This document is a Contract Data Requirements List (DD Form 1423) for a naval submarine power supply assembly refurbishment contract. The document details specific data items and reporting requirements for a Power Supply Assembly PP-7390/WIC-2B(V) for the SSBN 726 Class submarine system. Required reports include Receipt Inspection Report, Refurbishment Inspection Report, Test Inspection Report, Unplanned Work/Parts Usage Report, Certificate of Compliance, and Final Inspection Report. Each report has specific submission requirements, such as being submitted no later than 10 days prior to hardware acceptance, and must be completed using designated enclosures or equivalent vendor forms. The reports are to be distributed to SUBMEPP Code 1843, with varying numbers of copies required, and are categorized under Technical Data Package (TDP) documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3.02_Solicitation_N0010426QZ050_TIN 430 Power Supply Assemblies.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFURB INST. NO. 4330-012-0002 Rev D Chg 2
Encl (5)
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM SSBN 726 Cl Power Supply Assembly PP-
7390/WIC-2B(V)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Item Descript) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
RG - REGULAR
RP - REPRO
16. REMARKS
1. A001 2. Receipt Inspection Report 3.
4. RI Para 7.a.(1) 5. RI paragraphs 5.b. & 7.a.(1) 6. SUBMEPP Code 1843
7. 9. 10. 12. 14. DISTRIBUTION
SD As Req’d See 13 b. Copies 8.
11.
See 13
13. NLT 2 weeks after receipt of
GFM.
D R
R G
R P
16. REMARKS SUBMEPP Code 1831 1
The receipt inspection report will consist of the completion of Enclosure (1) or equivalent form
TOTAL 1
1. A002 2. Refurbishment Inspection Report 3.
4. Para 7.a.(2)
5. RI paragraph 7.a.(2) and Encl (2)
6. SUBMEPP Code 1843
13. NLT 10 days prior to hardware acceptance
D R
R G
R P
16. REMARKS SUBMEPP Code 1831 1 All inspections and test results shall be completed using Enclosure (2) or vendor’s equivalent form.
Copy in crate 1
TOTAL 2
1. A002 2. Test Inspection Report 3.
4. Para 7.a.(2)
5. RI paragraph 7.a.(2) and Encl (2)
6. SUBMEPP Code 1843
R G
R P
16. REMARKS SUBMEPP Code 1831 1 All inspections and test results shall be completed using Enclosure (2) or vendor’s equivalent form.
Copy in crate 1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Page 1 of 2 Pages
REFURB INST. NO. 4330-012-0002 Rev D Chg 2
Encl (5)
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM SSBN 726 Cl Power Supply Assembly PP-
7390/WIC-2B(V)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. A003 2. Unplanned Work/Parts Usage report 3.
4. Para 7.a.(6) 5. RI paragraph 7.a.(6) 6. SUBMEPP Code 1843
7. 9. 10. 12. 14. DISTRIBUTION
R G
R P
16. REMARKS SUBMEPP Code 1831 1
This report to include Contingency Parts to be repaired/replaced and any
Unplanned Parts/Repairs required. Copy in crate
TOTAL 1
1. A004 2. Certificate of Compliance 3.
4. DI-MISC-80678 5. RI paragraph 7.a.(5)
6. SUBMEPP 1843
R G
R P
16. REMARKS SUBMEPP Code 1831 1
This report shall consist of the completion of Enclosure (4) or vendor’s equivalent form.
Identify contract and Rotatable Pool Serial Number Copy in crate 1
1. A006 2. Final Inspection Report 3.
4. RI paragraph 7.a.(3) 5. RI paragraph 7.a.(3)
6. SUBMEPP 1843
SD As Req’d See 13 b. Copies
8. 11.
See 13
R G
R P
16. REMARKS SUBMEPP Code 1831 1
This report shall consist of the completion of Enclosure (3) or vendor’s equivalent form.
. TOTAL 1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Page 2 of 2 Pages
File details come from the government source that posted it. Updated .