About this file

This is a Request for Qualifications (RFQ) issued by the Johnson Water Improvement District (JWID) in Roosevelt, Utah, for contractor pre-qualification on the East System Waterline Improvements Project. The project involves the installation of approximately 13,070 linear feet of new 8-inch HDPE waterline across two schedules along 1500 E and 3000 S, including associated infrastructure such as fire hydrants, air valves, gate valves, pressure reducing valves, bores, and utility crossings. The work encompasses tribal and private land crossings and requires contractors to hold current Utah business licenses, Tribal Business Licenses (UTERO), and access permits. Statements of Qualifications are due by June 17, 2026, at 10:00 a.m. at the JWID office located at 3748 W UT-87, Roosevelt, UT 84066. A pre-bid meeting for pre-qualified contractors is anticipated for the end of June 2026. Construction is expected to begin as early as weather and materials availability permit, with project completion targeted by September 1, 2027, under a 120-calendar day contract with potential winter shutdown provisions.

Qualification evaluation is based on a 100-point scoring system: Company History and Bonding Status (20 points), Relevant Experience and Local Presence (30 points), Workforce and Availability (30 points), and References (20 points). Minimum pre-qualification requirements include sufficient bonding capacity to complete the project and demonstrated ability to meet the November 1, 2025 completion deadline. Contractors must provide bonding capacity exceeding $1 million per project and $5 million aggregate bonding capacity to receive maximum points. The project is funded by the Community Impact Board (CIB). All pre-qualification packets become the property of JWID upon submittal and will not be returned. Six copies of the SOQ must be submitted in sealed packages with proposal page limits of 12 pages excluding cover and appendices. Questions regarding the RFQ should be directed to Sunrise Engineering, LLC, the project's engineering firm.

View the file

Other files

File Type Posted
2-Project Layout Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z:\Shared\VNL\Projects\Johnson Water\WTR\EAST SYSTEM IMPROVEMENTS 2024\Admin & Eng\Bid Docs\Prequalifications\JWID East System Waterline RFPQ.docx

REQUEST FOR QUALIFICATIONS

JOHNSON WATER IMPROVEMENT DISTRICT

EAST SYSTESM WATERLINE IMPROVEMENTS PROJECT, 2026

CONTRACTOR PRE-QUALIFICATION PROPOSALS

Due

June 17, 2026 10:00 a.m.

Johnson Water Office

3748 W, UT-87

Roosevelt, UT 84066

Introduction The Johnson Water Improvement District (JWID) is requesting statements of qualification (SOQ) from qualified contractors for the construction of the East System Waterline Improvements Project, 2025. This phase is to pre-qualify contractors based upon statements of qualifications. Contractors that are pre-qualified will be invited to participate in a subsequent cost bidding phase where the project will be awarded to the lowest responsible, responsive bidder.

Project Description Schedule A: On 1500 E, a new 8-inch HDPE line will be installed along the road about 1 mile from the intersection of 3750 S and 1500 E by connecting the existing lines on 5000 S to the line at about 4000 S, along 1500 E. This portion of the pipeline will begin by connecting to the existing 8-inch line on 5000 S and run north on 1500 E to about 4000 S where it will tie into the other existing 8-inch line. That section of pipe will be approximately 5,520 ft and will include the installation of fire hydrants, air valves, gate valves, a bore, and connections as well as several utility crossings as shown in the plans. Also included;

on 1500 E, north of 3750 S, a new 8-inch HDPE line will be installed along the road from about 3500 S to 3000 S and then along 3000 S to about 536 E and north again through private line to the end of 450 E.

This portion of the pipe will tie into the existing 8-inch line at 3500 S and then run north on 1500 E to 3000 S and then run along 3000 S to about 536 E where it will turn north again and run through private land until it ties into an existing 8-inch line at the end of 450 E. This will all be a total of approximately 7,550 ft and includes hydrants, air valves, a prv, bore, and connections as well as several utility crossings and tribal and private land crossing.

Funding for the project will be provided by the Community Impact Board (CIB).

Z:\Shared\VNL\Projects\Johnson Water\WTR\EAST SYSTEM IMPROVEMENTS 2024\Admin & Eng\Bid Docs\Prequalifications\JWID East System Waterline RFPQ.docx

Construction is anticipated to begin as early as the contractor is able and depending on weather and materials availability. The project is expected to have a 120-calendar day contract with a possible winter shutdown if contractor desires to start in the winter. Completion of the project is expected by September 1, 2027.

Proposal Format Proposals should be presented in a bound format using 8 ½ x 11 sheets and should be prepared according to the outline below. Proposal page limit shall be 12 pages excluding cover and Appendix.

1. Contractor Introduction

a. Provide a brief history of the company.

b. Outline areas of expertise.

c. Summarize applicable licenses held by Contractor.

d. Does the contractor have current UTERO with Ute Tribe?

2. Bonding Status

a. Name of Bonding Company?

b. How long has Contractor been with Bonding Company?

c. Bonding Capacity?

d. Has your company ever had to file on a bond? Explain.

3. Relevant Experience & Qualifications

a. Provide brief resumes of key personnel to be assigned to project including relevant project experience.

b. Profile past projects which demonstrate Contractor’s experience and capabilities.

c. Outline critical or challenging components of the project and explain how your experience and qualifications will help address these items and provide benefit to the project.

4. Workforce, Availability, & Schedule

a. Describe the workforce, equipment, and resources maintained by the Contractor which are necessary to complete the project.

b. Detail the available workforce, equipment, and resources that can be committed to this project if the project were to be awarded to Contractor.

c. Include a statement indicating Contractor’s ability and commitment to complete the project by the November 2025 completion date. Provide a preliminary schedule for project completion.

5. References

a. Provide a list of references including entity, contact names, phone numbers, and email addresses.

Appendix - Provide a brief listing of projects completed by Contractor within the past 5 years.

Include similar waterline projects.

Evaluation Criteria All proposals will be evaluated and ranked according to the following point system.

A. Company History and Bonding Status- (20 POINTS AVAILABLE)

a. 15 points based on bonding capacity over $1 million per project, and aggregate bonding capacity over $5 million.

Z:\Shared\VNL\Projects\Johnson Water\WTR\EAST SYSTEM IMPROVEMENTS 2024\Admin & Eng\Bid Docs\Prequalifications\JWID East System Waterline RFPQ.docx

b. 5 points based on contractors’ years in business.

B. Relevant Experience, Local Presence, & Qualifications- (30 POINTS AVAILABLE)

a. 10 points based on applicable project experience.

b. 10 points based on when applicable projects were completed.

c. 10 points based on local presence shown through projects or location.

C. Workforce & Availability- (30 POINTS AVAILABLE)

a. 10 points based upon availability to complete the work no later than November 1, 2025.

b. 10 points based on listed staff qualifications directly relevant to applicable projects completed and years of experience.

c. 10 points based on UTERO and Ute Tribe Business License status.

D. References- (20 POINTS AVAILABLE)

a. 5 points based on listing 3+ references.

b. 5 points based on references pertaining to applicable projects.

c. 10 points based on references contacted.

Please note that minimum requirements for pre-qualification include sufficient bonding capacity to complete the project and the ability to meet the required deadline. SOQ’s not meeting these minimum requirements will not be considered further for pre-qualification. A committee of JWID board members, Sunrise Engineering, and the JWID staff will review the SOQ’s and grade them in accordance with the listed evaluation criteria. SOQ’s not meeting the minimum score threshold will not be qualified to bid on the project.

Pre-Bid Meeting Those contractors who are pre-qualified will be expected to attend a pre-bid meeting. This meeting is anticipated to be scheduled for the end of June 2026.

Submittal Six copies of the statement of qualifications shall be submitted to JWID before 10:00 A.M. on June 17, 2026, at the following address:

Johnson Water Office

3748 W UT-87

Roosevelt, UT 84066

Statements shall be submitted in a sealed package clearly bearing the name of the Contractor, address, and title of “Johnson Water Improvement Project Statement of Qualification”.

Inquiries regarding the RFSQ should be directed to Sunrise Engineering, LLC.

Sherry Taylor (435) 999-5873 sherry.taylor@sunrise-eng.com Kurtis Shawcroft (435) 216-9197 kshawcroft@sunrise-eng.com

Thank you for your interest in this project.

Z:\Shared\VNL\Projects\Johnson Water\WTR\EAST SYSTEM IMPROVEMENTS 2024\Admin & Eng\Bid Docs\Prequalifications\JWID East System Waterline RFPQ.docx

Attachments Project Location Map

Notes & Disclaimers:

All Contractors shall be licensed to conduct business in the State of Utah and hold a current Tribal Business License, UTERO, and Access Permit for the small Tribal land crossing area of the project.

Pre-qualification packets shall be completed in accordance with the submittal instruction contained herein.

Failure to comply with the instructions may result in rejection of the submitting contractor, at the sole discretion of the selection committee.

JWID reserves the right to reject all pre-qualification packets. The District also reserves the right to waive any irregularity, informality, or technicality in the proposals at its sole discretion.

All costs related to the preparation of pre-qualification packets and any other related activities are the sole responsibility of the applicant. JWID assumes no liability for any costs incurred by applicants throughout the entire selection process.

All pre-qualification packets, including all attachments, supplementary materials, renderings, sketches, addenda, etc. shall become the property of JWID upon submittal by the applicant and shall not be returned to the applicant.