This is a Technical Evaluation Factors Statement for a federal contract opportunity dated June 2, 2026. The solicitation is for replacement of ceiling tiles at Naval Weapon Station, Earle, and will be awarded using a Lowest Priced Technically Acceptable (LPTA) evaluation methodology. Award will be made to the responsive and responsible offeror with the lowest total evaluated price among proposals that meet all technical requirements.
Technical acceptability is determined on a pass/fail basis using three evaluation criteria: the proposal must address all requirements stated in the Statement of Work (SOW); indicate the offeror will meet or exceed all minimum SOW requirements; and provide a delivery date within the timeframe specified in the SOW. Only proposals receiving "Yes" ratings on all three factors will be considered technically acceptable and eligible for award consideration. Past performance will be evaluated based on information submitted with the solicitation and any relevant previous performance on similar FEMA or DHS contracts, with no separate past performance documentation required. Among technically acceptable proposals, the award will be made solely on the basis of lowest total evaluated price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1.1.3 SOW - DHS-FEMA NWSE Ceiling Tiles 2026 05.30.26 v1.docx | DOCX document | |
| Sol_70FBR226Q00000023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Evaluation Factors Statement
Dated: June 02, 2026
Title: Naval Weapon Station, Earle - Replacement of ceiling tiles
Evaluation Methodology
Award will be made to the responsive, responsible offeror whose proposal is the Lowest Priced Technically Acceptable (LPTA) solution to the Government. Technical acceptability will be determined on a pass/fail basis, based on the following criteria:
Technical Evaluation Criteria
To be considered technically acceptable, an offeror’s proposal must receive a “Yes” for each of the following questions:
1. Does the offeror’s proposal address all requirements as stated in the Statement of Work (SOW)?
2. Does the offeror’s proposal indicate it will meet or exceed all minimum SOW requirements?
3. Does the offeror’s proposal provide for a delivery date that is within what is speci�ied in the SOW?
Only proposals rated “Yes” (acceptable) for all factors will be considered technically acceptable.
Past Performance:
Past performance will be evaluated based on information submitted as part of the contract solicitation and any relevant previous performance for similar FEMA or DHS contracts. Offerors are not required to submit separate past performance documentation for this evaluation.
Price Evaluation:
Among technically acceptable proposals, the award will be made to the offeror with the lowest total evaluated price.
Summary for Offerors:
Proposals will be evaluated for technical acceptability on a pass/fail basis using the criteria above.
Only proposals that are technically acceptable will be considered for award, and among those, the offeror with the lowest total evaluated price will be selected.