This document is an Erosion and Sediment Pollution Control Plan prepared by Benesch for the Orwigsburg Borough's Fisher's Dam Maintenance Dredging Project located in Schuylkill County, Pennsylvania. The project involves maintenance dredging of Fisher's Dam, with sealed bids to be received online via the PennBid Program until 2 PM on Tuesday, October 7, 2025, with bid results to be publicly announced at the borough meeting on October 8, 2025. The entire project will be awarded to a single contractor, with all bidding documents available at no cost through the PennBid platform. The project is part of the Watershed Restoration and Protection Program (WRPP) and has received funding assistance from the Department of Community and Economic Development (DCED).
The bid requires a certified check or bid bond of 10% of the total bid amount, and the successful bidder must provide performance and payment bonds each covering 100% of the contract price. Pennsylvania Wage Rates apply to the project, and bidders must submit a Public Works Employment Verification Form. The project involves removing silt and sediment from the reservoir, with dredged materials to be transported to an existing permitted waste area. Contractors must adhere to specific erosion and sediment control measures, including installing perimeter best management practices (BMPs) such as compost filter sock, rock filter, rock construction entrance, and inlet protections. The project emphasizes environmental due diligence, with specific requirements for handling and testing fill materials to ensure they qualify as clean fill.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
thereof, is strictly prohibited, except by written permission of this firm.
Benesch. Use, reuse, reproduction or modification of this plan or design information, or any part
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of
PREPARED BY:
PROJECT MANAGER DATE
0325-609037.21
DRAWING NO.
PROJECT
WATERSHED RESTORATION AND PROTECTION PROGRAM (WRPP)
FISHER'S DAM MAINTENANCE DREDGING PROJECT
BOROUGH OF ORWIGSBURG
July, 2025
Orwigsburg Borough, Schuylkill County, Pennsylvania
LOCATION MAP
SCALE: 1" = 2000'
ORWIGSBURG, PA 17961
SOUTH WASHINGTON STREET
FISHER'S DAM
PROJECT LOCATION
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
AT WWW.PAONECALL.ORG
COORDINATE YOUR PROJECTS VIA COORDINATE PA
PENNSYLVANIA ONE CALL SYSTEM SERIAL NUMBER
20251913463
START OF EXCAVATION.
THAN 10 BUSINESS DAYS PRIOR TO THE
THAN 3 BUSINESS DAYS NOR MORE
DIAL 8-1-1 OR 1-800-242-1776 NOT LESS
TITLE
NO.
DRAWING
DRAWING INDEX
COVER SHEET
EROSION & SEDIMENT POLLUTION CONTROL PLAN DETAILS
EROSION & SEDIMENT POLLUTION CONTROL PLAN DETAILS
EROSION & SEDIMENT POLLUTION CONTROL PLAN DETAILS
EROSION & SEDIMENT POLLUTION CONTROL PLAN DETAILS
EROSION & SEDIMENT POLLUTION CONTROL PLAN DETAILS
P E
N
N S Y L V
A
N
I A
C O
M
M O
NW EALT
H
O
F
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
AUTHORIZED UNDER BENESCH PROJECT NO. 0325-609037.21
CONTRACT NO. C000092754
AUTHORITY (CFA).
PROTECTION PROJECT (WRPP) ADMINISTERED UNDER THE COMMONWEALTH FINANCING
COMMUNITY AND ECONOMIC DEVELOPMENT (DCED) WATERSHED RESTORATION AND
THIS PROJECT HAS RECEIVED FUNDING ASSISTANCE FROM THE DEPARTMENT OF
Orwigsburg Borough
Paul Datte, Esq
William Reppy
Harlee Lomas
Kerry Marano
Richard Bubeck
- Solicitor
- Manager
- Secretary
- Vice President
- President
8/19/2025
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction or
Orwigsburg Borough, Schuylkill County, Pennsylvania
MAINTENANCE DREDGING PROJECT
FISHER'S DAM
0325-609037.218/19/2025
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
KMB KMB KRR
P E
N
N S Y L V
A N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
OF 7
CONTROL PLAN DETAILS
EROSION AND SEDIMENT POLLUTION
EROSION AND SEDIMENTATION CONTROL POLICIES
AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT
PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70 PERCENT VEGETATIVE COVER OR 27.
ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN
REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION
BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE
OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE 26.
STANDARDS OF THIS PLAN.
SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE
SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A
ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT 25.
STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE 24.
FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.23.
FILLS.
FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO 22.
MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE 21.
ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.20.
COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE
ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER 19.
TOPSOIL.
TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF
COMPACTED SOILS PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF
AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES 6 TO 12 INCHES ON 18.
ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.17.
SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE
SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY 16.
AT THE TIME OF INSPECTION.
WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS
A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY 15.
REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO PERFORM AS EXPECTED, AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, GREATER, AND ON A WEEKLY BASIS UNLESS INDICATED MORE FREQUENTLY FOR A SPECIFIC BMP. ALL PREVENTATIVE
MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT OF 0.25 INCHES OR
UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE 14.
PLAN, OVER UNDISTURBED VEGETATED AREAS.
ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS 13.
REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 12.
DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION 11.
BURIED, DUMPED, OR DISCHARGED AT THE SITE.
271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, ACCORDANCE WITH THE DEPARTMENT OF SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN 10.
BOROUGH AND THE ENGINEER.
PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND IMMEDIATELY NOTIFY THE
EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT
IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED 9.
MUST BE 2H:1V OR FLATTER.
MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES
ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE
DISTURBANCE OR ON THE EXISTING PARKING LOT IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF
TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED WITHIN THE PROJECT LIMIT OF 8.
LOCATIONS AS NOTED ON THE PLAN BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF IN CERTAIN
AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE 7.
OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE
THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE
CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF 6.
ROOTS AND OTHER OBJECTIONABLE MATERIAL.
AREAS TO BE FILLED SHOULD BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, 5.
TO IMPLEMENTATION.
DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE CITY OF HAZLETON PRIOR
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN 4.
EXISTING UNDERGROUND UTILITIES.
UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF
AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY 3.
TO AN ON-SITE PRECONSTRUCTION MEETING.
OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE CITY OF HAZLETON
THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT
OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE 2.
DISCRETION.
REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS
BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE
BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL
ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILL SHALL BE DONE IN 1.
EROSION AND SEDIMENTATION CONTROL POLICIES (CONT'D)
CRIMINAL PENALTIES FOR EACH VIOLATION.
PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR
IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000
RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED
CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY
FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE 39.
GERMINATING SEASON.
REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS SHOULD BE DONE ONLY DURING THE
DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID
OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED 38.
PRIOR TO REMOVAL OF THE E&S BMPS.
AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE CITY OF HAZLETON TO SCHEDULE A FINAL INSPECTION
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED 37.
BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS.
EROSION AND SEDIMENT BMP'S MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE 36.
