1._DSH-A_Fuel_Oil_Transfer_Piping_-_OSFM_Approved_Drawings.pdf
PDF 8 MB Posted
- Attached to
- Certified Welding for Fuel Oil Piping Project
- Solicitation number
- 0000031077
- Issued by
- San Luis Obispo County, San Luis Obispo City, California
About this file
The document provided is a set of architectural, mechanical, and electrical drawings related to a fuel oil transfer piping project at the Department of State Hospitals facility in Atascadero, California. The project involves the demolition and replacement of existing fuel oil system components, including the day tank, pumps, and piping, as well as the addition of a new fuel oil polishing station and controls. The project also includes seismic upgrades to the new piping and equipment. The drawings have been approved by the Office of the State Fire Marshal, and the project is under the jurisdiction of the City of San Luis Obispo and San Luis Obispo County.
The document does not provide information about a specific contract opportunity, but rather the technical details and drawings that would be included as part of a bid package for a construction project to upgrade the fuel oil system at the Atascadero facility. As such, the document does not include details about bid submission dates, award dates, contract terms, pricing, or funding sources.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL
A1 EXITING PLAN
MECHANICAL
M0.1 MECHANICAL COVER SHEET
M1.1 MECHANICAL DEMOLITION FLOOR PLAN
M2.1 MECHANICAL NEW WORK FLOOR PLAN
M3.1 FUEL OIL PIPING FLOW DIAGRAM
M3.2 MECHANICAL DETAILS
M3.3 MECHANICAL DETAILS
ELECTRICAL
E0.1 ELECTRICAL COVER SHEET
E1.1 ELECTRICAL DEMOLITION FLOOR PLAN
E2.1 ELECTRICAL NEW WORK FLOOR PLAN
E3.1 ELECTRICAL DETAILS
1 10-31-22 SFM COMMENTS
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-4241
CODES
1. 2019 CALIFORNIA HISTORICAL BUILDING CODE, PART 8, TITLE 24 CCR
(INCLUDED IN PART 10).
2. 2019 CALIFORNIA EXISTING BUILDING CODE, PART 10, TITLE 24 CCR
(INCLUDED IN PART 10).
3. HEALTH AND SAFETY CODE SECTIONS 1250 ET SEQ.- LICENSING PROVISIONS
FOR HEALTH FACILITIES.
4. HEALTH AND SAFETY CODE SECTION 1418- DEFINES LONG-TERM FACILITIES.
5. HEALTH AND SAFETY CODE SECTIONS 16000-16023- ESSENTIAL SERVICES
BUILDINGS.
6. HEALTH AND SAFETY CODE SECTION 17922- RULES AND REGULATIONS.
7. HEALTH AND SAFETY CODE SECTION 17960- REGULATION OF BUILDINGS USED
FOR HUMAN HABITAT.
8. HEALTH AND SAFETY CODE SECTION 18909- DEFINES "BUILDING STANDARD".
9. HEALTH AND SAFETY CODE SECTIONS 18950-18961- STATE HISTORICAL.
10. CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 8.
11. CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 17.
12. CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 19.
13. CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 22.
14. CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 23.
15. CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24.
16. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 99 HEALTH CARE
FACILITIES CODE.
17. GOVERNMENT CODE SECTION 4450- ACCESS TO PUBLIC BUILDINGS BY
PHYSICALLY HANDICAPPED PERSONS.
18. GOVERNMENT CODE SECTION 4465- DISABILITY ACCESS AND EDUCATION.
19. GOVERNMENT CODE SECTION 8875.2- LOCAL BUILDING DEPARTMENTS.
20. GOVERNMENT CODE SECTION 14680- RELOCATION OR REMOVAL OF PUBLIC
UTILITY FACILITIES WHEN A STATE STRUCTURE IS TO BE CONSTRUCTED.
21. GOVERNMENT CODE SECTION 14963- FIRE AND LIFE SAFETY.
22. GOVERNMENT CODE SECTION 14685- CALIFORNIA HIGHWAY PATROL
REGULATIONS FOR PROTECTION OF STATE EMPLOYEES, PROPERTIES,
BUILDINGS AND GROUNDS, AND OCCUPANTS OF STATE PROPERTIES.
23. GOVERNMENT CODE SECTION 14672.95- LEASING BUILDING AT PATTON STATE
HOSPITAL FOR PURPOSE OF PROVIDING SERVICES TO ELDERLY PERSONS.
24. GOVERNMENT CODE SECTION 14672.6- LEASING TO A NONPROFIT
CORPORATION, FOR THE PURPOSE OF CONDUCTING A CANTEEN AT NAPA
STATE HOSPITAL.
25. GOVERNMENT CODE SECTION 14670.2- LEASING TO A PUBLIC
GOVERNMENTAL AGENCY NOT EXCEEDING 10.5 ACRES LOCATED WITHIN THE
GROUNDS OF NAPA STATE HOSPITAL.
26. PUBLIC RESOURCES CODE SECTIONS 5024, 5024.1, 5024.5- PROJECT
COMPLIANCE WITH FEDERAL AND STATE HISTORIC PRESERVATION LAWS.
27. PUBLIC RESOURCES CODE SECTION 42982- MANAGEMENT OF POST
CONSUMER CARPET REMOVED FROM STATE BUILDINGS STANDARDS
33. PATIENT AND STAFF SAFETY (SB1299) OSHA.
34. AMERICANS WITH DISABILITY ACT (ADA).
35. OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT (OSHPD) LEVEL 1
ACUTE PSYCHIATRIC HOSPITALS, OSHPD 5.
36. "PATIENT SAFETY STANDARDS, MATERIALS AND SYSTEMS GUIDELINES"
PUBLISHED BY NEW YORK STATE OFFICE OF MENTAL HEALTH, CURRENT
VERSION.
37. BEHAVIORAL HEALTH DESIGN GUIDE BY FACILITIES GUIDELINES INSTITUTE
(FGI), CURRENT VERSION.
OTHER AGENCY REQUIREMENTS
1. DSH SUSTAINABILITY ROADMAPS.
2. STATE FIRE MARSHALL- AUTHORITY HAVING JURISDICTION ON STATE
CONSTRUCTION PROJECTS, ANNUAL INSPECTIONS, ENFORCEMENT OF THE
CALIFORNIA FIRE CODE AND THE CALIFORNIA BUILDING STANDARDS CODE.
3. CALIFORNIA DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (CAL/OSHA)-
REGULATES JOB SAFETY.
ADDL. APPLICABLE CODES & STANDARDS
HAZARDOUS MATERIAL NOTES SEISMIC PROTECTION NOTES
1. REFER TO SPECIFICATIONS SECTION FOR FURTHER INFORMATION AND
RECOMMENDATIONS REGARDING MITIGATION OF ASBESTOS CONTAINING
MATERIALS (ACM'S) AND LEAD BASED PAINT (LBP'S).
2. FURNISH ALL LABOR, MATERIALS, FACILITIES, EQUIPMENT, SERVICES,
EMPLOYEE TRAINING AND TESTING, PERMITS, LICENSES AND AGREEMENTS
NECESSARY TO PERFORM THE REQUIRED HAZARDOUS MATERIAL ABATEMENT,
PAINT STABILIZATION, SELECTIVE DEMOLITION, STRUCTURE DEMOLITION, AND
OTHER HAZARDOUS MATERIAL-RELATED CONSTRUCTION WORK OF THE
PROJECT IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS, DRAWINGS,
NOTATIONS, AND THE LATEST REGULATIONS FROM THE U.S. ENVIRONMENTAL
PROTECTION AGENCY (EPA), AIR QUALITY MANAGEMENT DISTRICT, THE
CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS, DIVISION OF
OCCUPATIONAL SAFETY AND HEALTH (DOSH, “CAL/OSHA”), CALIFORNIA
DEPARTMENT OF PUBLIC HEALTH (CDPH), AND ALL OTHER APPLICABLE
FEDERAL, STATE, AND LOCAL GOVERNMENTAL REGULATIONS. WHENEVER
THERE IS A CONFLICT OR OVERLAP OF THE ABOVE REFERENCES, THE MOST
STRINGENT PROVISION APPLIES.
3. THE HAZARDOUS MATERIALS AT THE SITE INCLUDE:
A. LEAD-CONTAINING PAINT IS PRESUMED TO BE PRESENT ON ALL
STRUCTURAL AND NON-STRUCTURAL (PIPING SUPPORT, BRACING,
ANCHORAGE, ETC.) STEEL COMPONENTS AND SURFACE. SURFACE
COATINGS AT THE PROJECT SITE ARE ASSUMED TO CONTAIN LEAD. ALL
OTHER PAINTS AND COATINGS SHALL BE CONSIDERED TO CONTAIN LEAD
AT DETECTABLE LEVELS IN THE ABSENCE OF LABORATORY DATA TO THE
CONTRARY.
