This document contains a federal contract solicitation for sidewalk replacement and stormwater drainage installation at the Salt Lake City Air Route Traffic Control Center. The Federal Aviation Administration is seeking offers for the project, which has an estimated value between $100,000 and $250,000. A pre-bid site visit will be held on February 15, 2024, with attendees required to RSVP by February 13. Questions are due by February 21 and offers are due by March 8, with email submissions not to exceed 10MB. The selected contractor will replace deteriorating concrete sidewalks and install drainage pipes and structures at the air traffic control facility located at 2150 W. 700 N. in Salt Lake City, Utah.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| 1. Specifications.pdf | ||
| 2. Wage Determination.pdf | ||
| 697DCK-24-R-00222.pdf | ||
| 1.A. Drawings.pdf | ||
| 3. Past Performance Survey Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
PHOTOS
APP.A-1
Main Entry Walkway
Figure 1: Protruding flagpole light
Figure 2: Cracked panel in main walkway.
Figure 3: Foyer area in front of main entrance.
Concrete panels and joints along building perimeter in need of replacement.
Figure 4: Another photo of main foyer.
APP.A-2
Southeast Sidewalk
Figure 5: Location of wheelchair tipping incident.
Requires elimination of uneven transition dip.
Figure 6: Another view of sidewalk panels in need of replacement.
Figure 7: Sunken panels in this span. Needs to either be raised or replaced to remove uneven edges.
Figure 8: Possible trip hazard due to uneven panel edges.
Also in need of repair or replacement.
APP.A-3
Northeast Sidewalk
Figure 9: Sunken curb & gutter in need of repair.
Figure 10: Sunken corner panel deteriorated curb.
Figure 11: Alternate view of corner panel & curb.
Figure 12: Sunken curb & gutter near cooling towers.
APP.A-4
Automation Wing Sidewalk
Figure 13: Curb previously shaved to create slope. Entire section needs replacement with proper construction.
Figure 14: Drainage pipe needs to be properly seated with new concrete.
Figure 15: NIFO transition ramp needs to be reconstructed to be aligned with walkway coming out of building. Existing ramp is off center.
APP.A-5
Support Building Sidewalk
Figure 13: Cracked panels near support building entrance.
Figure 14: Second angle of cracked panels.
File details come from the government source that posted it. Updated .