GREATEST EXTENT POSSIBLE.
WHICH ARE TO BE STABILIZED WITH VEGETATION ONCE FINAL GRADE IS REACHED SHOULD BE MINIMIZED TO THE
AND MULCHING TO BEGIN (ANTICIPATE THE COMPLETION DATE AND SCHEDULE THE SEEDER). THE DISTURBED AREAS
AS DISTURBED AREAS WITHIN THE PROJECT APPROACH FINAL GRADE, PREPARATIONS SHOULD BE MADE FOR SEEDING 35.
LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS.
FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, 34.
SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A 33.
THE DESIGN DIMENSIONS WILL BE PROVIDED AFTER PLACEMENT OF THE PROTECTIVE LINING.
CHANNELS HAVING RIPRAP, RENO MATTRESS, OR GABION LININGS MUST BE SUFFICIENTLY OVER-EXCAVATED SO THAT 32.
RESTORATION IS COMPLETE.
CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE MANNER DESCRIBED IN THIS PLAN UNTIL SUCH
CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW WITHIN THE
UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY BACKFILLED AND THE 31.
DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, LEAVES, WOODY 30.
SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. IN NO CASE 29.
OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE CITY OF HAZLETON.
E&S BMPS MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED 28.
MAINTENANCE OF E&S CONTROL DEVICES
STORM PRIOR TO STABILIZATION.
NECESSARY BY THE ENGINEER OR BOROUGH OFFICIAL IN ORDER TO CORRECT UNFORESEEN PROBLEMS CAUSED BY A
MISCELLANEOUS ADJUSTMENTS AND CORRECTIONS SHALL BE MADE TO ANY EROSION CONTROL STRUCTURE AS DEEMED
ENGINEER UPON REQUEST.
INSPECTION. THE INSPECTION LOG SHALL BE KEPT ON SITE AT ALL TIMES AND MADE AVAILABLE TO THE BOROUGH OR
THIS PURPOSE INCLUDING THE COMPLIANCE ACTIONS, DATE, TIME AND NAME OF THE PERSON CONDUCTING THE
PERSON CONDUCTING THE INSPECTION. ALL SITE INSPECTIONS WILL BE DOCUMENTED IN AN INSPECTION LOG KEPT FOR
AND INCLUDE: A SUMMARY OF SITE CONDITIONS, BMPS AND COMPLIANCE, AND THE DATE, TIME, AND THE NAME OF THE
EFFECTIVE IN PREVENTING SEDIMENT FROM LEAVING THE SITE. A WRITTEN REPORT OF EACH INSPECTION SHALL BE KEPT
SUPERVISION RESPONSIBILITIES, TO ASCERTAIN THAT THE EROSION CONTROL MEASURES ARE OPERATIONAL AND
BMP, BY A QUALIFIED PERSON TRAINED AND EXPERIENCED IN EROSION AND SEDIMENTATION CONTROL AND WHO HAS SITE
RUNOFF EVENT OF AT LEAST 0.25 INCHES AND ON A WEEKLY BASIS, UNLESS INDICATED MORE FREQUENTLY FOR A SPECIFIC
MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION MEASURES AFTER EACH SIGNIFICANT
PROCEDURES OUTLINED BELOW.
EROSION AND SEDIMENTATION CONTROLS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING GENERAL MAINTENANCE
SHALL PERFORM CERTAIN PERIODIC DUTIES IN ORDER TO ASSURE PROPER CONTROL. MAINTENANCE OF THE VARIOUS
MAINTAINED IN ORDER TO KEEP THEM FUNCTIONING PROPERLY UNTIL SITE STABILIZATION OCCURS. THE CONTRACTOR
THE SOIL EROSION AND SEDIMENTATION CONTROLS UTILIZED IN THE DEVELOPMENT OF THIS PLAN SHALL BE ROUTINELY
OCCUR.
REMOVE INLET PROTECTION ONCE SUBBASE MATERIAL HAS BEEN INSTALLED AND PAVING OF THE SITE IS ABOUT TO 4.
CLEAN STONE.
STONE WHICH BECOMES CHOKED WITH SEDIMENT AND IS NOT FUNCTIONAL SHALL BE REMOVED AND REPLACED WITH 3.
SEDIMENT SHALL BE REMOVED FROM THE DEVICE WHEN THE DEPTH OF SEDIMENT IS 1/3 OF THE TOTAL HEIGHT.2.
INLET PROTECTION DEVICES SHALL BE INSPECTED REGULARLY AND AFTER EACH MEASURABLE PRECIPITATION EVENT.1.
INLET PROTECTION:
REPAIR AND RESECURE ANY UPLIFTED OR SHIFTED LININGS IMMEDITELY.3.
REPAIR ANY TORN OR DAMAGED LININGS IMMEDIATELY.2.
LININGS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT OF AT LEAST 0.25 INCHES.1.
EROSIONS CONTROL LININGS
REMOVE ANY BLOCKAGES OF INLETS OR PIPES IMMEDIATELY.2.
STORM SEWER SYSTEMS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT OF AT LEAST 0.25 INCHES.1.
STORM SEWER SYSTEMS
PLASTIC LINERS SHOULD BE REPLACED WITH EACH CLEANING OF THE WASHOUT FACILITY.3.
ACCUMULATED MATERIALS SHOULD BE REMOVED WHEN THEY REACH 75% CAPACITY.2.
IMMEDIATELY.
INSPECT WASHOUT FACILITIES DAILY. DEACTIVATE AND REPAIR OR REPLACE DAMAGED OR LEAKING WASHOUTS 1.
CONCRETE WASHOUT:
WELL VEGETATED AREAS AND THAT THE OUTFLOW IS BEING DISCHARGED TO A STABLE, EROSION RESISTANT AREA.
REGULARLY INSPECT THE OPERATION OF FILTER BAGS TO ENSURE THAT THEY ARE LOCATED ON RELATIVELY FLAT, 3.
REPLACED AND THE SEDIMENT SHALL BE PROPERLY DISPOSED.
DO NOT USE BAGS WHICH ARE GREATER THAN 1/2 FULL. WHEN BAGS REACH THAT CAPACITY, THEY SHALL BE 2.
FILTER BAGS SHALL BE INSPECTED DAILY. IMMEDIATELY DISPOSE OF BAGS WHICH ARE SPLIT OR TORN1.
PUMPED WATER FILTER BAG:
PUMPING AND PENETRATING INTO THE STRUCTURE.
GEOTEXTILE FABRIC SHALL BE INSTALLED UNDER ALL ROCK CONSTRUCTION ENTRANCES TO KEEP SOIL FROM 4.
AND SEDIMENT.
ROCK CONSTRUCTION ENTRANCES SHALL BE CLEANED AND REDRESSED WHEN VOIDS BECOME CHOKED WITH MUD 3.
SITE. WASHING OF THE ROADWAY IS NOT PERMITTED.