B. PCBs: POLYCHLORINATED BIPHENYLS (PCBs) ARE PRESUMED TO BE
PRESENT WITHIN TRANSFORMER.
4. SPECIFICATIONS HAVE BEEN PREPARED ON THE BASIS OF EXISTING
DOCUMENTATION AND SITE INSPECTIONS. LOCATION OF ASBESTOS
MATERIALS, LEAD-CONTAINING MATERIALS AND OTHER HAZARDOUS AND NON
HAZARDOUS MATERIALS AND COMPONENTS TO BE REMOVED IS GENERAL IN
NATURE, AND INTENDED TO PROVIDE AN “APPROXIMATE” INDICATION OF
MATERIALS TO BE REMOVED AND EXISTING CONDITIONS.
5. THE SITE WILL BE AVAILABLE FOR EXAMINATION OF EXISTING CONDITIONS.
THE CONTRACTOR SHALL REVIEW ALL APPLICABLE CONTRACT DOCUMENTS,
VISIT THE SITE, AND VERIFY LOCATION, SIZE AND QUANTITY OF MATERIALS TO
BE REMOVED. CHANGE ORDERS WILL NOT BE ALLOWED FOR ANY MATERIAL
THAT CAN BE REASONABLY QUANTIFIED FROM PROJECT DRAWINGS OR
THROUGH SITE INSPECTION.
6. THE CONTRACTOR SHALL ADHERE TO ALL ASPECTS OF THE PROJECT PLANS
AND SPECIFICATIONS. REQUESTS TO DEVIATE FROM ANY ASPECT OF THE
PLANS AND SPECIFICATIONS SHALL BE SUBMITTED IN WRITING TO THE STATE
FOR APPROVAL. THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FOR
ANY DEVIATIONS.
7. HAZARD COMMUNICATION: THE CONTRACTOR SHALL CONFORM WITH ALL
APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO
WORKER AND ENVIRONMENTAL PROTECTION WITH REGARD TO ALL KNOWN
OR PRESUMED TOXIC OR HAZARDOUS BUILDING MATERIALS WHICH MAY BE
PRESENT ON SITE AND INVOLVED IN THE CONTRACTOR'S ABATEMENT,
DEMOLITION, LEAD RELATED CONSTRUCTION, CLEAN-UP OR OTHER WORK OF
THE PROJECT. THE CONTRACTOR SHALL UTILIZE EQUIPMENT, METHODS AND
PROCEDURES THAT MINIMIZE PRODUCTION OF ENVIRONMENTAL EXPOSURES
AND HAZARDOUS WASTES TO THE EXTENT POSSIBLE. THE CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR ALL COSTS RESULTING FROM PRODUCTION
OF SUCH WASTES AND ENVIRONMENTAL EXPOSURES AT NO ADDITIONAL COST
TO THE OWNER.
8. ALL WORKERS AND THEIR SUPERVISORS SHALL BE TRAINED FOR ALL
ANTICIPATED HAZARDS INCLUDING ASBESTOS, LEAD, MOLD, AND BIOLOGICAL
WASTES. WORKERS AND THEIR SUPERVISORS SHALL BE APPROPRIATELY
CERTIFIED FOR ASBESTOS AND LEAD WORK THROUGH CAL/OSHA AND CDPH
RESPECTIVELY. ALL WORKERS ENTERING HAZARDOUS MATERIALS WORK
AREAS SHALL BE TRAINED AND FITTED FOR SUITABLE RESPIRATORY
PROTECTION AND SHALL BE TRAINED REGARDING THE SPECIFIC HEALTH AND
SAFETY HAZARDS OF THIS SITE. THE CONTRACTOR IS SOLELY RESPONSIBLE
FOR ALL ASPECTS OF CONSTRUCTION HEALTH AND SAFETY AS REQUIRED FOR
THE PERFORMANCE OF THIS WORK.
9. HAZARDOUS MATERIAL WORK, INCLUDING CONTAINMENT SET UP AND
PREPARATION SHALL NOT START UNTIL THE CONTRACTOR'S HAZARDOUS
MATERIALS SUBMITTALS HAVE BEEN APPROVED BY THE STATE.
10. THE CONTRACTOR SHALL SUBMIT DETAILED HAZARDOUS DEMOLITION AND
ABATEMENT SCHEDULE AND PHASING PLAN FOR APPROVAL BY THE STATE
PRIOR TO START UP OF WORK. THE CONTRACTOR SHALL UPDATE SCHEDULE
WEEKLY AND WHEN ANY SCHEDULE CHANGES OCCUR OR ARE ANTICIPATED.
11. THE CONTRACTOR SHALL TAKE ALL NECESSARY PROTECTIVE MEASURES
INCLUDING PROVIDING PERSONAL PROTECTIVE EQUIPMENT AND SUFFICIENT
SAFETY TRAINING TO ALL PERSONNEL RELATED TO THE FOLLOWING
ANTICIPATED HAZARDS: ASBESTOS, LEAD, NOISE, HEAT STRESS; ELECTRICAL
(GFCI USE, LOCK OUT AND TAG OUT); FALL HAZARDS; WATER USAGE AROUND
ELECTRICAL SYSTEMS, AND OTHER CONSTRUCTION HAZARDS.
12. ALL POLYETHYLENE SHEETING AND MATERIALS USED FOR CONTAINMENT AND
CRITICAL BARRIERS SHALL BE FIRE RETARDANT. ALL LUMBER USED SHALL BE
FIRE RATED.
13. FOLLOWING COMPLETION OF ABATEMENT AND APPROVAL OF WORK BY THE
STATE, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL REMAINING
POLYETHYLENE SHEETING AS ASBESTOS OR LEAD CONTAMINATED WASTE, AS
APPLICABLE TO THE WORK.
14. THE CONTRACTOR SHALL PROVIDE AT LEAST 48 HOUR ADVANCE NOTICE,
PRIOR TO CANCELING ANY WORK SHIFT, AND SHALL BE RESPONSIBLE FOR ALL
RESULTING CONSULTANT COSTS IF TIMELY NOTICES NOT RECEIVED. PROVIDE
AT LEAST 48 HOURS ADVANCE NOTICE PRIOR TO STARTING OR RE-STARTING
HAZARDOUS MATERIALS RELATED WORK OR ABATEMENT.
1. ONLY ONE PRE-APPROVED BRACING SYSTEM SHALL BE USED FOR A RUN OF
PIPE, DUCT, OR CONDUIT. ANY SUBSTITUTION OF ANY COMPONENT OF A
PRE-APPROVED BRACING SYSTEM SHALL REQUIRE OWNER REVIEW AND
APPROVAL. COMPONENTS OF TWO OR MORE BRACING SYSTEMS SHALL NOT
BE MIXED. A COPY OF THE CHOSEN BRACING SYSTEM(S) INSTALLATION
GUIDE/MANUAL SHALL BE ON THE JOBSITE PRIOR TO STARTING THE
INSTALLATION OF HANGERS AND/OR BRACES. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO OBTAIN COPIES OF OSHPD PRE-APPROVALS AND FURNISH
THE OWNER WITH A COPY OF EACH.
2. IF AN OSHPD PRE-APPROVED BRACING SYSTEM IS UTILIZED, PROVIDE COPIES
OF PRE-APPROVED DETAILS ON JOB SITE PRIOR TO STARTING INSTALLATION
OF THE COMPONENT OR SYSTEM. A COPY OF THE CHOSEN BRACING
SYSTEM(S) INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOBSITE PRIOR TO
STARTING THE INSTALLATION OF HANGERS AND/OR BRACES.
3. IN NEW WORK AREAS AND LIMITED NEW WORK AREAS ALL NEW PIPING,
CONDUIT, DUCTWORK, EQUIPMENT, PANELS, ETC. SHALL BE SEISMICALLY
BRACED (SEE NOTE 4 BELOW).
4. SEISMIC ANCHORAGE OF ALL NEW PIPING, CONDUIT, DUCTWORK, EQUIPMENT,
PANELS, ETC. SHALL BE BY ONE OF THE FOLLOWING MANUFACTURERS IN
ACCORDANCE WITH THE 2019 CBC AND THE LATEST ISSUE OF "ENGINEERED
SEISMIC BRACING OF SUSPENDED UTILITIES" AS PUBLISHED BY THE
INTERNATIONAL SEISMIC APPLICATION TECHNOLOGY (ISAT). APPROVED
MANUFACTURERS INCLUDE: ISAT OPM-0403-13, MASON INDUSTRIES
OPM-0043-13, B-LINE/TOLCO OPM-0052-13, OR EQUAL.
