ENTRANCE PADS,
SIDEWALKS AND DRIVEWAYS.
5. EXTERIOR FACE OF ALL CONCRETE WALLS SHALL BE FINISHED WITH
WATER REPELLENT, REFERENCE SPECIFICATION SECTION 07_11_00
6. REFERENCE SPECIFICATION SECTION 10_14_00 AND TYPICAL DETAIL
AN500/TYP FOR SIGNAGE REQUIREMENTS.
# KEY NOTES:
1 7
/2
EXISTING BUILDING
J
C C
1. EXTERIOR GRADE PLYWOOD SIDING WITH BATTENS AT SEAMS,
LOOK TO MATCH EXISTING BUILDINGS ON SITE
B
(TYP) 2. SANDWICH PANEL ROOFING SYSTEM, REFERENCE SPECIFICATION
SECTION 07_41_14, COLOR TO MATCH EXISTING BUILDING
3. HOLLOW METAL DOOR AND FRAME, REFERENCE SPECIFICATION
SECTION 08110 AND DOOR SCHEDULE FOR DETAILS
4. ALUMINUM GUTTERS AND DOWNSPOUT, REFERENCE TYPICAL
DETAIL AG227/TYP
5. CONCRETE SPLASH BLOCK, REFERENCE TYPICAL DETAIL AG229/TYP
6. PREFINISHED RIDGE CAP PER MANUFACTURER'S STANDARD
DETAIL
7. 16" CAST IN PLACE CONCRETE
B
SOUTH
30A09
F ELEVATI N
SCALE: 1/4" = 1'-0"
D D
E E
(TYP) 4
(TYP) 5
F
G FINAL REVIEW SUBMITTAL 90%
NOT FOR CONSTRUCTION
REV BY DATE DESCRIPTION
DESIGNED
MEH
DRAWN
NK
CHECKED
JCA
DATE
JUNE 2026
1 2 3 4 5 6 7
WEST
G ELEVATI N
SCALE: 1/4" = 1'-0"
8 9 FILE NAME: Autodesk Docs://Mountain Regional Water SSD/203230_30A0801.rvt
MOUNTAIN REGIONAL WATER SSD
SIGNAL HILL WTP OPTIMIZATION
ARCHITECTURAL
MAIN PROCESS BUILDING
SOUTH AND WEST ELEVATIONS
10 11 12
VERIFY SCALES
BAR IS ONE INCH ON
ORIGINAL DRAWING
1" 0
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
F
JOB NO.
203230
DRAWING NO.
30A05
SHEET NO.
OF XX
G
P L O
T D
A T
E
/1
/2
:5
:3
FINAL REVIEW SUBMITTAL 90%
NOT FOR CONSTRUCTION
JUNE 2026
1 2 3 4 5 6 7 8 9 10 11 12 13
GENERAL NOTES:
7 6 5 4 3 2 1
1. FOR BUILDING CODE AND DOOR AND HARDWARE INFORMATION,
REFERENCE DRAWING 70A01.
2. REFERENCE STRUCTURAL DRAWINGS FOR CONCRETE
DIMENSIONS, TOP OF FINISH FLOOR AND TOP OF WALL ELEVATIONS,
AND ADDITIONAL STRUCTURAL INFORMATION.
A 7 2
3. REFERENCE MECHANICAL DRAWINGS FOR MECHANICAL A
INFORMATION.
4. REFERENCE CIVIL DRAWINGS FOR EXTERIOR ENTRANCE PADS,
SIDEWALKS AND DRIVEWAYS.
5. EXTERIOR FACE OF ALL CONCRETE MASONRY UNITS SHALL BE
5 (TYP)