CONSTRUCTION DAY, ALL SEDIMENT DEPOSITED ON PUBLIC ROADWAYS, WILL BE REMOVED AND RETURNED TO THE
STOCKPILE OF ROCK MATERIAL WILL BE MAINTAINED ON SITE FOR THIS PURPOSE. AT THE END OF EACH
THE STRUCTURE'S THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSION BY ADDING ROCK. A 2.
INCHES.
ROCK CONSTRUCTION ENTRANCES SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT OF AT LEAST 0.25 1.
ROCK CONSTRUCTION ENTRANCE:
AN APPROVED LANDFILL. CONSTRUCTION WASTE SHALL NOT BE BURIED ON THE SUBJECT SITE.
MATERIAL ACCUMULATED FROM CONSTRUCTION ACTIVITIES SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN
MANNER. BARRIERS SHALL BE CHECKED AND REALIGNED OR RESET AS REQUIRED. ANY DEBRIS OR SOLID WASTE
ANY DEBRIS ACCUMULATED AT SILT SOCK BARRIERS SHALL BE REMOVED AND PROPERLY DISPOSED IN A RESPONSIBLE 5.
ADHERE TO ANY MANUFACTURER'S RECOMMENDATIONS FOR REPLACING FILTER SOCK.4.
BACKFILL MATERIAL.
ALL UNDERCUTTING OR EROSION OF THE TOE ANCHOR OR BASE SHALL BE REPAIRED IMMEDIATELY WITH COMPACTED 3.
REMOVE DEPOSITS WHERE ACCUMULATIONS REACH 1/2 ABOVE THE GROUND HEIGHT OF THE DEVICE.
ACCUMULATED SEDIMENT SHALL BE REMOVED AS REQUIRED TO KEEP THE DEVICES FUNCTIONAL. IN ALL CASES, 2.
NECESSARY REPAIRS WILL BE MADE IMMEDIATELY.
THE FILTER SOCK SHALL BE INSPECTED WEEKLY AND AFTER EVERY RAINFALL EVENT OF AT LEAST 0.25 INCHES. ANY 1.
FILTER SOCK:
Scale: AS NOTED Date: Project No.:
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction or
Orwigsburg Borough, Schuylkill County, Pennsylvania
MAINTENANCE DREDGING PROJECT
FISHER'S DAM
0325-609037.218/19/2025
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
KMB KMB KRR
P E
N
N S Y L V
A N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
OF 7
CONTROL PLAN DETAILS
EROSION AND SEDIMENT POLLUTION
SEEDING & MULCHING SPECIFICATIONS
APPLIED DURING THE PRESCRIBED PLANTING PERIOD.
TRANSPORTATION (PADOT) SPECIFICATIONS, PUBLICATION 408, LATEST EDITION, SECTIONS 804 AND 805 AND SHALL BE
SEEDING, MULCHING AND SOIL SUPPLEMENTS SHALL MEET THE REQUIREMENTS OF THE PA DEPARTMENT OF
FERTILIZER: 10-10-20 ANALYSIS COMMERCIAL FERTILIZER TO BE APPLIED AT 210 LBS./1,000 SQ. YDS.
LIME: AGRICULTURAL LIME AT 2,480 LBS/1,000 SQ. YDS.
PERMANENT APPLICATION:
FERTILIZER: 10-10-10 ANALYSIS COMMERCIAL FERTERLIZER TO BE APPLIED AT 100 LBS./1,000 SQ. YDS.
LIME: AGRICULTURAL LIME AT 410 LBS/1,000 SQ. YDS.
TEMPORARY APPLICATION:
APPLIED DURING THE APPROPRIATE TIMES.
SUPPLEMENTS SHALL CONFORM TO THE REQUIREMENTS OF PADOT PUBLICATION 408, SECTION 804 AND SHALL BE 1.
SOIL SUPPLEMENTS:
WITH SPECIFIED MULCH BINDERS APPLIED IN ACCORDANCE WITH SECTION 805.3.
MULCH SHOULD BE ANCHORED IMMEDIATELY AFTER APPLICATION TO PREVENT BEING WINDBLOWN. ANCHOR MULCH 4.
OF SPECIFIED NETTING MATERIAL.
HOURS OF PLACING SEEDING. ON STEEP SLOPES OF 3:1 OR GREATER, MULCH SHALL BE SECURED THROUGH THE USE
STRAW MULCH SHALL BE APPLIED AT THE RATE OF 1,200 POUNDS PER 1,000 SQUARE YARDS AND APPLIED WITHIN 48 3.
STOCKPILES, GRADED SLOPES AND OTHER AREAS TO BE GRASSED IN THE FUTURE.
THE MULCHING SHALL ALSO BE UTILIZED DURING WINTER MONTHS FOR GROUND COVER STABILIZATION ON TOPSOIL 2.
PRESCRIBED IN SECTION 805 OF PUBLICATION 408.
MULCHING SHALL CONSIST OF STRAW MULCH AND SHALL MEET THE SPECIFICATIONS AND APPLICATION RATES AS 1.
MULCHING:
FOR THE PLACEMENT OF GRASSES AND VEGETATION WITHIN THESE FACILITIES.
BOTTOM OF THE SWM / BMP FACILITIES - REFERENCE THE PLANTING SCHEDULE ON THE LAND DEVELOPMENT PLANS 3.
ALL OTHER AREAS - SEE LANDSCAPING PLAN AND BMP SEEDING SCHEDULE FOR SEEDING APPLICATIONS.
LAWN AREAS - FORMULA B SEED MIXTURE WITH A SEEDING APPLICATION RATE OF 42 LBS./1,000 SQ. YDS.
RYE) AND SHALL MEET THE REQUIREMENTS OF PADOT FOR THE FOLLOWING APPLICATIONS:
PERMANENT SEEDING SHALL CONSIST OF PERENNIAL GRASSES (I.E., KENTUCKY BLUEGRASS, FESCUE, PERENNIAL 2.
MIXTURE. THE SEEDING APPLICATION RATE SHALL BE 10 LBS./1,000 SQ. YDS.
REQUIREMENTS OF THE PA DEPARTMENT OF TRANSPORTATION (PADOT) SPECIFICATIONS FOR FORMULA T SEED
TEMPORARY SEEDING SHALL CONSIST OF 100 PERCENT ANNUAL RYE GRASS AND SHALL CONFORM TO THE 1.
SEEDING:
FILL MATERIALS NOTES AND ENVIRONMENTAL DUE DILIGENCE
APPLICABLE. THESE REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM.
CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS
MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA.
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE
APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH
REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF REGULATED SUBSTANCE, IT
PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF
ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE
QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS, SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL
INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE
FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS:
ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE DILIGENCE TO DETERMINE IF THE
FILL. A COPY OF FORM FP-001 CAN BE FOUND AT THE END OF THE NOI INSTRUCTIONS.