5. DEFERRED APPROVAL - LAYOUT DRAWINGS, SHOWING THE BRACING/SUPPORT
LOCATIONS AND REFERENCES TO DETAILS FROM THE RELEVANT OSHPD
PRE-APPROVALS FOR PIPING/DUCTS/CONDUITS EXCEPT FIRE SPRINKLERS,
NEED TO BE SUBMITTED FOR USE BY THE INSPECTOR IF RECORD (IOR) (IF
APPLICABLE FOR THIS PROJECT) AND OWNER. THE LAYOUT DRAWINGS,
PREPARED PER ASCE 7 CHAPTER 13 AS MODIFIED BY CBC SECTIONS
1613A/1615A, NEED TO BE REVIEWED AND ACCEPTED BY THE EOR (SE AND/OR
ME/EE) AND OWNER PRIOR TO STARTING INSTALLATION OF THE
BRACING/SUPPORT. IOR (IF APPLICABLE FOR THIS PROJECT) SHALL ENSURE
THE ABOVE REQUIREMENTS ARE SATISFIED.
6. AT LEAST FOUR WEEKS PRIOR TO BEGINNING INSTALLATION, FOUR COPIES OF
THE PLANS SHALL BE SUBMITTED TO THE ARCHITECT OF RECORD WHO WILL
SUBMIT THEM TO THE STRUCTURAL ENGINEER OF RECORD FOR REVIEW AND
APPROVAL. THE PLANS SHALL BE COORDINATED WITH THE PLANS OF THE
OTHER TRADES. A COPY OF THE CHOSEN BRACING SYSTEM INSTALLATION
GUIDE/MANUAL SHALL BE ON THE JOBSITE PRIOR TO STARTING THE
INSTALLATION. SEE DEFERRED APPROVAL NOTES ON ARCHITECTURAL SHEET
T0.1.
7. CONTRACTOR SHALL PROVIDE CALCULATIONS AND DETAILS FOR THE
SUPPORT AND BRACING OF ALL PIPES, DUCTS, EQUIPMENT AND CONDUITS.
SHOP DRAWINGS SHALL INCLUDE ALL BRACING AND SUPPORT LOCATIONS
AND REFERENCES TO DETAILS.
FROM RELEVANT OSHPD PRE-APPROVALS AND SHALL BE SUBMITTED TO THE
IOR (IF APPLICABLE FOR THIS PROJECT) AND OWNER.
8. EQUIPMENT SUPPORTS AND ANCHORAGE SHALL BE APPROVED BY THE
APPROPRIATE DESIGN PROFESSIONAL OF RECORD AND PRIOR TO
INSTALLATION. THE IOR (IF APPLICABLE FOR THIS PROJECT) SHALL ASSURE
THAT THE FIELD INSTALLATION CONFORMS TO APPROVED SUBMITTED
DETAILS.
9. SEISMIC LATERAL FORCE Fp, INCLUDING ap & Rp MUST BE DETERMINED AT
EACH LEVEL OF THE BUILDING BY THE CONTRACTOR'S STRUCTURAL
ENGINEER SO THAT THE BRACING SPACING CAN BE CALCULATED AND
SUBMITTED TO THE SEOR FOR REVIEW.
10. ONCE EXACT LOCATIONS OF ALL CONDUIT HAVE BEEN ESTABLISHED, THE
STRUCTURAL ENGINEER MUST CHECK THE ADEQUACY OF THE SUPPORTING
STRUCTURE TO ENSURE THAT THE ORIGINAL DESIGN IS STILL ADEQUATE. THE
INSPECTOR OF RECORD SHALL ENSURE THAT ALL WORK IS PROPERLY
INSTALLED PER THE APPLICABLE OSHPD PRE-APPROVAL.
11. SPECIAL INSPECTION SHALL BE PERFORMED BY SPECIAL INSPECTOR IN
ACCORDANCE WITH CBC 1705A.12.4 FOR SPECIAL SEISMIC CERTIFICATION.
PRE-APPROVED COMPONENT AND SYSTEM LIMITATIONS:
A. SOME PRE-APPROVALS HAVE LIMITATIONS THAT REQUIRE EITHER A DEFERRED
SUBMITTAL COMMENT ON LAYOUT DRAWINGS AND COMPONENT DESIGN OR A
PRE-ENGINEERED DESIGN THAT IS A PART OF THE CONTRACT DOCUMENTS. ALL
OF THE PRE-APPROVED SYSTEMS REQUIRE THAT THE SEISMIC LATERAL FORCE,
Fp, INCLUDING CONSIDERATION OF Ap AND Rp BE DETERMINED AT EACH LEVEL
OF THE BUILDING SO THAT BRACE SPACING AND ANCHORAGE REQUIREMENTS
CAN BE DETERMINED. PROVIDE ALL PARAMETERS REQUIRED TO COMPUTE Fp (e.g. Ap,Rp,Sps,Ip,h AND z AT EACH LEVEL) ON THE SHOP DRAWINGS. THE SEOR
MAY APPROVE SEISMIC LATERAL FORCE COMPUTATIONS SUBMITTED BY THE
CONTRACTOR.
PRE-APPROVED PIPE, DUCT, AND CONDUIT BRACING:
A. SHOP DRAWINGS OF THE SUPPORT AND BRACING SYSTEMS PER THE
PRE-APPROVAL SHALL BE SUBMITTED TO THE DISCIPLINE IN RESPONSIBLE
CHARGE OF THE PROJECT FOR REVIEW TO VERIFY THAT THE DETAILS ARE IN
CONFORMANCE WITH ALL CODE REQUIREMENTS. THE SHOP DRAWINGS SHALL
BE IN ACCORDANCE WITH ASCE 7-10 SECTION 13.6 AS MODIFIED BY THE CBC
2016 SECTION 1614A.
a) THE CONTRACTOR'S STRUCTURAL ENGINEER SHALL FORWARD THE
ANCHORAGE AND BRACING PLANS (INCLUDING APPROVED CHANGE
ORDERS FOR SUPPLEMENTARY FRAMING WHERE REQUIRED) TO THE
STRUCTURAL ENGINEER OF RECORD (SEOR) WITH A NOTATION INDICATING
THAT THE PLANS HAVE BEEN REVIEWED AND ARE IN GENERAL
CONFORMANCE WITH THE PRE-APPROVAL AND THE DESIGN OF THE
PROJECT.
b) A "SHOP DRAWING STAMP" MAY BE USED TO INDICATE COMPLIANCE WITH
THIS REQUIREMENT.
c) THE REGISTERED DESIGN PROFESSIONAL (OTHER THAN SEOR) MAY
PROVIDE THE SHOP DRAWING STAMP FOR SMALL INSTALLATIONS AT THE
DISCRETION OF THE SEOR.
B. THE CONTRACTOR'S STRUCTURAL ENGINEER SHALL DESIGN ANY
SUPPLEMENTARY FRAMING THAT IS NEEDED TO RESIST THE LOADS, MAINTAIN
STABILITY AND/OR IS REQUIRED FOR INSTALLATION OF PRE-APPROVED
SYSTEM. THE SUPPLEMENTARY FRAMING SHALL BE SUBMITTED TO THE SEOR
PRIOR TO CONSTRUCTION FOR REVIEW.
C. THE SHOP DRAWINGS (WITH THE SHOP DRAWING STAMP) SHALL BE SUBMITTED
TO THE SEOR TO REVIEW THE Fp FOR PRE-APPROVED SYSTEM.
D. THE SHOP DRAWINGS (WITH THE SHOP DRAWING STAMP) SHALL BE KEPT ON
THE JOBSITE AND CAN THEN BE USED FOR INSTALLATION OF THE SUPPORT AND
BRACING.
CONT. SEISMIC PROTECTION NOTES CONT. APPLICABLE CODES & STANDARDS
HAZARDOUS MATERIAL,
SEISMIC PROTECTION,
APPLICABLE CODES &
STANDARDS NOTES
T0.2
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D S H
-A \C
A D
\2 T .d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
503A
532 531
CS-40
546 542
510A
504A
505A
5B
5A
506A
508A
MB-104
MB-107
MB-103
MB-101
607 606
509B
508B
506B
B
305304
503B
502B
501B 510B
S-16
512A
(110A)
S-8
SB-2
SB-3
MB-102
CS-35 - CS-37
SB-1
CS-25
CS-38
SB-5
CS-39
S-18 S-19
S-7
CS
-23
CS
-24
SB-4
CS-17 CS-31
&CS-32
CS-1 - CS-16
CS-18 - CS-22
S-17
CS-33 & CS-34
S-1
S-3 S-2
S-4
S-5
S-15
509A
S-10
S-12
S-13
S-11
S-9 511A
CS-26
-CS-30
B
S-6
510C
502A
FIRE ACCESS SITE PLAN
NO SCALE N
SITE ACCESS FROM PUBLIC RIGHT
OF WAY AND FROM ATASCADERO
HOSPITAL FIRE DEPARTMENT
USING EXISTING PAVED ROADS
FIRE ACCESS SITE
PLAN
T0.3
LEGEND:
FIRE TRUCK ROUTE
(E) FIRE HYDRANT
BUILDING 830
SEE SHEET T0.5 FOR FIRE
SEPARATION DISTANCE
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D S H
-A \C
A D
\2 T .d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
ITEM
SUBMITTAL REQUIREMENTS SUBMITTAL RESPONSE REFERENCE
GENERAL
SEE FOR SPECIFIC SECTION COMMENTS NOT APPLICABLE
PROVIDE A COMPLETE PLAN REVIEW APPLICATION
SUBMIT PLANS SUFFICIENT SIZE
PROVIDE SITE ADDRESS
PROVIDE NAME OF OWNER AND OCCUPANT
IDENTIFY IF NEW CONSTRUCTION OR T.I.
