1-Final Specifications - Cibolo Animal Services Facility.pdf
PDF 8 MB Posted
- Attached to
- City of Cibolo Animal Services Facility
- Solicitation number
- 2026-547-40
- Issued by
- Grimes County, Texas
About this file
Summary of Final Specifications - Cibolo Animal Services Facility
This document contains final specifications for the City of Cibolo's construction of a new Animal Services Facility in Texas. The project entails construction of a 9,490-square-foot facility with associated site improvements, requiring all necessary labor, materials, equipment, and services to deliver a complete and fully operational animal services center. The specifications establish the technical requirements, construction standards, and performance criteria that bidders and the contractor must meet throughout the project delivery and completion phases.
The specifications document provides detailed construction standards, material requirements, and workmanship criteria applicable to all trades and systems within the facility. This technical document serves as a binding reference for all parties involved in the project and establishes the baseline requirements against which contractor performance and project completion will be measured. Specific pricing, contract terms, delivery schedules, site visit information, and bid deadlines are not contained within the specifications document itself but would be referenced in the associated solicitation materials and contract award documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cibolo Animal Services Job No. 25030
00 01 01 Project Title Page
PROJECT MANUAL
FOR
CLIENT
CITY OF CIBOLO
ANIMAL SERVICES FACILITY
CIBOLO, TEXAS
9/14/26
100% PERMIT / BID SET
QAI PROJECT #25030
ARCHITECT
QUORUM ARCHITECTS, INC.
825 WEST VICKERY BOULEVARD, SUITE 100
FORT WORTH, TX 76104
CONTACT: KIM DOWDY-HICKMAN, EMAIL: KIMD@QARCH.COM; PH: 817-546-6325
00 01 07 Seals Page
END OF SECTION 00 01 07
Architectural Design:
David G. Duman, AIA
825 W. Vickery Blvd Suite 100 Fort Worth, TX 76104
817.546.6315
Mechanical Design:
Leslie R. Brown, P.E.
Baird, Hampton, & Brown 6300 Ridglea Place, Suite 700
Fort Worth, TX 76116 817.253.0069
Electrical Design:
Paul Morris, P.E.
Baird, Hampton, & Brown 6300 Ridglea Place, Suite 700
Fort Worth, TX 76116 682.348.0762
Structural Design:
Ankith Patel, P.E.
IMEG | formerly JQ Engineering 15810 Park Ten Place, Suite 225
Houston, TX 77084 713.458.7684
FO T EE XTA AT SS
ANKITH PATEL
158023
09/14/2026
9/14/2026
09/14/2026
This page intentionally left blank
00 01 03 Project Directory
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Identification of project team members and their contact information.
1.02 OWNER:
A. Name: City of Cibolo
1. Address Line 1: 240 Haeckerville Road.
2. City: Cibolo.
3. State: Texas.
4. Zip Code: 78108.
B. Primary Contact: All correspondence from the Contractor to the Architect will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting.
1. Title: Principal/Director of Animal Care Design.
2. Name: Kim Dowdy-Hickman.
3. Email: kimd@qarch.com.
1.03 CONSULTANTS:
A. Architect: Design Professional of Record. All correspondence from the Contractor regarding construction documents authored by Architect's consultants will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting.
1. Company Name: Quorum Architects Inc.
a. Address Line 1: 825 W. Vickery Blvd, Suite 100.
b. City: Fort Worth.
c. State: Texas.
d. Zip Code: 76104.
2. Primary Contact:
a. Title: Principal/Director of Animal Care Design.
b. Name: Kim Dowdy-Hickman.
c. Email: kimd@qarch.com.
B. Civil Engineering Consultant:
1. Company Name: Kimley-Horn & Associates.
a. Address Line 1: 10101 Reunion Pl Ste 400.
b. City: San Antonio.
c. State: Texas.
d. Zip Code: 78216.
C. Landscape Architecture Consultant:
1. Company Name: Kimley-Horn & Associates.
a. Address Line 1: 10101 Reunion Pl Ste 400.
b. City: San Antonio.
c. State: Texas.
d. Zip Code: 78216.
D. Structural Engineering Consultant:
1. Company Name: IMEG Engineers.
a. Address Line 1: 15810 PARK TEN PLACE, SUITE 225.
b. City: HOUSTON.
c. State: Texas.
d. Zip Code: 77084.
E. Mechanical Engineering Consultant
1. Company Name: Baird Hampton Brown Engineers.
a. Address Line 1: 6300 Ridglea Place, Suite 700.
b. City: Fort Worth.