QUALIFY THE MATERIAL AS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING THE
USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO
ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST
FP-1A AND FP-1B FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
MATERIAL CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE RESIDENTIAL LIMITS IN TABLES
RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED THE TESTING REVEALS THAT THE FILL
CLEAN FILL AFFECTED BY SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR
FOR RE-USE).
AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED
TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE
CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE
TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE
ENVIRONMENTAL DUE DILIGENCE AND DETERMINATION OF CLEAN FILL WILL REST WITH THE OPERATOR.
IF THE SITE WILL NEED TO IMPORT OR EXPORT MATERIAL FROM THE SITE, THE RESPONSIBILITY FOR PERFORMING
CaD
PERCENT SLOPES
CALVIN SHALY SILT LOAM, 15 TO 25
VERY LIMITED POOR
KeB
PERCENT SLOPES
KEDRON SILT LOAM, 3 TO 8
VERY LIMITED POOR
WINTER GRADING WILL BE AVOIDED OR COMPLETED DURING WARM PERIODS TO AVOID FROST ACTION
PROJECT CONSISTS OF REMOVAL OF DREDGED SITE/SEDIMENT FROM FISHERS DAM. NO PROPOSED GRADING IS ANTICIPATED AS PART OF THIS PROJECT.
SOIL LIMITATIONS AND RATINGS
SYMBOL
MAP UNIT
MAP UNIT NAME
AND STREETS
LOCAL ROADS
SOURCE
ROADFILL
SOURCE
TOPSOIL
POOR
POOR
EMBANKMENTS
VERY LIMITED
VERY LIMITED
STEEL
CONCRETE/
CORROSION TO
MODERATE/LOW
HIGH/HIGH
(CM)
BEDROCK
DEPTH TO
>200
ACTION
FROST
MODERATE
MODERATE
VULNERABILITY
DROUGHT
VULNERABLE
VULNERABLE
SHALLOW
SYSTEMS,
INFILTRATION
LIMITED
SEVERELY
LIMITED
SEVERELY
SOILS INFORMATION, LIMITATIONS & RESOLUTIONS
CONSTRUCTION SEQUENCE
STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS DOCUMENT.
NOTE: DO NOT COMMENCE DREDGING UNTIL THE E&S BMPS SPECIFIED BY THE CONSTRUCTION SEQUENCE FOR THAT
SYSTEM INCORPORATED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES
PREVIOULSY UNMARKED, ALL CONTRACTORS INVOLVED IN THE ACTIVITIES SHALL NOTIFY THE PENNSULVANIA ONE CALL
NOTE: AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA
IMPLEMENTED
THE OPERATOR SHALL ASSURE THAT THE EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY
LeB
3 TO 8 PERCENT SLOPES
LECK KILL CHANNERY SILT LOAM,
LIMITED
SOMEWHAT
FAIR POOR
LIMITED
SOMEWHAT
MODERATE/LOW 147 MODERATE
DROUGHT
MODERATELY
LIMITED
SOMEWHAT
UU URBAN LAND-UDULTS COMPLEX NOT RATED NOT RATED NOT RATED NOT RATED NOT RATED >200 NOT RATED NOT RATED NOT RATED
SLIDING, OR OTHER MOVEMENTS.
ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
STABILIZED IMMEDIATELY. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70 PERCENT
ROCK FILTER, CONCRETE WASHOUT AREAS, ETC. AREAS DISTURBED DURING THE REMOVAL OF THE BMPS SHALL BE
AREAS, ALL TEMPORARY EROSION AND SEDIMENT BMPS ARE TO BE REMOVED INCLUDING COMPOST FILTER SOCK, UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED 8.
E&S DETAILS.
COMPLETE FINAL CONSTRUCTION ITEMS INCLUDING VEGETATIVE STABILIZATION OF ALL DISTURBED AREAS PER THE 7.
THE CLAY LINER THAT EXISTS ALONG THE BOTTOM OF THE REVERVIOR.
FORCES UPON COMPLETION OF MAINTENANCE DREDGING. CONTRACTOR MUST NOT IMPACT OR IN ANYWAY BREECH
RETURN THE DAM FLOOR TO IS ORIGINAL EXISTING CONTOURS. COORDINATE REFILLING THE DAM WITH BOROUGH 6.
DETAILED WITHIN THE CONTRACT DOCUMENTS.
PLACE THE DREDGED MATERIAL INTO A HAUL TRUCK AND TRANSPORT IT TO AN EXISTING PERMITTED WASTE AREA AS 5.
THE CONTRACT DEOCUMENTS.
DREDGE THE RESERVOIR AREA TO REMOVE SILT AND SEDIMENT PER ALL APPLICABLE RESTRICTIONS FOUND WITHIN 4.
DREDGING ACTIVITIES.
COORDINATE WITH THE BOROUGH REGARDING THE DRAWNDOWN OF THE DAM PRIOR TO COMLETING MAINTENANCE 3.
WASHINGTON STREET AS SHOWN ON THE E&S DETAILS.
ROCK FILTER, ROCK CONSTRUCTION ENTRANCE, AND TWO (2) INLET PROTECTIONS ON EXISTING INLETS ALONG SOUTH
INSTALL ALL EROSION AND SEDIMENT POLLUTION CONTROL PERIMETER BMPS INCLUDING COMPOST FILTER SOCK, 2.
STAKE OR MARK THE PROPERTY LIMITS. 1.
Scale: AS NOTED Date: Project No.:
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction or
Orwigsburg Borough, Schuylkill County, Pennsylvania
MAINTENANCE DREDGING PROJECT
FISHER'S DAM
0325-609037.218/19/2025
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
KMB KMB KRR
P E
N
N S Y L V
A N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
OF 7
CONTROL PLAN DETAILS
EROSION AND SEDIMENT POLLUTION
PERMANENT SEEDING APPLICATION RATE
AGRICULTURAL LIME 6 TONS 240 LB 2,480 LB
REQUIRED IN AGRICULTURAL FIELDS
OR AS PER SOIL TEST; MAY NOT BE
10-10-20 FERTILIZER 1,000 LB 25 LB 210 LB
REQUIRED IN AGRICULTURAL FIELDS
OR AS PER SOIL TEST; MAY NOT BE
TEMPORARY SEEDING APPLICATION RATE
AGRICULTURAL LIME
TOPSOIL STOCKPILES
TYPICALLY NOT REQUIRED FOR
SOIL AMENDMENT APPLICATION RATES EQUIVALENTS
BE SUBSTITUTED FOR THE SOIL AMENDMENTS SHOWN IN THE ABOVE TABLE.
A COMPOST BLANKET WHICH MEETS THE STANDARDS OF THE MANUAL MAY 1.
