1-EQ TANK SLIDE GATE REPLACEMENT DRAWINGS.pdf

PDF 3 MB Posted

Attached to
Equalization Basin Gates Upgrade
Solicitation number
US.255820
Issued by
Northampton County, Pennsylvania

About this file

This document is a set of bid plans and drawings for the Equalization Basin Gates Upgrade project prepared by CP Engineers, LLC for the Sunbury Municipal Authority (SMA) in Sunbury, Northumberland County, Pennsylvania. The project, identified as Contract No. CP-410, involves the removal and replacement of slide gates at the Sunbury Wastewater Treatment Plant (WWTP). The base bid work includes replacement of five existing aluminum slide gates at Aeration Tank T-14, consisting of two 30" x 30" upward-opening gates and three 72" x 36" downward-opening weir gates. Additionally, unit price work is available for the optional removal and replacement of up to seven additional slide gates of the same types at Aeration Tanks T-11, T-12, and T-13, along with minor concrete and metal fabrication work as necessary. The work must be substantially complete by April 30, 2027. A non-mandatory pre-bid meeting is scheduled for 11:00 a.m. on Thursday, October 15, 2026, at the Sunbury WWTP, with attendance strongly encouraged. Contractors are responsible for field verification of existing conditions, including gate dimensions, opening sizes, anchor stud locations, stem centerlines, operator locations, and mounting conditions prior to fabrication.

The replacement slide gate assemblies must include frames, slides, stems, operators, anchors, hardware, seals, and all accessories required for complete operating installations. Gates shall be manufactured to fit existing bolt patterns and mounting conditions without modification to existing concrete structures unless approved by the Engineer. All installation work must comply with manufacturer specifications and contract specifications, including field adjustments to ensure smooth operation and specified leakage performance, as well as field testing in accordance with contract requirements. The project is funded by the SMA's existing cash reserves and is subject to Pennsylvania public bidding and prevailing wage requirements.

View the file

Other files

File Type Posted
4-Addendum No. 1.pdf PDF
2-EQ TANK SLIDE GATE REPLACEMENT SPECIFICATIONS.pdf PDF
5-BidTab Gate Replacement.pdf PDF
3-Addendum No. 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

FOR

PROFESSIONAL ENGINEER

COMMONWEALTH OF PENNSYLVANIA

FOR

C P

E ng in ee rs

M ic ha el

.S ha m al la

C lie nt s\

Su nb ur y

M un ic ip al A ut ho ri ty

\C P

-4

E

Q T an k

Sl id e G at e

R ep l\D R

A W

IN

G

S\ C

U R

R E

N T

\G E

N E

R A

L \G

-0

_C O

V E

R S

H E

E T

.d w g

T hu

Se p

:1

9p m

G-001 COVER SHEET

SUNBURY MUNICIPAL AUTHORITY

BID PLANS

WWTP EQ TANK SLIDE GATE REPLACEMENT

SUNBURY

NORTHUMBERLAND COUNTY, PENNSYLVANIA

CONTRACT NO. CP-410

SEPTEMBER 2026

BID PLANS

WWTP EQ TANK SLIDE GATE REPLACEMENT

SUNBURY

NORTHUMBERLAND CO, PENNSYLVANIA

BRIAN L BOOK

LIC. NO. PA043016

CP-410

KEY MAP

SCALE 1:12,000

1" = 100'

CP ENGINEERS

2013 SANDY DRIVE

SUITE 101

STATE COLLEGE, PA 16803

(814) 753-4249

CPENGINEERS.COM

PROJECT LOCATION

SMA BOARD MEMBERS & MANAGEMENT

NORMAN KOCH, CHAIRMAN

THOMAS McBRYAN, VICE CHAIRMAN

CORY FASOLD, SECRETARY/TREASURER

DAVID PERSING, ASST. SECRETARY/TREASURER

THOMAS KRIEGER, BOARD MEMBER

MICHAEL THOMAS, BOARD MEMBER

JEROME ALEX, BOARD MEMBER

DERRICK BACKER, SMA GENERAL MANAGER

MATT BILLMAN, SMA WWTP MANAGER

30"X30" SLIDE GATE

GATE No. G-1.6

30"X30" SLIDE GATE

GATE No. G-1.5

30"X30" SLIDE GATE

GATE No. G-1.4

30"X30" SLIDE GATE

GATE No. G-1.3

30"X30" SLIDE GATE

GATE No. G-1.1

30"X30" SLIDE GATE

GATE No. G-1.2

72"X36" SLIDE GATE

GATE No. G-2.3

BAFFLE

BAFFLE

BAFFLEBAFFLEBAFFLE

BAFFLE

72"X36" SLIDE GATE

GATE No. G-2.2

72"X36" SLIDE GATE

GATE No. G-2.1

72"X36" SLIDE GATE

GATE No. G-2.4

72"X36" SLIDE GATE

GATE No. G-2.5

72"X36" SLIDE GATE

GATE No. G-2.6N

LETTER REVISIONS ARE NOT TO BE USED FOR CONSTRUCTIONC

P

E ng in ha el

.S ha m

C lie nt s\

Su nb ur y

M un ic ip al A ut ho ri ty

\C P

-4

E

Q T an k

Sl id e G at e

R ep l\D R

A W

IN

G

S\ C

U R

R E

N T

\C

IV

IL

\C

-1

_S

IT

E P

L A

N .d w

Se p

:1 9p m

PROFESSIONAL ENGINEER

C.W.O. PENNSYLVANIA

BRIAN L. BOOK

LIC. NO. PE043016 C-101

WWTP EQ TANK SLIDE

GATE REPLACEMENT

SUNBURY MUNICIPAL AUTHORITY

462 S. 4TH STREET, SUNBURY

NORTHUMBERLAND CO, PENNSYLVANIA

SITE PLAN

CP ENGINEERS

2013 SANDY DRIVE

SUITE 101

STATE COLLEGE, PA 16803

(814) 753-4249

CPENGINEERS.COM

0 1010 20 30

SCALE: 1" = 10' - 0"

1"=10' (1:10)

PLANT SCHEMATIC VIEW1

NTS

EXISTING WALKWAY TYP.A

PLAN NOTES:

1. BASE BID WORK SHALL INCLUDE REMOVAL AND REPLACEMENT OF THE EXISTING TYPE G-1 AND

TYPE G-2 SLIDE GATES LOCATED AT AERATION TANK T-14.

2. SLIDE GATES LOCATED AT AERATION TANKS T-11, T-12, AND T-13 ARE SHOWN FOR REFERENCE

AND UNIT PRICE WORK.

3. UNIT PRICE WORK SHALL BE PERFORMED ONLY AS AUTHORIZED BY THE OWNER.

4. EXISTING FEATURES AND EQUIPMENT SHOWN ARE APPROXIMATE AND ARE BASED ON AVAILABLE

RECORD INFORMATION AND LIMITED FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AFFECTING THE WORK.

5. COORDINATE SLIDE GATE REMOVAL AND REPLACEMENT WITH EXISTING TANK COMPONENTS,

PIPING, BAFFLES, WALKWAYS, AND OTHER FACILITIES TO REMAIN.

6. PROTECT EXISTING FACILITIES FROM DAMAGE DURING THE WORK.

7. REFER TO DRAWING C-501 AND SECTION 40 05 59 FOR SLIDE GATE REQUIREMENTS.

NTS

PLANT SCHEMATIC VIEW2

PLANT ENTRANCE

PROPOSED LAYDOWN AREA

AERATION BASINS

WHERE WORK IS TO

BE PERFORMED

A C-101

N

TYP1

TYP

PROPOSED LAYDOWN AREA

CONCRETE

SLIDE GATE

HAND WHEEL OPERATOR

ANCHOR TYP.

BAFFLE

SLIDE GATE

CONCRETE

HAND WHEEL OPERATOR

ANCHOR TYP.

6"

PLAN

ELEVATION

SIDE ELEVATION

BAFFLE GUSSET

BAFFLE GUSSET

3'

2'

2' -6

8'

2"

LETTER REVISIONS ARE NOT TO BE USED FOR CONSTRUCTIONC

P

E ng in ha el

.S ha m

C lie nt s\

Su nb ur y

M un ic ip al A ut ho ri ty

\C P

-4

E

Q T an k

Sl id e G at e

R ep l\D R

A W

IN

G

S\ C

U R

R E

N T

\C

IV

IL

\C

-5

D E

T A

IL

S.

dw

Se p

:1 9p m

PROFESSIONAL ENGINEER

C.W.O. PENNSYLVANIA

BRIAN L. BOOK

LIC. NO. PE043016 C-501

WWTP EQ TANK SLIDE

GATE REPLACEMENT

SUNBURY MUNICIPAL AUTHORITY

462 S. 4TH STREET, SUNBURY

NORTHUMBERLAND CO, PENNSYLVANIA

DETAILS

CP ENGINEERS

2013 SANDY DRIVE

SUITE 101

STATE COLLEGE, PA 16803

(814) 753-4249

CPENGINEERS.COM

NTS2 TYPE G-2 SLIDE GATES1 TYPE G-1 SLIDE GATES

NTS

NTS3 SLIDE GATE SCHEDULE

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING GATE DIMENSIONS, OPENING SIZE, ANCHOR STUD LOCATIONS, STEM CENTERLINE, OPERATOR LOCATION, AND MOUNTING CONDITIONS PRIOR TO FABRICATION

OF REPLACEMENT GATES.

2. NOTIFY THE ENGINEER OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THE CONTRACT

DOCUMENTS PRIOR TO FABRICATION.

3. REMOVE EXISTING SLIDE GATES, OPERATORS, AND ACCESSORIES INDICATED FOR REPLACEMENT. PROTECT

ADJACENT CONCRETE SURFACES AND EXISTING FACILITIES DURING DEMOLITION.

4. REPAIR DAMAGED CONCRETE AND GROUT RESULTING FROM GATE REMOVAL AS DIRECTED BY THE

ENGINEER.

5. FURNISH AND INSTALL COMPLETE REPLACEMENT SLIDE GATE ASSEMBLIES, INCLUDING FRAME, SLIDE, STEM, OPERATOR, ANCHORS (IF REQUIRED), HARDWARE, SEALS, AND ACCESSORIES REQUIRED FOR A COMPLETE

OPERATING INSTALLATION.

6. REPLACEMENT GATES SHALL BE MANUFACTURED TO FIT THE EXISTING BOLT PATTERN, OPENINGS AND MOUNTING CONDITIONS WITHOUT MODIFICATION OF THE EXISTING CONCRETE STRUCTURE UNLESS

APPROVED BY THE ENGINEER.

7. INSTALL GATES PLUMB, LEVEL, AND SQUARE IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN

INSTALLATION INSTRUCTIONS.

8. FIELD ADJUST GATES AFTER INSTALLATION TO PROVIDE SMOOTH OPERATION AND SPECIFIED LEAKAGE

PERFORMANCE.

9. PERFORM FIELD TESTING IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS.

1. BAFFLE TO BE REPLACED IN-KIND, IN CONJUNCTION WITH REPLACEMENT OF GATE G-2.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING GATE DIMENSIONS, OPENING SIZE, ANCHOR

STUD LOCATIONS, STEM CENTERLINE, OPERATOR LOCATION, AND MOUNTING CONDITIONS

PRIOR TO FABRICATION OF REPLACEMENT GATES.

3. NOTIFY THE ENGINEER OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THE

CONTRACT DOCUMENTS PRIOR TO FABRICATION.

4. REMOVE EXISTING SLIDE GATES, OPERATORS, AND ACCESSORIES INDICATED FOR

REPLACEMENT. PROTECT ADJACENT CONCRETE SURFACES AND EXISTING FACILITIES DURING

DEMOLITION.

5. REPAIR DAMAGED CONCRETE AND GROUT RESULTING FROM GATE REMOVAL AS DIRECTED BY

THE ENGINEER.

6. FURNISH AND INSTALL COMPLETE REPLACEMENT SLIDE GATE ASSEMBLIES, INCLUDING

FRAME, SLIDE, STEM, OPERATOR, ANCHORS (IF REQUIRED), HARDWARE, SEALS, AND

ACCESSORIES REQUIRED FOR A COMPLETE OPERATING INSTALLATION.

7. REPLACEMENT GATES SHALL BE MANUFACTURED TO FIT THE EXISTING BOLT PATTERN,

OPENINGS, AND MOUNTING CONDITIONS WITHOUT MODIFICATION OF THE EXISTING

CONCRETE STRUCTURE UNLESS APPROVED BY THE ENGINEER.

8. INSTALL GATES PLUMB, LEVEL, AND SQUARE IN ACCORDANCE WITH THE MANUFACTURER'S

WRITTEN INSTALLATION INSTRUCTIONS.

9. FIELD ADJUST GATES AFTER INSTALLATION TO PROVIDE SMOOTH OPERATION AND SPECIFIED

LEAKAGE PERFORMANCE.

10. PERFORM FIELD TESTING IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS.

GENERAL NOTES

NTS4 BAFFLE DETAIL

NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING BAFFLE DIMENSIONS, OPENING SIZE,

ANCHOR STUD LOCATIONS AND MOUNTING CONDITIONS PRIOR TO FABRICATION OF

REPLACEMENT BAFFLE.

2. MATERIAL TO BE REPLACED IN-KIND.

GATE No. CLEAR OPENING TYPE MOUNTING OPENING SEATED HEAD UNSEATED HEAD OPERATOR G-1.1 30"x30" 4-SIDED WALL MOUNT UPWARD 5' 5' NON-GEARED LIFT MOUNTED YOKE

G-1.2 30"x30" 4-SIDED WALL MOUNT UPWARD 5' 5' NON-GEARED LIFT MOUNTED YOKE

G-1.3 30"x30" 4-SIDED WALL MOUNT UPWARD 5' 5' NON-GEARED LIFT MOUNTED YOKE

G-1.4 30"x30" 4-SIDED WALL MOUNT UPWARD 5' 5' NON-GEARED LIFT MOUNTED YOKE

G-1.5 30"x30" 4-SIDED WALL MOUNT UPWARD 5' 5' NON-GEARED LIFT MOUNTED YOKE

G-1.6 30"x30" 4-SIDED WALL MOUNT UPWARD 5' 5' NON-GEARED LIFT MOUNTED YOKE

G-2.1 72"x36" 3-SIDED WEIR WALL MOUNT DOWNWARD 2.5' 2.5' NON-GEARED LIFT MOUNTED TO PEDESTAL

G-2.2 72"x36" 3-SIDED WEIR WALL MOUNT DOWNWARD 2.5' 2.5' NON-GEARED LIFT MOUNTED TO PEDESTAL

G-2.3 72"x36" 3-SIDED WEIR WALL MOUNT DOWNWARD 2.5' 2.5' NON-GEARED LIFT MOUNTED TO PEDESTAL

G-2.4 72"x36" 3-SIDED WEIR WALL MOUNT DOWNWARD 2.5' 2.5' NON-GEARED LIFT MOUNTED TO PEDESTAL

G-2.5 72"x36" 3-SIDED WEIR WALL MOUNT DOWNWARD 2.5' 2.5' NON-GEARED LIFT MOUNTED TO PEDESTAL

G-2.6 72"x36" 3-SIDED WEIR WALL MOUNT DOWNWARD 2.5' 2.5' NON-GEARED LIFT MOUNTED TO PEDESTAL

1. FIELD VERIFY EXISTING ANCHOR STUD PATTERN PRIOR TO FABRICATION.

2. ALL GATE CONFIGURATIONS SHALL CONFORM TO THE GATE SCHEDULE AND SECTION 40 05

59.24 - ALUMINUM SLIDE GATES.

Sheets and Views
G-001 COVER SHEET
C-101 SITE PLAN
C-501 DETAILS