FINISHED WITH WATER REPELLENT, REFERENCE SPECIFICATION
SECTION 07_11_00
6. REFERENCE SPECIFICATION SECTION 10_14_00 AND TYPICAL
8 DETAIL AN500/TYP FOR SIGNAGE REQUIREMENTS.
6 (TYP)
# KEY NOTES:
1. EXTERIOR GRADE PLYWOOD SIDING WITH BATTENS AT SEAMS,
B LOOK TO MATCH EXISTING BUILDINGS ON SITE B
2. CORRUGATED CORTEN STEEL ROOFING SYSTEM AND INSULATION,
REFERENCE SPECIFICATION SECTION 07_41_14, COLOR TO MATCH
CLIENTS STANDARDS
3. HOLLOW METAL DOOR AND FRAME, REFERENCE SPECIFICATION
SECTION 08_11_13 AND DOOR SCHEDULE FOR DETAILS
4. OVERHEAD COILING DOOR, REFERENCE SPECIFICATION SECTION
08_33_23 AND DOOR SCHEDULE FOR DETAILS
5. ALUMINUM GUTTERS AND DOWNSPOUT, REFERENCE TYPICAL
DETAIL AG227/TYP
NORTH 6. CONCRETE SPLASH BLOCK, REFERENCE TYPICAL DETAIL AG229/TYP
F ELEVATI N 7. PREFINISHED RIDGE CAP PER MANUFACTURER'S STANDARD DETAIL
C 70A02 SCALE: 3/16" = 1'-0" 8. 30" CAST IN PLACE CONCRETE C
9. ACMV BASE - STONE LOOK TO MATCH STONE BASE AT OTHER
BUILDING
10. EXTERIOR LIGHT FIXTURES, REFERENCE ELECTRICAL DRAWINGS
D C B A
D D
(TYP) 10
6 (TYP)
(TYP) 5
E E
F F
4 3 9
G 70A02
EAST
ELEVATI N
SCALE: 3/16" = 1'-0"
G
DESIGNED
MEH MOUNTAIN REGIONAL WATER SSD VERIFY SCALES
JOB NO.
203230 G
REV DATE BY DESCRIPTION
DRAWN
NK
CHECKED
JCA
DATE
SIGNAL HILL WTP OPTIMIZATION
ARCHITECTURAL
CHEMICAL BUILDING
NORTH AND EAST ELEVATIONS
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
DRAWING NO.
70A05
SHEET NO.
OF XX
1 2 3 4 5 6 7 8 9 10 11 12 13 FILE NAME: Autodesk Docs://Mountain Regional Water SSD/203230_70A0801.rvt
P L O
T D
A T
E
/1
/2
:1
:2
FINAL REVIEW SUBMITTAL 90%
NOT FOR CONSTRUCTION
JUNE 2026
C
1 2 3 4 5 6 7 8 9 10 11 12 13
GENERAL NOTES:
1 2 3 4 5 6 7
1. FOR BUILDING CODE AND DOOR AND HARDWARE INFORMATION,
REFERENCE DRAWING 70A01.
2. REFERENCE STRUCTURAL DRAWINGS FOR CONCRETE
DIMENSIONS, TOP OF FINISH FLOOR AND TOP OF WALL ELEVATIONS,
AND ADDITIONAL STRUCTURAL INFORMATION.
A 6
3. REFERENCE MECHANICAL DRAWINGS FOR MECHANICAL A
INFORMATION.
4. REFERENCE CIVIL DRAWINGS FOR EXTERIOR ENTRANCE PADS,
2 SIDEWALKS AND DRIVEWAYS.
5. EXTERIOR FACE OF ALL CONCRETE MASONRY UNITS SHALL BE
FINISHED WITH WATER REPELLENT, REFERENCE SPECIFICATION
SECTION 07_11_00
6. REFERENCE SPECIFICATION SECTION 10_14_00 AND TYPICAL
DETAIL AN500/TYP FOR SIGNAGE REQUIREMENTS.
4 (TYP) # KEY NOTES:
1. EXTERIOR GRADE PLYWOOD SIDING WITH BATTENS AT SEAMS,
LOOK TO MATCH EXISTING BUILDINGS ON SITE
B B
2. CORRUGATED CORTEN STEEL ROOFING SYSTEM AND INSULATION,
7 1 REFERENCE SPECIFICATION SECTION 07_41_14, COLOR TO MATCH
CLIENTS STANDARDS
3 (TYP) 3. HOLLOW METAL DOOR AND FRAME, REFERENCE SPECIFICATION
SECTION 08_11_13 AND DOOR SCHEDULE FOR DETAILS
8 4. ALUMINUM GUTTERS AND DOWNSPOUT, REFERENCE TYPICAL
DETAIL AG227/TYP
5. CONCRETE SPLASH BLOCK, REFERENCE TYPICAL DETAIL AG229/TYP
5 (TYP) 6. PREFINISHED RIDGE CAP PER MANUFACTURER'S STANDARD DETAIL
7. 30" CAST IN PLACE CONCRETE
8. ACMV BASE - STONE LOOK TO MATCH STONE BASE AT OTHER
BUILDING
H 70A02
SOUTH
ELEVATI N
SCALE: 3/16" = 1'-0"
A B C D
D
D
(TYP) 4
E E
F
5 (TYP)
F
J 70A02
WEST
ELEVATI N
SCALE: 3/16" = 1'-0"
G
DESIGNED
MEH MOUNTAIN REGIONAL WATER SSD VERIFY SCALES
JOB NO.
