SCOPE OF WORK SUMMARY
This is a Scope of Work document for the installation of a ProofCert, LLC pull test machine at SRF-JRMC Detachment Sasebo, Japan (Building 480, Shop 72, 1st floor). The contractor must provide all necessary materials, equipment, and personnel to install the equipment, conduct operational testing and calibration, and train Government personnel in machine operation. The Period of Performance runs from September 28, 2026 through October 20, 2026.
The contractor is responsible for furnishing a Planned Maintenance Schedule that details scheduling, tools, and equipment required for installation, calibration, and operational testing. The Government will provide material handling support (forklift, pallet jack, overhead crane with operator), receiving/shipping point address, electrical service, miscellaneous hand tools, rotary hammer drill with bits, shims as needed, and hydraulic oil with dispensing means. The contractor bears full responsibility for transportation to and from the Sasebo Detachment in Japan, as well as all meals and lodging during the performance period. Technical points of contact at SRF-JRMC are identified in the document, though specific names and contact information are redacted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK FOR INSTALLATION OF PULL TEST MACHINE
The description set forth below reflects those characteristics which are essential to the minimum needs of the government. A new OEM ProofCert, LLC pull test machine was purchased and needs to be installed in the production shop (Shop 72), located at SRF-JRMC Detachment Sasebo, BLDG 480 on the 1st floor. This equipment is vital in the testing of weight handling equipment supporting ship repair and maintenance.
1. Requirements:
SCOPE – This statement of work requires the contractor to provide the necessary materials, equipment, and personnel necessary to install the pull test machine. The contractor will provide operational testing/calibration of the pull test machine, and train Government personnel in the operation of the pull test machine. The government shall provide the following to the contractor –
1.1 General material handling/equipment lifting using forklift, pallet jack, and overhead crane.
1.2 Operator for the material handling equipment.
1.3 Providing a receiving and shipping point address for tools/equipment.
1.4 Provide proper electrical service to the equipment.
1.5 Provide miscellaneous hand tools (wrenches, sockets, hex keys, hammers, small wire brush for cleaning foundation holes, screwdrivers, powered screwdriver with driver bits to remove crating).
1.6 Provide rotary hammer drill and proper size bit for drilling foundation holes and a vacuum to assist during clean up.
1.7 Provide miscellaneous shims (if needed) to correct inconsistencies in the flatness of the foundation.
1.8 Provide the correct amount of hydraulic oil to fill the reservoir, as well as a means for dispensing the oil.
2. Installation Plan:
The contractor shall provide a Planned Maintenance Schedule to include scheduling, the tools and equipment required to conduct the installation, calibration, and operational testing of the pull test machine.
3. Transportation/Meals/Lodging:
The contractor shall be responsible for their own transportation to and from SRF-JRMC Sasebo Detachment, Japan. The contractor shall be responsible for their own meals and lodging while performing the requirements noted in this scope of work.
4. Period of Performance: 9/28/2026 – 10/20/2026
5. Technical Points of Contact
The technical points of contact at SRF-JRMC are as follows: