About this file
This is a Performance Work Statement (PWS) for crane services under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to support military diver training operations at Naval Support Activity Panama City.
The contractor shall provide mobile crane services with certified operator, certified rigger, and weight handling equipment capable of performing routine lift operations. The government anticipates approximately 5 minimum and 30 maximum medium-capacity lifts annually, with specific lift requirements including load weight, operating radius, lift configuration, and location to be defined at the task order level. Medium-capacity mobile crane requirements include: lifting a minimum of 20,000 pounds at a 40-foot operating radius; providing minimum hook height of 15 feet at the required operating radius; providing sufficient boom length and configuration for extended boom radii; performing 180-degree rotation; and safely operating in pier-side and waterfront environments to lift equipment from pier to water (submerged to maximum 20-foot depth) and to moored naval vessels. Qualified military divers will perform all equipment de-rigging operations below the waterline.
The contractor must demonstrate current verifiable experience in safe crane operations; provide documentation and certificate of compliance verifying all cranes and weight handling equipment meet OSHA 29 CFR 1926 Subpart CC and applicable ANSI/ASME standards prior to entry onto NSA Panama City; ensure all operators and riggers possess valid certifications per OSHA and NSA PC requirements; comply with all NSA PC crane safety and base access regulations; post crane operator certification on the crane during operations; submit load plans to NSA PC Transportation Office five business days prior to scheduled lifts; obtain prior written approval for any subcontractor utilization; maintain full Florida state licensing; conduct safety briefings prior to all lift operations; and coordinate with the Designated Government Representative. The contract location is Panama City Beach, Florida 32407, with performance period from January 1, 2027 through December 31, 2031, consisting of a base year and four option years. Changes to routine and unscheduled lifts will be communicated ten business days in advance, while emergent lifts will be communicated three days in advance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
CRANE SERVICES
1. BACKGROUND. has a recurring requirement for routine mobile cargo crane services. Delivery of this service supports the dive training and evaluation of more than 1,500 joint service students annually.
2. DESCRIPTION OF SERVICE. The contractor shall provide mobile crane services with operator, certified rigger and weight handling equipment (WHE) capable of performing routine lift operations in support of training requirements.
The Government requires crane lift requirements to support military diver training operations under this Indefinite Delivery/Indefinite Quantity (IDIQ) contract.
Quantities are estimates for planning purposes only and do not guarantee minimum order volume beyond contract minimum. Task orders will be issued based on mission requirements and the availability of funding.
The government anticipates approximately:
Five (5) Minimum and 30 maximum Medium-capacity lifts annually
3. Performance Capability: The crane capability requirements identified in this section represent minimum operational capabilities. Specific lift requirements including load weight, operating radius, lift configuration, and location will be defined at the task order level. The Contractor shall be capable of provide mobile crane service following two capability categories.
1. Medium-Capacity Mobile Crane- The Contractor shall be capable of providing a mobile crane capable of:
a. Lifting a minimum of 20,000 pounds at 40-foot operating radius.
b. Providing a minimum hook height of 15 feet at the required operating radius.
c. Providing sufficient boom length and configuration to safely execute lifts at extended boom radii.
d. Performing 180-degree rotation.
e. Operating safely in pier-side and waterfront environments lifting equipment from the pier and placing it into the water submerged to a maximum depth of 20 feet and from the water (floating) to the pier.
f. Operating safely in pier-side and waterfront environments lifting equipment from the pier to a moored naval vessel and from the vessel to the pier.
g. Qualified military divers will perform all equipment de-rigging operations below the waterline.
4. REQUIREMENTS. The contractor shall:
a. Demonstrate current verifiable experience in safe crane operations.
b. Provide documentation and a certificate of compliance verifying that all cranes and weight handling equipment (WHE) meet OSHA 29 CFR 1926 Subpart CC and applicable ANSI/ASME standard prior to entry onto Naval Support Activity Panama City (NSA PC).
c. Ensure all operators and riggers possess valid certifications in accordance with OSHA and NSA PC requirements.
d. Comply with all NSA PC crane safety, operational and base access regulations.
e. Post Crane Operator certification on the crane during operations.
f. Submit a load plan to NSA PC Transportation Office five (5) business days prior to scheduled lift unless otherwise directed.
g. Contractor shall not utilize subcontractors without prior written approval from the contracting officer.
h. Contractor shall be fully licensed in the State of Florida.
i. Conduct safety briefing prior to all lift operations.
j. Coordinate with the Designated Government Representative (DGR) to ensure compliance with installation safety, transportation, and crane operation requirements.
5. TASK ORDER PROCEDURES.
a. Identify crane capability category required per PWS.
b. Identify estimated lift date (s).
c. Specify anticipated load weights and estimated operating radius.
d. Specify location.
e. Individual task orders will define specific lift requirements within the capability categories established in Section 3.
6. SCHEDULES. A lift schedule will be provided to the contractor upon contract award.
Changes to routine and unscheduled lifts will be communicated to the contractor ten (10) business days in advance. Emergent Lifts will be communicated three (3) days in advance.
7. Location. Panama City Beach, FL. 32407
8. PERIOD OF PERFORMANCE
• Base Year: 01 Jan 2027 – 31 Dec 2027
• Option I: 01 Jan 2028 – 31 Dec 2028
• Option II: 01 Jan 2029 – 31 Dec 2029
• Option III: 01 Jan 2030– 31 Dec 2030
• Option IV: 01 Jan 2031 – 31 Dec 2031