SOIL AMENDMENT PER ACRE PER 1000 SF PER 1000 SY NOTES
10-10-10 FERTILIZER
TOPSOIL STOCKPILES
TYPICALLY NOT REQUIRED FOR
1 TON 40 LB 410 LB
500 LB 12.5 LB 100 LB
SEEDING SEASON DATES:
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL RATE
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:
/15 TO 6/1 & 8/1 TO 10/153
HAY
6.0
SEE TABLE A
FORMULA T(TEMPORARY)
LB/1000 SY
LB/1000 SY
LB/1000 SY
(X-X-X)
LB/1000 SY
10-20-20
AND
38-0-0 UREAFORM
OR
59 TO 50 AS DIRECTED
32-0-0 TO 38-0-0 SULFER COATED UREA
OR
31-0-0
SEEDING SEASON DATES:
ANCHORING METHOD:
RATE OF ANCHOR MATERIAL APPL:
ANCHOR MATERIAL:
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL RATE
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:(PERMANENT, <3:1 SLOPES)
LB/1000 SY
LB/1000 SY
LB/1000 SY
LB/1000 SY
LB/1000 SY
(X-X-X)
LB/1000 SY
/15 TO 6/1 & 8/1 TO 10/153
PER MANUFACTURERS' INSTRUCTIONS
STRAW
B: 42.0
SEE TABLE A
FORMULA B
10-20-20
AND
38-0-0 UREAFORM
OR
59 TO 50 AS DIRECTED
32-0-0 TO 38-0-0 SULFER COATED UREA
OR
31-0-0
RECYCLED CELLULOSE FIBER
AND
WOOD FIBER
OR
PER MANUFACTURERS' INSTRUCTIONS
NONASPHALTIC EMULSION
OR
PER MANUFACTURERS' INSTRUCTIONS
POLYVINYL ACETATE
OR
RECYCLED CELLULOSE FIBER/WOOD FIBER MIXTURE
SEEDING SEASON DATES:
RATE OF ANCHOR MATERIAL APPL:
ANCHORING METHOD:
ANCHOR MATERIAL:
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL RATE
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:(PERMANENT, SLOPES/SWALES)
LB/1000 SY
LB/1000 SY
LB/1000 SY
LB/1000 SY
(X-X-X)
LB/1000 SY
NURSERY CROPS: ANYTIME ~ NATIVE: 10/15 TO 5/15
PER MANUFACTURERS' INSTRUCTIONS
PER MANUFACTURERS' INSTRUCTIONS
PER MANUFACTURERS' INSTRUCTIONS
PER MANUFACTURERS' INSTRUCTIONS
ROLLED EROSION CONTROL PRODUCT
AS INDICATED BY SOIL TESTS
AS INDICATED BY SOIL TESTS
AS INDICATED BY SOIL TESTS
8.0
SEE TABLE A
FORMULA N
SEEDING SEASON DATES:
RATE OF ANCHOR MATERIAL APPL:
ANCHORING METHOD:
ANCHOR MATERIAL:
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL RATE
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:(PERMANENT, BASIN)
LB/1000 SY
LB/1000 SY
LB/1000 SY
LB/1000 SY
(X-X-X)
LB/1000 SY
NURSERY CROPS: ANYTIME ~ NATIVE: 10/15 TO 5/15
PER MANUFACTURERS' INSTRUCTIONS
PER MANUFACTURERS' INSTRUCTIONS
PER MANUFACTURERS' INSTRUCTIONS
PER MANUFACTURERS' INSTRUCTIONS
ROLLED EROSION CONTROL PRODUCT
AS INDICATED BY SOIL TESTS
AS INDICATED BY SOIL TESTS
AS INDICATED BY SOIL TESTS
9.0
SEE TABLE A
FORMULA R
(LB/ACRE)
LB/1000 SQ YD
SEEDING RATE
WEED SEED
MAX. %
GERMINATIONPURITY
MINIMUM %
FORMULA AND SPECIES
TABLE A
WEIGHT
% BY
FORMULA B RESIDENTIAL MIX:
VARIETY EXCEEDING 50% OF THE TOTAL BLUEGRASS COMPONENT.
COMBINATION OF IMPROVED CERTIFIED VARIETIES WITH NO ONE
KENTUCKY BLUEGRASS MIXTURE (POA PRATENSIS). A
OR SSP COMMUTATE) (IMPROVED AND CERTIFIED)
CREEPING RED FESCUE OR CHEWINGS FESCUE (FESTUCA RUBRA
VARIETY EXCEEDING 50% OF THE TOTAL RYEGRASS COMPONENT.
COMBINATION OF IMPROVED CERTIFIED VARIETIES WITH NO ONE
PERENNIAL RYEGRASS MIXTURE (LOLIUM PERENNE). A
0.15
0.10
0.10
21.0 (105)
12.5 (62.5)
8.5 (42.5)
42.0 (210) TOTAL
2.5
2.5
0.75
0.25
2.5
1.25
0.625
0.625
1.25
6.25
2.5
SHOWY TICK-TREFOIL (DESMODIUM CANADENSE)
PARTRIDGE PEA (CHAMAECRISTA FASCICULATA)
COMMON MILKWEED (ASCLEPIAS SYRIACA)
WHITE AVENS (GEUM CANADENSE)
OX-EYE SUNFLOWER (HELIOPSIS HELIANTHOIDES)
BLACK-EYED SUSAN (RUDBECKIA HIRTA)
ROUNDSEED PANICGRASS (PANICUM SPHAEROCARPUM)
INDIANGRASS
SWITCHGRASS (PANICUM VIRGATUM)
CANADA WILDRYE (ELYMUS CANADENSIS)
LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM)
PURPLE TOP (TRIDENS FLAVUS)
PERMANENT SPECIES
CEREAL RYE (SECALE CEREALE) (FALL)
OATS (AVENA SATIVA) (SPRING)
NURSERY CROPS
0.20
0.20
0.20
0.20
0.20
0.20
0.10
0.10
0.2 (1.0)
0.2 (1.0)
0.06 (0.3)
0.02 (0.1)
0.2 (1.0)
0.32 (1.6)
0.1 (0.5)
0.05 (0.25)
0.05 (0.25)
0.1 (0.5)
0.5 (2.5)
0.2 (1.0)
6 (30)
6 (30)
8 (40.0) TOTALFORMULA N CONSERVATION MIX: *
8.33
3.33
6.11
3.33
3.33
2.22
2.22
1.11
3.33
66.67
66.67
REDTOP PANICGRASS (PANICUM RIGIDULUM)
SOFT RUSH (JUNCUS EFFUSUS)
DEERTONGUE (PANICUM CLANDESTINUM)
SOFTSTEM BULRUSH (SCHOENOPLECTUS TABERNAEMONTANI)
WOOLGRASS (SCIRPUS CYPERINUS)
LURID SEDGE (CAREX LURIDA)
PRAIRIE CORDGRASS (SPARTINA PETINATA)
RICE CUTGRASS (LEERSIA ORYZOIDES)
VIRGINIA WILDRYE (ELYMUS VIRGINICUS)
PERMANENT SPECIES
CEREAL RYE (SECALE CEREALE) (FALL)
OATS (AVENA SATIVA) (SPRING)
NURSERY CROPS
0.2
0.1
0.1
0.75 (3.75)
0.3 (1.5)
0.55 (2.75)
0.3 (1.5)
0.3 (1.5)
0.2 (1.0)
0.2 (1.0)
0.1 (0.5)
0.3 (1.50)
6 (30)
6 (30)
