1-IFB0290-031326-BID PACKAGE-WWTF Loading Dock and Tank Wall Coating Project.pdf

PDF 4 MB Posted

Attached to
WWTF Loading Dock and Tank Wall Coating Project
Solicitation number
IFB0290-031326
Issued by
Hillsborough County, New Hampshire

About this file

This is a bid package document for the City of Nashua, New Hampshire Division of Public Works for the WWTF Loading Dock and Tank Wall Coating Project (IFB0290-031326). The project involves the recoating of metal structures and concrete surfaces at the Wastewater Treatment Facility, including loading dock steel columns and beams, screenings garage steel columns, three concrete tanks, a retaining wall, and the loading dock floor. The base bid includes rust removal and coating of all metal loading dock components, with four additional bid alternates for concrete coating work on the TPS tanks, Grit tank, retaining wall with stair renovation, and loading dock deck sealing. A mandatory pre-bid meeting and site tour is scheduled for Thursday, February 26, 2026, at 10:00 a.m. at the Wastewater Treatment Facility, 2 Sawmill Road, Nashua, NH. Bidders must submit questions by Monday, March 9, 2026, at noon, with answers posted by Wednesday, March 11, 2026, at 4:00 p.m. Bids are due Friday, March 13, 2026, at 2:00 p.m., submitted electronically via Bonfire or in person at City Hall, 229 Main Street, Lower Level, Room 11. The project requires 130 calendar days for substantial completion and 160 calendar days for final completion from the Notice to Proceed, with liquidated damages of $250 per working day assessed for delays. Results will be posted within 24 hours of the bid opening.

Contractors must demonstrate at least five years of experience and five similar projects with successful performance records and provide references upon request. General liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, combined single limit automobile liability of $1,000,000, and workers' compensation coverage are required. Bid bonds equal to 5% of the bid price and performance and payment bonds equal to 100% of the contract price must be provided. Coating materials must be from acceptable manufacturers such as Sherwin Williams or Tnemec, with specific application methods and dry film thickness requirements detailed in the specifications. The City reserves the right to reject any and all bids and will not accept bids from contractors in default on tax payments or other obligations to the City. Contractors must provide a three-year warranty on all coated areas free from visible corrosion and comply with holiday spark testing to ensure uniform coating application. All bids are binding for 90 days following the bid deadline, and the successful bidder must comply with all applicable federal and state laws and equal employment opportunity requirements.

View the file

Other files

File Type Posted
2-DESIGN PLANS OF LOADING DOCK.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Nashua, New Hampshire Division of Public Works

Bidding Specifications and Contract Requirements

WWTF Loading Dock and Tank Wall Coating Project

IFB0290-031326

February 2026

Table of Contents

TABLE OF CONTENTS

DIVISIONS

INVITATION TO BID………………………………………………………………………………………………

1. BID FORM

BID SCHEDULE

CONTRACTOR QUALIFICATIONS

BID BOND .......................................................................................................... ………… NON-COLLUSION AFFIDAVIT ............................................................................. ………….

2. SCOPE OF WORK / SPECIFICATIONS

GENERAL

DESCRIPTION OF WORK-METAL STRUCTURE COATING

DESCRIPTION OF WORK-CONCRETE TANK, WALL AND FLOOR COATING

WORK CONDITIONS

SPECIFICATIONS

o COATING MATERIALS o COATING APPLICATION METHODS o SUBMITTALS o TESTING AND WARRANTY

MEASUREMENT AND PAYMENT

3. STANDARD FORM OF AGREEMENT AND GENERAL CONDITIONS

4. PAYMENT BOND

PERFORMANCE BOND

CERTIFICATE OF LIABILTY INSURANCE

5. EXHIBITS…………………………………………………………………………………………………………………

NOTICE OF AWARD

NOTICE TO PROCEED

CHANGE ORDER

CERTIFICATE OF SUBSTANTIAL COMPLETION

CERTIFICATE OF FINAL COMPLETION

CONTRACTOR’S RELEASE AND WAIVER OF LIEN

APPENDICES

APPENDIX A – PICTURES OF LOADING DOCK AND SURROUNDING TANKS

City of Nashua Purchasing Department

Administrative Services Division 229 Main Street - Nashua, NH 03060

(603) 589-3330 Fax (603) 594-3233

February 19, 2026

INVITATION TO BID

WWTF Loading Dock and Tank Wall Coating Project

The City of Nashua, Division of Public Works, invites qualified contractors with experience in industrial coating of steel tanks to submit bids for the WWTF Loading Dock and Tank Wall Coating Project.

The project involves recoating of three locations adjacent to each other: loading dock steel components, screenings garage steel columns, and concrete coating work of several adjacent structures, which will be bid as an alternate. The first two locations involve metal support structures to be recoated. There are 3 concrete tanks and an adjacent retaining wall that are in need of concrete coating. The construction of these structures was originally completed around 1974, and they have likely not been recoated since their original installation.

