USS TRIPOLI (LHA-7) Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace
Solicitation number
N6264926Q0461
Issued by

About this file

This is a Job Specification document for naval ship maintenance work on the USS Tripoli (LHA-7). The document outlines the replacement of seawater flushing piping located across multiple deck levels (02 Deck through 2nd Deck Level) in frames 98-121 on both port and starboard sides. The work encompasses approximately 700 feet of copper piping that must be replaced with copper-nickel (Cu-Ni 90/10) piping material. The project also includes removal and reinstallation of 8-inch chilled water supply piping and three ventilation ducts to facilitate the primary replacement work.

The work is anticipated to be awarded on July 24, 2026, with a period of performance beginning August 17, 2026 and concluding November 30, 2026. The preparing activity is SASEBO. The specification requires compliance with multiple military standards and construction details, including pipe bending requirements per MIL-STD-1627, welding specifications per 009-12 and 009-25 standards, and operating pressure testing with zero allowable leakage. The government will furnish all materials, including over 100 line items of pipes, fittings, couplings, elbows, unions, valves, gaskets, welding rods, brazing alloys, insulation materials, and adhesives. Key requirements include cleaning and reusing existing valves and hangers, accomplishing backing ring fabrication per specifications, performing local air hose testing of penetration sleeves, witnessing operating pressure tests, and visual inspection of installed ventilation ducts with submission of a condition report.

View the file

Other files

File Type Posted
2.01 SF18 26Q0461.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA-7 USSTRIPOLI

JON. 380JA52106 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:

SASEBOPOP Start Date: POP End Date:

PREPARED BY:

A.HAMADA

CODE

PHA

DATE

12/22/2025

APPROVEDBY:

S.MURAKAMI

A CODE

S225

CONCURRED BY:

T.TAKAMASU 0L-'

a'-

CODE

S234

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(S): EROI -0396 CASREP#

S/F CONTACT: GARCIA HTI CWP # CCNS #

Approved by 5300!S900 Date: /?/3/Z . AvI: 6A1

LWC:

Work Completed

S/Force: Rate:

SHIPSUPT: Date:

Date:

SRF CONTROL NO.:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE DATE:

1/ /12

Sakura.Yamaguchi.ja Typewritten Text R

Sakura.Yamaguchi.ja Typewritten Text 7/24/2026

Sakura.Yamaguchi.ja Typewritten Text 8/17/2026

Sakura.Yamaguchi.ja Typewritten Text 10/2/2026

Sakura.Yamaguchi.ja Typewritten Text 11/30/2026

Sakura.Yamaguchi.ja Typewritten Text 1301389915

LHA-7 USSTRIPOLI

JON 38DJA52106 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

1. SCOPE:

1.1 Title: Seawater Flushing Piping in 02 Deck Through 2nd Deck Level;

replace

1.2 Location of Work:

1.2.1 02 Deck Through 2nd Deck Level, Frames Between 98 and 121, Port and Starboard

1.2.1.1 Passage (02-97-0-L)

1.2.1.2 WR/WC (02-109-2-L)

1.2.1.3 Passage (02-113-01-L)

1.2.1.4 Passage (01-120-2-L)

1.2.1.5 WR/WC (01-120-4-L)

1.2.1.6 WR/WC (02-102-4-L)

1.2.1.7 ENG DEPT Office (02-102-2-Q)

1.2.1.8 OPN DEPT Office (02-101-2-Q)

1.2.1.9 SQN Work Center (Flight EQPT) (02-101-0-A)

1.2.1.10 SQN MAINT Office QA & TECH Library (02-101-1-Q)

1.2.1.11 Fan Room (02-98-3-Q)

1.2.1.12 WR/WC (02-98-5-L)

1.2.1.13 Air DEPT Office (02-101-3-Q)

1.2.1.14 WR/WC (02-103 1/2-1-L)

1.2.1.15 Access (01-104-1-L)

1.2.1.16 Boat Stowage Upper Level (1-105-3-A)

1.2.1.17 Access (1-105-1-L)

1.2.1.18 Access (2-105-3-L)

1.2.1.19 Passage (2-105-1-L)

1.2.1.20 SD STRM AVN Bulk No.3 (2-105-5-A)

1.2.1.21 WR/WC (2-111-1-L)

/12

Sakura.Yamaguchi.ja

R

LHA -7 USS TRIPOLI JON. 38DJA521 06 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