IDENTIFY IF NEW OR EXISTING TENANT SPACE
IDENTIFY IF DEFERRED SUBMITTAL
ADD OSFM FILE NUMBER TO TITLE SHEET
PROJECT IS A PHASED SUBMITTAL
SLIP SHEETS SHALL BE BOUND TO SET
SHEET INDEX
WET STAMP AND SIGN SHEETS
ELECTRONIC SIGNATURE APPROVAL REQUIRED
SCOPE OF WORK
PROVIDE A KEY PLAN COORDINATED TO EACH SHEET
PROVIDE A NORTH ORIENTED SITE MAP
ORIENTATE ALL SHEETS TO NORTH
PROVIDE ADOPTED CODE CYCLE LISTINGS AND STANDARDS
PROVIDE A LEGIBLE SCALE. TYPICALLY 1/8"
PROVIDE APPROVED REFERENCE PLANS/DOCUMENTATION
PROVIDED WITH SUBMITTAL
FLOOR PLANS ARE 1/8"=1' MINIMUM
10333 EL CAMINO REAL, ATASCADERO, CA 93422
OWNER: DEPARTMENT OF STATE HOSPITAL
T.I.
EXISTING
ALL RELEVANT
SHEETS
N/A
T0.1
T0.1
OSFM NO 22-S-4241-C-DR IS NOTED ON THE TITLE SHEET T0.1
PROJECT IS NOT PHASED
NOT APPLICABLE
SHEET INDEX IS ON T0.1 T0.1
ELECTRONIC SIGNATURE PROVIDED ON DOCUMENT ALL SHEETS
SCOPE OF WORK IS INCLUDED ON TITLE SHEET T0.1
SITE KEY PLAN IS PROVIDED
NORTH ORIENTED SITE PLAN IS PROVIDED
ALL RELEVANT
SHEETS
SITE PLAN IS ORIENTED TO NORTH, INDIVIDUAL DRAWINGS HAVE KEYPLAN
ALL RELEVANT
SHEETS
ADOPTED CODE CYCLE LISTINGS ARE INCLUDED ON TITLE SHEET
ALL FLOOR PLANS ARE 1/8" SCALE MINIMUM. ALL SITE PLANS ARE 1"=30'
RELEVANT SHEETS FROM THE APPROVED PLANS ARE ATTACHED AS REFERENCE.
SEE REFERENCE
DRAWINGS
T0.1
ITEM SUBMITTAL REQUIREMENTS SUBMITTAL RESPONSE REFERENCE
ACCESS AND WATER SUPPLY
PROVIDE LOCAL FIRE AUTHORITY APPROVAL LETTER
FIRE DEPARTMENT ACCESS
FIRE DEPARTMENT CONNECTION
FIRE HYDRANTS
FIRE ALARM ANNUNCIATOR
FIRE ALARM CONTROL PANEL
KNOX BOX/KEY SWITCH
EMERGENCY RESPONDER RADIO COVERAGE
ELEVATOR GURNEY ACCOMODATION
PROVIDE A COMPLETE FIRE ACCESS PLAN
PROVIDE 6 MO. CURRENT SITE FIRE FLOW INFORMATION
OTHER
ALL RELEVANT
SHEETS
ALL RELEVANT
SHEETS
OCCUPANT: DEPARTMENT OF STATE HOSPITAL
ELECTRONIC DOCUMENT SIGNATURE APPROVAL LETTER ATTACHED LETTER
PROVIDED ON SITE PLAN
T0.3
NOT APPLICABLE
NOT APPLICABLE
LOCAL FIRE DEPARTMENT SHOWN ON SITE PLAN
NOT APPLICABLE - BUILDING HAS ONLY 1 LEVEL AND DOES NOT HAVE AN
ELEVATOR
ALL BUILDINGS ARE FIRE TRUCK ACCESSIBLE USING EXISTING ROADS
N/A
T0.5
T0.3
T0.3
PROVIDED ON SITE PLAN
NOT AVAILABLE - USE FIRE HYDRANTS
NOT AVAILABLE
-N/A
T0.1
STATE FIRE MARSHAL
TRIAGE LIST
T0.4
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 T .d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
SEE A1 EXITING PLAN
1 10-31-22 SFM COMMENTS
OCCUPANCY: A/B/F-1/I-3
YEAR BUILT 1954; NEW WAREHOUSE
1=STORY; WAREHOUSE=3 STORIES
AREA: 70,172; WAREHOUSE 20,488
BUILDING IS PARTIALLY SPRINKLERED
AND PROTECTED WITH A FULLY
AUTOMATIC FIRE ALARM SYSTEM
15'.
NON-OCCUPIED (E) EQUIPMENT BUILDINGS
(E) MAINTENANCE BUILDING
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL
TRANSFER PIPING
AT BUILDING 830
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
DSHDN
DN
88'-6"
1.4"
7 OCC
56'
.6"
3 OCC
17'-6"
.2"
1 OCC
135'-6"
4.4"
22 OCC
28' -6"
49' -0"
9' -6"
20' -0"
6"
10' -6"
6' 0"
13' -0"
(E) EQUIP MEZZ
(E) BOILER ROOM
(E) ELECTRICAL
RM
25 (E) ELECT RM
(E) EMERGENCY
GENERATOR RM
35'
.6"
3 OCC
1/8" = 1'-0"
BUILDING 830
GENERAL NOTES:
1. MAXIMUM TRAVEL DISTANCE SHALL NOT
EXCEED 200' IN COMPLIANCE WITH CBC
TABLE 1017.2.
2. THIS DRAWING SHOWS EXIT FEATURES IN A
DIAGRAMMATIC WAY.
3. ALL SINGLE EXIT DOORS ARE 33 INCHES
CLEAR AND WILL ACCOMODATE 165
OCCUPANT LOAD.
4. ALL DOUBLE EXIT DOORS ARE 68 INCHES
CLEAR AND WILL ACCOMODATE 340
OCCUPANT LOAD.
35'
.35"
TOTAL NUMBER OF
OCCUPANTS
SERVED BY EXIT
TOTAL EXIT ACCESS
TRAVEL DISTANCE
(FEET)
TOTAL EGRESS
WIDTH REQUIRED (IN
INCHES)
EXIT ACCESS TRAVEL PATH
THIS PORTION OF (E) EXIT PATH, FOR ROOM
24, EXTENDS UNDER THE MEZZANINE
(E) FIRE EXTINGUISHER AND EXIT SIGN AT EA EXIT DOOR, TYP
(E) FIRE EXTINGUISHER AND EXIT SIGN AT EA EXIT DOOR, TYP
TOTAL AREA
ROOM SCHEDULE
A1
EXITING PLAN
DRAWING ADDED
1 10-31-22 SFM COMMENTS
D A T E /T
IM
E O c t
:5
P M
F
IL
E
C h a d a m
\J C C
\A ta s c a d e ro
\F u e l O il T ra n s fe r P ip in g \R e v is e d D ra w in g s
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
MECHANICAL COVER
SHEET
M0.1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 M
.d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
TYPE OF DIFFUSER OR GRILLE
POINT OF DISCONNECTION
SHEET WHERE DETAIL IS DRAWN
ROOM THERMOSTAT
8x8 OR 10ø
DUCT SIZE IN INCHES
T
DETAIL NO.
NEW WORK KEY NOTE
DEMOLITION KEY NOTE
POINT OF CONNECTION
MANUAL DAMPER
MOTORIZED DAMPERM
AIR VOLUME FROM SUPPLY
DIFFUSER OR TO RETURN GRILLE IN
CFM
EXHAUST
CUBIC FEET PER
ABOVE FLOOR
ACCESS DOOR
GALLONS PER MINUTE
GAUGEGA.
GPM
EXH.
A.D.
A.F.
CFM
DOMESTIC HOT WATER
FUEL OIL PIPING
WASTE
INDUSTRIAL COLD WATER
CONDENSATE DRAIN
FIRE SPRINKLER LINE
COMPRESSED AIR
VENT
CW
HW
ICW
W
CD
F
CA
V
SYMBOL DESCRIPTION
CONTROL VALVE
M MOTOR ACUATED MODULATING
SYMBOL
S
A
PUMP
P
PRESSURE RELIEF
AUTOMATIC AIR VENT
PETE'S PLUG
PRESSURE GAUGE
THERMOMETER
PNEUMATIC ACTUATED
SOLENOID ACTUATED
PRESSURE REGULATOR
ANGLE VALVE
CHECK VALVE
VENTURI FLOW METER
PLUG VALVE
GAS VALVE
STRAINER
GLOBE VALVE
BUTTERFLY VALVE
DESCRIPTION
GATE VALVE
BALL VALVE
MECHANICAL PIPING SYMBOLS
MINUTE
EXISTING(E)
OPENING
PLATFORM
OPNG.
PLAT.
POINT OF DISCONNECTPOD
NEW(N)
MECHANICAL ABBREVIATIONS
POINT OF CONNECTIONPOC
CONDENSER WATER SUPPLYCWS
CONDENSER WATER RETURNCWR
CONDENSER WATERCW
BUILDING MANAGEMENT SYSTEMB.M.S.
DEMO(D)
GENERAL NOTES MECHANICAL SYMBOLS
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPERVISION, MATERIALS,
EQUIPMENT, TOOLS, TRANSPORTATION, WAREHOUSING, AND ANY OTHER
SERVICES REQUIRED TO COMPLETE THE WORK IN A TIMELY AND EFFICIENT
MANNER.
2. INDIVIDUAL ITEMS OF WORK ARE DETAILED IN THE VARIOUS SECTIONS OF THIS
SCOPE OF WORK, THE ATTACHED DRAWINGS, AND THE NOTES AND LEGENDS
ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO COMPLETE THE
REQUIREMENTS FOUND IN ANY OF THE ABOVE.
3. CONTRACTOR BIDS ARE TO BE BASED UPON COMPLETING THE WORK WITHIN
THE AMOUNT BID. ANY QUESTIONS PERTAINING TO UNKNOWN CONDITIONS,
CHANGES IN DESIGN, OMISSIONS IN THE DESIGN OR SCOPE OF WORK,
MATERIALS, AND INSTALLATION TECHNIQUE ARE TO BE DISCUSSED WITH THE
PROJECT MANAGER. THE PROJECT MANAGER WILL GET THE ANSWERS TO
QUESTIONS, AS SOON AS POSSIBLE, IF "ON-THE-SPOT" ANSWERS CAN NOT BE
PROVIDED. UNKNOWN CONDITIONS ENCOUNTERED DURING THE COURSE OF
WORK, WHICH MAY DELAY WORK OR ADD COST, WILL BE REPORTED TO THE
PROJECT MANAGER IMMEDIATELY-SO THAT PROPER ARRANGEMENTS CAN BE
MADE WITHOUT WORK STOPPAGE.
4. ALL WORK SHALL BE IN COMPLIANCE WITH THE EDITION OF THE OWNERS
STANDARDS AND REQUIREMENTS CURRENTLY IN FORCE AND ALL LOCAL
ORDINANCES AND REQUIREMENTS.
5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL ALL
TEMPORARY BRACING AND SHORING OF EQUIPMENTS TO INSURE THE SAFETY
OF THE WORK UNTIL IT IS IN ITS COMPLETED FORM.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL
APPLICABLE SAFETY LAWS ARE STRICTLY ENFORCED AND TO MAINTAIN A
SAFE CONSTRUCTION PROJECT.
7. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS DAMAGED BY
DEMOLITION OR CONSTRUCTION, AND FINISH TO MATCH EXISTING ADJACENT
SURFACES.
8. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" DRAWINGS TO THE OWNER
REPRESENTATIVE PROJECT MANAGER UPON COMPLETION OF
CONSTRUCTION.
9. DAILY, AND UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE
DEBRIS, RUBBISH, WASTE, AND SURPLUS MATERIAL FROM THE PREMISES.
10. THE CONTRACTOR SHALL PROTECT AND COVER ALL FIXTURES AND
EQUIPMENT IN AREAS AFFECTED BY WORK, AND UPON COMPLETION OF WORK,
SHALL THOROUGHLY CLEAN ALL FIXTURES, EQUIPMENT, WALLS, CEILING,
FLOOR, AND HARDWARE.
11. ALL PERMITS SHALL BE OBTAINED AS REQUIRED BY LOCAL CODES AND AHJ.
12. CONTRACTOR SHALL VERIFY ALL INDOOR/OUTDOOR DIMENSIONS AND
OUTDOOR JOB CONDITIONS AT THE JOB SITE PRIOR TO BID, DO NOT SCALE
DRAWINGS.
13. CONTRACTOR SHALL PROVIDE ALL PLAN CHECK SERVICES, WHERE
APPLICABLE.
14. CONTRACTOR SHALL OBTAIN A BURN PERMIT FOR ALL HOT WORK FROM FIRE
PREVENTION COORDINATOR.
15. FOR PURPOSES OF CLEARNESS AND LEGIBILITY, THE CONTRACT DRAWINGS
ARE ESSENTIALLY DIAGRAMMATIC AND, ALTHOUGH LOCATION OF THE
EQUIPMENT IS DRAWN TO SCALE, THE CONTRACTOR SHALL MAKE USE OF ALL
DATA IN ALL THE CONTRACT DOCUMENTS, TO ACCOMPLISH A COMPLETE,
OPERABLE AND MAINTAINABLE INSTALLATION.
16. ALL INSULATION AND COVERINGS INSTALL ON PIPING AND TUBING SHALL HAVE
A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY NOT TO
EXCEED 50 WHEN TESTED IN ACCORDANCE WITH NFPA 255. (PER PARAGRAPH
1201.2.1.8 CMC 2019.
17. CONTRACTOR SHALL MEET OWNER'S CONSTRUCTION STANDARDS.
18. THE SYSTEM SHALL REMAIN OPERATIONAL EXCEPT FOR SCHEDULED
SHUT-DOWNS.
19. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND SCHEDULE WITH
FACILITY ENGINEER "OFF-HOURS" GENERAL SYSTEM SHUT-DOWN OF THE
UTILITIES.
20. ALL NEW PIPE AND EQUIPMENT SUPPORTS AND SEISMIC SHALL COMPLY WITH
OSHPD REQUIREMENTS AND ASCE/SEI 7.
21. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE A FULLY FUNCTIONAL
INSTALLATION AND TO INTEGRATE THE NEW WORK TO EXISTING SITE
CONDITIONS.
22. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF PIPING, CONTROLS AND
PIPING SYSTEMS TO OWNER REPESENTATIVE FOR APPROVAL PRIOR TO
FABRICATION. CONTRACTOR SHALL PROVIDE EQUIPMENT SUBMITTALS OF ALL
HARDWARE TO BE INSTALLED ON THIS JOB PRIOR TO PURCHASE.
23. CONTRACTOR SHALL LABEL FINAL PIPING INSTALLATION SHOWING DIRECTION
OF FLOW ARROWS AND TYPE OF WATER (E.G. CONDENSER WATER SUPPLY,
AND RETURN, VENT, DRAIN, ETC).
24. CONTRACTOR SHALL PROVIDE ONE (1) HARD COPY AND ONE (1) SOFT COPY OF
EQUIPMENT SUBMITTALS OR SHOP DRAWINGS OF ALL EQUIPMENT SPECIFIED
IN THE MATERIAL LIST AND SCHEDULES ON DRAWINGS M0.2, TO OWNER
REPRESENTATIVE FOR APPROVAL PRIOR TO PURCHASE.
25. CONTRACTOR SHALL PROVIDE ONE (1) HARD COPY AND ONE (1) SOFT COPY OF
OPERATION & MAINTENANCE MANUALS OF ALL EQUIPMENT SPECIFIED.
26. CONTRACTOR SHALL INSTALL NEW PIPING WITH SPOOL SECTIONS TO ALLOW
MAINTENANCE ACCESS TO NEW EQUIPMENT PER EQUIPMENT
MANUFACTURER'S REQUIREMENT AND ALL CODE CLEARANCES.
MECHANICAL PIPING LEGEND
SYMBOL DESCRIPTION
FUEL SYSTEM NOTES
1. REFER TO SPECIFICATIONS AND SHEETS M0.1, M2.1, and M3.1 FOR FUEL
SYSTEM REQUIREMENTS.
2. CONTRACTOR SHALL USE A SINGLE SUPPLIER AND SHALL PROVIDE ALL
COMPONENTS OF FUEL SYSTEM FOR A COMPLETE WORKING SYSTEM.
3. COORDINATE WITH ELECTRICAL SHEETS FOR ELECTRICAL REQUIREMENTS.
4. CONTRACTOR SHALL PAINT ALL NEW FUEL PIPING PER SPECIFICATIONS.
MECHANICAL GENERAL NOTES
1. ALL WELDING ON PROJECT SHALL BE PER ASME B31.1 STANDARDS.
2. CONTRACTOR SHALL PROVIDE PIPING LABELS WHICH SHOW DIRECTION OF
FLOW AND TYPE OF SERVICE. ALL NEW LINES SHALL BE LABELED PER
SPECIFICATIONS.
3. ALL UTILITIES SHUTDOWNS SHALL BE REQUESTED 72 HOURS IN ADVANCE FOR
APPROVAL.
4. ALL JOB SITE WORK HOURS SHALL BE COORDINATED WITH THE INSTITUTION.
5. ALL EQUIPMENT CONNECTIONS SHALL NOT HAVE A DIAMETER LESS THAN
THAT OF THE INLET CONNECTIONS TO THE EQUIPMENT AS PROVIDED BY THE
MANUFACTURER AND EACH EQUIPMENT SHALL BE CONNECTED TO THE PIPING
WITH MATERIALS AS APPROVED IN 2019 CPC.
MP MPRN RN
ADDITIVEADD
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
X
X X X X X X X
MECHANICAL
DEMOLITION
FLOOR PLAN
M1.1
MECHANICAL DEMOLITION FLOOR PLAN
SCALE:
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 M
.d w g
D A T E /T
IM
E N o v
:3
P M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
(E) 8000 GALLON
MAIN STORAGE TANK 2
(E) 8000 GALLON
MAIN STORAGE TANK 1
(E) FUEL OIL
PUMP TO
BOILERS
DEMOLITION KEYNOTES:
DAY TANK TO BE REPLACED.
FUEL OIL POLISHING STATION TO BE REMOVED.
FUEL OIL PUMP TO BE REMOVED.
FUEL OIL HAND PUMP TO BE REMOVED.
EXISTING UNDERGROUND TANK TO BE DISCONNECTED.
EXISTING UNDERGROUND PIPING TO BE
DISCONNECTED AND CAPPED.
EXISTING FUEL OIL POLISHING TRANSFER ASSEMBLY
INCLUDING CIRCULATION PUMPS AND STRAINERS TO
BE REMOVED. PREPARE EXISTING TANK INLETS AND
OUTLETS FOR NEW PIPING.
GENERAL NOTES:
1. EXISTING UNDERGROUND FUEL TANK REMOVAL IS
UNDER SEPARATE PROJECT AT DSH. SEPARATE
PROJECT INCLUDES DRAINING AND REMOVAL PROCESS.
N
0 FEET8
1/8" = 1'-0"
4 16
MP MPRN RN
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
MECHANICAL NEW
WORK FLOOR PLAN
M2.1
MECHANICAL NEW WORK FLOOR PLAN
SCALE:
MP MP
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
(E) FUEL OIL
PUMP TO
BOILERS
NEW WORK KEYNOTES:
CONNECT 2" SUPPLY AND RETURN PIPING TO EXISTING
AND ROUTE TO NEW FUEL OIL PUMP SKID AND DAY TANK.
SUPPORT PIPING AS REQUIRED. ALL FUEL PIPING SHALL
BE SCH 80 SOCKET WELDED AND SHALL BE PRESSURE
TESTED PRIOR TO USE.
REFER TO SHEET M3.1 FOR TOP TANK CONNECTIONS.
FUEL OIL PUMP SKID. SEE M3.1 FLOW DIAGRAM AND 1/M3.2
FOR DETAILS.
SECURE PIPING WITH CLAMPS TO SUPPORTS. PIPING
SUPPORTS SHALL BE SPACED PER DETAIL 2/M3.2. ADD
SUPPORTS AND/OR INCREASE WIDTH OF SUPPORTS AS
REQUIRED BASED ON ACTUAL PIPING LAYOUT.
ADD ALTERNATE: FUEL OIL POLISHING STANDALONE
STATION. SEE 3/M3.2.
EXTEND DAYTANK 4" VENT UP THROUGH ROOF.
NEW FUEL OIL RETURN PUMP MOUNTED ON DAYTANK.
NEW DAY TANK. UL 142 DOUBLE WALL RECTANGULAR 500
GALLON FUEL STORAGE DAY TANK, INCLUDES
EXTERNAL POLYURETHANE COATING (WHITE), KINDORF
FOR CONTROLS MOUNTING, AND CONTAINMENT LIP.
REFER TO M3.1 FOR ADDITIONAL INFORMATION.
REPAIR ALL WALL SURFACES DISTURBED BY NEW
CONSTRUCTION SO THAT WALL IS MADE WEATHERTIGHT.
PROVIDE NEW PAINT SURFACE AT INTERIOR WALL
SURFACES DISTURBED BY NEW CONSTRUCTION.
ROOF PIPE SUPPORTS. SEE DETAIL ON 1/M3.3 AND 2/M3.3.
(N) DAY TANK
2" FUEL
OIL PIPING
(INSIDE)
(E) 8000 GALLON
MAIN STORAGE TANK 2
(E) 8000 GALLON
MAIN STORAGE TANK 1
FUEL SYSTEM NOTES:
1. CONTRACTOR SHALL INSTALL ALL PIPING, FUEL
EQUIPMENT, ALL ELECTRICAL WIRING AND CONTROLS
WIRING ON DAY TANK, FUEL FILTRATION AND FUEL
SYSTEM CONTROL PANEL FOR A COMPLETE WORKING
SYSTEM AND SHALL CONNECT TO EXISTING WIRING FOR
MAIN TANK.
2. EXISTING ABOVE GROUND STORAGE TANKS SHALL BE
PER NFPA 30 (NATIONAL FIRE PROTECTION
ASSOCIATION). TANK SHALL HAVE DOUBLE WALL
CONTAINMENT AND SHALL BE BUILT PER UL142 WITH
UL508 COMPLIANT DAY TANK CONTROLS AND
REQUIREMENTS PER 2019 IFC (INTERNATIONAL FIRE
CODE).
3. FINAL NUMBER AND TYPES OF TOP CONNECTIONS ON
DAYY TANK SHALL BE COORDINATED WITH TANKA ND
CONTROLS MANUFACTURER. NUMBER AND TYPES OF
TOP CONNECTIONS SHOWN ON THIS DRAWING ARE FOR
REFERENCE.
4. SIGNAGE AND MARKINGS SHALL BE INSTALLED PER
NFPA 704.
5. FUEL SYSTEM AND TANKS SHALL BE CONNECTED TO
MASTER CONTROLLER.
6. CONTRACTOR SHALL ROUTE PIPING TO AND FROM DAY
TANK TO GENERATOR PER MANUFACTURER'S
REQUIREMENTS.
7. SEE SHEET M3.2 FUEL OIL SYSTEM FLOW DIAGRAMS AND
SPECIFICATIONS FOR ADDITIONAL COMPONENTS NOT
SHOWN ON THIS SHEET.
8. ALL PIPING IS TO BE SOCKET WELDED AND SHALLBE
PRESSURE TESTED PRIOR TO START UP.
9. FUEL SYSTEM PUMPS AND STORES DIESEL FUEL.
10. FINAL INSTALLATION OF DAY TANK, FUEL PIPING AND ALL
OTHER COMPONENTS SHALL BE IN ACCORDANCE WITH
AN APPROVED PIPING FLOW DIAGRAM AND CONNECTION
DETAILS PROVIDED BY CONTRACTOR'S FUEL DESIGNER
AND APPROVED BY MECHANICAL ENGINEER OF RECORD
(MEOR).
11. ADD ALTERNATE: PROVIDE SEPARATE LINE ITEMS IN THE
BID FOR ADDITIONAL ALTERNATE SCOPE IDENTIFIED IN
KEYNOTES.
2" FUEL
OIL PIPING
(INSIDE)
2" FUEL OIL
PIPING ON ROOF.
(TYP)
42" FUEL OIL
PIPING ON ROOF.
N
0 FEET8
1/8" = 1'-0"
4 16
(TYP)
RN RN
1 10/31/22 SFM COMMENTS
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
FUEL OIL PIPING
FLOW DIAGRAM
M3.1
FUEL OIL PIPING FLOW DIAGRAM
SCALE: NOT TO SCALE
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 M
.d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
(N) DAY TANK 1
(E) 8000 GALLON
MAIN STORAGE TANK 2
(E) 8000 GALLON
MAIN STORAGE TANK 1
DUPLEX PUMP SKID
ANTI-SIPHON
VALVE BALL
VALVE
4" E-VENT
4" E-VENT
(SECONDARY)
2" STICK PORT
2" VENT
2" CLOCK GAUGE
RETURN PUMP SENSOR
SUPPLY LEVEL SENSOR
TO GENERATOR
COMPOUND GAUGE
BALL VALVE
COMPOUND GAUGE
DUPLEX STRAINER
PRESSURE GAUGE
COMPOUND GAUGE
BALL VALVE
3" TANK FILL
2" VENT
E-VENT
E-VENT
CMFTS MT ASV VALVE ASSEMBLY
(SEE 5/M3.2)
MAIN TANK OVERFILL SENSOR
TANK LEAK
SENSOR
TANK LEVEL
PROBE
CMFTS MT RVA
VALVE ASSEMBLY
LEAK SENSOR
GENERAL NOTES:
1. ALL CONNECTIONS ARE NOT SHOWN HERE. REFER TO
SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL
REQUIREMENTS. FINAL TANK CONNECTIONS SHALL BE
DETERMINED BY MANUFACTURER BASED UPON
SPECIFICATIONS AND CONTROL REQUIREMENTS.
COOLING FLOW SEQUENCE
1. WHEN DAY TANK TEMPERATURE REACHES 120°F,
THE RETURN PUMP WILL TURN ON WHICH WILL
INITIATE SEQUENCE FOR MAIN TANK PUMP TO TURN
ON AND SUPPLY FUEL FROM THE MAIN TANK TO THE
DAY TANK. THIS SUPPLY AND RETURN LOOP WILL
CONTINUE UNTIL THE TEMPERATURE OF THE FUEL
IN THE DAY TANK LOWERS TO 80°F.
2. NOTE: THESE TEMPERATURES ARE BASED ON THE
MAX TEMPERATURE OF 150°F ALLOWED FOR THE
GENERATOR INJECTORS. FURTHER ANALYSIS IS
REQUIRED BY INSTALLING CONTRACTOR PRIOR TO
FINAL PROGRAMMING OF SEQUENCE.M3.1
95% 90%
LS
95%
3" TANK FILL
2" VENT
E-VENT
E-VENT
CMFTS MT ASV VALVE ASSEMBLY
(SEE 5/M3.2)
MAIN TANK OVERFILL SENSOR
TANK LEAK
SENSOR
TANK LEVEL
PROBE
CMFTS MT RVA
VALVE ASSEMBLY
95% 90%
LS
95%
LK-2A
LP-2
LK-2A
LP-2
90% 80%
70%
60% 50%
LS-1A
LK-1D
CMFTS CV-HL 3/4"
VALVE ASSEMBLY
(SEE 5/M3.2)
RETURN PUMP
CMFTS-DT-RP-PD (ALL)
LEAK SENSOR,
LK-1E
FDP-1A
FDP-1B
BALL
VALVE
FUEL OIL POLISHING STATION
ADD. ALTERNATE
SEE 3/M3.2
PRESSURE SAFETY RELIEF PIPING
DAY TANK/MAIN TANK
FUEL OIL CONTROL & POWER
DISTRIBUTION SYSTEM
MP MPRN RN
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
MECHANICAL
DETAILS
M3.2
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 M
.d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
FUEL OIL PUMP SKID SECTION
SCALE: NOT TO SCALE M3.2
STRAP
1/8"x1"
RESTRAINING
C-CLAMP
LOCK NUT
LOCK NUT
U-BOLT
CLEVIS
STEEL
EYE BOLT
STEEL OFFSET
WALL BRACKET
U-BOLT
U-BOLT
I-BEAM CLAMPS
STEEL STRAP
TURNBUCKLE
WALL BRACKET
WELDED STEEL
(TYP)
CINCH ANCHOR,
U-BOLTS
CINCH ANCHORS
ADJUSTABLE
PIPE STAND
PIPING SUPPORT DETAIL
2-1/2"
FT.SPACING
ALLOWABLE
PIPE SIZE
MAX
1"
FT.FT.FT.
1-1/4" 1-1/2"
2"
1/2" DIA.
3/8" DIA
ROD SIZE
HANGER ROD SCHEDULE
2-1/2" THRU 3"
UP TO 2"
PIPE SIZE
FT.FT.
11 12
3"
HANGER ROD
SEE BELOW FOR
SIZE AND SPACING
(TYP.)
ADJUSTABLE
CLEVIS HANGER
(TYP.)
U-BOLT
DOUBLE UNISTRUT P-1001
8 FOOT SPAN
THREADED ROD
(TYPICAL)
STEEL ANGLE
NUT WITH WASHER
(TYPICAL).
DOUBLE UNISTRUT P-1001
8 FOOT SPAN
SPRING NUTS
HANGER ROD SPACING SCHEDULE
M3.2
SCALE: NOT TO SCALE
FUEL OIL POLISHING STATION DETAIL
SCALE: NOT TO SCALE M3.2
THRU ROOF PENETRATION DETAIL
MINIMUM 12" ABOVE ROOF
NORMALLY.
ANCHOR PIPE TO ROOF DECK WITH
U-BOLT AROUND PIPE AND ANGLE
IRON WELDED OR SCREWED TO
ROOF DECK OR JOIST.
FLASHING AND
COUNTERFLASHING.
ADDITIONAL ALTERNATE
DAYTANK RELIEF VENT
VALVE ASSEMBLY DETAILS
M3.2
SCALE: NOT TO SCALEM3.2
CMFTS MT RVA
VALVE ASSEMBLY
CMFTS CV-HL
VALVE ASSEMBLY
CMFTS MT ASV
VALVE ASSEMBLY
BALL VALVE
GAUGE
FLOW SWITCH
STRAINER
UNION
SOLENOID VALVE 120VAC
(NORMALLY OPEN)
VISI FLOW
UNION
UNION
VISI FLOW
SOLENOID VALVE 120VAC
(NORMALLY CLOSED)
UNION
STRAINER
FLOW
SWITCH GAUGE
BALL VALVE
BALL VALVE
GAUGE
FLOW SWITCH
STRAINER
UNION
SOLENOID VALVE 120VAC
(NORMALLY CLOSED)
EMERGENCY
BYPASS
HIGH LEVEL SOLENOID
(NORMALLY CLOSED)
VISUAL FLOW INDICATOR
(VISI FLOW)
FLOW RESTRICTORUNION
MP MPRN RN
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
MECHANICAL
DETAILS
M3.3
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 M
.d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
FIXED ROLLER SUPPORT DETAIL
ADJUSTABLE-HEIGHT ROLLER SUPPORT DETAIL
MP MPRN RN
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
LIGHT, THIN LINES INDICATE EXISTING.
HEAVY, THICK LINES INDICATE NEW
HEAVY, SHORT DASHED LINES INDICATE
DEMOLITION OR REMOVAL
TYPICAL PLAN LEGEND
THIS SYMBOLOGY TO BE USED BY ELECTRICAL AND LAYOUT FOR ALL
FLOOR PLANS, EQUIPMENT, DEVICES, UTILITIES, ETC., SHOWN ON
DRAWINGS.
ABBREVIATIONS ELECTRICAL SYMBOL LIST
SWITCHBOARD 208/120V, 3Ø, 4W
PANELBOARD 208D/120V, 3Ø, 4W
P4-10 BRANCH CIRCUIT DESTINATION (PANEL NAME-CIRCUIT
NUMBER)
HOMERUN INDICATES PROVIDING CONDUIT AND
CONDUCTORS
MINIMUM CONDUIT SIZE: 3/4"
MINIMUM CONDUCTOR SIZE: #12AWG
PROVIDE 3/4"C-2#12+1#12G WHERE NO CONDUIT/WIRE SIZE IS
STATED.
PROVIDE DEDICATED NEUTRAL FOR ALL BRANCH CIRCUIT
WIRING.
CONTRACTOR RESPONSIBLE FOR DE-RATING CONDUIT WITH
MORE THAN SIX CURRENT CARRYING CONDUCTORS PER CEC
310.
#12 AWG FOR CIRCUITS UP TO 100'
#10 AWG FOR CIRCUITS FROM 100' TO 200'
#8 AWG FOR CIRCUIT GREATER THAN 200'
UNFUSED DISCONNECT SIZED AS INDICATED ON DWGS.
CONTRACTOR TO CONFIRM FUSE SIZING BASED ON
EQUIPMENT MANUFACTURER RECOMMENDAITON
JUNCTION BOX
1. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH APPLICABLE CODES
AND STANDARDS. SEE T0.1 FOR A LIST OF APPLICABLE CODES AND
STANDARDS.
2. CEC 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED,
OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY
ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH
ADMINISTRATION.
3. CEC 130.5(C): VOLTAGE DROP: THE MAXIMUM COMBINED VOLTAGE DROP ON
BOTH INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORS
TO THE FARTHER CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5
PERCENT.
4. ALL CABLE/WIRE, CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY & THEY
SHALL BE ROUTED TO SUIT ACTUAL FIELD CONDITIONS, EXCEPT WHERE
LOCATIONS ARE EXPLICITLY DIMENSIONED ON THE DRAWINGS.
5. THE ELECTRICAL CONSTRUCTION DRAWINGS PROVIDED HEREIN ARE
DIAGRAMMATIC AND SYMBOLIC IN REPRESENTATION. LOCATIONS DEPICTED
ON THE DRAWINGS FOR ELECTRICAL EQUIPMENT/DEVICES (MOTORS,
STARTERS, DISCONNECT SWITCHES, RECEPTACLES, JUNCTION/OUTLET BOXES,
CONTROL SWITCHES, EQUIPMENT RACKS, SMALL TRANSFORMERS, ETC.) ARE
ONLY APPROXIMATE. FURTHERMORE, THE EQUIPMENT/DEVICE DEPICTIONS
ARE GENERALLY SYMBOLIC AND NOT DRAWN TO SCALE.
6. IN EVENT OF CONFLICT OR DISCREPANCY BETWEEN DRAWINGS,
SPECIFICATIONS, CONTRACT DOCUMENTS, SPECIFICATIONS, DRAWINGS AND
SITE CONDITIONS, THE CONTRACTOR SHALL PROVIDE THE MORE STRINGENT
OF THE DRAWINGS, SPECIFICATIONS, AND CONTRACT DOCUMENTS FOR THE
CONSTRUCTIONS AND BIDDING PURPOSES.
7. ELECTRICAL DRAWINGS INDICATE NEW WORK, UNLESS OTHERWISE NOTED.
EXISTING ELECTRICAL SYSTEMS ARE NOT SHOWN EXCEPT WHERE
INTERFACING IS REQUIRED.
8. ALL NEW BOXES, PANELS, OUTLET COVERS, ENCLOSURES, ETC. MOUNTED ON
THE EXTERIOR OF ANY STRUCTURE SHALL BE WEATHERPROOF (NEMA 3R
MINIMUM) & ALSO PAINTED TO MATCH THE EXISTING BUILDING/STRUCTURE.
9. ALL EXISTING SURFACES DAMAGED BY NEW CONSTRUCTION, SHALL BE
PATCHED, OR REPAINTED TO MATCH EXISTING CONDITIONS, PAINTED
SURFACE SHALL BE PAINTED FROM BREAK TO BREAK. IT SHALL BE THE
CONTRACTORS RESPONSIBILITY TO PATCH & REPAIR ALL DAMAGE TO EXISTING
SURFACES AND FINISHES. FURTHERMORE, THE AFFECTED AREA(S) OF WORK
SHALL BE REPAIRED TO MATCH THE FINISH THAT WAS PREVIOUSLY EXISTING,
PRIOR TO THE COMMENCEMENT OF WORK.
10. RUN CONDUITS CONCEALED IN WALLS AND CEILINGS UNLESS NOTED. CUT
EXISTING WALLS AS REQUIRED. PATCH AND PAINT TO MATCH EXISTING
SURFACE.
11. UPDATE ALL POWER PANEL DIRECTORIES AND ELECTRICAL OUTLET
IDENTIFICATION LABELS (KROYTAPE) TO REFLECT NEW CONSTRUCTION.
12. ALL FLEX AND SEALTIGHT CONDUIT SHALL HAVE A GROUND CONDUCTOR.
13. CONDUITS PENETRATING FIRE RATED AREAS SHALL BE SEALED, INSTALLED ON
OUTSIDE OF CONDUIT, WITH APPROVED FIRE STOP MATERIAL TO MAINTAIN THE
SAME FIRE RATING AS ORIGINAL.
14. ALL MATERIALS AND WORKS ARE NEW, UNLESS OTHERWISE NOTED. EXISTING
ELECTRICAL SYSTEMS ARE NOT SHOWN EXCEPT WHERE INTERFACING IS
REQUIRED.
15. MAINTAIN CONTINUITY OF ALL EXISTING CIRCUITS OR PORTIONS THEREOF
AFFECTED BY NEW WORK.
16. CONTRACTOR SHALL VISIT AND FAMILIARIZE AT THE SITE PRIOR TO START OF
PROJECT. COORDINATE WITH OWNER REPRESENTATIVE FOR EXACT LOCATION
OF ALL EQUIPMENT.
17. SEISMIC ANCHORAGE OF ALL NEW AND EXISTING PIPING, CONDUIT,
DUCTWORK, EQUIPMENT, PANELS, ETC. SHALL BE BY FOLLOWING THE
MANUFACTURERS SPECIFICATIONS IN ACCORDANCE WITH THE 2019 CBC AND
THE LATEST ISSUE OF "ENGINEERED SEISMIC BRACING OF SUSPENDED
UTILITIES" AS PUBLISHED BY THE INTERNATIONAL SEISMIC APPLICATION
TECHNOLOGY (ISAT) OPA-0485, MASON INDUSTRIES OPA-0349, TOLCO
OPA-0300, COOPER B-LINE OPA-0114, OR M.W. SAUSSE OPA-0029 OR EQUAL.
18. CONDUIT FITTINGS FOR USE IN EMT RUNS SHALL BE GALVANIZED STEEL
CONNECTORS AND COUPLINGS SHALL BE WATERTIGHT TYPE.
19. ALL SINGLE PHASE CIRCUITS SHALL HAVE A DEDICATED NEUTRAL.
20. ALL CONDUITS SHALL BE PROVIDED AN EQUIPMENT GROUNDING CONDUCTOR
SIZED PER CEC 250.
21. ALL NEW (ADDITIONAL) METALLIC STRUCTURES AND EQUIPMENT FABRICATED
WITH METALLIC MATERIALS SUCH AS GENERATORS, MOTOR FRAME,
ENCLOSURES, ETC, PANELS, RACEWAY SHALL BE PERMANENTLY &
EFFECTIVELY GROUNDED, WHETHER SHOWN ON DRAWING OR NOT. GROUND
CABLE SHALL BE CONNECTED TO COLD WATER PIPE PER CEC 250.52(A)(1), TO
BUILDING GROUNDING PER CEC 250.52(A)(2) OR CONNECTED TO GROUND ROD
PER CEC 250.52(A)(5).
22. OWNER RESERVES THE RIGHT TO REQUIRE MINOR CHANGES IN LOCATION OF
OUTLETS OR EQUIPMENT PRIOR TO ROUGHING-IN WITHOUT INCURRING ANY
ADDITIONAL COST OR CHARGES.
23. DURING CONSTRUCTION, DO NOT INTERRUPT OR IMPEDE OPERATION AND
WORK IN ADJACENT AREAS.
24. UPON COMPLETION OF ALL WORK, THOROUGHLY CLEAN ALL EQUIPMENT AND
DUCTS FROM INSIDE AND OUTSIDE OF EQUIPMENT. REMOVE ALL TRACES OF
SOIL, DUST, LABELS, GREASE, OIL, AND FOREIGN MATERIALS. CLEANUP AND
REMOVE FROM THE PREMISES ALL DEBRIS AND SURPLUS MATERIAL CAUSED
BY THIS WORK.
25. WHERE THERE IS A CONFLICT BETWEEN THE DRAWINGS & ANY RELEVANT
CODES, THE CODES SHALL GOVERN, EXCEPT WHERE THE DRAWINGS INDICATE
A QUALITY LEVEL SUPERIOR TO THAT SPECIFIED BY THE CODES.
26. THE WORD "PROVIDE" MEANS THAT THE CONTRACTOR SHALL FURNISH,
INSTALL, ADJUST, TEST, AND INTEGRATE INTO A COMPLETE SYSTEM THE ITEM
INDICATED INCLUDING ALL HARDWARE, WIRING AND MISCELLANEOUS ITEMS
AS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM.
GENERAL NOTES
15A, 125V DUPLEX RECEPTACLE (NEMA 5-15R)
SUBSCRIPTS DENOTE THE FOLLOWING:
"WP" - WEATHERPROOFED
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
FUEL OIL TRANSFER
PIPING AT BUILDING
DSH
Client Agency
10/28/2022
DEPARTMENT OF STATE HOSPITALS
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
F
IL
E L \2
-6
F u e l O il T ra n s fe r P ip in g D
S H
-A \C
A D
\2 E .d w g
D A T E /T
IM
E O c t :0
A M
JCCA
100% CONSTRUCTION DOCUMENTS 10/28/22 - V2
ELECTRICAL COVER
SHEET
E0.1
DISTANCE
DENOTES EXISTING
CIRCUIT BREAKER
EACH
COPPER
GROUND
MINIMUM
AMPERE
CIRCUIT
LOW VOLTAGE
AMPERE
INTERRUPTING
CAPACITY
ABOVE FINISHED
FLOOR
NOT TO SCALE
WEATHER PROOFWP
SWITCHBOARDSWBD
TYP. TYPICAL
UG UNDERGROUND
SWITCHSW
PULL BOXPB
SLD SINGLE LINE DIAGRAM
POLEP
PANELBOARDPNL
(R) RELOCATED
SUB SUBSTATION
NEW(N)
TIME DELAY
UNLESS
OTHERWISE
NOTED
UON
TRANSFORMERXFMR,
TRANSF.
VD VOLTAGE DROP
TD
DEMOLITION
D
(E)
CB
EA
CU
GND, G
MIN
A
CKT
LV
AIC
AFF
NTS
(D)
DRDR SA SA
ADDITIVEADD
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/02/22
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
ELECTRICAL
DEMOLITION FLOOR
PLAN
E1.1
N
DEMOLITION KEYNOTES:
ELECTRICAL DEMOLITION FLOOR PLAN
SCALE:
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #: 22791-6
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE…
This is the start of the file's text. The full file is on GovTribe.