Adjacent to the loading dock are two circular concrete tanks and one rectangular tank that extend several feet above grade. The exterior concrete walls of these tanks are currently coated with a cementitious coating that is peeling. Three alternate bid items are included for removal of the deteriorated cementitious coating and application of a new coating as specified in the Scope of Work/Specifications section in Division 2 of this bid package. A fourth bid alternate is for cleaning, repairing concrete and sealing the concrete deck of the loading dock.

Completion time, from the notice-to-proceed, for the project in calendar days, will be as follows:

130 days for contract substantial completion

160 days for final contract completion.

Liquidated damages of $250 for each working day will be assessed for delays beyond the established dates for substantial completion and final completion.

The City of Nashua, through the Mayor, who is the awarding authority, reserves the right to reject any and all bids or parts of bids; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; to award contracts or to cancel this request if in the City’s best interest.

INFORMATION FOR BIDDERS:

The City is now accepting submittals electronically via Bonfire. Please review the electronic documents linked here, Bonfire Vendor Registration and Bonfire Vendor Submission for more information. We strongly recommend that https://www.nashuanh.gov/DocumentCenter/View/28837/Bonfire-Process-Overview---Vendor-Registration https://www.nashuanh.gov/DocumentCenter/View/28838/Bonfire-Process-Overview---Vendor-Submission you give yourself sufficient time and at least one (1) business day before due date to begin the uploading process and finalize your submission. Copies are also available on the City’s website in the Purchasing section within the Bids section.

Regardless of the method of submission bids must be received no later than 2:00 pm on Friday, March 13, 2026, in the Purchasing Department; City Hall, 229 Main Street, Lower Level, Room 11, Nashua NH 03061. Postmarks or other timestamps will not be accepted in lieu of actual delivery. Bidders can use whatever delivery mechanism it chooses as long as it remains clear that the Bidder is responsible for submissions prior to the date and time.

The time of receipt shall be considered when a bid has been officially documented by the Purchasing

Department, in accordance with its established policies, as having been received at the location designated above. The City accepts no responsibility for mislabeled mail. Any and all damage that may occur due to shipping shall be the Bidders responsibility.

Complete specifications and related documentation are available on our website, www.nashuanh.gov, under

Services, Bid Opportunities, Current Bids; and on the Bonfire website. Refer to Document IFB0290-031326 and related documents. Please note paper copies of bid documents are not available in the City’s Purchasing Office.

The timeline for this project is as follows:

Projected Timeline Date

MANDATORY Pre-Bid Meeting followed by a site tour

Thursday, February 26, 2026 at 10:00 am

Deadline for Bidder Questions Monday, March 9, 2026 at Noon

Bidder Questions Answers Posted Wednesday, March 11, 2026 at 4:00 pm

Bids Due Friday, March 13, 2026 at 2:00 pm

A MANDATORY Pre-Bid Meeting to discuss the project is scheduled to begin promptly Thursday, February 26, 2026, at 10:00am at the Wastewater Treatment Facility, 2 Sawmill Road, Nashua, NH 03060 in the

Administration/Control Building Conference Room. A site tour will follow the pre-bid meeting.

Bidders are encouraged to submit questions via email; however, the City assumes no liability for assuring accurate and complete email transmission/receipt and is not responsible to acknowledge receipt. Inquiries must be submitted in writing, citing the IFB title/number, Page, Section, and must be received no later than Monday, March 9, 2026 at Noon to:

Bids will be opened publicly on the due date and time. Results of the proposal opening will be posted on the

City's website, www.nashuanh.gov, under Services; Bid Opportunities; Bid Results; (Refer to Document

IFB0290-031326) within twenty-four (24) hours of the opening.

file://///CityFile/Secure/DPWShare/ADMIN%20DEPT/Finance/DPW%20PROJECTS/WWTF/Primary%20and%20Secondary%20Digester%20Coating/BIDDING/TO%20PURCHASING/%20www.nashuanh.gov, file://///CityFile/Secure/DPWShare/ADMIN%20DEPT/Finance/DPW%20PROJECTS/WWTF/Primary%20and%20Secondary%20Digester%20Coating/BIDDING/TO%20PURCHASING/%20www.nashuanh.gov, 229 Main Street, Room 11, Nashua, NH 03060 purchasing@nashuanh.gov

The City will consider all timely-received questions and requests for change and, if reasonable and appropriate, will issue an addendum to clarify or modify this IFB. Answers to Bidder submitted questions and other addenda will be posted on the City of Nashua website www.nashuanh.gov, under Services; Bid Opportunities; Current Bids; (Refer to Document IFB0290-031326) and on Bonfire no later than Wednesday, March 11, 2026 at 4:00pm.

The City hereby notifies all Bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, or disability in consideration for an award.

Pursuant to NRO 5-71 (A), the City of Nashua supports the concept of purchasing products which are biodegradable, can be or have been recycled, or are environmentally sound. Due consideration will be given to the purchase of such products. If you are proposing any such products which qualify, please so indicate in a cover sheet by item number and description. We are also conscious of energy use and encourage Bidders to propose products that are energy efficient.

All bids are binding for ninety (90) days following the deadline for bids, or until the effective date of any binding resulting contract, whichever is later.

Bids must be submitted in the format provided and address the items specified in this request. The City may reject any or all of the bids on any basis and without disclosure of a reason. The failure to make such a disclosure shall not result in accrual of any right, claim or cause of action by any unsuccessful bidder against The City. The City reserves the right to waive any irregularities when the public interest will be served thereby. The City also reserves the right to negotiate any change or amendment in any bid without soliciting further requests for bids if the action is necessary for the best interest of The City.

The City of Nashua will reject the bid of any proposer who is presently debarred, declared ineligible or excluded by any Federal department or agency, and reserves the right to reject the bid of any proposer who has previously failed to perform any contract properly for any purchaser, or to complete on time, contracts of a similar nature, who is not in the position to perform the contract, or who has neglected the payment of bills or otherwise disregarded its obligations to clients, purchasers, subcontractors, material men, or employees.

The City is exempt of all taxes. All bids must be FOB Nashua, NH. All Bidders must comply with all applicable Equal Employment Opportunity laws.

Pursuant to NRO 5-78 (F), the Purchasing Manager shall not solicit a bid from a contractor who is in default on the mailto:purchasing@nashuanh.gov http://www.nashuanh.gov/ payment of taxes, licenses or other monies due the City. Therefore, this bid request is void as to anyone who is in default on said payments.

GENERAL REQUIREMENTS

A. Contractor’s Qualifications: Bidders must have at least five (5) years’ experience and at least five (5) projects similar to that indicated for this Project and with a record of successful in-service performance. References shall be provided to the Owner’s Representative upon request.

B. To be eligible for an award, a Bidder must be deemed "responsible". A responsible Bidder:

• has the ability, capacity and skill to provide the goods or services required;

• can provide the goods or services within the time frame specified;

• has a satisfactory record of integrity, reputation, judgment and experience;

• has sufficient financial resources to provide the goods or services;

• providing the Bidder has provided goods or services to the City, has developed a positive track record with the City.

C. The Successful Bidder will be required to provide the City with certificates of insurance for coverage as listed below and endorsements affecting coverage required by the contract within ten (10) calendar days after the City issues the Notice of Award. The City requires thirty (30) calendar day’s written notice of cancellation or material change in coverage. The certificate and endorsements for each insurance policy must be signed by a person authorized by the insurer and who is licensed by the State of New Hampshire. General Liability, Employer's Liability and Auto Liability policies must name the City of Nashua as an additional insured and be reflected on the certificate of insurance:

• General Liability insurance in the amount of $1,000,000 per occurrence and $2,000,000 aggregate;

• $1,000,000 Combined Single Limit Automobile Liability (coverage must include all owned, non-owned and hired vehicles)

• Workers' Compensation Coverage in compliance with the State of New Hampshire statutes, $100,000/$500,000/$100,000

All Bidders and subcontractors at every tier under this project will fully comply with NH RSA Chapter 281-A, "Workers' Compensation".

It is the responsibility of the Successful Bidder to submit, to the City, certificates of insurance for the Successful Bidder and all other subcontractors prior to the start of the project. It is the responsibility of the Successful Bidder to provide the City with updated certificates of insurance for the Successful Bidder and all subcontractors 10 days prior to the expiration of coverage. The City may, at any time, order the Successful Bidder to stop work, suspend the contract or terminate the contract for non-compliance. All subcontractors are subject to the same insurance requirements as the Successful Bidder.

D. The Successful Bidder will be required to post the following bonds. Cost of bond premiums to be incorporated into the bid item costs.

• Bid Bond: A bid guarantee from each bidder equivalent to 5% of the bid price. The "bid guarantee" must consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of the bid, execute such contractual documents as may be required within the time specified.

• Payment & Performance Bonds: Successful Bidder shall furnish Performance and Payment Bonds, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all obligations under the Contract Documents. These Bonds shall remain in effect at least until one year after the date when final payment becomes due, except as provided otherwise by Laws or Regulations or by the Contract Documents. Successful Bidder shall also furnish such other Bonds as are required by the Contract Documents. When Successful Bidder delivers the executed agreements to the City, Successful Bidder shall also deliver to the City such Bonds as may be required to furnish.

E. The City also reserves the right to negotiate any change or amendment in any bid without soliciting further bids if the action is necessary for the best interest of the City.

F. The City may conduct discussions with responsible Bidders prior to selection. Successful Bidders shall begin performance upon receipt of an executed contract and a valid purchase order issued from the City.

G. The City may reject any and all responses on any basis and without disclosure of a reason. The failure to make such a disclosure shall not result in accrual of any right, claim, or cause of action by any unsuccessful bidder against the City.

H. After the initial designation of a Bidder, City Staff will work with the selected Bidder to negotiate final terms and conditions between the City and the successful Bidders prior to the Contract Award. A draft contract is attached (Division 3).

I. The Bidder shall meet all requirements of the Americans with Disabilities Act.

J. The City encourages disadvantaged business enterprise (DBE) participation from contractors and/or subcontractors.

K. The Bidder should understand that under the New Hampshire Right-to-Know Law, all documents submitted in response to this request, including financial information, are considered public information and will be made available to the public upon request, unless specifically exempted under the law.

L. Any Bidder submitting a bid may appeal a pending award prior to award by the City. The appellant must:

a. Submit a written protest to the City’s Purchasing Manager within five (5) business days after the bid opening;

b. Describe, in the written protest, the issues to be addressed on appeal;

c. Post, with the written protest, a bond with a surety meeting the requirements of

General Condition 5.02 authorized to do business in this state or submit other security in a form approved by the City who will hold the bond or security until a determination is made on the appeal;

d. Post the bond or other security in the amount of 25% of the total dollar value of the appellant’s bid, up to a maximum bond or other security amount of $250,000;

e. Not seek any type of judicial intervention until the City has rendered its final decision on the protest.

If an appeal is granted, the full amount of the posted bond or security will be returned to the appellant. If the appeal is denied or not upheld, a claim may be made against the bond for expenses suffered by the City because of the unsuccessful appeal. The City is not liable for any costs, expenses, attorney's fees, loss of income, or other damages sustained by the appellant in a bid appeal process.

M. The City assumes no liability for the payment of costs and expenses incurred by any Bidder in responding to this request. All bids become sole property of The City. This is not a contract and shall not be interpreted as such but rather serves as an instrument through which qualifications and cost bids are solicited.

N. Bid Document Submission List:

To be considered a complete response, the following documents must be submitted along with your bid.

a. Division 1 of the Bidding Specifications and Contract Requirements

i. Bid Form – which includes a tabulation of Subcontractors, Suppliers and other individuals and entities required to be identified in this Bid;

ii. Bid Schedule

iii. Contractors Qualifications

iv. Bid Bond;

v. Non-Collusion Affidavit

b. Any and all addendums issued after the release of this IFB. Upon issuance, addendums can be found on the City website or on Bonfire with the original bid documents.

Please ensure you have reviewed all documents before submitting all bids to the City

ADDITIONAL CONSIDERATIONS:

The Bidder selected shall be expected to comply with all applicable federal and state laws in performance of services. The consideration of all bids and subsequent selection of the Successful Bidder shall be made without regard to race, color, sex, age, handicap, religion, political affiliation or national origin. Services provided by the

Successful Bidder shall be rendered through a Standard Form of Agreement Between Owner and Contractor

Contract, which has been included in Division 3 of the Bidding Specifications and Contract Requirements.

Bidder must identify any exceptions or objections it has to the City’s sample Standard Form of Agreement Between

Owner and Contractor, General Conditions, and Supplementary documents. Copies are part of the Bidding

Specifications and Contract Requirements.

The City may from time to time revise the above listed documents. The City will not accept or entertain any exceptions or objections to the above listed documents at any time after Bid submittal except and only to the extent the City subsequently makes a material change to a substantive provision of the above listed terms and conditions.

The bid must declare that it is made without collusion with any other person or entity submitting a bid pursuant to this IFB.

Disclosure of any potential conflict or statement that there are none to the best knowledge of the Bidder(s). Also, Bidder(s) should state its intention to conform to the no conflict provisions of the IFB.

Prospective applicants who have any questions regarding this opportunity may contact:

Amy Girard, Purchasing Manager City of Nashua, Administrative Services Division 229 Main Street, Nashua, NH 03060 Email: purchasing@nashuanh.gov Ph: 603-589-3332 mailto:Email:%20purchasing@nashuanh.gov

DIVISION 1

BID FORM

BID SCHEDULE

CONTRACTOR QUALIFICATIONS

BID BOND

NON-COLLUSION AGREEMENT

THIS FORM MUST BE SUBMITTED WITH ALL RESPONSES

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 1 of 9

BID FORM

PROJECT IDENTIFICATION: WWTF LOADING DOCK AND TANK WALL COATING PROJECT

CONTRACT IDENTIFICATION NUMBER: IFB0290-031326

THIS BID IS SUBMITTED TO: City of Nashua, New Hampshire

Purchasing Department 229 Main Street, City Hall Nashua, NH 03061‐2019

1. The undersigned Bidder proposes and agrees, if this BID is accepted, to enter into an agreement with the

City in the form included in the BID Documents to perform all Work as specified or indicated in the BID Documents for the prices and within the times indicated in this BID and in accordance with the other terms and conditions of the BID Documents.

2. The Bidder accepts all of the terms and conditions of the Advertisement for BID and Information for Bidders, including without limitation those dealing with the disposition of Security. The bid will remain subject to acceptance for ninety 90 days after the day of bid opening, or for such longer period of time that Bidder may agree to in writing upon request of the City.

3. In submitting this BID, Bidder represents, as set forth in the Agreement, that:

A. Bidder has examined and carefully studied the BID Documents and the following Addenda, receipt of all which is hereby acknowledged.

Addendum No. Addendum Date

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, and performance of the work.

C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.

D. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, and safety precautions and programs incident thereto.

E. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the BID Documents.

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 2 of 9

F. Bidder is aware of the general nature of work to be performed by the City and others at the Site that relates to the Work as indicated in the BID Documents.

G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the BID Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the BID Documents.

H. Bidder has given written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the BID Documents, and the written resolution thereof by the City is acceptable to Bidder.

I. The BID Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance of the Work for which the BID submitted.

4. Bidder further represents that this BID genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham BID Bidder has not solicited or induced any individual or entity to refrain from bidding; and has not sought by collusion to obtain for itself any advantage over any other Bidder or over the City .

5. The requirements of the New Hampshire Revised Statutes Annotated shall apply to this project. The Bidder is responsible for compliance with all applicable statutes. The entire set of the Revised Statutes Annotated is available online at:

http://gencourt.state.nh.us/rsa/html/indexes/default.html

6. The following documents are attached to and made a condition of this BID:

A. Bid Form – which includes a tabulation of Subcontractors, Suppliers and other individuals and entities required to be identified in this proposal;

B. Bid Schedule;

C. Contractor Qualifications

D. Non-Collusion Affidavit;

E. Any and all addendums issued after the release of this BID. Upon issuance, addendums can be found on the City website or on Bonfire with the original BID documents

7. Communications concerning this BID shall be addressed to:

Amy Girard, Purchasing Manager

Email: purchasing@nashuanh.gov

SUBMITTED on , 20

Business Name (typed or printed):

Individual Partnership Corporation Joint Venture http://gencourt.state.nh.us/rsa/html/indexes/default.html mailto:purchasing@nashuanh.gov

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 3 of 9

Type:

General General Publicly Traded Professional Limited Services Other Limited Liability

By: (SEAL)

(Individual's Signature, General Partner, Officer with authority to sign)

Doing Business as):

Business Address:

Phone: Email:

Date and State of Organization:

Date and State of Incorporation:

Date of Qualification to do business is

Names of Current General Partners/Executive Officers/Joint Partners

Name: Title

(Indicate managing partner by an asterisk *)

Bidder Address for receipt of official communications:

Each joint ventured must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 4 of 9

SUBCONTRACTORS

(To be submitted with BID)

The name and address of each subcontractor who will be paid at least five percent (5%) of the prime contractor s total BID shall be listed below. To be deemed a responsive BID this form must be submitted even if no subcontractors are required to be listed. In that case, the Bidder should state "None" (or similar language stating that no subcontractors need to be listed) in the space below.

Name & Address of Subcontractor Portion of Work

In compliance with your BID, we hereby submit our BID for the above project. Having examined the plans and specifications and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and labor, we hereby propose to furnish all supervision, labor, materials and supplies, and to construct the project in accordance with the contract documents, dated Including Addenda noted below.

EXPERIENCE AND REFERENCES:

References: Provide references for recently completed projects related to industrial coating of steel structures or tanks.

Include company name, project name, cost, dates, and contact information of company. References may be contacted as part of the bid review to assist in assessing Contractor’s qualifications. Current City of Nashua personnel and elected officials shall not be used as references.

Acknowledgement is made of receipt of the following addenda:

If notice of acceptance of this proposal is given to the undersigned within ninety 90 days after the date of opening of bids, or any time thereafter before this bid is withdrawn, the undersigned will execute and deliver a contract in the prescribed form within 10 days after the contract has been presented to them for signature.

Immigration Reform and Control Act of 1986: The undersigned certifies that it does not and will not during the performance of this Contract violate the provisions of the Federal Immigration Reform and Control Act of 1986, which prohibits employment of illegal aliens.

DISQUALIFICATION OF CONTRACTORS: By signing this BID FORM the undersigned certifies that this person/firm/corporation is not currently barred from bidding on contracts by any Agency of the State of New Hampshire, nor is this person/firm/corporation a part of any firm/corporation that is currently barred from bidding on contracts by any Agency of the State of New Hampshire.

Either the undersigned or one of the following individuals, if any, is authorized to modify this BID prior to the deadline for receipt of bids by writing the modification and signing their name on the face of the BID, on the

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 5 of 9 envelope in which it is enclosed, on a separate document, or on a document which is faxed to the City or by sending the City's representative an e-mail message:

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 6 of 9

BID SCHEDULE

(See Bid Item Descriptions in Scope of Work / Specifications)

Attach additional supporting documents as appropriate

Bidder:

Address:

Phone: E-mail:

Provide written and numeric values for each item. The bidder agrees to perform the specified work for the following prices:

Base Bid

($ ) (Use figures)

Dollars Cents (Use words)

Bid Alternate 1

($ ) (Use figures)

Dollars Cents (Use words)

Bid Alternate 2

($ ) (Use figures)

Dollars Cents (Use words)

Bid Alternate 3

($ ) (Use figures)

Dollars Cents (Use words)

Bid Alternate 4

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 7 of 9

TOTAL BID:

Authorized Signature:

Printed Name and Tile:

Date: ____________________________

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 8 of 9

REFERENCES

INSTRUCTIONS FOR SUBMITTALS:

Bidder must demonstrate successful performance on previous similar projects within the last five years. Provide a list of recently completed projects related to coating of metal structures or columns. Include project name, costs, dates, and contact information of owner. Contractor must have prior experience similar to this project and be confined space entry certified. Use additional pages if needed.

(1) Company Name:

Project Name:

Project Cost:

Project Dates:

Contact Name and Title:

Email: Phone:

(2) Company Name:

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project Page I 9 of 9

(3) Company Name:

(4) Company Name:

(5) Company Name:

CQ - 1 of 7

CONSTRUCTION CONTRACTOR’S

QUALIFICATION STATEMENT

1. On Schedule A, attached, list major similar projects completed by this organization in the past five (5) years. (If joint venture, list each participant’s projects separately).

2. On Schedule B, attached, list current projects under construction by this organization, (If joint venture, list each participant’s projects separately).

3. Name of Surety Company and name, address, and phone number of agent.

4. Is your organization a member of a controlled group of corporations as defined in I.R.C. Sec.

1563?

Yes No

If yes, show names and addresses of affiliated companies.

5. Furnish on Schedule C, attached, details of the construction experience of the principal individuals of your organization directly involved in construction operations.

6. Has your organization ever failed to complete any construction contract awarded to it?

If yes, describe circumstances and provide details on attachment.

7. Has any Corporate officer, partner, joint venture participant or proprietor ever failed to complete a construction contract awarded to him or her in their own name or when acting as a principal of another organization?

8. In the last five years, has your organization ever failed to substantially complete a project in a timely manner?

9. Does your organization now have any legal suits or arbitration claims pending or outstanding against it or any officers?

CQ - 2 of 7

10. Has your organization had a contract partially or completely terminated for default (cause) within the past five years?

11. List the licensed categories of work that your company normally performs with its own workforce.

12. If required, can your organization provide a bid bond for this project?

13. What is your approximate total bonding capacity?

$500,000 to $2,000,000

$2,000,000 to $5,000,000

$5,000,000 to $10,000,000

$10,000,000 or more

14. Describe the permanent safety program you maintain within your organization. Use attachment if necessary.

15. Furnish the following information with respect to an accredited banking institution familiar with your organization.

Name of Bank

Address

Account Manager

Telephone

CQ - 3 of 7

I hereby certify that the information submitted herewith, including any attachment is true to the best of my knowledge and belief.

By:

Title:

Dated:

CQ - 4 of 7

This Page Intentionally Left Blank

CQ - 5 of 7

Schedule A – List of Similar Projects Completed in the Past Five (5) Years

Name, Location and Description of Project

Owner

Date Completed

Contract Price

Reference/Contact & Address & Phone

CQ - 6 of 7

Schedule B – List of Current Projects Under Construction

CQ - 7 of 7

Schedule C - Construction Experience of Principal Individuals Involved in Construction Operations

BB - 1 of 2

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project

BID BOND

PENAL SUM FORM

BIDDER (Name and Address):

SURETY (Name and Address of Principal Place of Business):

OWNER (Name and Address):

BID

BID DUE DATE:

PROJECT (Brief Description Including Location):

BOND

BOND NUMBER:

DATE: (Not later than Bid Due Date): PENAL SUM:

(Words) (Figures)

IN WITNESS WHEREOF, Surety and Bidder, Intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause the Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal) Bidder’s Name and Corporate Seal

Signature and Title

Attest:

Surety’s Name and Corporate Seal

(Attach Power of Attorney)

Attest:

Note: (1) Above addresses are to be used for giving required notice.

(2) Any singular reference to Bidder, Surety, OWNER or other party shall be considered plural where applicable.

BB - 2 of 2

IFB0290-031326 – WWTF Loading Dock and Tank Wall Coating Project

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond.

2. Default of Bidder shall occur upon the failure of

Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents.

3. This obligation shall be null and void if:

3.1. OWNER accepts Bidder’s bid and Bidder

delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents, or

3.2 All bids are rejected by OWNER, or

3.3 OWNER fails to issue a notice of award to

Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).

4. Payment under this bond will be due and payable upon default by Bidder and Within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by OWNER and Bidder, provided that the time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid Due Date without Surety’s written consent.

6. No suit or action shall be commenced under this

Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety, and in no case later than one year after Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notice required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of the Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer or proposal as applicable.

Certification Regarding Non-Collusion, Debarment, Suspension, and Other Responsibility Matters

I/We declare under penalty of perjury under the laws of the United States and the State of New Hampshire that I/We have not either directly or indirectly entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this Bid, and further that:

(1). The prospective primary participant certifies to the best of its knowledge and belief, that it and all its principals: (a)

Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not within a three-year period preceding this bid been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or Local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or Local) with commission of any of the offenses enumerated in Paragraph (1) (b) of this certification and (d) Have not within a three-year period preceding this bid had one or more public transactions (Federal, State or Local) terminated for cause or default. (2). Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

Date: ____________________________

(If a firm or individual)

Signature of Bidder____________________________________________________

Print Name _________________________________________________________

Address of Bidder _____________________________________________________

Names and Addresses of Members of the Firm:

(If a Corporation)

Signature of Bidder___________________________________________________

Title _______________________________________________________________

Print Name__________________________________________________________

Business Address ___________________________________________________

Incorporated under the laws of the State of ______________________________________________

DIVISION 2

SCOPE OF WORK / SPECIFICATIONS

GENERAL

DESCRIPTION OF WORK-METAL STRUCTURE COATING

DESCRIPTION OF WORK-CONCRETE TANK, WALL AND FLOOR

COATING

WORK CONDITIONS

SPECIFICATIONS

o COATING MATERIALS o COATING APPLICATION METHODS o SUBMITTALS o TESTING AND WARRANTY

MEASUREMENT AND PAYMENT

CITY OF NASHUA, NEW HAMPSHIRE

SCOPE OF WORK/SPECIFICATIONS

I. GENERAL

The City of Nashua, Division of Public Works, invites qualified contractors with experience in industrial coating of steel tanks to submit bids for the WWTF Loading Dock and Tank Coating

Upgrade project.

The project involves recoating of three locations adjacent to each other: loading dock steel components, screenings garage steel columns, and concrete coating work of several adjacent structures, which will be bid as an alternate. The first two locations involve metal support structures to be recoated. There are 3 concrete tanks and an adjacent retaining wall that are in need of concrete coating. The construction of these structures was originally completed around 1974, and they have likely not been recoated since their original installation.

Adjacent to the loading dock are two circular concrete tanks and one rectangular tank that extend several feet above grade. The exterior concrete walls of these tanks are currently coated with a cementitious coating that is peeling. Three alternate bid items are included for removal of the deteriorated cementitious coating and application of a new coating, as specified in the Specifications. A fourth bid alternate is for cleaning, repairing concrete and sealing the concrete deck of the loading dock

Completion time, from the notice-to-proceed, for the project in calendar days, will be as follows:

130 days for contract substantial completion

160 days for final contract completion.

Liquidated damages of $250 for each working day will be assessed for delays beyond the established dates for substantial completion and final completion.

The contractor to be awarded the project shall have a crew ready to start work pending weather and temperatures.

II. DESCRIPTION OF WORK - METAL STRUCTURE COATING

There are many I-beams and columns supporting the loading dock and the roof above. The following is a listing of the different metal structures I-beams and below is a summary table:

There are 7 existing 10”x10” vertical metal columns, six tall and one short, that support the dock. There are 11 I-beams holding up the roof of the loading dock. The length of the beams, which span the width of the loading dock, were measured at 19’-3”. The measurement shown on the attached structural plan sheet states 20’-3”, which is a foot more than field measurement. There are 2 sets of 10 interconnected beams over the length of loading dock and adjacent screen garage entrance, with a total length of 89’-10”. These I-beams are supporting the roof over the length of it.

There are also I-beams below the concrete deck of the loading dock that hold up the concrete platform and are heavily corroded. Below the concrete loading dock there are 8 I-beams, each with a length of 14’ per design plans and field measurement, and 2 segmented structural beams running the length of platform, in total approximately 69’ per the design drawing. These run the full width of the concrete deck. The depth below the platform is 3-4 feet.

In addition, at the outside edge of the loading dock, there are galvanized rain-guards that need to be recoated.

Refer to the separate attachment for the design structural plans of the loading dock. In

Appendix A there are pictures of the loading dock and adjacent concrete structures.

Summary of Metal Components for Coating:

Below is a table of the dimensions and surface area of each aspect in the Loading Dock. This can be used as a guide for calculating the cost and amount of coating material needed, however, the contractor shall verify all measurements in the field prior to determining costs.

Item Qty. Length Width Height Surface Area

Short Column 1 10" 10” 10'-

10” 9.02' x4=36' (3D column surface area)

Tall Column 6 10" 10” 14'-4” 11.62' x4=46.48'

Ceiling EA 89'-10" 19’ 1700 S.F. (beams and other structures blocking the ceiling results in a lower s.f.)

I-Beams for roof-width 11 19.25 I-beam is 10” deep per drawing – SA not calculated

I-Beams for roof-length 20 90’ I-beam is 10” deep per drawing-SA not calculated

I-beams for roof (cross)

4 15’ These I-beams run diagonally on ceiling, 8” deep per drawing – SA not calculated

I-Beam below concrete deck

8 14.83’ I-beam is 10” deep per drawing – SA no calculated

End beam below conc.

deck

3 70.5’ 4” 1’ 70.5 x 2sides*1’x.0.25 = 35 s.f.

Install new beam bolts in concrete base

6 N/A N/A N/A N/A

Install new beam bolts-metal to metal

6 N/A N/A N/A N/A

Repair conc pad for column

4 N/A N/A N/A N/A

Metal rain-guard 80 6’ 9” N/A 80 louvers arranged in 8 sections-10 high, 80x6’x0.75=360s.f.

Garage Door (front side)

1 18’ 13.5 243

III. DESCRIPTION OF WORK – TANK, WALL AND FLOOR COATING

There are two round concrete tanks for thickened primary sludge (TPS), one rectangular tank for grit, and a retaining wall. The tanks were constructed around 1974 and had a protective concrete coating on the outside of the concrete walls. This coating has delaminated in many portions of the walls and a new coating is needed using the material described below.

The concrete retaining wall in this area, including the associated concrete steps, as identified in the summary table below, requires application of a concrete overlay system followed by a protective seal coating.

The concrete overlay on the three tanks and concrete retaining wall shall extend a minimum of six inches below grade, requiring the contractor to expose the below grade surfaces and then recover them following completion and approval of the work.