00 01 03 Project Directory
c. State: Texas.
d. Zip Code: 76116.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION 00 01 03
00 01 10 Table of Contents
PROCUREMENT AND CONTRACTING REQUIREMENTS
2.01 DIVISION 00 - FRONT END DOCUMENTS/COMPETITIVE SEALED PROPOSAL DOCUMENTS
BY OWNER
2.02 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - Project Title Page 00 01 03 - Project Directory 00 01 07 - Seals Page 00 31 00 - Available Project Information 00 43 23 - Alternates Form
SPECIFICATIONS
3.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 10 00 - Summary B. 01 23 00 - Alternates C. 01 25 00 - Substitution Procedures D. 01 30 00 - Administrative Requirements E. 01 32 16 - Construction Progress Schedule F. 01 40 00 - Quality Requirements G. 01 42 16 - Definitions H. 01 42 19 - Reference Standards I. 01 50 00 - Temporary Facilities and Controls J. 01 52 13 - Field Offices and Sheds K. 01 57 13 - Temporary Erosion and Sediment Control L. 01 57 19 - Temporary Environmental Controls M. 01 60 00 - Product Requirements N. 01 70 00 - Execution and Closeout Requirements O. 01 71 23 - Field Engineering P. 01 78 00 - Closeout Submittals Q. 01 79 00 - Demonstration and Training R. 01 91 13 - General Commissioning Requirements
3.02 DIVISION 02 -- EXISTING CONDITIONS
3.03 DIVISION 03 -- CONCRETE
A. 03 05 16 - Underslab Vapor Barrier - Stego Industries B. 03 10 00 - Concrete Forming and Accessories C. 03 30 00 - Cast-in-Place Concrete D. 03 35 00 - Concrete Floor Finishing
3.04 DIVISION 04 -- MASONRY
A. 04 05 11 - Masonry Mortaring and Grouting B. 04 20 00 - Unit Masonry C. 04 26 13 - Masonry Veneer D. 04 29 00 - Engineered Unit Masonry
E. 04 72 00 - Cast Stone Masonry
3.05 DIVISION 05 -- METALS
A. 05 12 00 - Structural Steel Framing B. 05 12 13 - Architecturally-Exposed Structural Steel Framing C. 05 31 00 - Steel Deck D. 05 40 00 - Cold-Formed Metal Framing E. 05 51 00 - Metal Stairs
3.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 10 00 - Rough Carpentry B. 06 20 00 - Finish Carpentry C. 06 64 00 - Plastic Paneling D. 06 83 16 - Fiberglass Reinforced Paneling
3.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 05 43 - Cladding Support Systems B. 07 17 16 - Bentonite Composite Sheet Waterproofing C. 07 19 00 - Water Repellents D. 07 21 00 - Thermal Insulation E. 07 21 19 - Foamed-In-Place Insulation F. 07 24 00 - Exterior Insulation and Finish Systems G. 07 41 13 - Metal Roof Panels H. 07 42 13 - Metal Wall Panels I. 07 52 00 - Modified Bituminous Membrane Roofing J. 07 62 00 - Sheet Metal Flashing and Trim K. 07 71 23 - Manufactured Gutters and Downspouts L. 07 72 00 - Roof Accessories M. 07 84 00 - Firestopping N. 07 92 00 - Joint Sealants
3.08 DIVISION 08 -- OPENINGS
A. 08 11 13 - Hollow Metal Doors and Frames B. 08 16 13 - Fiberglass Doors C. 08 36 13 - Sectional Doors D. 08 43 13 - Aluminum-Framed Storefronts E. 08 62 23 - Tubular Skylights F. 08 71 00 - Door Hardware G. 08 80 00 - Glazing
3.09 DIVISION 09 -- FINISHES
A. 09 21 16 - Gypsum Board Assemblies B. 09 30 00 - Tiling C. 09 51 00 - Acoustical Ceilings D. 09 65 00 - Resilient Flooring E. 09 67 00 - Fluid-Applied Flooring
F. 09 68 13 - Tile Carpeting G. 09 72 00 - Wall Coverings H. 09 83 00 - Acoustic Finishes I. 09 90 00 - Painting and Coating - Commercial Facility Guide Specification - Sherwin-Williams J. 09 91 13 - Exterior Painting
3.10 DIVISION 10 -- SPECIALTIES
A. 10 11 00 - Visual Display Units B. 10 14 16 - Plaques C. 10 14 19 - Dimensional Letter Signage D. 10 14 23 - Panel Signage E. 10 26 00 - Wall and Door Protection F. 10 28 00 - Toilet, Bath, and Laundry Accessories G. 10 73 16.23 - Fabric Canopies
3.11 DIVISION 11 -- EQUIPMENT
3.12 DIVISION 12 -- FURNISHINGS
A. 12 24 00 - Window Shades B. 12 36 00 - Countertops
3.13 DIVISION 13 -- SPECIAL CONSTRUCTION
3.14 DIVISION 14 -- CONVEYING EQUIPMENT
3.15 DIVISION 21 -- FIRE SUPPRESSION
21 00 10 - Basic Fire Protection Requirements 21 05 12 - Fire Protection and Electrical Coordination 21 11 00 - FIre Protection Piping 21 13 00 - Automatic Sprinkler System
3.16 DIVISION 22 -- PLUMBING
22 00 10 - Basic Plumbing Requirements 22 05 12 - Plumbing and Electrical Coordination 22 05 19 - Plumbing Meters and Gauges 22 05 29 - Plumbing Supports and Anchors 22 05 53 - Plumbing Identification 22 05 93 - Plumbing Testing, Adjusting and Balancing 22 07 16 - Plumbing Piping Insulation 22 10 00 - Plumbing Piping 22 10 01 - Plumbing Specialties 22 11 19 - Piping Specialties 22 30 00 - Plumbing Equipment 22 40 01- Plumbing Fixtures
3.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 10 - Basic Mechanical Requirements 23 05 12 - Mechanical and Electrical Coordination 23 05 53 - Mechanical Identification
