About this file
Summary
This Request for Bids (RFB) is issued by Letcher County, Kentucky in partnership with the USDA Natural Resources Conservation Service (NRCS) for streambank stabilization work at Spring Branch as part of the Emergency Watershed Protection (EWP) Program. The project scope includes installing Rail & Cribbing (rail piling plus guardrail lagging) at two sites totaling approximately 255 linear feet, installing gabions and Reno mattresses at one site covering approximately 88 linear feet of embankment, and removing approximately 700 linear feet of earthen debris from the channel. An optional pre-bid site visit is scheduled for Tuesday, October 13, 2026 at 11:00 AM EST at the church located at the intersection of KY-7 and Spring Branch (GPS coordinates 37.170003, -82.931354). Questions must be submitted through the DFS Procurement Portal (dfs.bonfirehub.com) by Friday, October 16, 2026 at 2:00 PM EST. All bids and required documents must be submitted electronically through the DFS Portal no later than Thursday, October 22, 2026 at 2:00 PM EST, with public bid opening occurring at 3:00 PM EST the same day. Award is anticipated during a special call Letcher County Fiscal Court meeting the week of October 26–30, 2026, and all work must be completed by December 31, 2026.
Bids shall be submitted on a unit price basis with all prices all-inclusive and conforming to NRCS Standards and Specifications. Bid items include debris removal, seeding and mulching, mobilization and demobilization, rockfill materials, gabion installation, steel rail piling, guardrail lagging, and grouting. Bid security of either a bid bond or certified check equal to not less than 5 percent of the contract amount is required prior to the submission deadline, and a performance bond for 100 percent of the contract award amount is required prior to work commencement. Successful bidders must provide proof of liability insurance, auto coverage, and workers' compensation. The project is federally funded through the NRCS Emergency Watershed Protection Program. All proposers must complete and certify various compliance forms including non-collusion declarations, debarment certifications, lobbying certifications, affirmative action confirmations, conflict-of-interest statements, and drug-free workplace affidavits. The County reserves the right to accept or reject any bids, to request additional pricing information and breakdowns, and to award work by location or line item.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LETCHER COUNTY - DSR-21-05-23-5076-017 - RFB
REQUEST FOR BIDS
FOR
LETCHER COUNTY, KENTUCKY
EMERGENCY WATERSHED PROTECTION
STREAMBANK STABILIZATION
SPRING BRANCH
DSR-21-05-23-5076-017
BID DUE ON 10/22/2026
NO LATER THAN 2:00 PM EST
TABLE OF CONTENTS
I. PURPOSE: 3
II. SCHEDULE 3
III. POINT OF CONTACT: 3
IV. GENERAL TERMS & INFORMATION: 4
V. PROJECT SCOPE
Attachment 1: Certification and Cost Proposal Form 7 Attachment 1: Certification and Cost Proposal Form 8
SAMPLE COST PROPOSAL FORM 8
Attachment 2: NON-COLLUSION DECLARATION 9 Attachment 3: CERTIFICATION REGARDING LOBBYING 10 Attachment 4: FORM 200.321 AFFIRMATIVE STEPS 11 Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and
VOLUNTARY EXCLUSION 12
Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT 13 Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT 14
APPENDIX A: Construction and Material Specifications 16
APPENDIX B: Drawing Sets
LETCHER COUNTY, KENTUCKY
EWP STREAMBANK STABILIZATION
DSR-21-05-23-5076-017
I. PURPOSE:
Letcher County (hereafter referred to as “County”) is soliciting bids from experienced contractors to provide Streambank Stabilization services near Spring Branch as part of the USDA Natural
Resources Conservation Service’s (NRCS) Emergency Watershed Protection (EWP) Program, according to NRCS Standard Practices and Specifications and Construction Plans, The work for this project involves installing Rail & Cribbing (rail piling + guardrail lagging) at two
(2) sites, gabion baskets and Reno mattresses at one (1) site, and removing approximately 700 LF of earthen debris along Spring Branch. The planned work will stabilize the channel to lessen flooding hazards in rural areas.
