1. SOW_VGLZ 182012 Munitions Area Modification.doc
DOC document 31 KB Posted
- Attached to
- Remove & Replace Concrete Pavement Munitions Storage Area Selfridge ANGB Federal contract opportunity
- Solicitation number
- W50S8520B0006
About this file
This document provides a statement of work (SOW) and related solicitation for a fixed price construction contract to remove and replace approximately 6,886 square yards of concrete pavement in the munitions storage area at Selfridge Air National Guard Base. The contractor shall provide all materials, labor, and equipment to complete the project, which includes removing and replacing concrete pavement panels, repairing 1,220 linear feet of fencing, replacing two motorized vehicle gates, and performing storm water work. Interested contractors are encouraged to attend a mandatory site visit on August 20, 2020 at 10:00 am EST. The solicitation is issued by the Department of the Army Michigan Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Abstract - W50S8520B0006 Munitions Concrete 1.pdf | ||
| MSA Concrete Pavement Bid Opening Attendance Sheet.pdf | ||
| Bid Opening Abstract - W50S8520B0006 Munitions Concrete.xls | XLS spreadsheet | |
| Pre-Proposal Conference Minutes - Replace Concrete Pavement MSA.pdf | ||
| WDOL update.pdf | ||
| W50S8520B00060001.pdf | ||
| Pre-Solicitation Site Visit Attendance Sheet.pdf | ||
| Munitions Pad Modifications VGLZ 182012 Construction Plans Complete 06 APR 20.pdf | ||
| Munitions Pad Modifications VGLZ 182012 Drawings Plans Complete 06 APR 20.pdf | ||
| Specifications Complete 06 MAR 20 VGLZ 182012 AEW 0275-0014.pdf | ||
| New 127th Vendor Vetting Form.xlsx | XLSX spreadsheet | |
| AFMAN 91-201 - Explosives Safety Standards.pdf | ||
| W50S8520B0006 .pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Project Title: VGLZ 182012 Munitions Area Modifications 2 April 2020 The work shall be in strict compliance with this SOW, the specifications and the plans. Sections of this SOW may supersede the requirements of the specifications, in which case the more stringent/higher quality requirements shall apply. Work will be coordinated with Base Operations. Keep work site clean at all times to prevent FOD. A Macomb County Soil Erosion Permit will be required for this project. The contractor shall obtain, pay for and follow the requirements of this permit.
1. STATEMENT OF WORK
a. This project generally consists of removing and replacing approximately 6,886 square yards of concrete pavement panels in the Building 892 area and other related work.
b. This work also generally includes salvaging and repairing fencing, replacing two vehicles gates and storm drainage work.
c. Work is to be completed as a “Fixed Price Construction Contract.” Estimated quantities provided on the plans sheets are provided for the bidders use and to provide for a consistent basis for the Contract Fixed Price.
2. ATTACHMENTS
a. Munitions Area Modifications Specification and Contract Documents dated March 2020. Prepared by Anderson Eckstein & Westrick Inc. Civil Engineers Surveyors, Architects.
b. Munitions Area Modifications 100% Design Plans dated 6 Mar 2020, 16 sheets.
3. PROJECT CRITERIA
a. Refer to attached design plans and specifications.
4. INITIATION OF WORK
a. The contractor may not proceed or initiate any work prior to receipt of original notice to proceed. Any work done without being directed to do so by the Contracting Officer shall be at the contractors own risk.
5. GOVERNMENT REVIEW
a. All materials, components, and equipment shall be specified for approval by the Contracting Officer. All items designated for submittal and test shall be sufficiently described to provide the government a basis for review and approval or disapproval.
END OF SOW
File details come from the government source that posted it. Updated .