23 05 93 - Mechanical Testing, Adjusting and Balancing 23 07 13 - HVAC Duct Insulation 23 23 00 - Refrigerant Piping 23 31 13 - Metal Ductwork 23 31 13.19 - Ductwork Accessories 23 34 00- Fans 23 37 13 - Air Outlets and Inlets 23 75 33 - Outside Air Handling Units 23 81 27 - Ductless Split Air Conditioning Units 23 81 50 - Variable Refrigerant Flow System 23 89 65 - Motor Controllers
3.18 DIVISION 24 -- RESERVED (NOT USED)
3.19 DIVISION 26 -- ELECTRICAL
26 05 10 - General Requirements for Electrical Work 26 05 19 - Wires and Cables 26 05 20 - Wire Connection and Devices 26 05 20 - Grounding 26 05 27 - Sealing of Penetrations 26 05 29 - Supporting Devices 26 05 32 - Pull and Junction Boxes 26 05 33 - Conduits 26 05 34 - Outlet Boxes 26 05 35 - Wireway 26 05 36 - Cable Tray 26 09 24 - Occupancy sensors 26 09 26 - Miscellaneous Items 26 09 27 - Lighting Control System 26 24 16 - Panelboards 26 24 17 - Distribution Panelboards 26 25 51 - Generator Docking Station 26 27 16 - Cabinets 26 27 26 - Wiring Devices 26 28 16 - Overcurrent Protective Devices 26 28 17 - Disconnect Switches 26 32 13 - Diesel Generator System 26 36 23 - ONAN-Automatic Transfer Switches 26 43 13 - Surge Protection Devices (SPDs) 26 51 13 - Lighting
3.20 DIVISION 27 -- COMMUNICATIONS
27 05 28 - Empty Conduit Systems
3.21 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY
28 31 05 - Intelligent Reporting Fire Detection System - Silent Knight
3.22 DIVISION 31 -- EARTHWORK
A. 31 10 00 - Site Clearing B. 31 23 16 - Excavation C. 31 23 16.13 - Trenching D. 31 23 23 - Fill
3.23 DIVISION 32 -- EXTERIOR IMPROVEMENTS
32 18 13 - Synthetic Grass Surfacing 32 31 13 - Chain Link Fences and Gates 32 31 19 - Decorative Metal Fences and Gates 32 33 00 - Site Furnishings
3.24 DIVISION 33 -- UTILITIES
3.25 DIVISION 34 -- TRANSPORTATION
3.26 DIVISION 40 -- PROCESS INTEGRATION
3.27 DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT
00 31 00 Available Project Information
PART 1 GENERAL
1.01 EXISTING CONDITIONS
A. Certain information relating to existing surface and subsurface conditions and structures is available to bidders but will not be part of Contract Documents, as follows:
B. Geotechnical Report: Entitled RABA KISTNER Project No. AMA25-026-00, dated 01/2/2026.
1. This report identifies properties of below grade conditions and offers recommendations for the design of foundations, prepared primarily for the use of Architect.
2. This report, by its nature, cannot reveal all conditions that exist on the site. Should subsurface conditions be found to vary substantially from this report, changes in the design and construction of foundations will be made, with resulting credits or expenditures to the Contract Price accruing to Owner.
PART 2 PRODUCTS - NOT USED
END OF SECTION 00 31 00
01 10 00 Summary
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Cibolo Animal Services B. Architect's Name: Quorum Architects, Inc..
C. The Project consists of the construction of
Construction of a new 9,490-square-foot Animal Services Facility and associated site improvements. The project includes all labor, materials, equipment, and services necessary to deliver a complete and operational facility.
The building shall provide animal intake, housing, adoption, veterinary support, administration, storage, maintenance, and staff support functions. Animal housing shall be designed to accommodate 66 cats and 30 dogs with appropriate separation, sanitation, ventilation, and operational support areas.
Site improvements shall include construction of covered outdoor dog kennel areas, secure dog exercise and play yards, and perimeter fencing with controlled access gates. Exterior animal areas shall include appropriate drainage, lighting, and durable surface materials suitable for animal care operations.
Parking and site circulation improvements shall include 20 public parking spaces, with sufficient area reserved for the future expansion of 10 additional public parking spaces, and 21 dedicated staff parking spaces. Additional site work shall include driveways, sidewalks, accessible routes, landscaping, stormwater management, utility connections, site lighting, and signage.
The completed project shall provide a modern, durable, code-compliant Animal Services Facility designed to support efficient operations, animal welfare, public access, and future growth while meeting all applicable local, state, and federal requirements.
1.02 OWNER OCCUPANCY
A. Owner intends to occupy the Project upon Substantial Completion.
B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.
C. Schedule the Work to accommodate Owner occupancy.
1.03 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
B. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
END OF SECTION 01 10 00
01 23 00 Alternates
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description of Alternates.
B. Procedures for pricing Alternates.
C. Documentation of changes to Contract Price and Contract Time.
1.02 RELATED REQUIREMENTS
A. Document 00 21 13 - Instructions to Bidders: Instructions for preparation of pricing for
Alternates.
1.03 ACCEPTANCE OF ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option.
Accepted Alternates will be identified in the Owner-Contractor Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.
1.04 SCHEDULE OF ALTERNATES
A. Deduct Alternate - No. 1 - Remove the South Drive, Dumpster Enclosure and Gate:
1. Remove the South Drive Approach from East Schaefer Road, including concrete driveway extended to south vehicular gate, including roadway prep. Remove Dumpster Enclosure near East Schaefer Road. Remove South vehicular chainlink gate, including motorized controller, replace with chainlink fence to match adjacent panels.
B. Deduct Alternate No. 2A - Replace ceramic floor tile with LVT in the Vetibule, Lobby, and Public Corridors.
1. Refer to Finish Schedule for LVT materials. Rubber Base to remain.
C. Deduct Alternate No. 2B - Replace Ceramic Tile with LVT in the Back of House and Office Areas
1. Refer to Finish Schedule for LVT materials. Rubber Base to remain
D. Deduct Alternate No. 3 - Replace Ceramic Wall Tile in Work Rooms and Medical Room with FRP Wall Panels.
1. Refer to Finish Schedule for FRP materials. Epoxy cove base to remain.
E. Deduct Alternate No.4 - Remove glazing/frame at Reception Counter F. Deduct Alternate No. 5 - Provide Composition Shingle Roof, equal to Elk Prestique and cement fiber fascia and soffit.– in lieu of standing seam metal roof and metal fascia and soffit.
PART 2 PRODUCTS - NOT USED
END OF SECTION 01 23 00
01 25 00 Substitution Procedures
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 RELATED REQUIREMENTS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
4. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
5. Waives claims for additional costs or time extension that may subsequently become apparent.
6. Agrees to reimburse Owner and Architect for review or redesign services associated with re-approval by authorities.
B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
C. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. Forms indicated and included in the Project Manual are adequate for this purpose, and must be used.
2. Each substitution request shall include the name of the materrial or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cutsheets, performance and test data and any other materials, equipment or other Work that incoporation of the substitute would require shall be included.
3. The burdon of proof of the merit of the proposed substitute is upon the proposer.
D. Limit each request to a single proposed substitution item.
E. The materials, products and equipment described in the Bidding Documents established a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Submittal Time Restrictions:
1. Instructions to Bidders specifies time restrictions and the documents required for submitting substitution requests during the bidding period.
B. Submittal Form (before award of contract):
1. Submit substitution requests by completing the form attached to this section. See this form for additional information and instructions. Use only this form; other forms of submission are unacceptable.
3.03 SUBSTITUTION PROCEDURES DURING CONSTRUCTION
A. Submittal Form (after award of contract):
1. Submit substitution requests by completing the form attached to this section. See this section for additional information and instructions. Use only this form; other forms of submission are unacceptable.
B. Architect will consider requests for substitutions only within 15 days after date of Agreement.
3.04 RESOLUTION
A. Architect may request additional information and documentation prior to rendering a decision.
Provide this data in an expeditious manner.
B. Architect will notify Contractor in writing of decision to accept or reject request and shall be final.
3.05 CLOSEOUT ACTIVITIES
A. Include completed Substitution Request Forms as part of the Project record.
3.06 ATTACHMENTS
A. Substitution Form is attached following spec section..
END OF SECTION
SUBSTITUTION REQUEST TO FOLLOW
PROJECT:
TO: QUORUM ARCHITECTS, INC. REQUEST NO. ______________
825 WEST VICKERY BLVD., SUITE 100 DATE:
FORT WORTH, TX 76104
DAVID DUMAN - DAVIDD@QARCH.COM 817.546.6315
CONTRACTOR:____________________________
SPECIFIED ITEM:
SECTION: _________ PAGE: _________ PARAGRAPH: _________ DESCRIPTION:
DRAWING NUMBER(S): _________________ DETAIL NUMBER(S):__________________________
THE UNDERSIGNED REQUEST CONSIDERATION OF THE FOLLOWING:
PROPOSED SUBSTITUTION
REASON FOR NOT GIVING PRIORITY TO SPECIFIED ITEMS:
SAVINGS OR CREDIT FOR ACCEPTING SUBSTITUTE: $____________________________________
ATTACHED DATA INCLUDES DESCRIPTION, SPECIFICATIONS, DRAWINGS, PHOTOGRAPHS,
PERFORMANCE, AND TEST DATA ADEQUATE FOR EVALUATION OF REQUEST; APPLICABLE
PORTIONS OF DATA ARE CLEARLY IDENTIFIED.
ATTACHED DATA ALSO INCLUDES A DESCRIPTION OF CHANGES TO CONTRACT DOCUMENTS
THAT PROPOSED SUBSTITUTION WILL REQUIRE FOR ITS PROPER INSTALLATION.
THE UNDERSIGNED CERTIFIES THAT THE FOLLOWING PARAGRAPHS, UNLESS MODIFIED BY
ATTACHMENTS, ARE CORRECT:
1. PROPOSED SUBSTITUTION HAS BEEN FULLY CHECKED AND COORDINATED WITH
CONTRACT DOCUMENTS.
2. PROPOSED SUBSTITUTION DOES NOT AFFECT DIMENSIONS SHOWN ON DRAWINGS.
3. PROPOSED SUBSTITUTION DOES NOT REQUIRE REVISIONS TO MECHANICAL OR
ELECTRICAL WORK.
4. THE UNDERSIGNED WILL PAY FOR CHANGES TO BUILDING DESIGN, INCLUDING
ARCHITECTURAL AND ENGINEERING DESIGN, DETAILING, AND CONSTRUCTION COSTS
CAUSED BY REQUESTED SUBSTITUTION.
5. PROPOSED SUBSTITUTION WILL HAVE NO ADVERSE AFFECT ON OTHER TRADES,
CONSTRUCTION SCHEDULE, OR SPECIFIED WARRANTY REQUIREMENTS.
6. MAINTENANCE AND SERVICE PARTS WILL BE LOCALLY AVAILABLE FOR PROPOSED
SUBSTITUTION.
THE UNDERSIGNED FURTHER STATES THAT THE FUNCTION, APPEARANCE, AND QUALITY OF
PROPOSED SUBSTITUTION ARE EQUIVALENT OR SUPERIOR TO SPECIFIED ITEM.
ATTACHMENTS: THE ATTACHED DATA IS FURNISHED HEREWITH FOR EVALUATION OF THE
PROPOSED SUBSTITUTION.
[] CATALOG [] DRAWINGS [] SAMPLES [] REPORTS [] TESTS []
OTHER
SUBMITTED BY:
(FIRM)
(AUTHORIZED LEGAL SIGNATURE)
(ADDRESS)
(TELEPHONE)
FOR USE BY:
[] APPROVED [] APPROVED AS NOTED [] NOT APPROVED [] RECEIVED TOO LATE
DATE: BY:
(AUTHORIZED LEGAL SIGNATURE)
REMARKS:
END OF SUBSTITUTION REQUEST FORM
01 30 00 Administrative Requirements
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Administrative Provivisions C. Watertight-Weathertight D. Correlation and Intent of the Contract Documents E. Time F. Substantial Completion G. Supplementary Contractor Rules and Guidelines H. Safety I. Security J. Cleanliness K. Environmental L. Project Managment System M. Preconstruction meeting.
N. Site mobilization meeting.
O. Progress meetings.
P. Construction progress schedule.
Q. Progress photographs.
R. Submittals for review and information.
S. Number of copies of submittals.
T. Requests for Interpretation (RFI) procedures.
U. Submittal procedures.
1.02 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 01 70 00 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Architect:
1. Requests for Information (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
1.03 ADMINISTRATIVE PROVISIONS
A. References to “Contractor” throughout the Documents are intended to include the Construction
Manager, General Contractor and the applicable subcontractor.
B. Occupancy Prior to Completion: The Owner’s general intent is to accept the entire project;
however, the Owner shall have the right to occupy a portion of the project considered substantially completed even though the Contractor may not have completed the entire project.
Such occupancy by the Owner will not release the Contractor or the bonding agency from any warranties or guarantees and final completion of work in accordance with the Contract Documents.
C. Contractor Use of Premises: The Contractor shall limit the storage of materials and equipment to the areas approved by the Owner. At no time during the work under the Contract shall the Contractor place or cause to be placed any material or equipment, etc. at any location that would impede or impair traffic or security. The Contractor shall fully cooperate with the Owner and Architect in providing traffic control during course of construction.
The Contractor shall send proper notices, make all necessary arrangements, and perform all services required in the care and maintenance of all public utilities. The Contractor shall, during the construction period and until final acceptance of the work by the Owner, assume all responsibility concerning the same for which the Owner may be liable.
D. Disposition of Utilities: Observe rules and regulations governing the respective utilities in executing all work under this heading. Adequately protect active utilities from damage and remove or relocate only as indicated or specified. Remove, plug or cap inactive and abandoned utilities encountered during the work. If there are no specific requirements, plug or cap such utility lines at least 3 feet outside of new building walls or as required by local regulations.
E. Reference Standards: For products specified by association or trade standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. The Date of the Standard is in effect as of the date of the Contract Documents, except when a specific date is specified.
F. Contractor shall submit weekly reports identifying work completed the previous week and work expected to be completed the next three weeks. AT the end of each month, Contractor shall issue a monthly summary documenting progress, changes, RFIs, ASIs, Change Orders, etc issued that month and any outstanding issues or concerns as well as a contingency log.
1.04 SIGNED DRAWINGS AND SPECIFICATIONS
A. Not Used
1.05 WATERTIGHT-WEATHERTIGHT
A. Anything in the Contract Documents not withstanding, the Contractor accepts the responsibility of constructing a watertight and weathertight project.
1.06 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS
A. Before performing any portion of the Work, the Contractor shall investigate the physical aspects of the Project Site and verify all dimensions and elevations, existing improvements, surface and subsurface soil conditions, drainage of both surface and subsurface, soil plasticity, and general suitability of conditions at the Project Site.
B. In the event of conflicts, explanatory notes in the Drawings take precedence over graphic indications, large scale drawings and details take precedence over smaller scale drawings and figured, or calculated dimensions take precedence over scaled dimensions. The Contractor shall verify all dimensions by measurements of conditions and of Work in place.
C. The inter-relation of the Project Manual, the Drawings and the schedules are as follows: The Project Manual determines the quality, nature and setting of the materials; the Drawings establish the quantities, dimensions, and details; and the schedules give the location.
D. Should the drawings disagree in themselves, or with the Project Manual or with one another, or if proprietary information disagrees with performance requirements in either the Drawings or the Project Manual, the better quality or greater quantity of the Work or materials shall be estimated upon, and unless otherwise ordered by the Architect in writing, shall be performed or furnished.
Should discrepancies or doubt occur, do not proceed with the Work without clarification from the Architect. Contractor shall request clarification in sufficient time to avoid delays and increases in the contract sum.
1.07 TIME
A. Contractor shall not request additional time to complete the project because of delay occurring on Saturdays, Sundays, or holidays.
B. The Time estimated by the Contractor for completion of the entire work ready for use shall include the number of calendar days, for anticipated delays due to normal weather conditions.
C. No time extension for delays due to weather will be allowed until and unless such delays exceed the time included for normal weather delays on a contractual basis. In case of claims for extension of time because of abnormal inclement weather, such extension of time shall be granted only when the contractor proves in a manner acceptable to the Architect, that such abnormal inclement weather prevented the execution of major items of work on normal working days for that month and affected the critical path for completion. A weather table reflecting the meteorological data from the local area is provided herein and will be used to determine contract time extensions due to abnormally inclement weather.
D. To this contract, “abnormal inclement weather” will be interpreted as the number of days more than the normal on which rainfall exceeds 0.01 inch or snow/ice pellets exceed 1.0 inch.
Extension of time to complete the project will be based on actual working days. No extension of time will be allowed for extreme temperatures unless the installation of a material is specified to be installed within tolerance. Extensions will then only be granted if conditions identified in 1.08 are followed. All requests for extensions must be submitted monthly for the previous month's work and accompany the scheduled Pay Application. Any days not requested in this manner will not be considered.
WEATHER TABLE
MONTH AVERAGE DAYS
RAIN (1)
INCHES RAINFALL
(2)
SNOW/ICE PELLETS
(3)
JANUARY 7 1.80 1
FEBRUARY 7 2.36 *
MARCH 7 2.54 *
APRIL 8 4.30 0
MAY 8 4.47 0
JUNE 6 3.05 0
JULY 5 1.84 0
AUGUST 5 2.26 0
SEPTEMBER 7 3.15 0
OCTOBER 5 2.68 0
NOVEMBER 6 2.03 *
DECEMBER 6 1.82 *
ANNUAL TOTALS: 77 32.30 1
(1) Mean number of days rainfall, 0..01" or more
(2) Average normal precipitation, in"
(3) Mean number of days 1.0" or more
* Less than one-half"
1.08 SUBSTANTIAL COMPLETION
A. The Work will not be considered suitable for Substantial Completion review until all project systems included in the work are complete, tested, and operational as designed and scheduled, all designated or required governmental inspections and certifications including certificate of occupancy, have been made and posted, designated instruction of Owner's personnel in the operation of systems has been completed, and all final finishes within the Contract documents are in place. In general, the only remaining work shall be minor in nature, so that the Owner could occupy the building on that date and the completion of the Work by the Contractor would not interfere or hamper the Owner's normal business operations. As a further condition of Substantial completion acceptance, the Contractor shall certify that all remaining Work, the same being solely of a "punchlist" nature, will be completed within thirty (30) consecutive calendar days following the Date of Substantial completion.
B. Notwithstanding the foregoing, the Owner may refuse to make payment on any Certificate of Substantial completion or any Certificate of Payment (including, without limitation, the final Certificate of Payment) for any default of the Contractor. The Owner shall not be deemed in default by reason of withholding payment while any of such defaults remain uncured. The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such certificate. Upon such acceptance and consent of surety, the Owner shall make such payment as to bring the total payment for the work completed to 95% of the contract amount. Such payment shall be adjusted for work that is incomplete or not in accordance with the requirements of the contract documents. No reduction in retainage will be considered until all remaining items, no matter the size or complexity, are complete and Final Completion is achieved.