The purpose of this work is to reduce risks to agricultural resources or civil infrastructure by removing obstructions that hinder channel flow or sediment transport in order to restore flow capacity and direction, prevent excessive bank erosion by eddies or redirection of flow, and reduce the undesirable formation of bars and/or minimize blockages by debris.
II. SCHEDULE
A. PRE-BID OPTIONAL SITE VISIT: Tuesday, October 13, 2026 at 11:00 AM EST at the church at the intersection of KY-7 and Spring Branch, Letcher County, KY (GPS 37.170003, -82.931354)
B. BID SUBMISSION DEADLINE: Thursday, October 22, 2026 at 2:00 PM EST
C. PUBLIC BID OPENING: Thursday, October 22, 2026 at 3:00 PM EST in the Judge Executive’s Office
D. MEETING FOR AWARD: Week of October 26–30, 2026 during a special call Fiscal Court meeting (exact date and time to be announced).
E. WORK TO BE COMPLETED NO LATER THAN: December 31, 2026
III. POINT OF CONTACT:
Points of contact for this Bid: Please copy all contacts on emails.
Terry Adams, Judge: judgeadams@letchercounty.ky.gov mailto:judgeadams@letchercounty.ky.gov
ER Assist Grant Manager: ky-letcher@erassist.com
IV. GENERAL TERMS & INFORMATION:
A. Bids and all required documents must be submitted online to the DFS Procurement Portal
(hereinafter “DFS Portal” or “Portal”) at dfs.bonfirehub.com no later than October 22, 2026 at
2:00 PM, local time (EST).
B. Submittals received after the closing time will not be accepted. Multiple submittals from the same entity will not be accepted. Submission is electronic only through the DFS Portal. Hard copy Bids or offers by telephone, fax, or email will not be accepted.
C. All proposers are encouraged to attend an optional Pre-Bid Meeting and Site Visit scheduled for Tuesday, October 13, 2026 at 11:00 AM EST at the church at the intersection of KY-7 and
Spring Branch, Letcher County, KY (GPS 37.170003, -82.931354). No synopsis or summary of the meeting will be provided.
D. Addenda regarding this will be posted to the DFS Portal at dfs.bonfirehub.com. Proposers are responsible for obtaining addenda and are advised to check the website frequently.
E. Questions regarding this are to be submitted to dfs.bonfirehub.com no later than Friday, October 16, 2026 at 2:00 PM EST. For questions regarding portal registration or navigation, please email: procurement@erassist.com.
F. All bids must be properly certified by the entity bidding for the work and signed by an officer, director or owner that has authority to bind and commit the Contractor to perform said work and services.
G. Work shall be bid by unit price and all prices shall be all-inclusive and shall include all work required to complete the scope of work according to the Standards, Specifications, and
Construction Plans in Appendices A and B, including but not limited to vegetating disturbed areas, traffic control, mobilization and demobilization, contractor quality control, and pollution control measures.
H. Prices offered in the Cost Proposal Form by contractor shall be all inclusive and in accordance with the NRCS Standards and Specifications attached in Appendix A and shall not be increased or changed for any reason other than changes requested or approved by Letcher County.
I. Bid Security as either a bid bond or certified check are required prior to the submission deadline for not less than 5% of the contract amount.
Performance Bonds will be required for 100% of the contract work award amount prior to the start of work.
RFB
J.
mailto:ky-letcher@erassist.com http://dfs.bonfirehub.com http://dfs.bonfirehub.com http://dfs.bonfirehub.com mailto:procurement@erassist.com
The County of Letcher reserves the right to request additional information for any and all prices offered in the Cost Proposal Form, including but not limited to a comprehensive breakdown of prices offered.
The following forms are provided in this for reference. Proposers must review each form and enter their response as directed in the Portal’s Required Information section. The confirmation or declaration statement for each form for which a response is required is provided in a gray box at the bottom of each form in this document. All responses must be true and accurate and shall be considered the equivalent of a legally-binding electronic signature.
1. Attachment 1: Bid Certification and Cost Proposal Form
2. Attachment 2: NON-COLLUSION DECLARATION
3. Attachment 3: CERTIFICATION REGARDING LOBBYING
4. Attachment 4: FORM 200.321 AFFIRMATIVE STEPS
5. Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and VOLUNTARY EXCLUSION
6. Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT
7. Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT
Costs of preparation of a response to this request for Bids are solely those of the proposers.