1.2.1.22 WR/WC (2 -lll -2-L)

1.2.1.23 Passage (2-105 -O1 -L)

1.2.1.24 Passage (2-113-01-L)

1.2.1.25 WR/WC (2-120-2-L)

1.3 Identification:

1.3.1 Quantity (One EA), 1/4 Inch IPS through 2 Inch IPS Seawater Flushing Piping Located in 1.2.1 from Downstream of 1-1/2 Inch IPS Pressure Reducing Glove Valve (ASW-V-1143), 1-1/2 Inch IPS Relief Valve (ASW-V-1146) and 1/4 Inch IPS Glove Valve (ASW-V-1144) in No.8 Reducing Station Located in 1.2.1.1 to Upstream of Each Flushing Valve Connection of Commode and Urinal Located in 1.2.1.2, 1.2.1.5, 1.2.1.6, 1.2.1.12, 1.2.1.14, 1.2.1.21, 1.2.1.22 and 1.2.1.25, Approximately 700 Feet Length, Existing Pipe Material: Copper, New Pipe Material: Cu-Ni, See ENCLOSURE (A)

1.3.2 Quantity (2 EA), 8 Inch IPS Chilled Water Supply Piping Located in 1.2.1.1, Between Frame 104 and 105, and Between Frame 105 and 106, CuNi Piping and Fittings

1.3.3 Quantity (One BA), 16 Inches by 5 Inches Rectangular

Ventilation Duct (Aluminum, 0.05 Inch Thick) for Supply System (S271) Located in 1.2.1.1, Non-Watertight

1.3.4 Quantity (One BA), 13 Inches by 14 Inches Rectangular

Ventilation Duct (Aluminum, 0.05 Inch Thick) for Supply System (S307) Located in 1.2.1.4, Non-Watertight

1.3.5 Quantity (One EA), 13 Inches by 6 Inches Rectangular

Ventilation Duct (Aluminum, 0.05 Inch Thick) for Supply System (S379) Located in 1.2.1.4, Non-Watertight

2. RFERENCS:

2.1 Standard Items (FY26)

2.2 521-7566288 Rev B, Seawater

2.3 521-7565160 Rev B, Firemain

2.4 521-7565156 Rev A, Firemain

2.5 521-7565162 Rev B, Firemain

2.6 521-7565166, FM & SW Flush

2.7 521-7565164 Rev A, Firemain

Flushing S

& Seawater

& Seawater

& Seawater

?P ASSY 432

& Seawater

'stem Dia

Flushing

Flushing

Flushing

Flushing gram

Piping ASSY 420

Piping Assembly 416

Piping ASSY 424

Piping ASSY 429

7k

Sakura.Yamaguchi.ja

ShipIHULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA-7 USS TRIPOLI

JON. 380JA521 06 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

2.8 521-7565159 Rev A,

2.9 521-7569539 Rev A,

2.10 521-7566738 Rev B,

2.11 521-7566739 Rev A,

2.12 SP000073 Rev H, Cc

2.13 532-7566299 Rev C,

2.14 514-7565059 Rev A, ASSY 420

Firemain

Firemain

Firemain

Firemain liar-Pipe

Chilled

Air COND

& Seawater Flushing Piping Assembly 419

& Seawater Flushing Piping ASSY 415

& Seawater Flushing Piping ASSY 463

& Seawater Flushing Piping ASSY 468

Fume-Tight BHD CONN ater Piping System Diagram

Chilled Water & Drip Pan Drain Piping

2.15 514-7565055 Rev B, Air COND Chilled Water & Drip Pan Drain PP ASSY

2.16 512-7566281 Rev E, HVAC System Diagram Zone No. 6

2.17 512-7564761 Rev A, VENT & Air COND ASSY 420 02 LVL FR 97-105 Port

2.18 512-7566282 Rev E, HVAC System Diagram Zone No. 7

2.19 512-7564802 Rev A, VENT & Air COND ASSY 424, 423 & 430 01 LVL FR 113- 121 Port & STBD