203230 G
P L O
T D
A T
E
/1
/2
:1
:2
REV DATE BY DESCRIPTION
DRAWN
NK
CHECKED
JCA
DATE
SIGNAL HILL WTP OPTIMIZATION
ARCHITECTURAL
CHEMICAL BUILDING
SOUTH AND WEST ELEVATIONS
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
DRAWING NO.
70A06
SHEET NO.
OF XX
1 2 3 4 5 6 7 8 9 10 11 12 13 FILE NAME: Autodesk Docs://Mountain Regional Water SSD/203230_70A0801.rvt
C
CB
40M02 X.5 Z.2
0.1 A A
NEW GAC
DA
60M01
B D E F G B
BA
30M01 AB AA
20M01 20M01
W 1
C C
CA 30 - MEMBRANE FILTRATION
40M01
1.8
D D
60 - SOLIDS HANDLING
E E
40 - EXISTING GAC
F
20 - PRETREATMENT, WET WELLS, SOLIDS THICKENING
F
G FINAL REVIEW
SUBMITTAL 90%
NOT FOR CONSTRUCTION
DESIGNED
CE
DRAWN
JRL
CHECKED
CAG
DATE
REV DATE BY DESCRIPTION JUNE 2026
1 2 3 FILE NAME: Autodesk Docs://Mountain Regional Water SSD/203230_30M0801.rvt
KEY PLAN
MOUNTAIN REGIONAL WATER SSD
SIGNAL HILL WTP OPTIMIZATION
MECHANICAL
MAIN TREATMENT BUILDING
OVERALL MECHANICAL PLAN
VERIFY SCALES
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
JOB NO.
203230
DRAWING NO.
00M01
SHEET NO.
OF XX
G
4 5 6 7 8 9 10 11 12 13PL
O
T D
AT
E:
/1
/2
1:
:4
PM
1. "NOT ALL VALVES AND FITTINGS SHOWN - REFER TO P&ID SHEETS
A
2. SUPPORT DETAILS ARE PROVIDED FOR REFERENCE ONLY.
CONTRACTOR SHALL FULLY DESIGN PIPE SUPPORTS IN
ACCORDANCE WITH SPECIFICATION 40 05 07.01. ALL CALCULATIONS
AND DETAILS SHALL BE STAMPED AND SIGNED BY A REGISTERED
ENGINEER IN THE STATE OF UTAH.
3. SEE PLUMBING DRAWINGS FOR FLOOR DRAIN, SAFETY SHOWER,
AND POTABLE WATER LOCATIONS AND PIPING.
A
4. CONTRACTOR TO COLOR CODE AND LABEL ALL CHEMICAL PIPES
PER SPEC SECTION 40_05_00.03 AND PIPE SCHEDULE.
B
70M02
E
70M04 U
70M11 L
5. CONTAINMENT AREAS DEFINED AS 3 FEET ABOVE FINISHED FLOOR
AND BELOW. HARDWARE WITHIN CONTAINMENT AREAS SHALL BE
COMPATIBLE WITH CHEMICALS STORED.
70M08 6. SOLVENT GLUE FOR CHEMICAL PIPING SHALL BE SPECIFICALLY
FORMULATED FOR RESISTANCE TO CHEMICAL SOLUTIONS.
7. ALL BALL VALVES USED FOR SODIUM HYPOCHLORITE SERVICE
SHALL BE VENTED.
B
8. ALL CHEMICAL PIPING SHALL BE ROUTED TO MINIMIZE BENDS,
TURNS, AND HIGH POINTS. B
SULFURIC
ACID
AREA
SODIUM
BISULFITE
AREA
PRIMARY
COAGULANT
AREA
CAUSTIC
SODA
AREA
V 70M12
C SOFTENING, BRINE,
AND TOTE
STORAGE AREA
C
C 70M03
D
W 70M13
P 70M09
D
H
70M06
SODIUM
HYPOCHLORITE
AREA
T 70M10
R 70M10
E FUTURE CHLORINE
DIOXIDE ROOM
ELECTRICAL
ROOM
MECHANICAL
ROOM
FILL AREA
E
K 70M07
6'
0"
F F
S 70M10
PLANA SCALE: 3/16" = 1'-0"
PL
O
T D
AT
E:
/1
/2
1:
:4
PM
DESIGNED JOB NO.