The County assumes no responsibility for any such costs incurred by the proposer. The proposer also agrees that the County bears no responsibility for any costs associated with any administrative or judicial proceedings resulting from the solicitation process.
Bids will be opened publicly prior to the award meeting on October 22, 2026 at 3:00 PM EST in the Judge Executive’s Office.
Award is set to occur at a special call of the Letcher County Fiscal Court, 156 Main St STE 107, Whitesburg, KY 41858 during the week of October 26–30, 2026.
Successful proposers must provide insurance policies showing proof of liability coverage, auto coverage and workers compensation.
Successful proposers, assigns, subcontractors must be compliant with all applicable Federal, State and Local laws.
The County has the right to cancel a solicitation at any time prior to approval of the award by the County.
The County of Letcher reserves the right to accept or reject any and all Bids, in addition, the
County reserves the right to accept multiple Bids and award work per location or per line item.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
V. PROJECT SCOPE
A. All work shall be performed as detailed or referenced in the attached NRCS National
Conservation Practice Standards and Specifications and Job Sheets attached hereto in
Appendices A and B. The work consists of (1) Rail & Cribbing (Grouted Steel Rail Wall) -furnishing and installing used railroad rail piling in drilled, grouted sockets with steel guardrail lagging and Class II riprap backfill, (2) Gabions and Gabion Mattresses - furnishing, assembling, and installing rock-filled wire-mesh gabions and gabion mattresses, (3) Debris Removal -removal of approximately 700 LF of earthen debris, (4) pollution control - work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities, (5) seeding and mulching - work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
B. Access points for each site are at the coordinates provided (where the stream meets the road).
Any additional or special instructions regarding site access will be provided at the Pre-Bid meeting.
C. All assigned work shall be performed at the specified location(s) and within the site parameters as determined by NRCS and provided below and in Appendix B. This project contains the following three (3) sites plus Debris Removal Only reaches, each having a site ID that correlates to the project map in Appendix B.
1. Site 2: Site 2: 37.15789, -82.92028 → 37.15810, -82.92050
i. Install approximately 95 LF of Rail & Cribbing (rail piling + guardrail lagging)
2. Site 3: 37.15822, -82.92067 → 37.15854, -82.92103
i. Install approximately 160 LF of Rail & Cribbing (rail piling + guardrail lagging)
3. Site 5: 37.16206, -82.92131 → 37.16230, -82.92127
i. Stabilize approximately 88 LF of embankment with Gabions and Reno
Mattresses
4. Debris Removal Only: See Appendix B, Sheets 2 and 10
i. Remove approximately 700 LF of earthen debris in the channel, culvert entrances, bridge entrances and floodways as needed
Attachment 1: Certification and Cost Proposal Form
Proposing Certification: I have carefully examined the Request for Bids and any other documents accompanying or made a part of this Request for Bids.
I hereby propose to furnish the goods or services specified in the
Request for Bids at the rates quoted in my Bid. I agree that my Bid will remain in effect for a period of up to one hundred eighty (180) days.
I agree to abide by all conditions of this Bid and understand that a background investigation may be conducted prior to award.
I certify that all information contained in this Bid is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to submit this Bid on behalf of the Proposer as its act and deed and that the Proposer is ready, willing and able to perform if awarded the Contract.
I certify this Bid is made without prior understanding, agreement, connection, discussion, or collusion with any other person, firm or corporation submitting a
Bid for the same product or service. I further certify that no officer, employee or agent of
County or of any other Proposer has a financial interest in this Bid. I further certify that the undersigned executed this Proposer's Certification with full knowledge and understanding of the matters therein contained and was duly authorized to do so.
DFS Portal Confirmation / Declaration:
By completing and submitting the Cost Proposal Form, you are certifying all of the above as well as the prices and data entered in the Cost Proposal Form in the DFS Portal. The following
Cost Proposal Form is provided for reference only.
Attachment 1: Certification and Cost Proposal Form
SAMPLE COST PROPOSAL FORM
Emergency Watershed Protection Program - Letcher County
DSR # 21-05-23-5076-017
The prices offered shall be “all-inclusive”, and shall not be increased or changed for any reason other than changes requested or approved by the County and shall conform to the NRCS Standards & Specifications.
Breakdown of costs will be required upon request by the County or NRCS.
This is a Sample Cost Proposal Form ONLY. Actual bid prices shall be entered in the Portal. This form is not required but can be submitted. In the case of price discrepancies, the prices in the Portal will prevail.
ITEM # Work/Material Unit Qty Unit Rate Proposed Cost
(extended)
1 Debris Removal LF 700
3 Seeding and Mulching Lump Sum
Mobilization and Demobilization
Lump Sum
5 Rockfill, #2 Stone TON 35
6 Rock Riprap, Class III TON 60
7 Rock Riprap, Class II TON 329
8 Gabions, 1' Reno Mattresses CY 20
9 Gabions CY 70
10 Steel, Railroad Rail Piling LF 900
11 Steel, Guard Rail Lagging SF 1978
12 Grouting CY 15
Total Cost
Attachment 2: NON-COLLUSION DECLARATION
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.
The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder.
All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price of any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the applicable laws that the foregoing is true and correct.
Do you confirm that you have read the Non-Collusion declaration and therefore declare under penalty of perjury under the applicable laws that the Non-Collusion Declaration is true and correct?
(Y/N)
Attachment 3: CERTIFICATION REGARDING LOBBYING
The undersigned certifies that, to the best of their knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with the awarding of any Federal contract, the making of any
Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a
Member of Congress, an officer or employee of Congress, or an employee of a Member of
Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report
Lobbying,” in accordance with its instruction.
3. The undersigned shall require that the language of this certification be included in the award document for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31 U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than
$10,000 and not more than $100,000 for each such failure.
Do you, the Contractor, confirm that you have read the Certification Regarding Lobbying form and certify or affirm the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31
U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any. (True/False)
Attachment 4: FORM 200.321 AFFIRMATIVE STEPS
CONTRACTING WITH SMALL AND MINORITY BUSINESSES, WOMEN’S BUSINESS
ENTERPRISES, AND LABOR SURPLUS AREA FIRMS §200.321
The County is required to take all necessary affirmative steps to assure that minority business, women's business enterprises, and labor surplus area firms are used when possible. If contractor uses subcontractors, they are also required to take the following affirmative steps:
1. Placing qualified enterprises on solicitation lists.
2. Assuring that enterprises are solicited whenever they are potential sources.
3. Dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by enterprises.
4. Establishing delivery schedules, where the requirement permits, which encourage participation by enterprises.
5. Using the services and assistance, as appropriate, of such organizations as the Small Business
Administration and the Minority Business Development Agency of the Department of
Commerce.
Do you confirm that you have read the 200.321 Affirmative Steps Confirmation and agree to take the listed affirmative steps when using subcontractors. (Y/N)
Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and
VOLUNTARY EXCLUSION
Neither the entity or its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency.
Do you confirm that neither the entity nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency? (Y/N)
Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT
To the best of our knowledge the bidder has no potential conflict of interest due to any other clients, contracts, or property interest for this project. [ SELECT YES IF TRUE ]
OR
The bidder, by attachment, submits information which may be a potential conflict of interest due to other clients, contracts, or property interest for this project. [ SELECT NO IF TRUE & UPLOAD
DOCUMENTATION ]
Failure to answer appropriately may result in disqualification of your bid.
Do you confirm that to the best of your knowledge the undersigned proposer has no potential conflict of interest due to any other clients, contracts, or property interest for this project?
(Y/N)
If answered no, documentation must be uploaded containing information regarding what may be a potential conflict of interest due to other clients, contracts, or property interest for this project.
Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT
The undersigned certifies that the responding firm has taken steps to :
1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are proposed, a copy of the drug- free workplace statement.
4. In the statement specified in drug-free workplace statement, notify the employees that as a condition of working on the commodities or contractual services that are under bid the employee will abide by the terms of the statement and will notify the employer of any conviction of or plea of guilty or nolo contendere to any violation of any controlled substance law of the United States or any state for a violation occurring in the workplace no later than five (5) days after such conviction.
5. Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community by any employee who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.
I certify that this firm complies fully with the above requirements.
Do you confirm that you have read the Drug-Free Workplace Affidavit and certify that the responding company complies fully with the listed requirements? (Y/N)
- Upload the contractor's Drug Free Workplace Policy
APPENDIX A
NRCS Construction & Material Specifications
EWP – KY 01/2025
5076 - DSR 21 05 23 5076 017 – SPRING BRANCH
EMERGENCY WATERSHED PROTECTION (EWP) STREAMBANK STABLIZATION PROJECT
with the cooperation of the LECTHER COUNTY FISCAL COURT, LECTHER COUNTY, KENTUCKY and the
NATURAL RESOURCES CONSERVATION SERVICE (NRCS)
CONSTRUCTION and MATERIAL SPECIFICATIONS
EWP – KY 01/2025
LIST OF APPLICABLE SPECIFICATIONS
SPECIFICATIONS:
• NRCS National Construction Specification 4, Channel Clearing and Shaping
• NRCS National Construction Specification 5, Pollution Control
• NRCS National Construction Specification 6, Seeding, Sprigging, and Mulching
• NRCS National Construction Specification 8, Mobilization and Demobilization
• NRCS National Construction Specification 9, Traffic Control
• NRCS National Construction Specification 11, Removal of Water
• NRCS National Construction Specification 21, Excavation
• NRCS National Construction Specification 25, Rockfill
• NRCS National Construction Specification 61, Rock Riprap
• NRCS National Construction Specification 64, Gabion and Gabion Mattress
• NRCS National Construction Specification 81, Metal Fabrication and Installation
• NRCS National Construction Specification 94, Contractor Quality Control
• NRCS National Construction Specification 95, Geotextile
• NRCS National Construction Specification 414, Grouting
MATERIAL SPECIFICATIONS
• NRCS National Material Specification 522, Aggregate for Portland Cement
• NRCS National Material Specification 523, Rock for Riprap
• NRCS National Material Specification 531, Portland Cement
• NRCS National Material Specification 592, Geotextile
CONSTRUCTION DRAWINGS
See drawing sheets.
(210-VI-NEH, May 2001)
Construction Specification 4—Channel Clearing and Shaping
1. Scope The work consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish, and the shaping of the channel.
2. Protection of existing vegetation Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or ne-glect shall be repaired by the contractor.
Earthfill, stockpiling of materials, vehicle or equipment parking, and excessive foot or vehicle traffic shall not be allowed within the drip line of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer.
Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.
Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk.
All roots 1 inch or larger in diameter that are cut, broken, or otherwise severed during channel shaping shall have the end smoothly cut perpendicular to the root. Roots exposed during channel shaping opera-tions shall be covered with moist soil as soon as possible to prevent roots from drying out.
3. Marking The limits of the area(s) to be cleared and shaped are marked by stakes, flags, paint, tree markings, or other suitable methods or as specified in section 8 of this specification, or they will be shown on the drawings. Trees to remain standing, undisturbed, and uninjured are designated by special markings.
4. Clearing Trees and other vegetation marked for clearing shall be cut off as near the ground surface as conven-tional tools and equipment normally permit. All trees not marked for preservation and all snags, logs, brush, shrubs, stumps, and rubbish shall be cleared from within the area limits identified.
5. Disposal All woody material, vegetation, and rubbish resulting from clearing from designated areas shall be dis-posed of at the locations and in a manner shown on the drawings, or as specified in section 8 of this specification.
6. Shaping The channel bottom and side slopes shall be shaped as shown on the drawings. The resulting shaped channel surface shall be reasonably smooth. Material excavated during the channel shaping operation shall be removed from the channel and disposed of as specified in section 8 of this specification.
4–1
(210-VI-NEH, May 2001)
7. Measurement and payment Method 1—For items of work for which specific unit prices are established by the contract, the desig-nated cleared and shaped area is measured and the area determined to the nearest 0.1 acre. Payment for clearing and shaping is made at the contract unit price for the item and shall constitute full compensa-tion for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory completion of the work.