2.20 512-7569293 Rev A, VENT & Air COND Instructions

2.21 SS 000007 Rev R, Construction-Detail -VENT -

2.22 MIL-STD-1627 Rev C, Bending of Pipe or Tube for Ship Piping Systems

2.23 635-7566068 Rev E, INSTL ARR for HULL INSUL

3. REQUIRENTS:

3.1 Remove existing and install new piping to replace the piping listed in 1.3.1, using 2.2 through 2.12 and ENCLOSURE (A) for guidance.

3.1.1 Remove existing and install the piping and the ventilation duct listed in 1.3.2 through 1.3.5 to facilitate the replacement work, using

2.13 through 2.21 for guidance.

3.1.2 Clean each existing valve and pipe hanger for reuse.

3.1.3 Accomplish the requirements of Paragraphs 4 and 5 of 2.22 for pipe bending section.

3.1.3.1 Use special thickness pipe for pipe bending section.

Sakura.Yamaguchi.ja

Ship!HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA -7 USS TRIPOLI

JON. 38DJA52106 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

3.1.4 Accomplish the requirements of 009-12 of 2.1, including Table One Column A and B, Lines One through 10.

3.1.4.1 Fabricate each backing ring in accordance with Line 6 for butt welding.

3.1.5 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7 for deck and bulkhead penetration welding.

3.1.6 Accomplish the requirements of 009-25 of 2.1 for local air hose test of penetration sleeve. Allowable leakage: None.

CV) (G) "OPERATING PRESSURE TEST"

3.1.7 Witness an operating pressure test of new and disturbed piping to be conducted by ship's force to verify tightness of each welded joint, each brazed joint and each mechanical joint affected by this work item, until the specified criteria is verified. Allowable leakage: None. - S130

3.1.8 Witness visual inspection of each installed ventilation duct to be conducted by Ship's Force.

CV) I!REPORT!!

3.1.8.1 Submit One legible copy of a condition report listing results of the requirements of 3.1.8 to SUPERVISOR.

3.2 Accomplish the requirements of 009-11 of 2.1 for the component affected by this work item, using 2.23 for guidance.

3.3 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.

4. NOTES:

4.1 Initial Condition - Incorrect Piping (Copper) is installed on seawater flushing piping listed in 1.3.1. Need to replace with copper nickel piping.

4.2 SRF tool room will issue pressure gauges.

5. GOVERNNT FURNISHED MATERIAL:

5.1 SRF will provide following material.

MATERIAL LIST

M I QTY

ITEM PC REF / STOCK 1-IAZI DOC REQD/ PARA

NO. NO. NO. C DESCRIPTION NUMBER MAll NO. UNIT NO.

001 M PIPE, 2"IPS, 2.375"OD X 0.104'WT, B 4730 SAPTEO2OB N 140/FT 3.1

MIL-T-16420 TV-I SPECIAL, CNA 90/10

Sakura.Yamaguchi.ja

LHA-7 USS TRIPOLI JON. 38DJA52106 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

MATERIAL LIST

M

QTY

ITEM PC REF / STOCK HAZ DOC REQD/ PARA

NO. NO. NO.

C DESCRIPTION NUMBER MA1 NO. UNIT NO.

