1.06 SOW DRAFT UPDATED - MAY28.docx
DOCX document 30 KB Posted
- Solicitation number
- N0024404308
About this file
This is a Statement of Work (SOW) for the modernization of the Main Control Center (MCC) at Naval Consolidated Brig Miramar (NCBM). The primary objective is to enable MCC operators to maintain constant situational awareness and operational oversight by providing a modernized, ergonomic, and technologically advanced surveillance and control environment. The current facility operates with legacy systems and non-ergonomic workspace layout that has resulted in sub-optimal operator performance and potential mission effectiveness compromise. The modernization will replace outdated equipment and create an efficient control center critical for minimizing operator fatigue and error.
The vendor must provide 15 specific equipment categories totaling at least 50 line items, including 42-inch and 36-inch core workstations, modular wall steel components, fabric inserts, wall top trim, vertical end trim, CPU dockers, core skins, linear lift work surfaces, monitor poles, dynamic height-adjustable arms, and power distribution units. All materials must be delivered within 30 days of award to Naval Consolidated Brig Miramar, San Diego, California. The contract is a firm fixed-price award structured under FAR 13.106 sole-source authority to Wright Line LLC, with an anticipated award date on or before June 30, 2026. All items must be packaged for domestic shipment per industry standards to ensure safe delivery without damage, and funding will be provided through the Wide Area Workflow (WAWF) payment system. The applicable NAICS code is 337214 (Office Furniture Manufacturing).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.01 NOTICE OF INTENT - draft.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
MAIN CONTROL CENTER UPGRADE
NAVAL CONSOLIDATED BRIG MIRAMAR (NCBM)
GENERAL:
The Main Control Center requires comprehensive modernization of a new ergonomic desk surveillance system, the integration of new computer towers and monitors, and the complete renovation of the control center workspace.
Currently, the Main Control Center operates with legacy systems and a workspace layout that is not conducive to an ergonomic and efficient environment. This has resulted in sub-optimal operator performance and could compromise mission effectiveness. The requested items are to replace the outdated and non-ergonomic equipment and to create a modern, efficient, and fully capable control center.
The command’s mission of providing uninterrupted security and operational oversight requires that control center staff can perform their duties with maximum alertness and efficiency. The proposed modernization will provide an ergonomic and updated environment, which is critical for minimizing operator fatigue and the potential for error. All requested equipment and renovations will provide the tools needed to meet this core requirement.
Other avenues of support in this matter, including minor system upgrades and piecemeal furniture replacement, have been unsuccessful in addressing the fundamental deficiencies of the current setup.
Objectives:
Enable Main Control Center operators to maintain constant situational awareness and uninterrupted operational oversight by providing a modernized, ergonomic, and technologically advanced surveillance and control environment, as required by the command's mission objectives for security and monitoring.
Description of Main Control Center Materials:
At the minimum the vendor must provide each of the following equipment:
| # |
| Name: |
| Description: / Qty: |
| 1 |
| 42” Core, Single Sided Steel: Color Required |
| PC4229S1 / 4 ea |
| 2 |
| 36” Core, Single Sided Steel: Color Required |
| PC3629S1 / 2 ea |
| 3 |
| 42x16 Modular Wall SS Steel: Color Required |
| PMW4216S / 4 ea |
| 4 |
| 36x16 Display Wall SS Steel: Color Required |
| PDW3616S / 2 ea |
| 5 |
| 21x16 Fabric Insert (User Fac) Fabric: Color Required |
| PWFP2116 / 8 ea |
| 6 |
| 42” Wide Wall Top Trim, SS Steel: Color Required |
| PDWT42S1 / 4 ea |
| 7 |
| 36” Wide Wall Top Trim, SS Steel: Color Required |
| PDWT36S1 / 2 ea |
| 8 |
| Vertical End Trim T1 (16) Steel: Color Required |
| PVET16T1 / 4 ea |
| 9 |
| CPU Docker |
| PCPD3628 / 2 ea |
| 10 |
| 19" Wide Core Skin Steel: Color Required |
| PCSK1900 / 8 ea |
| 11 |
| 84W X 30D Sgl Surface Linear Lift Steel:NuGrey – Laminate: White Matrix (NuGrey Trim) |
| 17602585 / 2 ea |
| 12 |
| 36x30 Bullnose Worksurface Steel: Color Required – Laminate: Colord Required |
| PBW3630D / 2 ea |
| 13 |
| Black, Centris Head, Extreme Tilt |
| KONWL9D / 2 ea |
| 14 |
| 20” Monitor Pole & Base Plate |
| KONWLC20B / 4 ea |
| 15 |
| Dynamic Hgt Adj Arm. |
| KONWLK1B / 6 ea |
| 16 |
| Zerou; 24.0” x 2.15”/3.4”x1.97”; 6.8” Slots (2each); 10, Low Profile; Input, 120V, 20Amps, Nema 5-20P, 3wire, 1P+N+Gnd, lp20, 15” Length; Output; Nema 5-20R (12); No Outlet Control, No Metered Outlet. |
| MDP1624403C / 6 ea |
Other Important Information:
Vendors may submit supporting technical documentation, e.g., product literature and specifications to help evaluator determine if the quoted MCC equipment meets or exceeds all essential characteristics specified in the solicitation.
Delivery Date:
Main Control Center Materials shall be delivered no later than 30 days after award.
Address for shipment of the MCC Equipment:
Naval Consolidated Brig Miramar Attn: LSC Tesoro 46141 Miramar Way, Suite 1 San Diego, CA 92145-2135
Type of Contract:
The government will award a firm fixed contract.
Package and Marking:
All items are to be packed for domestic shipment to comply with standards and practices of the industry to ensure safe delivery without marks, scratches, dents or other damage. This packaging shall be such that shock and vibration incidental to shipping and handling will not affect the characteristics or factory settings of the components.