Method 2—For items of work for which specific unit prices are established by the contract, the length of the cleared and shaped channel designated is measured to the nearest 100 feet. Payment for clearing and shaping is made at the contract unit price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory performance of the work.
Method 3—For items of work for which specific unit prices are established by the contract, the cleared and shaped area(s) is measured and the area determined to the nearest 0.1 acre. The designated cleared and shaped area(s) is determined from the measured width at representative sections and the distance between the sections. Payment for clearing and shaping is made at the contract unit price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory completion of the work.
Method 4—For items of work for which specific lump sum prices are established by the contract, the extent of clearing and shaping is not measured or determined for payment. Payment for clearing and shaping is made at the contract lump sum price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensa-tion for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they have been made subsidiary are identified in section 8 of this specification.
8. Items of work and construction details
4–2
(4/21/2023-EWP-KY) 04-3
8. Items of work and construction details Items of work to be performed in conformance with this specification and the construction details therefore are:
(A) Bid Item – Debris Removal
(1) This item shall consist of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, rubbish, and man-made debris from the streams as shown on the plans and as located by the engineer during construction.
(2) Marking – The upper and lower ends of the work will be designated by GPS coordinates and marked with flagging. The width varies as shown on the plans and as located by the COR.
(3) Protection of existing vegetation:
a. Trimming or treatment of cuts, scrapes or bruises to bark or limbs is not required.
b. Limbs or branches 3 inches or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk.
(4) Tree Clearing/Removal:
a. The removal or adverse impacts to all existing trees, shrubs or other native vegetation shall be avoided and minimized to the extent possible. In general, trees and shrub removal should be targeted for removal only when they inhibit construction, cause a safety hazard within the work limits, or are already felled, severely dislodged or down.
b. Trees that exhibit exfoliating bark characteristics such as shell and shagbark hickories, white oak species; or dead and dying trees with exfoliating bark, broken tree tops, splintered or split areas; trees with cavities or hollowed areas shall not be removed unless (a) above applies.
c. When possible and feasible all required tree removal shall occur between November 15th and March 31st and will not require NRCS State Biologist prior approval. Tree removal from April 1 to November 14th will require prior approval from the NRCS State Biologist and be marked for retention or removal by an NRCS representative.
Trees and shrubs less than 3 inches in diameter may be removed any time of year.
d. If the construction activity occurs in proximity to a known Indiana and/or northern long-eared bat maternity colony or hibernaculum area, any tree removal will require prior approval from the NRCS State Biologist (regardless of time of year) and be marked for removal or retention by an NRCS representative prior to implementation.
e. NRCS will designate any needed ingress and egress, access points, or work areas in woodland and mark trees for removal or retention by an NRCS representative prior to construction.
f. If additional tree removal is required during construction, all the criteria listed above is required.
g. NRCS inspectors will ensure that sponsors and contractors adhere to the above requirements by inspecting the site prior to any work and by making site visits every day or every other day once work has commenced.
(4/21/2023-EWP-KY) 04-4
(5) Stream Debris Removal/Clearing:
a. The use of construction equipment, green concrete, pesticides or other pollutants including fuel and oil products within flowing streams or natural waterbodies during construction activities is prohibited. Plan and install appropriate measures to minimize sediment and turbidity during construction or debris removal.
b. During construction activities, appropriate measures shall be implemented to ensure that the transport of excess nutrients, sediments, pesticides or toxic substances to streams, wetlands and adjacent waterbodies does not occur.
c. Construction activities along the streams and within riparian corridors will be performed only to the minimum level needed to effectively extract targeted debris from the stream. Tree removal must be performed as outlined above (4).
d. Man-made or natural debris of salvageable value to sponsor or landowner shall be moved, disposed of, or secured in a manner agreeable to sponsor, landowner, Insurance provider, contractor and as determined by the Government Representative.
Examples would be marketable timber or damaged autos.
e. Man-made debris dislodged from blockage removal shall be secured and removed from the work area.
(6) Disposal –
a. All disposal areas shall be approved by the NRCS representative prior to implementation.
b. Unsalvageable man-made debris disposal shall conform to any State and local regulations.
c. Woody and earthen debris removed from the reach shall be hauled to a disposal site designated by the sponsor or placed in designated disposal areas determined by a Government Representative on site, or as shown on the drawings.
d. Woody debris that is burned on site, shall be done in accordance with all local and state burning regulations. No burning within the channel shall occur.
e. Areas designated for burn and burial of woody debris, as shown on the drawings, shall be regraded to slopes and grades that are consistent with the surrounding area.
f. Woody debris may also be chipped into mulch and spread uniformly over site to a depth of no more than 2” if acceptable by Sponsor and Landowner.
(7) Shaping – Areas disturbed during the removal process, including banks and access routes, shall be regraded to slopes and grades that are consistent with the surrounding area.
(8) Measurement and Payment – In Section 7, Method 2 shall apply.
(9) Items subsidiary to this bid item:
a. Construction Specification 9, Traffic Control
b. Construction Specification 21, Excavation
c. Construction Specification 94, Contractor Quality Control
Construction Specification 6—Seeding, Sprigging, and Mulching
1. Scope The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
The following BioPreferred® product categories are applicable to this specification:
— Mulch and compost materials
— Erosion control materials
— Fertilizers
— Agricultural spray adjuvants
2. Material Seed—All seed must conform to the current rules and regulations of the State where it is being used and must be from the latest crop available. It must meet or exceed the standard for purity and germination listed in section 7.
Seed must be labeled in accordance with State laws and U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed may be accepted with a test date of more than 9 months before the date of delivery to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable must be as defined in the current State laws relating to agricultural seeds. Each type of seed must be delivered in separate sealed containers and fully tagged unless an exception is granted in writing by the contracting officer.
Fertilizer—Unless otherwise specified, the fertilizer must be a commercial-grade fertilizer. It must meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor must furnish a supplier’s certification of analysis and weight. When required by the contract, a representative sample of the fertilizer must be furnished to the contracting officer for chemical analysis.
Inoculants—The inoculant for treating legume seeds must be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and must not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, must be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer must be used, except that four times the amount must be used when seed is applied using a hydraulic seeder. Seed must be sown within 24 hours of treatment and must not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments—Lime must consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State department of agriculture.
Other soil amendments must meet quality criteria and application requirements specified in section 7.
Mulch tackifiers—Asphalt emulsion tackifiers must conform to the requirements of ASTM D977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations must be as specified in section 7.
Straw mulch material—Straw mulch must consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material must be air-dry, reasonably light in color, and must not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor must provide a method satisfactory to the contracting officer for determining weight of mulch furnished.
Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer’s recommendations for methods of application.
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting must be as shown on the plans or as specified in section 7.
(210-VI-NEH, Amend. 2, Sept. 2018) 6–1
4. Seedbed preparation and treatment Areas to be treated must be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed must be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed must be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations must be removed or disposed of as specified in section 7.
Seedbed preparation must be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the responsible engineer.
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations must be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application must be as specified in section 7. Unless otherwise specified, seeding or sprigging must be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments must be applied as specified in section 7. When specified, the fertilizer and soil amendments must be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh must be as specified in section 7. Mulches must be applied uniformly to the designated areas. They must be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material must be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it must have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it must be operated on the contour. Hand methods must be used where equipment cannot safely operate to perform the work required.
The tackifier must be applied uniformly over the mulch material at the specified rate, or it must be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials must be applied smoothly but loosely on the designated areas. The edges of these materials must be buried or securely anchored using spikes or staples as specified in section 7.
The contractor must maintain the mesh or netting areas until all work under the contract has been completed and accepted.
Maintenance must consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas must be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas must be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in section 7 and the area is calculated to the nearest 0.1 acre. Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.
When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted.
Payment is made at the contract unit price and will constitute full compensation for completion of the work.
6–2 (210-VI-NEH, Amend. 2, Sept. 2018)
Method 2—For items of work for which specific lump-sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump-sum price for the item and constitutes full compensation for the completion of the work.
Method 3—For items of work for which lump-sum prices are established in the contract, payment is made as the work proceeds.