9 (45) TOTAL*FORMULA R SEASONALLY FLOODED CONSERVATION MIX:
FORMULA T TEMPORARY GRASS MIX:
CEREAL RYE (SECALE CEREALE) (FALL)
OATS (AVENA SATIVA) (SPRING)
0.1
0.1
6 (30)
6 (30)
6 (30) TOTAL
IF A SPECIES IS UNAVAILABLE IN THIS MIX, SUBSTITUTE BY INCREASING THE PERCENTAGE OF OTHER ITEMS IN THE MIX.*
SEED FORMULA SPECIFICATIONS
APPLICATION RATE FOR SLOPES LESS THAN 3:1
STRAW 3 TONS 140 LB 1240 LB
WEEDS, NOT CHOPPED OR FINELY BROKEN
EITHER WHEAT OR OAT STRAW, FREE OF
HAY 3 TONS 140 LB 1240 LB
OTHER NATIVE FORAGE GRASSES
TIMOTHY, MIXED CLOVER AND TIMOTHY OR
WOOD CHIPS 4-6 TONS 185-275 LB 1650-2500 LB
GRASSES AND LEGUMES
MAY PREVENT GERMINATION OF
HYDROMULCH 1 TON 47 LB 415 LB SEE NOTES
SLOPES 3:1 AND GREATER
MULCH BLANKET
EROSION CONTROL
MANUFACTURERS' INSTRUCTIONS
APPLY BLANKET AND ANCHOR PER
SC150 (2:1) OR APPROVED EQUALS
NORTH AMERICAN GREEN S150 (3:1) AND
MULCH APPLICATION RATES
3. THE APPLICATION RATE FOR ANY HYDROMULCH SHOULD BE 2,000 LB/ACRE AT A MINIMUM.
2. WOOD FIBER HYDROMULCH MAY BE APPLIED ON STEEPER SLOPES PROVIDED A TACKIFIER IS USED.
1. SHREDDED PAPER HYDROMULCH SHOULD NOT BE USED ON SLOPES STEEPER THAN 5%.
NOTES:
MULCH TYPE PER ACRE PER 1000 SF PER 1000 SY NOTES
TABLE B
T
R
N
B
FORMULA
TEMPORARY SEEDING
DRAINAGE CHANNELS, NON-STEEP WET AREAS
SLOPES STEEPER THAN 3:1
NON-STEEP, HIGHLY MAINTAINED SURFACES, LAWN
APPLICATION
SCHEDULE OF SEEDING AND SOIL SUPPLEMENTS
Scale: AS NOTED Date: Project No.:
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction or
Orwigsburg Borough, Schuylkill County, Pennsylvania
MAINTENANCE DREDGING PROJECT
FISHER'S DAM
0325-609037.218/19/2025
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
KMB KMB KRR
P E
N
N S Y L V
A N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
OF 7
CONTROL PLAN DETAILS
EROSION AND SEDIMENT POLLUTION
NOT TO SCALE
EROSION CONTROL BLANKET INSTALLATION
SHALL BE RESTORED OR REPLACED WITHIN 4 CALENDAR DAYS.
COVERAGE THROUGHOUT THE BLANKETED AREA. DAMAGED OR DISPLACED BLANKETS
UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM UNIFORM 70%
BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT 6.
RECOMMENDATIONS.
THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE MANUFACTURER’S 5.
MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET.
THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR STAPLE TO
BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL 4.
SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.3.
PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE.2.
PLAN DRAWINGS PRIOR TO INSTALLING THE BLANKET.
SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE 1.
NOTE:
GOOD SOIL CONTACT.
STRETCHED; IT MUST MAINTAIN
THE BLANKET SHOULD NOT BE
STYLE). STAPLE SECURELY.
DOWNSLOPE BLANKET (SHINGLE
THE UPSLOPE BLANKET OVERLYING THE
OVERLAP BLANKET ENDS 6" (MIN.) WITH
SLOPE BEING BLANKETED.
FOR STEEPNESS AND LENGTH OF
RECOMMENDED STAPLING PATTERN
REFER TO MANUFACTURER'S
BLANKET.
PRIOR TO INSTALLATION OF
LIME, FERTILIZER, & SEED)
(INCLUDING APPLICATION OF
PREPARE SEED BED
AND COMPACT SOIL.
TRENCH, STAPLE, BACKFILL
ROLL IN 6" x 6" ANCHOR
INSTALL BEGINNING OF
OF WATER FLOW
ROLL BLANKETS IN DIRECTION
STARTING AT TOP OF SLOPE,
AND STAPLED.
OVERLAPPED 4" (MIN.)
BLANKET EDGES
NOT TO SCALE
EROSION CONTROL BLANKET STAPLE PATTERNS
SLOPES FLATTER THAN 3:1
ANCHOR PATTERN FOR
(INCLUDING 3:1)
BETWEEN 3:1 AND 2:1
ANCHOR PATTERN FOR SLOPES
(INCLUDING 2:1)
BETWEEN 2:1 AND 1:1
ANCHOR PATTERN FOR SLOPES
3'-0"
3'-0"
" 4
"3'-0"
1'-6"1'-6"
(TYP)
ANCHORS
(TYP)
ANCHORS
(TYP)
ANCHORS
PLACE 1 ANCHOR/SY
PLACE 1.5 ANCHOR/SY
PLACE 2 ANCHOR/SY
NOT TO SCALE
FILTER BAG INLET PROTECTION - TYPE C INLET
DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY CAUSE TRAFFIC HAZARDS. 6.
NOTES.
AFTER THE INSPECTION. DISPOSE ACCUMULATED SEDIMENT AS WELL AS ALL USED BAGS ACCORDING TO THE PLAN BE MAINTAINED ON SITE FOR REPLACEMENT OF BAGS. ALL NEEDED REPAIRS SHALL BE INITIATED IMMEDIATELY CAUSE FLOODING OR BYPASSING OF THE INLET. DAMAGED OR CLOGGED BAGS SHALL BE REPLACED. A SUPPLY SHALL EMPTIED AND RINSED OR REPLACED WHEN HALF FULL OR WHEN FLOW CAPACITY HAS BEEN REDUCED SO AS TO INLET FILTER BAGS SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH RUNOFF EVENT. BAGS SHALL BE 5.
OF TRAPPING ALL PARTICLES NOT PASSING A NO. 40 SIEVE.
STRENGTH OF 200 PSI, AND A MINIMUM TRAPEZOIDAL TEAR STRENGTH OF 50 LBS. FILTER BAGS SHALL BE CAPABLE AT A MINIMUM, THE FABRIC SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 120 LBS., A MINIMUM BURST 4.
