About this file

This is a Statement of Work (SOW) for the procurement of two specialized shipping containers for the U.S. Coast Guard Air Station Ventura, located at Naval Base Ventura County Point Mugu, California. The containers will serve as Helicopter Support Kits (HSK) for shipboard deployment maintenance and operations. Delivery is required within 45 days of contract award, with a period of performance from April 21, 2026 through August 1, 2026. The point of contact is LTJG Brian Golliher at Brian.M.Golliher@uscg.mil, phone 512-420-3521, located at Building PM-190 (Hangar).

Both containers must be manufactured to the latest ISO Standard and painted in OD Green #34088 or Desert Tan #33446. Each container must include corrugated steel sides, roof, and swing doors on both sides; a heavy-duty steel floor; four-way forklift pockets; twenty wall tie-down steel lashing rings rated at 4,000 lbs. capacity each; twenty door corner post tie downs with shoring slots supporting 2" x 6" lumber; two closeable vents; five sets of adjustable shelving brackets with ten vertical E-Track sections total; two manifest boxes with manuals; three connecting couplers per container with one storage bracket per container; fifteen decking and shoring beams; and eight 6" poly swivel caster wheels with brakes (4,000 lbs. capacity each, mounted on each container with removable welded twist locks). The containers must maintain a tare weight of 2,800 lbs. or less while meeting or exceeding specified payload, gross weight, and cubic capacity requirements. A one-year warranty covering workmanship and materials, including peeling, chipping, fading, and defects, is required. The government requires vendors to provide base access forms no less than 35 days prior to delivery to brian.m.golliher@uscg.mil for unrestricted site access.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Shipping Containers

U.S. COAST GUARD

AIR STATION VENTURA

190 3rd ST

POINT MUGU, CA 93042

LOCATED AT

NAVAL BASE VENTURA COUNTY POINT MUGU

Scope of Work

1. Introduction:

This Scope of Work outlines the requirements for the furnishing and delivery of two shipping containers. The specific requirements are outlined in section 4.

Location of Work and Point of Contact:

USCG Air Station Ventura LTJG Brian Golliher 190 3rd St Brian.M.Gollier@uscg.mil Point Mugu, CA 93042 Ph: 512-420-3521

Building: PM-190 (Hangar)

2. Delivery Schedule:

Delivery required 45 days after award.

3. Period of Performance:

04/21/2026 – 08/01/2026

4. Scope of Work:

The contract shall include two shipping containers that meet all the specifications outlined below and shall include delivery. The containers shall both be green. All the below parts and add-ons shall be installed on the containers prior to delivery.

· Corrugated steel sides, roof, and swing doors on both sides

· Heavy duty steel floor

· Four-way forklift pockets

· Wall tie down steel lashing rings, 4,000 lbs. cap. each (20) total

· Door corner post tie downs, (20) total = restraint system, shoring slot will support 2” x 6” lumber

· (2) Vents, closeable type

· Adjustable shelving brackets, (5) sets: (10) vertical E-Track section total

· Color OD Green # 34088 or Desert Tan #33446

· Decking and shoring beams (15)

· (2) Manifest boxes, each with a Manual

· Connecting couplers, (3) per container

· Connecting coupler storage bracket, (1) each

· (8) 6” Poly Swivel Caster Wheels with Brakes. (4 wheels on each container) Each wheel must have a 6,000 lbs. capacity and be removable via a welded twist lock. This is the only part that does not need to be installed prior to delivery.

· (12) Shoring and Decking Beams that are compatible for installation/removal with the adjustable shelving brackets and vertical E-Track.

· Dimensions and Capacity: Containers must be manufactured to the latest ISO Standard. Dimensions (including length, height, width) must match the below exterior dimensions and be greater than or equal to the listed interior dimensions. Door opening must be the same height and width or greater. Capacity must be equal to or better than the quantities listed below for payload, gross weight and cubic capacity while maintaining a 2,800 lb. or less tare weight.

5. Warranty:

· Provide a 1-year warranty on the workmanship and materials, covering peeling, chipping, fading, and other defects.

6. Owner Responsibilities:

The Owner shall be responsible for the following:

· Providing access to the site for delivery personnel. Delivery service shall fill out base access forms no less than 35 days prior to delivery for unrestricted access and forward them to brian.m.golliher@uscg.mil

7. Schedule:

The shipping containers shall be completed and delivered within 45 days from the date of contract signing.