Progress payments are determined as specified in section 7. Payment of the lump sum contract price constitutes full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7.
7. Items of work and construction details
(210-VI-NEH, Amend. 2, Sept. 2018) 6–3
Items of work to be performed in conformance with this specification and the construction details therefore are:
A. Bid Item – Seeding and Mulching
(1) This item shall consist of the application of seed and fertilizer on all areas disturbed by construction. All necessary grading and filling of rills and gullies shall be incidental to seedbed preparation.
(2) Section 2, Materials, no agricultural lime is required.
(3) Section 2, Materials, no fertilizer is required.
(4) Section 2, Materials. Small grain straw may be used for mulch applied at a rate of two tons per acre. Hydro seeding mulch may be used, follow manufacturer’s recommended application rates.
(5) Section 3, Seeding Mixtures, Sod, Sprigs, and Date of Planting, the designated areas will be seeded in accordance with the following:
(6) Section 4, Seedbed Preparation and Treatment. Removal and disposal of debris will be as specified in specification 4, Channel Clearing and Shaping.
(7) Section 6, Measurement and Payment. Measurement and Payment will be by shall be by Method 2.
(11//2023-EWP-KY) 06-4
Construction Specification 8—Mobilization and Demobilization
1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract.
Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment.
Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating sup-plies.
4. Items of work and construction details
(210-VI-NEH, May 2001) 8–1 27
4. Items of work and construction details The items of work to be performed in conformance with this specification and construction details is:
A. Bid Item - Mobilization
(1) This item shall consist of the Mobilization and Demobilization of the Contractor’s forces and equipment necessary for performing the work required under the contract.
(2) In Section 3, Measurement and Payment, payment will be made in a Lump Sum.
(11/2023-EWP-KY) 08-2
Construction Specification 9—Traffic Control
The work shall consist of establishing traffic control and maintaining safe, convenient use of public roads and rights-of-way.
2. Traffic and access The contractor's operations shall cause no unnecessary inconvenience to the public. The public rights-of-way shall be maintained at all times unless interruption is authorized by proper local authority.
Contractor's authorized closing or detour plans shall be provided to the engineer for approval.
Safe and adequate access shall be provided and maintained to all public protection devices and to all critical utility control locations. Facility access shall be continuous and unobstructed unless otherwise approved.
3. Storage of equipment and material in public streets Construction materials and equipment shall not be stored or parked on public streets, roads, or high-ways. During any material or equipment loading or unloading activities that may temporarily interfere with traffic, an acceptable detour shall be provided for the duration of the activity. Any associated expense for this activity is the responsibility of the contractor.
Excavated material, including suitable material that is intended for adjacent trench backfill or other earth backfill as specified in section 5 of this specification, shall not be stored on public streets, roads, or highways that remain in service for the public. Any waiver of this requirement must be obtained from the proper local authority and approved by the engineer. All excess and unsuitable material shall be re-moved from the site as soon as possible. Any spillage shall be removed from roadways before they are used by the public.
4. Street closures, detours, and barricades The contractor shall comply with the requirements of all applicable responsible units of government for closure of any street, road, or highway. The contractor shall provide the required barriers, guards, lights, signs, temporary bridges, and flaggers together with informing the public of any detours and construction hazards by the most suitable means available, such as local newspapers or radio stations.
The con- tractor is also responsible for compliance with additional public safety requirements that may arise during construction. The contractor shall furnish, install, and, upon completion of the work, promptly remove all signs, warning devices, and other materials used in the performance of this work.
Unless otherwise specified, the contractor shall notify, in writing, the fire chief, police chief, county sheriff, state patrol, schools that operate school buses, or any other government official as may be ap-propriate no less than 7 days before closing, partly closing, or reopening any street, road, or highway.
Unless otherwise specified, the contractor shall furnish to the engineer a written plan showing the pro-posed method of signing, barricading for traffic control, and safety for street detours and closures.
All temporary detours will be maintained to ensure use of public rights-of-way is provided in a safe man-ner. This may include dust control, grading, and graveling as required in section 7 of this specification.
(210-VI-NEH, May 2001) 9–1
5. General and specific references All…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .