1-HOP Permit.pdf

PDF 147 KB Posted

Attached to
Bridge Street Roadway and Pedestrian Improvements
Solicitation number
US.264203
Issued by
Cumberland County, Pennsylvania

About this file

This Highway Occupancy Permit (HOP #08120744) is issued by the Pennsylvania Department of Transportation (PennDOT) to the Borough of New Cumberland for roadway and pedestrian improvements on State Route 2035 (Bridge Street) in New Cumberland Borough, Cumberland County. The permit authorizes replacement of curb ramps and performance of roadway improvements within specified segments and offsets of the state highway right-of-way. The permit was issued on September 9, 2026, and expires on September 9, 2027, with no permit fee assessed. The permittee must notify the Traffic Management Center at 717-265-7600 two days in advance of any proposed lane or shoulder restrictions and 15 minutes prior to actual restrictions. The contractor must provide a proposed work schedule three days before the start of work and contact County Permit Supervisor Nicholas Jones at least five workdays prior to commencement. Lane restrictions are prohibited between 6:00 AM to 9:00 AM and 3:00 PM to 6:00 PM, with no restrictions permitted on freeways from 7:00 AM to 5:00 PM. Additional lane closure restrictions apply during major holiday weekends including Easter, Memorial Day, Fourth of July, Labor Day, Thanksgiving, Christmas, and New Year's periods. The permittee must inform New Cumberland Borough five working days prior to work commencement.

All work must comply with PennDOT Roadway Standards RC-64M and RC-67M for curb installation, with shoulders restored in accordance with Publication 408 and Roadway Construction Standards RC-25M. Sidewalk construction or replacement must provide accommodations for persons with disabilities consistent with ADA and PennDOT standards. The permittee is responsible for identifying all PennDOT-owned or operated facilities within the work limits and immediately contacting the Department if any are damaged, with restoration to original condition as required. All disturbed areas outside pavement or shoulders must be restored to conditions at least equal to pre-work conditions. Work zone traffic control must comply with Publication 213, and the permittee is responsible for removing mud, silt, and debris from vehicles before entering the highway. The permittee must submit Form M-937R (Route/Bridge Restriction) to the County Permit Inspector at least 15 days in advance for any lane restrictions or closures. The permittee must coordinate and fund relocation of any utility facility conflicts resulting from permitted activities in accordance with 67 PA Code Chapter 459. Completion must be reported through the ePermitting system dropdown menu "Notify PennDOT," with work certified as completed by the District Executive.

View the file

Other files

File Type Posted
8-CFA Requirements.pdf PDF
9-00 Plans.pdf PDF
3-01 Contract and Special Provisions.pdf PDF
4-04 Attachment 4.pdf PDF
6-CDBG Contractor Packet.pdf PDF
5-2026.11.23 Davis-Bacon Wage Rates.pdf PDF
2-02 Attachment 2.pdf PDF
7-03 Attachment 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Permit # 08120744

M-945P (6/12)

Highway Occupancy Permit Permit No.: 08120744

Name and Address of Permittee:

Borough of New Cumberland 1120 Market Street New Cumberland, PA 17070

County: Cumberland County Contact No.: (717) 243-5414 Issuing District Office: 8-0 District Contact No.: (717) 787-2522

Municipalities: New Cumberland Borough

Issue Date: 9/9/2026 Expiration Date: 9/9/2027 Application No.: 417840 Account No.:

Permit Fee: $ 0.00

Immediately upon completion of the work Permittee shall notify the permit office where application was made. Subject to all the conditions, agreements, restrictions, and regulations prescribed by the Pennsylvania Department of Transportation, (see in particular 67 Pa. Code, Chapter 212, 441 and 459 and State Highway Law, 36 P.S. Section 670 - 411, 420 and 421 ) and subject to the plans, special conditions, or restrictions herein set forth or attached hereto. This permit shall be located at the work site and shall be available for inspection by any police officer or Department representative.

Location and Description of Work Permit No.: 08120744 1 of 1 State Route #: 2035

Segment(s): From 0010 To 0020 Offset(s): From 0046 To 0111

102: REPLACE CURB RAMP

171: Perform Roadway Improvement

Permit Conditions Permit No.: 08120744 1 of 20 NOTIFY THE TRAFFIC MANAGEMENT CENTER (TMC) AT 717-265-7600 TWO DAYS IN

ADVANCE OF ANY PROPOSED LANE OR SHOULDER RESTRICTIONS AND 15 (FIFTEEN)

MINUTES PRIOR TO THE ACTUAL RESTRICTIONS AND PROVIDE THIS PERMIT

NUMBER TO THE TMC OPERATOR PRIOR TO SETTING UP ANY LANE CLOSURES OR

RESTRICTIONS, AND CALL AGAIN WHEN THE CLOSURE/RESTRICTION IS REMOVED

AND THE ROAD IS RESTORED TO NORMAL OPERATION. NO LANE RESTRICTION WILL

BE PERMITTED FROM 7.00 AM TO 5.00 PM ON ALL FREEWAYS INCLUDING ON AND OFF

RAMPS.

2 of 20 PERMITTEE'S CONTRACTOR MUST PROVIDE PROPOSED WORK SCHEDULE 3 DAYS

BEFORE START OF WORK. ALSO, PROVIDE AN EMERGENCY PHONE CONTACT

NUMBER TO THE DEPARTMENT.

3 of 20 CONTACT COUNTY PERMIT SUPERVISOR NICHOLAS JONES, AT LEAST 5 WORKDAYS

PRIOR TO THE START OF WORK AT +1 (717) 787-2522 OR NICHOJONES@PA.GOV.

4 of 20 THIS PERMIT AUTHORIZES WORK ONLY IN DEPARTMENT HIGHWAY RIGHT OF WAY.

5 of 20 CURB MUST BE INSTALLED IN ACCORDANCE WITH PENNDOT ROADWAY STANDARDS

RC-64M AND RC-67M.

6 of 20 SHOULDERS MUST BE RESTORED IN ACCORDANCE WITH APPROPRIATE SECTION OF

PUB. 408 AND ROADWAY CONSTRUCTION STANDARDS RC-25M.

7 of 20 ACCESS SIGNING AND PAVEMENT MARKINGS DISTURBED BY THE PERMITTED WORK

MUST BE REPLACED IN KIND.

Permit Conditions Permit No.: 08120744 8 of 20 SIDEWALK CONSTRUCTION OR REPLACEMENT SHALL PROVIDE ACCOMMODATIONS

FOR PERSONS WITH DISABILITIES CONSISTENT WITH ADA AND PENNDOT

STANDARDS.

9 of 20 IT IS THE PERMITTEES RESPONSIBILITY TO IDENTIFY ALL PENNDOT OWNED/

OPERATED FACILITIES WITHIN THE LIMITS OF PERMITTED WORK. IF DAMAGED BY

THE PERMITTED WORK, IT IS PERMITTEES RESPONSIBILITY TO CONTACT THE

DEPARTMENT IMMEDIATELY AND RESTORE THE FACILITY TO ITS ORIGINAL

CONDITION OR AS DIRECTED BY THE DEPARTMENT.

10 of 20 ALL DISTURBED AREAS OUTSIDE THE PAVEMENT OR SHOULDER SHALL BE

RESTORED TO A CONDITION AT LEAST EQUAL TO THAT WHICH EXISTED BEFORE THE

START OF WORK.

11 of 20 MINIMUM WORK ZONE TRAFFIC CONTROL TO BE IN ACCORDANCE WITH PUB. 213.

SEE PUB 212 FOR ADDITIONAL DETAILS.

12 of 20 NO LANES MAY BE RESTRICTED BETWEEN THE HOURS OF 6:00 AM TO 9:00 AM OR

BETWEEN THE HOURS OF 3:00 PM TO 6:00 PM.

13 of 20 LANE CLOSURES WILL NOT BE PERMITTED DURING THE FOLLOWING PERIODS:

EASTER WEEKEND - FRIDAY 6:00AM TO TUESDAY 9:00AM; MEMORIAL DAY WEEKEND

- FRIDAY 6:00AM TO TUESDAY 9:00AM; FOURTH OF JULY HOLIDAY - REQUEST

INFORMATION FROM DISTRICT OR COUNTY PERMIT OFFICE; LABOR DAY WEEKEND -

FRIDAY 6:00AM TO TUESDAY 9:00AM; THANKSGIVING WEEKEND -WEDNESDAY

6:00AM TO MONDAY 9:00AM; CHRISTMAS HOLIDAY-DECEMBER REQUEST

INFORMATION FROM DISTRICT OR COUNTY PERMIT OFFICE; NEW YEAR'S HOLIDAY -

REQUEST INFORMATION FROM DISTRICT OR COUNTY PERMIT OFFICE. THERE MAY

BE ADDITIONAL TRAFFIC RESTRICTIONS FOR SPECIAL EVENTS THAT ATTRACT

LARGE VOLUMES OF TRAFFIC IN THE AREA OF THE HOP.

14 of 20 PERMITTEE IS RESPONSIBLE FOR ENSURING THAT MUD, SILT AND OTHER DEBRIS IS

REMOVED FROM VEHICLES AND TIRES (BY POWER WASH, ETC.) BEFORE ENTERING

ONTO THE HIGHWAY.

15 of 20 THE DEPARTMENT MUST BE NOTIFIED IN THE EPERMITTING SYSTEM DROPDOWN

MENU, NOTIFY PENNDOT, UPON COMPLETION OF WORK.

16 of 20 ALL WORK WITHIN THE STATE RIGHT OF WAY MUST FOLLOW SPECIFICATIONS AND

STANDARDS OF PUBLICATIONS 408 AND 72M.

17 of 20 SUBMIT FORM M-937R (ROUTE/BRIDGE RESTRICTION), TO THE COUNTY PERMIT

INSPECTOR AT LEAST 15 DAYS IN ADVANCE FOR ANY LANE RESTRICTIONS, LANE

CLOSURES OR APPROVED DETOURS. THE INSPECTOR WILL REVIEW AND FORWARD

THE REQUEST TO THE DISTRICT HAULING UNIT FOR APPROVAL.

18 of 20 IT IS THE PERMITTEES RESPONSIBILITY TO PROVIDE NECESSARY EQUIPMENT FOR

TESTING OF MATERIALS DELIVERED ON SITE INCLUDING CERTIFIED TECHNICIANS.

19 of 20 PERMITTEE WILL BE RESPONSIBLE FOR COORDINATING RELOCATION OF ANY

UTILITY FACILITY CONFLICTS WHICH ARE A RESULT OF ACTIVITIES CONDUCTED

UNDER THIS PERMIT. ALL UTILITY FACILITY COORDINATION AND RELOCATION MUST

BE IN ACCORDANCE WITH 67 PA. CODE CHAPTER 459, OCCUPANCY OF HIGHWAYS BY

UTILITIES.

Permit Conditions Permit No.: 08120744 20 of 20 PERMITTEE MUST INFORM NEW CUMBERLAND BOROUGH FIVE WORKING DAYS

PRIOR TO THE START OF PERMITTED WORK.

Acknowledgement of Completion Permit work has been completed:

Date:

By:

Michael B. Carroll

Secretary of Transportation

Kevin M. Keefe, P.E.

District Executive

File details come from the government source that posted it. Updated .