G FINAL REVIEW JRC MOUNTAIN REGIONAL WATER SSD VERIFY SCALES G203230
BAR IS ONE INCH ON DRAWN SUBMITTAL 90% DRAWING NO. ORIGINAL DRAWING
DCS SIGNAL HILL WTP OPTIMIZATION
NOT FOR CONSTRUCTION 0 1" 70M01CHECKED MECHANICAL
SHEET NO. CHEMICAL BUILDING ELEV. 7060FT IF NOT ONE INCH ON
DATE THIS SHEET, ADJUST
REV DATE BY DESCRIPTION JUNE 2026 OVERALL PLAN SCALES ACCORDINGLY X OF XX
FILE NAME: Autodesk Docs://Mountain Regional Water SSD/203230_70M0801.rvt
APPENDIX D - PROJECT REFERENCE FORMS
July 2026 D-1 203230 pw://Carollo/Documents/UT/Mountain Regional Water SSD/203230-000000/04 Design/02 Deliverables/02 Intermediate Deliverables/Contractor Prequalification/Appendix D
PROJECT REFERENCE FORMS
MOUNTAIN REGIONAL WATER SPECIAL SERVICE DISTRICT
SIGNAL HILL WATER TREATMENT PLANT OPTIMIZATION PROJECT
Project
Project Description
Contractor’s Project Manager
Contractor’s On-site Superintendent
Construction Value $ Change Order Amount $
Required Completion Date ________________ Actual Completion Date
Value of Self-Performed Work ___________________________________________________________
Indicate Work Subcontracted and value of subcontracted work. (List separately all subcontracts greater than 2 percent of the construction value.)
Subcontractor Value of Subcontract
Owner
Contact Phone
Engineer
Contact Phone
Resident Engineer for CMS Phone
Liquidated Damages Assessed? Yes_____ No_____ Amount $
Describe:
Any Claims on Project? Yes_____ No_____ Amount $
July 2026 D-2 203230
PROJECT REFERENCE FORMS
MOUNTAIN REGIONAL WATER SPECIAL SERVICE DISTRICT
SIGNAL HILL WATER TREATMENT PLANT OPTIMIZATION PROJECT
Construction Value $ Change Order Amount $
Required Completion Date Actual Completion Date
Value of Self-Performed Work ___________________________________________________________
Indicate Work Subcontracted and value of subcontracted work. (List separately all subcontracts greater
Engineer
Contact Phone
Resident Engineer for CMS Phone
July 2026 D-3 203230
PROJECT REFERENCE FORMS
MOUNTAIN REGIONAL WATER SPECIAL SERVICE DISTRICT
SIGNAL HILL WATER TREATMENT PLANT OPTIMIZATION PROJECT
Construction Value $ Change Order Amount $
Required Completion Date Actual Completion Date
Value of Self-Performed Work ___________________________________________________________
Indicate Work Subcontracted and value of subcontracted work. (List separately all subcontracts greater
Engineer
Contact Phone
Resident Engineer for CMS Phone
| Mountain Regional Water Special Service District - Signal Hill Water Treatment Plant Optimization Project - General Contractor and Electrical Contractor - Request for Statement of Qualifications (July 2026) |
| TABLE OF CONTENTS |
| Notice Inviting Statements of Qualification |
| Instructions for Contractors |
| Schedule A - Key Personnel |
| LIST OF APPENDICES |
| APPENDIX A General Contractor's Prequalification Questionnaire |
| APPENDIX B Electrical Contractor's Prequalification Questionnaire |
| APPENDIX C Preliminary Drawings |
| 00G01 - Cover Sheet |
| 00G06 - Process Flow Diagram |
| 00C02 - Overall Site Plan, Facilities Index, and Staging Plan |
| 30A05 - GAC Elevations |
| 70A05 - Chemical Building North and East Elevations |
| 70A06 - Chemical Building South and West Elevations |
| 00M01 - Main Treatment Building Overall Mechanical Plan |
| 70M01 - Chemical Building Overall Mechanical Plan |
APPENDIX D Project Reference Forms
Accessibility Report
Filename:
MRWSSD Prequalification Package.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 0
Passed manually: 2
Failed manually: 0
Skipped: 0
Passed: 30
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Passed manually Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Passed manually Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Passed Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI