About this file

Summary of Draft RFP for Consulting Services - Terminal Cruise Parking Structure(s), Port Everglades

This is a Draft Request for Proposals (RFP) issued by Broward County, Florida, through its Purchasing Division on behalf of Port Everglades' Seaport Engineering & Construction Division. The solicitation seeks architectural and/or engineering professional design consulting services for the development of a new multi-level cruise terminal parking garage facility designed to provide adequate parking capacity, improve vehicular circulation, and enhance passenger access to cruise terminals. The scope of services encompasses six primary phases: (1) a feasibility study evaluating current and future parking demands based on Port Everglades Master Vision Plan 2024 data; (2) programming and conceptual design development; (3) preparation of construction documents with 30%, 60%, 90%, and 100% design packages; (4) permitting, bidding, and procurement support; (5) construction engineering inspection and construction administration services; and (6) post-construction warranty inspections. The project must achieve LEED Certification and incorporate sustainability and energy efficiency as key design objectives while coordinating with Port Operations, Security, and Seaport Engineering & Construction to minimize disruption to cruise terminal activities. The preliminary project schedule extends from the Notice to Proceed through warranty inspection approximately 1,525 calendar days later, with critical milestones including feasibility study completion at 90 days, programming and conceptual design at 180 days, and construction document phases at 240, 360, and 450 days.

This solicitation is governed by the Consultants' Competitive Negotiations Act (CCNA) under Florida Statutes Section 287.055, meaning price will not be considered in the evaluation and ranking of qualified firms. The County has established a 25 percent County Business Enterprise (CBE) goal for this solicitation. Vendor responses must be submitted electronically through BPRO by the closing date and time to be deemed valid, with responsiveness and responsibility determinations made by the Director of Purchasing or Evaluation Committee. Vendors must possess either a Florida Professional Engineer license or Registered Architect license at the time of submittal; joint ventures must satisfy the same licensing requirements with at least one partner holding the required credentials. Required submittals include Criminal History Screening Practices Certification, Domestic Partnership Act Certification (if applicable before September 30, 2026), Lobbyist Registration Requirement Certification, financial statements demonstrating capability for the past two years, insurance certificates or letters indicating ability to obtain required coverage, Litigation History certification, and vendor questionnaire with standard certifications including drug-free workplace, non-collusion, public entities crimes, and scrutinized companies list certifications. The project is funded entirely by County funds. The evaluation committee will rank vendors based on specified evaluation criteria totaling 100 points, with potential shortlisting of the most qualified firms prior to final evaluation and presentations. Tiebreaker criteria include location certification, domestic partnership act certification, drug-free workplace certification, and volume of previous payments attestation. Any written protest of solicitation specifications or proposed awards must be received by the Director of Purchasing within five business days of posting, with filing fees ranging from $500 to $5,000 depending on estimated contract value.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

INSTRUCTIONS TO VENDORS

REQUEST FOR PROPOSAL, REQUEST FOR QUALIFICATION, OR REQUEST FOR LETTER OF INTEREST

Consulting Services for Terminal Cruise Parking Structure(s) – Port Everglades

Vendor is instructed to read and follow the instructions carefully, as any misinterpretation or failure to comply with instructions may lead to Vendor’s submittal being rejected or may affect Vendor’s evaluation.

Vendor MUST submit its solicitation response electronically and MUST confirm its submittal in the electronic bidding system for the response to be deemed valid by the County. Refer to Submittal Instructions.

A. Responsiveness Criteria:

A responsive Vendor means a vendor who submits a response to a solicitation that the Director of Purchasing determines meets all solicitation requirements.

Information and applicable forms, are requested to be submitted by the solicitation’s closing date and time, as instructed. Failure to timely submit may result in the Vendor being deemed nonresponsive per instructions.

The County reserves the right to waive minor technicalities or irregularities as is in the best interest of the County in accordance with Section 21.37(b) of the Broward County Procurement Code.

1. Bond Requirement

Not applicable to this solicitation.

2. Criminal History Screening Practices Requirement Broward County’s Criminal History Screening Practices Ordinance applies to this solicitation. Vendor must follow the instructions and submit the completed Criminal History Screening Practices Certification with its submittal. If not provided with the submittal, the Vendor must submit within three business days after the County's written request. Failure to submit within the stated timeframe may determine the Vendor to be nonresponsive to the Criminal History Screening Practices requirement.

3. Domestic Partnership Act Requirement Broward County’s Domestic Partnership Act applies to this solicitation (as a requirement and a tiebreaker criteria) only if this solicitation is awarded before 09/30/26. Vendor must follow the instructions and submit the completed Domestic Partnership Act Certification with its submittal. If not provided with the submittal, the Vendor must submit within three business days after the County's written request. Failure to submit within the stated timeframe may determine the Vendor to be nonresponsive to the Domestic Partnership Act requirement. However, to be eligible for the Domestic Partnership tiebreaker, if applicable to this solicitation, the Vendor must currently offer the Domestic Partnership benefit and the completed form must be returned at the time of solicitation submittal. Vendors who fail to comply with this submittal deadline will not be eligible for the Domestic Partnership tiebreaker.

4. Funding Requirements (ex. Grant, State, or Federal) https://library.municode.com/fl/broward_county/codes/administrative_code?nodeId=CH21OPPOPRCOFIADSEDE_PTVPRCOSO_21.37ACREWATEIR https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH26PE_ARTVIIICRHICHEMAPVE_S26-125CRHISCPR https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH16_1-2HURI_ARTVIIIDOPAAC_S16_1-2_-157COCOPREQBEDOPA

5. Living Wage Requirements

6. Lobbyist Registration Requirement

Broward County’s Lobbyist Registration Act applies to this solicitation. Vendor must follow the instructions and submit the completed Lobbyist Registration Requirement Certification with its submittal. If not provided with the submittal, the Vendor must submit within three business days after the County's written request. Failure to submit within the stated timeframe may determine the Vendor to be nonresponsive to the Lobbyist Registration requirement.

7. Pricing Requirements and Submittal Not applicable to this solicitation, as this solicitation is covered by the Consultants’ Competitive Negotiations Act (CCNA), Section 287.055, Florida Statutes. In a CCNA solicitation, price will not be considered in the evaluation and ranking of the qualified firm.

8. Additional Responsiveness Requirement

B. Responsibility Criteria:

A responsible vendor means a vendor who is determined to have the capability in all respects to fully perform fully the requirements of a solicitation, as well as the integrity and reliability that will ensure good faith performance.

The Director of Purchasing or the Evaluation Committee (as applicable) may request additional information from any Vendor on matters that may affect a Vendor’s responsibility. A Vendor may submit additional information regarding its responsibility, but such information will not be considered if it contradicts or materially alters the information provided in the original solicitation response.

A Vendor’s failure to provide information requested in the manner required may result in a recommendation by the Director of Purchasing to, and/or a determination by an Evaluation Committee that the Vendor is nonresponsible.

1. Affiliated Entities of the Principal(s)

a. Vendor is required to disclose the names of “affiliated entities” of the Vendor’s principal(s) over the last five (5) years (from the solicitation’s closing deadline) that have acted as a Prime Vendor with the County. Vendor must follow the instructions and submit the completed Affiliated Entities of the Principal(s) Certification with its submittal. If not provided with the submittal, the Vendor must submit within three business days after the County's written request.

b. The County will review all affiliated entities of the Vendor’s principal(s) for contract performance evaluations and the compliance history with the County’s Small Business Program, including County Business Enterprise (CBE), and Disadvantaged Business Enterprise (DBE), goal attainment

DRAFT

https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH1AD_ARTXIIILOAC_S1-262LORESTFE requirements in its review and determination of responsibility. “Affiliated entities” of the principal(s) are those entities related to the Vendor by the sharing of stock or other means of control, including but not limited to a subsidiary, parent, or sibling entity.

2. Enterprise Technology Services (ETS) Vendor Security Questionnaire (VSQ)

3. Financial Information/Financial Ability

a. Vendor is required to submit the Vendor’s financial statements by the solicitation’s closing date and time, to demonstrate the Vendor’s financial capabilities. If not provided with the submittal, the Vendor must submit within three business days after the County's written request.

b. Vendor shall submit its most recent two years of financial statements for review. The financial statements are not required to be audited financial statements. The annual financial statements shall be in the form of:

i. Balance sheets, income statements and annual reports; or

ii. Tax returns; or

iii. SEC filings.

If tax returns are submitted, ensure the documents do not include any personal information (as defined under Section 501.171, Florida Statutes), such as social security numbers, bank account or credit card numbers, or personal pin numbers. If any personal information is part of financial statements, redact information prior to submitting to the County.

c. If a Vendor has been in business for less than the number of years of required financial statements, then the Vendor must disclose financial statements for all years that the Vendor has been in business, including any partial year-to-date financial statements.

d. The County may consider the unavailability of the most recent year’s financial statements and whether the Vendor acted in good faith in disclosing the financial documents in its evaluation.

e. Any claim of confidentiality on financial statements must be asserted at the time of submittal. Refer to Confidential Material/Public Records and Exemptions for instructions on submitting confidential financial statements. The Vendor’s failure to provide the information as instructed may lead to the information becoming public.

4. Foreign Country of Concern Requirements

5. Insurance Requirements The Minimum Insurance Requirement Form reflects the insurance requirements deemed necessary for

DRAFT

https://www.flsenate.gov/laws/statutes/2014/501.171 this project. Vendor is required to either submit insurance certificates indicating that the Vendor currently carries the level insurance coverages OR submit a letter from the insurance carrier indicating the Vendor can obtain the required insurance coverages if awarded this contract. If not provided with the submittal, the Vendor must submit within three business days after the County's written request.

6. License, Prequalification, or Certification Requirements

a. License Requirement:

Vendor should submit proof of licensing with its submittal. If not provided with submittal, the Vendor must submit such proof within three business days after County’s request. The Vendor may be deemed nonresponsive for failure to possess license at time of submittal.

To be considered a responsible and responsive Vendor for the scope of work set forth in this solicitation, Vendor must possess one of the following licenses (including any specified State registration, if applicable) at the time of submittal. Any certificate of competency that meets or exceeds the licensing requirements specified herein, as determined in the sole and absolute discretion of the County, will be considered responsible and responsive to the solicitation’s licensing requirements.

STATE OF FLORIDA: Professional Engineer;

OR

Registered Architect

Joint Venture Requirements (If applicable):

A Joint Venture should submit satisfactory proof with its submittal that the Joint Venture, or at least one of the Joint Venture partners, possess one of the above licenses (including any specified State registration, if applicable) at the time of submittal. If not submitted with its response, the Joint Venture must submit such proof within three business days of County’s written request. A Joint Venture may be deemed nonresponsive for failure to possess license at time of submittal.

If a Joint Venture is recommended for contract award, it must either 1) submit satisfactory proof that the Joint Venture holds the specified license (if applicable) or that a licensed contractor has qualified the Joint Venture, or 2) provide satisfactory proof it applied for the specified license (if applicable) or the licensee has applied to qualify the Joint Venture, within three business days of County’s written request. The license or qualification, as applicable, in the name of the Joint Venture, must be effective prior to contract execution.

Additional Requirements (for construction services only):

A Joint Venture proposer should submit satisfactory proof with its submittal that the Joint Venture complies with all applicable legal requirements, including but not limited to, Section 489.119, Florida Statutes and Rule 61G4-15.0022, Florida Administrative Code. If not submitted with its response, the Joint Venture must submit such proof within three business days of County’s written request. If not provided with the submittal, the Vendor must submit within three business days after the County's written request.

b. FDOT Prequalification:

c. Certification Requirement:

7. Litigation History Vendor must follow the instructions and submit the completed Litigation History with its submittal. If not provided with the submittal, the Vendor must submit within three business days after the County's written request.

8. Office of Economic and Small Business Development Program Requirements This solicitation has the following Broward County Business Enterprise Goal: 25 % CBE. Refer to the Office of Economic and Small Business Development Requirements: CBE Goal and submit all required forms and information as instructed.

9. Workforce Investment Program Requirements

10. Payment Card Processing Questionnaire

11. Additional Responsibility Requirement

C. Additional Information and Certifications The following forms and supporting information (if applicable) should be completed and provided with the solicitation response. If not provided with the submittal, the Vendor must submit within three business days after the County's written request. Failure to timely submit requested information and/or to certify to requirement may affect the Vendor’s evaluation.

1. Vendor Questionnaire and Standard Certifications

Refer to the Vendor Questionnaire and Standard Certifications and submit as instructed.

a. Drug-Free Workplace Certification

b. Non-Collusion Certification

c. Public Entities Crimes Certification

d. Scrutinized Companies List Certification

2. Procurement Preference for SBE and CBE (Section 1-81.10, Broward County Business Opportunity Act)

D. Standard Agreement Language Requirements

1. The solicitation’s contract terms and conditions are:

Standard Agreement Form BCF 202 (Dated 7/1/2025 BCF 202)

2. Vendor is required to review the terms and conditions and submit the Agreement Exceptions. The completed form should be provided with the solicitation response. If not provided with solicitation response, it shall be deemed an affirmation by the Vendor that it accepts all the referenced contract terms and conditions and any additional terms listed above.

3. If exceptions are taken, the Vendor must specifically identify each term and condition to which it is taking an exception. Any exception not specifically listed is deemed waived. Simply identifying a section or article number is not sufficient to state an exception. The Vendor must provide either a redlined version of the specific change(s) or specific proposed alternative language. Additionally, a brief justification specifically addressing each provision to which an exception is taken must be provided.

4. The acceptance of or any exceptions taken to the terms and conditions of the County’s agreement language is considered a part of the Vendor’s response and will be considered by the Evaluation Committee. Submission of exceptions by the Vendor does not constitute acceptance of those exceptions by the County. Furthermore, taking exceptions to the County’s terms and conditions may be viewed unfavorably by the Evaluation Committee and ultimately may impact the overall evaluation of a Vendor’s submittal.

E. Procurement Authority

Pursuant to Section 21.33 of the Procurement Code, RFPs, RLIs, and RFQs with an anticipated total value of more than $500,000 require Board approval.

Non-continuing contract: Professional services needed for a project in which the estimated construction cost exceeds the category five statutory limit of Section 287.017, Florida Statutes, in accordance with Section 287.055, Florida Statutes, the Consultants' Competitive Negotiation Act (CCNA).

F. Project Funding Source

This project is funded in whole or in part by:

County Funds

G. Cone of Silence

1. The County’s Cone of Silence Ordinance, Section 1-266, of the Broward County Code of Ordinances, prohibits all communications, oral or written, relating to a competitive solicitation among vendors/vendor representatives, County Staff, and Commissioner Offices while the Cone is in effect.

2. Only communications with Purchasing Division employees, the solicitation’s designated Project Manager(s) or designee(s), the Office of Economic and Small Business Development (OESBD) Small

DRAFT

DRAFT

https://www.broward.org/purchasing/documents/3%20-%20Standard%20Consultant%20Agreement%20Form%20(BCF%20202).pdf https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH1AD_ARTXIIILOAC_S1-266COSI https://www.broward.org/EconDev/Pages/default.aspx https://www.broward.org/EconDev/Pages/default.aspx

Business Development Specialist Supervisor (954) 357-6400, and others as specifically identified in the Cone of Silence Ordinance are permitted. Additionally, communication is permitted at pre-bid conferences and negotiation meetings, as applicable.

3. The Cone of Silence begins upon the advertisement of an ITB, RFP, RFQ, or RLI. The Cone of Silence terminates when the solicitation is awarded, all responses are rejected, or the Board takes other action which ends the solicitation, as more fully stated in the Cone of Silence.

4. Any violations of the Code of Silence Ordinance by any vendor or vendor representative may be reported to the County’s Professional Standards. If the County’s Professional Standards determines that a violation has occurred, a fine shall be imposed as provided in the Broward County Code of Ordinances. At the sole discretion of the Broward County Board of County Commissioners, a violation may void an award of the applicable competitive solicitation.

5. Review the Cone of Silence Ordinance, Section 1-266 of the Broward County Code of Ordinances, for more detailed information.

H. Vendor Questions

The County provides a specified time for Vendors to ask questions and seek clarification regarding the solicitation requirements. All questions or clarification inquiries must be submitted through BPRO by the Question due date. The County will respond to questions in BPRO (Messages section).

I. Addenda

The County reserves the right to amend this solicitation prior to the deadline for Vendor responses by issuing written addenda to the solicitation. If, upon review, a Vendor finds a nonclerical error in an addendum, that Vendor must contact the Purchasing Division immediately, prior to the deadline for submission of responses, to allow the County to review the alleged error and to issue any clarification, if the County determines that a clarification is necessary. Vendors are responsible for obtaining and reviewing each addendum prior to the deadline for submission of responses to the solicitation. The terms of all addenda are incorporated into the solicitation.

J. Committee Appointment and Project Manager

1. Committee Members Information:

An Evaluation Committee is responsible for recommending the most qualified Vendor(s). The solicitation’s appointed committee members are listed on the Purchasing Division’s website under Committee Appointment. Committee Members are covered by the Cone of Silence.

2. Project Manager Information:

Project Manager: Laura Sotomayor, Architect

K. Evaluation Criteria

1. The Evaluation Committee will evaluate Vendors as per the Evaluation Criteria. The County reserves the right

DRAFT

DRAFT

https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH1AD_ARTXIIILOAC_S1-266COSI https://www.broward.org/Purchasing/Pages/CommitteeAppointment.aspx https://www.broward.org/Purchasing/Pages/CommitteeAppointment.aspx to obtain additional information from a Vendor.

2. Unless the Evaluation Criteria is identified as a solicitation Responsiveness or Responsibility Requirement (i.e., pricing, certifications, etc.), a Vendor’s failure to respond to Evaluation Criteria will not be considered a matter of responsiveness or responsibility. Vendors that fail to submit information and/or documentation required by an evaluation criterion by solicitation’s closing date and time may receive no points (if applicable) for the corresponding Evaluation Criteria. The County is not required to request, consider, or analyze the Vendor’s Evaluation Criteria responses received after the solicitation’s closing date.

3. The County reserves the right to obtain clarifying information from a Vendor in writing for the Evaluation

Committee.

4. For Request for Proposals - the following shall apply:

a. The Evaluation Committee may shortlist the most qualified firms prior to the Final Evaluation, in accordance with the Procurement Code.

b. The Evaluation Criteria identifies points available; a total of 100 points is available.

c. If the solicitation includes a request for a pricing submittal, the formula for awarding points will be identified in the Evaluation Criteria.

d. After completion of scoring, the County may negotiate pricing as in its best interest.

5. For Requests for Letters of Interest or Request for Qualifications - the following shall apply:

a. The Evaluation Committee will create a shortlist of the most qualified firms.

b. The Evaluation Committee will either:

i. Rank shortlisted firms; or

ii. If the solicitation is part of a two-step procurement, shortlisted firms will be requested to submit a response to the Step Two procurement.

L. Review and Evaluation of Responses

The process for this procurement may proceed in the following manner:

1. Agency staff prepares a report, including a matrix of responses submitted by the Vendors. This may include a technical review, if applicable.

2. A solicitation may only be awarded to a Vendor determined responsive and responsible to the solicitation’s requirements. The Director of Purchasing shall determine whether submissions are responsive. The Director of Purchasing’s responsiveness determination is not binding on the Evaluation Committee; the Evaluation Committee may accept or reject the Director of Purchasing’s responsiveness determination but must specifically state the basis for any rejection.

3. When making determinations of responsibility, the Director of Purchasing or the Evaluation Committee (as applicable) may request additional information from any Vendor on matters that may affect a Vendor’s responsibility. The failure of a Vendor to provide information requested by the County may result in a determination of nonresponsibility. In addition, a Vendor may submit information regarding its responsibility; however, information shall not be considered if it contradicts or materially alters the information provided by the Vendor in its original response to the solicitation.

4. The Evaluation Committee, with assistance of the Purchasing Division and based on information provided by the applicable County Agencies and the Office of the County Attorney, shall determine whether Vendors who have submitted responsive submissions are responsible. The solicitation’s awarding authority shall have the ultimate authority to determine whether Vendors who have submitted responsive submissions are responsible.

M. Local Preference Broward County’s local preference provisions shall apply except where otherwise prohibited by federal or state law or other funding source restrictions.

Refer to Section 1-75 of the Broward County Local Preference Ordinance and the Location Certification Form for further information.

For RFPs: upon the completion of final rankings (technical and price combined, if applicable) by the Evaluation Committee, if a nonlocal Vendor is the highest ranked Vendor and one or more Local Businesses (as defined by Section 1-74 of the Broward County Code of Ordinances) are within five percent (5%) of the total points obtained by the nonlocal Vendor, the highest ranked Local Business shall be deemed to be the highest ranked Vendor overall, and the County shall proceed to negotiations with that Vendor. If impasse is reached, the County shall next proceed to negotiations with the next highest ranked Local Business that was within five percent (5%) of the total points obtained by the nonlocal Vendor, if any.

The Location Certification Form will be used for local preference and location tiebreaker criteria.

N. Demonstrations

O. Presentations

1. Vendors that are determined to be both responsive and responsible to the solicitation’s requirements and shortlisted (if applicable) may make a presentation to the Evaluation Committee on the Vendor’s submittal. The committee may provide a list of presentation topics. Each Vendor will have equal time to present; question-and-answer time may vary by Vendor.

2. In accordance with Section 286.0113, Florida Statutes, and the direction of the Broward County Board of Commissioners, presentations during Evaluation Committee meetings are closed. Only the Evaluation Committee members, County staff (and County’s representative, if applicable), and the Vendor and their team scheduled for that presentation will be present in the meeting during the presentation and subsequent question and answer period. Subconsultants/subcontractors may only participate during one presentation/question and answer session, if partnering with multiple Prime Vendors.

https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH1AD_ARTIVFIAF_DIV5BIPRLOVE_S1-75LOPRPR https://library.municode.com/fl/broward_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH1AD_ARTIVFIAF_DIV5BIPRLOVE_S1-74DE https://www.flsenate.gov/Laws/Statutes/2020/0286.0113

P. Evaluation Committee Meetings, Committee Questions, Request for Clarifications, Additional Information

1. Evaluation Committee Meetings dates, times and locations are posted on Broward County’s Sunshine Meetings website.

2. At any committee meeting, the Evaluation Committee members may ask questions, request clarification, or require additional information of any Vendor’s submittal or proposal. It is highly recommended Vendors attend to answer any committee questions (if requested), including a Vendor representative that has the authority to bind the Vendor. Vendor’s answers may impact evaluation (and scoring, if applicable).

Q. Confidential Material; Public Records and Exemptions

1. Broward County is a public agency subject to Chapter 119, Florida Statutes. Upon receipt, all submittals become “public records” and are subject to public disclosure consistent with Chapter 119, Florida Statutes. Submittals may be posted on the County’s public website or provided by the County in a public records request response, except to the extent records are identified by the Vendor as confidential and/or exempt pursuant to the public records law and in accordance with the procedures in this section.

2. Any material(s) that the Vendor asserts are confidential and/or exempt from public disclosure under Florida Statutes must be conspicuously labeled at the time of submittal as “Confidential” and marked with the specific Florida statute and subsection permitting that exemption under Florida public records law.

3. To submit material as confidential and/or exempt, the Vendor must submit to “Broward County Purchasing Division, 115 South Andrews Avenue, Room 212, Fort Lauderdale, Florida 33301,” in a sealed envelope labeled with the solicitation number and title, name and contact information for the Vendor, itemization of the contents, identification of the Florida statute(s) and subsection(s) permitting the applicable exemption(s), and the solicitation’s closing date and time, the following:

a. Three (3) hard copies of the materials, unredacted, with each page containing material that is confidential and/or exempt conspicuously labeled “Confidential”; and

b. One (1) copy of the same materials, titled “Redacted Copy,” redacted to remove/redact only those portions of the materials that are confidential and/or exempt under Florida law.

4. If the Vendor does not submit the materials in strict accordance with this section, then the Vendor may be deemed to have waived any claim that the materials are confidential and/or exempt and the County is deemed authorized to post the entire submittal on the County’s public website and/or produce the entire submittal in response to a public records request for the materials.

5. By submitting materials marked as confidential and/or exempt, Vendor agrees to indemnify County and its employees and agents from any and all claims, fines, penalties, damages, judgments, and liabilities of any kind, including attorneys’ fees and costs, relating to the County’s nondisclosure of those materials in response to a public records request by a third party. The Vendor shall be responsible for defending its determination that the redacted portions are not subject to disclosure under applicable law.

DRAFT

DRAFT

http://www.broward.org/Commission/Pages/SunshineMeetings.aspx http://www.broward.org/Commission/Pages/SunshineMeetings.aspx

6. Submitting material as confidential and/or exempt may impact discussion and consideration of the

Vendor’s submittal by the Evaluation Committee because the Evaluation Committee may be unable to fully discuss the confidential and/or exempt material at the public evaluation meeting.

R. Copyrighted Materials Submittal of copyrighted material will constitute a license and permission for the County to use, reproduce, distribute, and publish (including both hard copy and electronic copies) as reasonably necessary for the evaluation of the solicitation response by County staff and agents, as well as to make the materials available for inspection or production pursuant to Public Records Law, Chapter 119, Florida Statutes.

S. Public Art and Design Program

T. Tiebreaker Criteria In accordance with Section 21.42(d) of the Broward County Procurement Code, the tiebreaker criteria shall be applied based upon the information provided in the Vendor's solicitation response at time of submittal.

Complete and accurate information must be contained in the Vendor’s initial submittal to ensure credit is received for any tiebreaker criterion. Except to the extent precluded by applicable funding or legal requirements, tiebreaker criteria are as follows:

1. Location Certification;

2. Domestic Partnership Act Certification;

3. Drug-Free Workplace Certification;

4. Volume of Previous Payments Attestation;

5. If the foregoing does not resolve the tie, the Evaluation Committee shall reconsider the responses and re-rank the tied vendors;

6. If the foregoing does not resolve the tie, the Vendor receiving the most first place votes from the

Evaluation Committee's reranking.

U. Posting of Solicitation Results and Recommendations

The Broward County Purchasing Division's website is the location for the County's posting of all solicitations and recommendation for award and recommendation of rankings. It is the obligation of each Vendor to monitor the website in order to obtain complete and timely information.

V. Vendor Protest

Part X of the Broward County Procurement Code sets forth procedural requirements that apply if a Vendor intends to protest a solicitation or proposed award of a contract and states in part the following:

1. Any written protest concerning the specifications or requirements of a solicitation (or of any addenda thereto) must be received by the Director of Purchasing within five (5) business days after the applicable solicitation (or addenda) is posted on the Purchasing Division’s website.

DRAFT

DRAFT

https://www.flsenate.gov/Laws/Statutes/2021/Chapter119/All https://library.municode.com/fl/broward_county/codes/administrative_code?nodeId=CH21OPPOPRCOFIADSEDE_PTVPRCOSO_21.42PRRFRLRF https://library.municode.com/fl/broward_county/codes/administrative_code?nodeId=CH21OPPOPRCOFIADSEDE_PTXPTIRECO

2. Any written protest concerning a proposed award or ranking must be received by the Director of

Purchasing within five (5) business days after the proposed award or ranking is posted on the Purchasing Division’s website.

3. Failure to file a written protest so that it is received by the Director of Purchasing within the timeframes set forth in Part X of the Broward County Procurement Code shall constitute a waiver of the right to protest. A protest submitted to anyone other than the Director of Purchasing shall not be a valid protest.

4. Except as to any protest of the specifications or requirements of a solicitation, as a condition of initiating any protest, the protestor must, concurrently with filing the protest, pay a filing fee for the purpose of defraying the costs in administering the protest in accordance with the scheduled provided below. The filing fee shall be refunded if the protestor prevails in the protest. Failure to timely pay the required filing fee shall render the protest invalid.

Estimated Contract Amount Filing Fee Mandatory Bid Amount up to $250,000 $500 $250,000 - $500,00 $1,000 $500,001 - $5 million $3,000 Over $5 million $5,000

The estimated contract amount shall be the total bid (proposal) amount offered by the protesting Vendor in its response to the solicitation, inclusive of any contract renewals or extensions. If no amount was submitted by the protestor, the estimated contract amount shall be the County’s estimated procurement contract price. The County will accept a filing fee in the form of a money order, certified check, or cashier’s check, payable to “Broward County,” or other manner of payment approved by the Director of Purchasing.

W. Right To Appeal

The protestor may appeal the Director of Purchasing’s denial of the protest with respect to the proposed award of a solicitation in accordance with Part XII of the Broward County Procurement Code. Decisions by the Director of Purchasing with respect to the specifications or requirements of a solicitation may only be appealed to the County Administrator or their designee, who shall determine the method, timing, and process of the appeal and whose decision shall be final.

1. The appeal must be received by the Director of Purchasing within ten (10) days after the date of the determination being appealed.

2. The appeal must be accompanied by an appeal bond by a Vendor having standing to protest and must comply with all other requirements of Part XII of the Broward County Procurement Code. The appeal bond is based on the estimated contract amount, per Section 21.84 of the Procurement Code.

3. Except as otherwise provided by law, the filing of an appeal is an administrative remedy that must be https://library.municode.com/fl/broward_county/codes/administrative_code?nodeId=CH21OPPOPRCOFIADSEDE_PTXIIAP exhausted prior to the filing of any civil action against the County concerning any subject matter that, had an appeal been filed, could have been addressed as part of the appeal.

X. Rejection of Responses

The Director of Purchasing may reject all responses to a solicitation, even when only one response is received, if the Director of Purchasing determines that doing so would be in the best interest of the County; provided, however, that only the Board may reject all responses to a solicitation where the issuance of the solicitation was approved by the Board.

Y. Negotiations

Once a ranking is deemed final, the County shall commence contract negotiations with the top-ranked Vendor (or, if provided in the solicitation, with multiple top-ranked Vendors simultaneously). If the negotiation does not result in mutually satisfactory contract terms within a reasonable time, as determined by the Director of Purchasing, then the Director of Purchasing may terminate negotiations with the applicable Vendor and commence (or continue, if the solicitation provided for negotiation with multiple top-ranked Vendors) negotiations with the next-ranked Vendor(s) or issue a new solicitation, as the Director of Purchasing determines to be in the best interest of the County.

Z. Submittal Instructions

1. Vendor MUST submit its solicitation response electronically through BPRO and receive a Submission Receipt. It is solely the Vendor’s responsibility to ensure its response is submitted and received through BPRO by the closing date and time. The County will not consider solicitation responses received by other means. Vendors are encouraged to submit in advance of the closing date and time. Refer to the Purchasing Division website or contact support@gobonfire.com for submittal instructions. In the event that the Vendor is having difficulty submitting a document, immediately notify the Purchasing Agent and then contact support@gobonfire.com for technical assistance.

2. Vendor must view and download each of the documents in the electronic bidding system.

3. After all documents are viewed and downloaded from the electronic bidding system, the Vendor must upload additional information requested by the solicitation (i.e. Evaluation Criteria, certifications, etc.) in the Provide Submission Information section in the electronic bidding system, Evaluation Criteria responses should be non-locked file format.

4. If a Vendor is declaring any material confidential and exempt from Public Records, refer to Confidential Material; Public Records and Exemptions section for submittal instructions.

5. After all files are uploaded, Vendor must submit and finalize submission for offer to be received electronically through the electronic bidding system.

6. If a solicitation includes a Bond Requirement (Responsiveness Criteria), the Vendor must submit in a sealed envelope, labeled with the solicitation number, title, by the solicitation’s closing date and time, to:

DRAFT

DRAFT

https://www.broward.org/purchasing/Pages/Default.aspx https://www.broward.org/purchasing/Pages/Default.aspx mailto:support@gobonfire.com mailto:support@gobonfire.com

Broward County Purchasing Division 115 South Andrews Avenue, Room 212 Fort Lauderdale, FL 33301

A copy of the bond should also be uploaded into the electronic bidding system; this does not replace the requirement to submit an original bond by the solicitation’s closing date and time.

7. Broward County does not require any personal information (as defined under Section 501.171, Florida

Statutes), such as social security numbers, driver license numbers, passport, military ID, bank account or credit card numbers, or any personal pin numbers, in order to submit a response for ANY Broward County solicitation. DO NOT INCLUDE any personal information data in any document submitted to the County.

If any personal information data is part of a submittal, this information must be redacted prior to submission to the County.

Form Date 11/14/25 https://www.flsenate.gov/laws/statutes/2014/501.171

Scope of Services

Consulting Services for Terminal Cruise Parking Structure(s) – Port Everglades

Port Everglades, Seaport Engineering & Construction Division, is seeking an architectural and/or engineering professional design consultant for the development of a new multi-level cruise terminal parking garage facility within Port Everglades (Port). The purpose of this project is to provide adequate parking capacity to support cruise terminal operations, improve vehicular circulation, and enhance passenger access to cruise terminals within the Port.

The design may include provisions for future expansion, allowing for the addition of parking levels or horizontal expansion, or structural capacity to meet long-term operational demands. The consultant will ensure that all planning and design efforts align with the Port Everglades Master Vision Plan and consider future integration with the projected Airport–Seaport–Convention Center Connector system, which may be connected directly or through the Port. The parking structure is to be designed and constructed to achieve LEED Certification, incorporating sustainability, energy efficiency, and environmental responsibility as key design objectives.

The scope of services includes, but is not limited to: (1) preparing a feasibility study to evaluate current and future parking demands using existing Port data and projected growth in port operations and vessels calls as outlined in the Port Everglades Master/Vision Plan 2024 Update;

(2) analysis and evaluation of: roadway alignment, capacity, ingress and egress conditions, interface with adjacent cruise terminal ground transportation areas, and impacts of future cruise terminal renovations/expansions on parking and traffic circulation; (3) a comprehensive programming study beginning with the evaluation of potential site locations; (4) a full design process, including preparation of CDs; (5) construction administration services and construction engineering inspection services; and (6) post-construction warranty inspections, using the prime vendor’s or subconsultant’s staff, as required to complete the project. All work must be coordinated with Port Operations, Security, and Seaport Engineering & Construction to minimize disruption to cruise terminal activities during design and construction.

The project will be developed in the following phases:

A. Phase 1 – Feasibility Study

Based on the current Port Everglades Master Vision Plan, Port’s existing and projected data, and site investigations, the consultant will conduct a Feasibility Study to determine the most suitable location or locations for parking garage(s) to support cruise activity within Port Everglades. The study will analyze parking demand at each terminal, including terminal support staff and cruise passenger vehicles. The consultant shall review passenger and provisioning vehicle circulation, pedestrian circulation, connectivity to nearby cruise terminals and the projected Airport-Seaport-Convention Center Connector system to inform the recommendation.

The study will also address how the future garage(s) can provide a more efficient and accessible flow for passengers, supporting both current and anticipated future demands.

Strategies and conceptual solutions to achieve this connectivity goal are to be developed and evaluated as part of the Feasibility Study. The consultant shall examine access points, roadway alignment, existing infrastructure, and utilities to identify potential constraints.

Recommendations shall include the preferred site location or locations, parking capacity, number of stories, structural provisions for future vertical or horizontal expansion. The findings and recommendations must be presented in a comprehensive feasibility report with graphical conceptual site alternatives, preliminary layouts, and cost analyses for Port review and approval.

B. Phase 2 – Programming and Conceptual Design

Following acceptance of the feasibility study, the consultant shall develop the project program and conceptual design consistent with the approved recommendations and selected approach.

This phase will define spatial requirements, establish operational layouts, and produce conceptual architectural and structural designs that integrate efficient vehicle and pedestrian circulation, Americans with Disability Act (ADA) accessibility, emergency access, and revenue control systems. Preliminary cost estimates and schedules will be prepared for Port review and direction.

C. Phase 3 – Construction Documents (CDs)

During this phase, the consultant will advance the design to a higher level of detail for all required disciplines while maintaining compliance with all applicable codes and standards. A Building Information Model (BIM) will be developed in coordination with County/Port standards.

The consultant will submit 30%, 60%, 90%, and 100% design packages for Port review and approval, with updated schedules and cost estimates for each phase of design development.

The consultant will prepare complete, signed, and sealed construction documents and technical specifications suitable for permitting and bidding. The consultant shall coordinate with local, state, and federal regulatory agencies and obtain all required approvals from the Authority Having Jurisdiction (AHJ).

Final deliverables must include permit-ready drawings, technical specifications, and final BIM and Computer Aided Design (CAD) files in accordance with County/Port standards.

D. Phase 4 – Permitting, Bidding and Procurement Support

During the bidding and procurement process, the consultant will provide technical support by responding to bidders’ inquiries, preparing addenda, and clarifying design intent. If any revisions are needed to the Construction Documents during the contractor’s permitting process, the design consultant shall amend the drawings as necessary to obtain approvals from the AHJ. The consultant will assist the Port in evaluating contractor proposals for compliance with design and technical requirements and participate in pre-bid meetings.

Following receipt of bids, the Consultant shall provide a bid analysis report.

E. Phase 5 – Construction Engineering Inspection (CEI) and Construction Administration (CA)

During construction, the consultant will provide construction engineering inspection and administration services, including reviewing shop drawings, submittals, and requests for information. The consultant will attend progress meetings, conduct site visits to observe construction for general conformance with the design intent, and assist in resolving field issues.

Responsibilities also include reviewing contractor pay applications, supporting project closeout, and providing record drawings and final BIM/CAD updates. Assistance during testing, commissioning, and system turnover, as required by the Port.

F. Phase 6 – Warranty Inspection

Approximately eleven months after substantial completion, the consultant will conduct a warranty inspection to verify the performance of materials and systems and to identify any deficiencies covered under warranty. A written report summarizing findings and recommended corrective actions will be submitted for Port review and follow-up with the contractor prior to warranty expiration.

All services described in this scope must comply with the most current editions of the Florida Building Code, the Florida Accessibility Code for Building Construction, the Florida Fire Prevention Code (NFPA 1 and 101), ADA Standards for Accessible Design, OSHA Regulations, the Broward County Land Development Code, all applicable local, state, and federal requirements, and the Port Everglades Design Guidelines.

Preliminary Project Schedule

The anticipated preliminary project schedule milestones are presented below where NTP is the Notice to Proceed date for this design project. (* Indicates project deliverables)

ACTIVITY COMPLETION DATE

* Feasibility Study 90 calendar days from NTP

* Programming and Conceptual Design 180 calendar days from NTP

* 30% CDs 240 calendar days from NTP

* 60% CDs 360 calendar days from NTP

* 90% CDs and Building Permit Dry Runs 450 calendar days from NTP

MGC Contract Award 640 calendar days from NTP

* 100% CDs 700 calendar days from NTP

Construction/CEI and CA Begins 700 calendar days from NTP

Substantial Completion 1190 calendar days from NTP

Warranty Inspection 1525 calendar days from NTP

RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 1 of 62

EXHIBIT A, SCOPE OF SERVICES

ATTACHMENT 1:

BIM and Electronic Media Submittal Requirements

Introduction The Contract Administrator will be utilizing electronic media as the principal way it develops, communicates and archives information concerning its various construction programs for the County. To that end, County's standard Professional Services Agreements for Consultant services and Construction Agreements for construction services require submittal of documents produced on electronic media. The County requires Building Information Modeling (BIM) based design, documentation and construction deliverables, scaled to the County’s needs, especially for all major projects, including all new construction.

These BIM processes are achieved through collaborative efforts of the Consultant and the Contractor and generally conclude with the completion of the Consultant’s Design Model and a Contractor’s As-Constructed Model as outlined in the Scope of Work and in the BIM Project Execution Plan (BIM PxP).

For projects utilizing BIM delivery, Consultant and Contractor will provide native BIM format and Industry Foundation Class (IFC) electronic BIM deliverables in addition to all other electronic copies of hardcopy submissions and other files that support the intent of the project at all project milestones. Data interoperability is important to the County. Design Authoring software shall be used throughout the project lifecycle and shall be parametric. It is also important that nationally defined standards and protocols be used when developing BIM’s so that data may be normalized for multiple uses, now and in the future. Most current versions of standards such as the National BIM Standards, BIMForum LOD Specification Part 1 and Commentary, OmniClass, Uniformat and MasterFormat, should be used whenever possible.

The Consultant will derive any two-dimensional (2D) deliverables from the Building Information Model. Further, it is the intent of the County to require open-standard facility management data as a project deliverable at all milestones. An important goal for the Construction Management Division is to not only enhance the value of all team efforts to efficiently design and construct lean, new and renovated construction projects using BIM, but also to assist in achieving a dependable use and development of BIM across multiple building types and for a wide range of County agencies.

Predictable, reliable, and uniform data will help to ensure a building dataset that will facilitate ongoing building operation and maintenance protocols. Project Consultant shall initiate and jointly develop BIM and Construction Operations Building Information Exchange (COBie) information to be completed by the Contractors throughout their corresponding phases of the project.

Definitions and Identifications for BIM terms used in this Attachment, requirements for electronic media, the BIM/CADD Standard of Care, LOD, COBie and other requirements are presented in Sections 1, 2 and 3 of this Attachment 1. The detailed BIM PxP Template is provided in Section 4

RLI/RFP/Contract # ________ BCF #202 7/1/25 (Locked) Page 2 of 62 and is required to be developed at project initiation to provide a master information and data management plan and assignment of roles and responsibilities for model creation and data integration. Wherever possible, the BIM PxP will be developed through a collaborative approach involving all Project Consultants, Contractors and applicable County staff. A small sample of the Model Progression Schedule/Agent Responsible Matrix Template (MPS) is provided in Section 5 and will be made available in its native Excel format upon request. The County template includes minimum LODs but will be adapted if needed for the Project. An Introduction and directions for completion are described on the first page of the document.

Table of Contents - Attachment 1:

Introduction Section 1 - Definitions and Identifications Section 2 - Electronic Media Section 3 - BIM/ CADD Standard of Care, Level of Development (LOD), COBie Section 4 - BIM Execution Plan (BIM PxP) (Template to be completed)…