UNTIL PERMANENT STABILIZATION IS COMPLETED OR REMAIN PERMANENTLY.
ROADWAY SHALL BE MAINTAINED UNTIL ROADWAY IS PAVED. EARTHEN BERM IN CHANNEL SHALL BE MAINTAINED ROLLED EARTHEN BERM IN ROADWAY SHALL BE MAINTAINED UNTIL ROADWAY IS STONED. ROAD SUBBASE BERM ON 3.
REQUIRED FOR ALL INSTALLATIONS.
INLET PROTECTION SHALL NOT BE REQUIRED FOR INLET TRIBUTARY TO SEDIMENT BASIN OR TRAP. BERMS SHALL BE 2.
MAXIMUM DRAINAGE AREA = 1/2 ACRE. 1.
NOTES:
TYPE C INSTALLATION DETAIL
RUBBER BLOCK
IN 4
32 IN x 2 IN x
(1/4 IN NYLON ROPE)
EXPANSION RESTRAINT
ISOMETRIC VIEW
WI
DTH LENGTH
2 F T
FROM INLET
BAG REMOVAL
1 IN REBAR FOR
INLET GRATE
SOCK, OR FILTER TURN
SANDBAG, FILTER LOG, COMPOST
Scale: AS NOTED Date: Project No.:
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction or
Orwigsburg Borough, Schuylkill County, Pennsylvania
MAINTENANCE DREDGING PROJECT
FISHER'S DAM
0325-609037.218/19/2025
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
KMB KMB KRR
P E
N
N S Y L V
A N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
OF 7
CONTROL PLAN DETAILS
EROSION AND SEDIMENT POLLUTION
NOT TO SCALE
COMPOST FILTER SOCK
SPREAD AS A SOIL SUPPLEMENT.
IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH
UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT 7.
POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. 6.
ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.
SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED 5.
AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT OF THE SOCK 4.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.3.
DOWNSLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER.
AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL (363-2134-008). STAKES MAY BE INSTALLED IMMEDIATELY
SOCK SHALL NOT EXCEED THAT IN THE EROSION AND SEDIMENT CONTROL REPORT AND/OR THE PADEP EROSION
AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY
COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED 2.
SHOWN IN TABLE BELOW.
SOCK FABRIC SHALL MEET STANDARDS AS SHOWN IN TABLE BELOW. COMPOST SHALL MEET THE STANDARDS AS 1.
NOTES:
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
TWO-PLY SYSTEMS
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
MATERIAL TYPE
CHARACTERISTICS
MATERIAL
DIAMETERS
SOCK
MESH OPENING
STRENGTH
TENSILE
(ASTM-G-155)
STRENGTH
ORIGINAL
STABILITY %
ULTRAVIOLET
LONGEVITY
FUNCTIONAL
MINIMUM
3 MIL HDPE
DEGRADABLE
PHOTO-
18"
12"
3/8"
1000 HR
23% AT
6 MONTHS
5 MIL HDPE
DEGRADABLE
PHOTO-
32"
24"
18"
12"
3/8"
26 PSI
1000 HR
23% AT
9 MONTHS
5 MIL HDPE
DEGRADABLE
BIO-
32"
24"
18"
12"
3/8"
26 PSI
6 MONTHS
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
DEGRADABLE
PHOTO-
32"
24"
18"
12"
3/8"
44 PSI
1000 HR
100% AT
1 YEAR
(HDMFPP)
POLYPROPYLENE
MULTI-FILAMENT
HEAVY DUTY
DEGRADABLE
PHOTO-
32"
24"
18"
12"
1/8"
202 PSI
1000 HR
100% AT
2 YEARS
INNER CONTAINMENT NETTING
OUTER FILTRATION MESH
HDPE BIAXIAL NET
CONTINUOUSLY WOUND
FUSION-WELDED JUNCTURES
3/4" X 3/4" MAX APERTURE SIZE
MECHANICALLY FUSED VIA NEEDLE PUNCH)
(WOVEN LAYER AND NON-WOVEN FLEECE
COMPOSITE POLYPROPYLENE FABRIC
3 /16" MAX APERTURE SIZE
ALTERNATIVE.
TABLE BELOW. THE STANDARDS CONTAINED IN THE PENNDOT PUBLICATION 408 ARE AN ACCEPTABLE
THE PHYSICAL PARAMETERS OF THE COMPOST SHOULD COMPLY WITH THE STANDARDS AS SHOWN IN THE
ACCEPTABLE AS THE ORGANIC COMPONENT OF THE MIX.
AND BARK CHIPS, GROUND CONSTRUCTION DEBRIS OR REPROCESSED WOOD PRODUCTS ARE NOT
COMPOST PRODUCT SHOULD NOT RESEMBLE THE RAW MATERIAL FROM WHICH IT WAS DERIVED. WOOD
ODORS AND SHOULD BE SEASONABLY FREE (<1% BY DRY WEIGHT) OF MAN-MADE FOREIGN MATTER. THE
COMPOST SHOULD BE AEROBICALLY COMPOSTED. THE COMPOST SHOULD POSSESS NO OBJECTIONABLE
AGRICULTURE, FOOD, STUMP GRINDINGS, AND YARD OR WOOD/BARK ORGANIC MATTER SOURCES. THE
COMPOST SHOULD BE A WELL DECOMPOSED, WEED-FREE ORGANIC MATTER DERIVED FROM
COMPOST STANDARDS
SOLUBLE SALT CONCENTRATION
PARTICLE SIZE
MOISTURE CONTENT
pH
ORGANIC PORTION
ORGANIC MATTER CONTENT
5.0 DS/M (MMHOS/CM) MAXIMUM
30% - 50% PASS THROUGH 3/8" SCREEN
30% - 60%
5.5 - 8.5
FIBROUS AND ELONGATED
25% - 100% (DRY WEIGHT BASIS)
SECTION VIEW
PLAN VIEW
AREA
UNDISTURBED
UNDISTURBED AREADISTURBED AREA
AREA
DISTURBED
M
IN
BLOWN / PLACED FILTER MEDIA COMPOST FILTER SOCK
2" x 2" WOODEN STAKES PLACED 10' OC
PLACED 10' OC (TYP)
2" x 2" WOODEN STAKES COMPOST FILTER SOCK
F L O
W F L O
W
CONTOURS
EXISTING
JOINING DETAIL
MIN
12"
STAKE
NOT TO SCALE
COMPOST SOCK WASHOUT
CONFIGURATION FOR ADDED HEIGHT.
INCH DIAMETER FILTER SOCK MAY BE STACKED ONTO DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL
COMPOST SOCKS MAY BE STACKED AND STAKED SO AS TO FORM A TRIANGULAR CROSS SECTION. 18-
PLASTIC LINERS SHOULD BE REPLACED WITH EACH CLEANING OF THE WASHOUT FACILITY.