Additionally, the surface of the loading dock deck requires seal coating. The scope of work should include thorough surface preparation, including full cleaning and pressure washing, followed by the application of an appropriate seal coat system.

The dimensions and approximate areas to coat are as follows:

Item Dimensions Surface Area (s.f.)

TPS Tanks (2) D1=30 ft, H2=3 ft 2*282.5 = 565

Top of TPS Tanks5 (2) Circumference = 94ft, W3 = 1 ft 2x94 = 188

Grit Tank L3 = 161.5 ft, H = 3.5 ft 565

Top of Wall Grit Tank L= 161.5, W = 1 ft 162

Retaining Wall4 L = 54 ft, H = 3.5 ft 190 + 12 + 40 = 242

Top of Retaining wall L=54+5.5=59.5 ft, W = 0,67 ft 40

Loading Dock Floor6 L = 70.5 ft, W = 18.5 ft 1305

Loading Dock Column Foundation (6 total)

L = 1.25 ft,W=1.25ft, H-0.5 ft 20

Total: 3087 sf.

1. D = tank outside diameter

2. H = height of tank from ground level to top of tank. Tank height varies along walls. The height shown is an estimate average height of the wall.

3. L = length of wall, W = width

4. Area of retaining wall includes side wall by stairs and stairs (5 steps, 5 ft wide, 12”x7” steps)

5. Top wall of TPS tanks has odor control hatches on it. The hatches can open but the aluminum bracing below remains in place. Due to bracing, coating area on top of TPS is considerably less than as show in table. Contractor shall leave the bracing in place and coat around it.

6. Loading dock floor shall be cleaned, pressure washed and seal coated (see materials below).

IV. WORK CONDITIONS

Contractor shall work within the hours of 6:45AM to 5PM, M-F. Any hours outside these or weekend work needs the approval of the Wastewater Engineer or Wastewater Superintendent.

Contractor workers shall park in a designated contractor staging area, close to the loading dock. No workers shall park in front of building which is limited to City employees only.

Contractor shall provide their own porta-potty and wash station. Workers should not be entering the building for any personal use.

The contractor may use existing outlets located near the loading dock. Additional electrical needs would have to be coordinated with Engineer and Wastewater Electrician.

The contractor shall provide their own trailers to house coatings and equipment. A staging area adjacent near the loading dock may be used.

The contractor may enter the screen garage area to drop off materials/equipment onto loading dock, but in general, that area should be left open tor use by Wastewater vehicles as needed.

Contractor shall be aware that birds (house sparrows) nest (in colonies) in the ceiling area, mainly above the beams in the ceiling area. Work should start, if possible, after the birds have vacated the nests, estimated to be by the end of May. If there are nests still there with eggs or fledging birds, the Contractor shall carefully remove the nest and put in a box.

Wastewater will relocate the nest to nearby bush. All other nests (vacated) should be disposed of, followed by pressure washing the area. If the bird tries to build another nest once work started, the contractor should remove and/or use a regular water hose with nozzle attached to spray water at it so that is will discourage the bird from entering the work space.

V. SPECIFICATIONS

A. COATING MATERIALS

Coating material shall be from an acceptable manufacturer that specializes in industrial type coatings. Both Sherwin Williams and Tnemec are considered acceptable manufacturers.

Based on discussions with company representatives, the following coating systems and application methods were recommended. The contractor shall independently confirm this information with the coating manufacturer’s representative to verify the specified material, required surface preparation, and appropriate application methods prior to implementation. prep work and method of application.

Metal Coating and Application Method

Tnemec: All surfaces scheduled for painting shall initially power washed using high pressure (4,000 psi) washing system equipped with zero oscillating tip. Equipment shall remove loose coating, rust, rust scale and soluble surface contamination

Primer shall be one spot coating of RD Coatings. Elastometal applied to all cleaned surfaces at a dry film thickness of 6 – 7 mils. Use brush to work into nuts, bolts and leading edges, etc.

Intermediate Coat: shall be one coat of RD Coatings – Monoguard applied to all surfaces scheduled for coating at a dry film thickness of 3 -4 mils dft.

Finish Coat: shall be one coat of RD Coatings – Monoguard applied to all surfaces scheduled for coating at a dry film thickness of 3 – 4 mils DFT.

Sherwin Williams: All metal beams surfaces above and below deck shall be cleaned using SSPC-SP6 commercial blast cleaning techniques. Galvanized steel shall be cleaned using SSPC-SP16 brush off blast cleaning of coated and uncoated galvanized steel.

Steel Beams Underneath deck: B58W00610 - 2 coats of Macropoxy 646 fast cure Epoxy, 4-6 mils DFT per coat

Steel Beams and Columns (above deck) – Primer shall be B58W00610 Macropoxy 646 Fast Cure Epoxy, 4 -6 mils DFT Intermediate and final coats shall be B65WJ0351 hi-solids polyurethane 250, 3 – 5 mils DFT.

Concrete Coating and Application Method

Tnemec –…

This is the start of the file's text. The full file is on GovTribe.