1.09 SUPPLEMENTARY CONTRACTOR RULES AND GUIDELINES
A. The Owner requires that all Contractors' personnel while on the Owner's premises comply with all Federal, State and Local ordinances and Standards. To assist in complying with these and other applicable requirements, the following Contractor Rules and Guidelines must be followed in addition to the requirements in Division 1. Violations of the following rules are considered major infractions and violation of these rules will subject Contractor's employees to immediate ejection from owner's property:
1. Possession of firearms on Owner's property.
2. Possession of or under the influence of alcoholic beverages or illegal drugs on Owner's property.
3. Unwarranted and/or objectionable comments or gestures to the Owner's or other personnel.
4. Physical assault on another individual.
5. Welding or using acetylene torches without proper safety measures.
6. Gross misconduct (includes language, harassment, etc.)
7. Willful destruction of the Owner's property.
8. Conviction of criminal action.
9. Theft of property.
10. Possession of pornographic or other objectionable materials.
11. Smoking in enclosed buildings, whether construction is complete.
1.10 SAFETY
A. Contractor shall enforce the most recent requirements of Occupational Safety and Health Act, at the Contractor's expense.
B. Contractor shall erect barricades, safety signs and warning lights around excavations, temporary structures, and construction equipment, where such obstructions present a hazard to pedestrians and automobile traffic.
C. When the use or storage of explosive or hazardous materials or equipment is necessary for the execution of the Work, the Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel and shall coordinate all such activity with the Owner.
D. Contractor must assure that all moves are made in such a manner that floor loads for buildings are not exceeded.
E. Contractor shall, at the Owner's request, provide safety records, including worker's Compensation insurance experience modification rate and the OSHA total recordable injury rate.
F. All equipment must meet applicable standards and be in good repair (i.e., ladders, power equipment, hand tools, etc.). All guards and protective devices must be in place and operating.
G. Cable trays, ductwork and/or piping systems shall not be used for climbing, walking, or sitting nor support of other facilities or equipment.
H. Violation of safe practices that are not corrected after ample notification will be grounds for termination of the Contract.
I. Contractor shall maintain a temporary construction fence around entire area of construction to prevent unauthorized access for the purpose of safety and security throughout the duration of construction. Contractor shall provide knox locks on fence as required by Fire Department.
1.11 SECURITY
A. Contractor will arrange work in such a manner as to cause minimal interruption to traffic and pedestrian flow.
B. If it is necessary to close streets, driveways, or walkways, a closure plan must be submitted in advance including times and re-routing plans for approval.
C. Contractor will provide such barricades and other closures as designated by the Owner. If left in place during darkness, provide, operate, and maintain lights for the duration of the closure.
D. Where job site requirements necessitate removal or breaching of security barriers such as construction or security fences, prior approval is required by Owner. The Contractor will then comply with the directions to maintain controlled access to secure areas. In no case will openings remain overnight or unattended in a breached condition.
1.12 CLEANLINES
A. The Contractor shall maintain the cleanliness of all areas affected by construction on this project.
B. Contractor shall clean up and clear obstructions in the work area. Cleanup will include the safe storage of flammable liquids such as paint and paint thinners.
1.13 ENVIRONMENTAL
A. All Work must be performed in accordance with all Federal, State and Local regulations pertaining to the protection of the environment.
B. Contractor and Subcontractors shall take all precautions necessary to prevent damage to the environment during the Work.
C. Contractor shall be held strictly responsible, both legally and financially, for all damage to the environment caused by the Contractor or his Subcontractors during the execution of this Contract.
D. Disposal of all chemical substances by the Contractor, including oils and chemical containers, will be per local, State, and Federal requirements.
E. In no case shall a Contractor dispose of any chemical substance or hazardous waste by pouring it on the ground, down a drain, in a sewer or storm sewer, or in a trash dumpster.
F. Contractor shall recycle all construction waste on this project to divert as much waste as possible from the Landfill.
G. All spills of chemical substances of hazardous or non-hazardous wastes shall be reported immediately by the contractor to the Owner.
H. Contractor shall recycle as much construction waste as reasonable on this project to divert as much waste as possible from the Landfill.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PROJECT MANGAGMENT SOFTWARE
A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format, as appropriate to the document, and transmitted via an Internet-based submittal service that receives, logs and stores documents, provides electronic stamping and signatures, and notifies addressees via email.
1. Besides submittals for review, information, and closeout, this procedure applies to
Requests for Information (RFIs), progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, Contractor's correction punchlist, and any other document any participant wishes to make part of the project record.
2. Contractor and Architect are required to use this service.
3. It is Contractor's responsibility to submit documents in allowable format.
4. Users of the service need an email address, internet access, and PDF review software that includes ability to mark up and apply electronic stamps (such as Adobe Acrobat, www.adobe.com, or Bluebeam PDF Revu, www.bluebeam.com), unless such software capability is provided by the service provider.
5. Paper document transmittals will not be reviewed; emailed electronic documents will not be reviewed.
6. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
B. Architect's Project Managment Selected Service:
1. Newforma Project Center (NPC) with Newforma Info Exhange (NIX): www.newforma.com.
C. Training: One, one-hour, web-based training session will be arranged for all participants, with representatives of Architect and Contractor participating; further training is the responsibility of the user of the service.
3.02 PRECONSTRUCTION MEETING
A. Owner will schedule a meeting after Notice of Award.
B. Attendance Required:
1. Owner.
2. Architect.
3. Contractor.
C. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract and Architect.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
D. Record minutes and distribute copies within two days after meeting to participants, with copies to Architect, Owner, participants, and those affected by decisions made.
3.03 SITE MOBILIZATION MEETING
A. Architect will schedule meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
C. Agenda:
1. Use of premises by Owner and Contractor.
2. Owner's requirements.
3. Construction facilities and controls provided by Owner.
4. Temporary utilities provided by Owner.
5. Survey and building layout.
6. Security and housekeeping procedures.
7. Schedules.
8. Application for payment procedures.
9. Procedures for testing.
10. Procedures for maintaining record documents.
11. Requirements for start-up of equipment.
12. Inspection and acceptance of equipment put into service during construction period.
D. Contractor shall record minutes and distribute copies within two days after meeting to participants, with copies to Architect, Owner, participants, and those affected by decisions made.
3.04 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals or as agreed upon by all parties.
B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of RFIs log and status of responses.
7. Review of off-site fabrication and delivery schedules.
8. Maintenance of progress schedule.
9. Corrective measures to regain projected schedules.
10. Planned progress during succeeding work period.
11. Coordination of projected progress.
12. Maintenance of quality and work standards.
13. Effect of proposed changes on progress schedule and coordination.
14. Other business relating to work.
E. Record minutes and distribute copies within two days after meeting to participants, with copies to Architect, Owner, participants, and those affected by decisions made.
3.05 CONSTRUCTION PROGRESS SCHEDULE
A. Within 15 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
D. Identify each item by specification number E. Show accumulated percentage of completion of each item, and total percentage of work completed, as of the first day of each month.
F. Coordinate content with schedule of values.
G. Submit updated schedule with each Application for Payment.
3.06 PROGRESS PHOTOGRAPHS
A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.
B. Photography Type: Digital; electronic files.
C. Provide photographs of site and construction throughout progress of work produced by a commercial photographer, acceptable to Architect.
D. In addition to periodic, recurring views, take photographs of each of the following events:
E. Views:
1. Provide aerial photographs from four cardinal views at each specified time, until structure is enclosed.
2. Provide non-aerial photographs from four cardinal views at each specified time, until date of Substantial Completion.
3. Consult with Architect for instructions on views required.
4. Provide factual presentation.
5. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.
F. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software.
1. Delivery Medium: Via email.
2. File Naming: Include project identification, date and time of view, and view identification.
3. PDF File: Assemble all photos into printable pages in PDF format, with 2 to 3 photos per page, each photo labeled with file name; one PDF file per submittal.
4. Hard Copy: Printed hardcopy (grayscale) of PDF file and point of view sketch.
3.07 REQUESTS FOR INFORMATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
B. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.
C. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of
Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare using software provided by the Electronic Document Submittal Service.
D. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
2. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response, with an explanatory notation.
3. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.
E. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Official Project name and number, and any additional required identifiers established in
Contract Documents.
2. Discrete and consecutive RFI number, and descriptive subject/title.
3. Issue date, and requested reply date.
4. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
5. Annotations: Field dimensions and/or description of conditions which have engendered the request.
6. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example;
routing, clearances, and/or specific locations of work shown diagrammatically in Contract Documents. If applicable, state the likely impact of the suggested resolution on Contract Time or the Contract Sum.
F. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
G. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
1. Indicate current status of every RFI. Update log promptly and on a regular basis.
2. Note dates of when each request is made, and when a response is received.
3. Highlight items requiring priority or expedited response.
H. Review Time: Architect will respond and return RFIs to Contractor within ten calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.
I. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Notify Architect within seven calendar days if an additional or corrected response is required by submitting an amended version of the original RFI, identified as specified above.
3.08 SUBMITTAL SCHEDULE
A. Submit to Architect for review a schedule for submittals in tabular format.
1. Submit at the same time as the preliminary schedule specified in Section - 01 32 16 - Construction Progress Schedule.
2. Coordinate with Contractor's construction schedule and schedule of values.
3. Format schedule to allow tracking of status of submittals throughout duration of construction.
4. Arrange information to include scheduled date for initial submittal, specification number and title, submittal category (for review or for information), and description of item of work covered.
5. Account for time required for preparation, review, manufacturing, fabrication and delivery when establishing submittal delivery and review deadline dates.
a. For assemblies, equipment, systems comprised of multiple components and/or requiring detailed coordination with other work, allow for additional time to make corrections or revisions to initial submittals, and time for their review.
3.09 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 78 00 - Closeout Submittals.
3.10 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; one of which will be retained by Architect.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.11 SUBMITTAL PROCEDURES
A. General Requirements:
1. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
2. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number; and specification section number and article/paragraph, as appropriate on each copy.
3. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned.
4. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 14 days excluding delivery time to and from the Contractor.
b. For sequential reviews involving Architect's consultants, Owner, or another affected party, allow an additional 14 days.
5. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
6. Provide space for Contractor and Architect review stamps.
7. When revised for resubmission, identify all changes made since previous submission.
8. Incomplete submittals will…