ACCUMULATED MATERIALS SHOULD BE REMOVED WHEN THEY REACH 75% CAPACITY.
WASHOUTS IMMEDIATELY.
INSPECT WASHOUT FACILITIES DAILY. DEACTIVATE AND REPAIR OR REPLACE DAMAGE OR LEAKING
MATERIALS MUST BE PROPERLY DISPOSED OF WHEN THEY REACH THE CLEANOUT LEVEL.
CONCRETE WASHOUT BMPS, THAT THEY ARE WATERTIGHT, AND APPROPRIATELY SIZED. ACCUMULATED
TAKEN TO ENSURE THAT THE CONTAINERS ARE INTENDED BY THE MANUFACTURER FOR USE AS
PREFABRICATED WASHOUT CONTAINERS MAY BE USED AS A SUITABLE ALTERNATIVE. CARE SHOULD BE
NOTES:
PLAN VIEW
SPACED 5' OC (TYP)
2" x 2" x 36" WOOD STAKES
FILTER RING
ON UPSLOPE SIDE OF
SOCK 4' MIN OVERLAP
24" COMPOST FILTER
INTO FILTER RING
WASHOUT WATER
DIRECT CONCRETE
NOT TO SCALE
SEDIMENT STORAGE DEWATERING FACILITY
IMMEDIATELY SHUT DOWN AND NOT RESTARTED UNTIL THE PROBLEM HAS BEEN CORRECTED.
REASON THE DEWATERING FACILITY CEASES TO FUNCTION PROPERLY, IT SHALL BE
DEWATERING FACILITY SHALL BE CONTINUOUSLY MONITORED DURING OPERATION. IF FOR ANY 3.
SHALL BE CLEANED FROM THE INSIDE OF THE BARREL.
PRIOR TO INITIATING OPERATION OF DEWATERING FACILITY, ALL ACCUMULATED SEDIMENT 2.
DEWATERING FACILITY SHALL BE INSTALLED IMMEDIATELY UPON COMPLETION OF BASIN/TRAP.1.
NOTES:
ELEVATION
CLEAN-OUT
#57
AASHTO
BASIN BOTTOM
PUMP
PERMANENT RISER
TEMPORARY OR
2" MIN
BARREL AND SLATS.
WRAP FILTER FABRIC AROUND THE
HORIZONTAL AND VERTICAL SPACING.
AROUND OUTSIDE OF BARREL @ 6"
PLACE 2" x 2" VERTICAL WOOD SLATS
AND VERTICAL SPACING
PERFORATIONS @ 6" HORIZONTAL
30 TO 55 GALLON BARREL WITH 1"
Scale: AS NOTED Date: Project No.:
$USERCFG$ $USER$ $DATE$ $TIME$ $FILE$
Copyright 2025, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction or
Orwigsburg Borough, Schuylkill County, Pennsylvania
MAINTENANCE DREDGING PROJECT
FISHER'S DAM
0325-609037.218/19/2025
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
KMB KMB KRR
P E
N
N S Y L V
A N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE087842
KEVIN R. RICHARDS
OF 7
CONTROL PLAN DETAILS
EROSION AND SEDIMENT POLLUTION
NOT TO SCALE
PUMPED WATER FILTER BAG
NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND 7.
WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR ½ THE MAXIMUM SPECIFIED BY THE MANUFACTURER, 6.
AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER 5.
SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER 4.
MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING
MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES
AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT 3.
STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON
PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME ½ FULL OF SEDIMENT. SPARE BAGS SHALL BE
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE 2.
HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS.
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, 1.
NOTES:
PLAN VIEW
ELEVATION VIEW
AOS% RETAINED
UV RESISTANCE
MULLEN BURST
PUNCTURE
GRAB TENSILE
AVG WIDE WIDTH STRENGTH
PROPERTY
ASTM-D-4751
ASTM-D-4355
ASTM-D-3786
ASTM-D-4833
ASTM-D-4632
ASTM-D-4884
TEST METHOD
80 SIEVE
70%
350 PSI
110 LB
205 LB
60 LB/IN
MINIMUM STANDARD
FILTER BAG
FILTER BAG
WELL VEGETATED, GRASSY AREA
GRASSY AREA
WELL VEGETATED,
DISCHARGE HOSE
PUMP
INTAKE HOSE
CLAMPS
PUMP
DISCHARGE HOSE
HOSE
INTAKE
(RECOMMENDED)
HEAVY DUTY LIFTING STRAPS
CLAMPS
COMPOST FILTER SOCK
FILTER SOCK
12" COMPOST
FILTER SOCK
12" COMPOST
PLACED 10' OC (TYP)
2" x 2" WOODEN STAKES
NOT TO SCALE
STOCKPILE CONTROL DETAIL
SECTION VIEW
MATERIAL
STOCKPILE
UNDISTURBED AREA
MATERIAL
STOCKPILE
(SEE DETAIL)
EQUIVALENT SILT FENCE.
18" HEIGHT OR
COMPOST FILTERSOCK,
(SEE DETAIL)
EQUIVALENT SILT FENCE.
18" HEIGHT OR
COMPOST FILTERSOCK,
SEE DETAIL
ANCHORING POST
M A
X
F
E E
T
MIN
6'-0"
2 (MAX)
FILL THIS AREA
MATERIAL SHALL NOT
SECTION
SEE
NOT TO SCALE
ROCK CONSTRUCTION ENTRANCE
LOCATION ADJACENT TO AN EXISTING PAVED SURFACE TO ENSURE SEDIMENT IS NOT TRACKED OFF SITE.
FINAL LOCATION OF ROCK CONSTRUCTION ENTRANCE TO BE MODIFIED SLIGHTLY AS NEEDED TO THE OPTIMAL 4.
DITCH BEING CROSSED.
SPECIFIED BY MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED APPROPRIATELY FOR SIZE OF
MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED AND PROPER PIPE COVER AS 3.
CONSTRUCTION ENTRANCE.
RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK 2.
OF ENTRANCE.
REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK OVER FULL WIDTH 1.
NOTES:
PROFILE
PLAN VIEW
IS NOT ACCEPTABLE.
ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES
ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE
EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION
DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF
DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT
MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED
PROVIDE PROPER COVER OVER PIPE
* MOUNTABLE BERM USED TO
M
IN
M
IN
M
IN
50' MIN
3'
ROADWAY
EXISTING
ROADWAY
EXISTING
EXISTING GROUND
GEOTEXTILE
MIN 8" AASHTO #1
EARTH FILL
PIPE AS NECESSARY
(6" MIN) *
MOUNTABLE BERM
| 01_Cover_Sheet |
| 08_ES_Det01 |
| 09_ES_Det02 |
| 10_ES_Det04 |
| 11_ES_Det05 |
| 12_ES_Det06 |
| 13_ES_Det07 |
File details come from the government source that posted it. Updated .