002 M PIPE, 1 -1/2"IPS, 1.900"ODX B473OSAPTEO2O7 N 70/FT 3.1

0.090"WT, MIL-T-1 6420 TY-I SPECIAL,

CNA 90/10

003 M PIPE, PIPE, 1 -1/4"IPS, 1.660"ODX

B473OSAPTEO2O6 N 70/FT 3.1

0.090"WT, MIL-T-1 6420 TY-I SPECIAL,

CNA 90/10

004 M PIPE, PIPE, lIPS, 1.315"ODX

B47305APTE0205 N 560/FT 3.1

0.082'Wr, MIL-T-16420 TY-I SPECIAL, CNA9O/10

005 M PIPE, PIPE, 314"IPS, 1.050"ODX

B473OSAPTEO2O4 N 70/FT 3.1

0.052"WT, MIL-T-16420 TY-I SPECIAL,

CNA 90110

006 M PIPE, PIPE, 1/2"IPS, 0.840"ODX 9B4730SAPTE0203 N 50/FT 3.1

0.082"WT, MIL-T-1 6420 TY-I SPECIAL,

CNA 90110

007 M PIPE, PIPE, 1/4"IPS, 0.540"ODX

JB473OSAPTEO224 N 8/FT 3.1

0.082"WT, MIL-T-16420 TY-I SPECIAL,

CAN 90110

008 M COUPLING,TUBE, COUPLING, 2"IPS, 9B 4730 014645442 N 10/EA 3.1

SW, 400#, 803-6397430, CNA 90110

009 M COUPLING,TUBE, COUPLING, 1-

9B 4730 014645439 N

8/EA 3.1

1/2"IPS, SW, 400#, 803-6397430, CNA

90/10

010 M COUPLING,TUBE, COUPLING, 1- 9B 4730 014635863 N 8/EA 3.1

1/4"IPS, SW, 400#, 803-6397430, CNA

90/10 011 M COUPLING,TUBE, COUPLING, lIPS, 9B 4730 014635857 N 50/EA 3.1

SW, 400#, 803-6397430, CNA 90/10

012 M COUPLING,TUBE, COUPLING,

9B 4730 014635878 N

8/EA 3.1

3/4'IPS, SW, 400#, 803-6397430, CNA

90/10 013 M COUPLING,TUBE, COUPLING, 9B 4730 014635873 N lOIEA 3.1

1/2"IPS, SW, 400#, 803-6397430, CNA

90/10

014 C ELBOW 90, ELBOW 90, LR, 3/4"IPS, 9B 4730 SA4462495 N 8/EA N/A

SW, CUNI-90/10

015 M ELBOW,PIPE, ELBOW 90, SR, lIPS, 9B 4730 014637039 N 30/EA 3.1

SW, CUNI-90/10

016 C ELBOW 90, ELBOW 90, LR, lIPS, SW, 9B 4730 5A4462496 N 20/EA N/A

CUNI-90/10

017 M ELBOW,PIPE, ELBOW, 3/4'IPS, 90

9B 4730 014637038 N 8/EA 3.1

DEG, SR, SW, 400#, 803-6397430,

CNA 90/10

018 M ELBOW,PIPE, ELBOW 90, SR, 1-

9B 4730 014637040 N 8/EA 3.1

1/4"IPS, SW, CUNI-90/10

019 M ELBOW9O, ELBOW 90, LR, 1 -114"IPS,

9B47305A4462497 N 5/EA 3.1

SW, CUNI-90/1 0

020 C ELBOW 90, ELBOW 90, SR, 1 -1/4"IPS,

9B 4730 SAPTAO17B N 5/EA N/A

BW, CUNI-90110

021 C ELBOW9O, ELBOW 90, LR, 1 -1/4"IPS,

9B47305A9304157 N 5/EA N/A

BW, CUNI-90/1 0

022 M ELBOW,PIPE, ELBOW 90, SR, 1-

9B 4730 014637043 N 8/EA 3.1

1/2"IPS, SW, CUNI -90/10

023 C ELBOW 90, ELBOW 90, LR, l -1/2"IPS, 9B 4730 5A4462498 N 5/EA N/A

SW, CUNI -90110

024 C ELBOW 90, ELBOW 90, SR, 1 -1/2"IPS, 9B 4730 5A9812299 N 5/EA N/A

BW, CUNI-90/10

6i

Sakura.Yamaguchi.ja

Shi /HULL NO. Shi /HULL NAME ICN: Rev: Key Op:

LHA-7 USS TRIPOLI JON: 38DJA521 06 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

MATERIAL LIST

M

QTY

ITEM PC REF I STOCK I-IAZ DOC REQDI PARA

NO. NO. NO. C DESCRIPTION NUMBER MAT NO. UNIT NO.

025 C ELBOW,TUBE, ELBOW 90, LR, 1- 9B 4730 007256989 N 5/EA N/A

1/2"IPS, BW, CUNI-90/10

026 M ELBOW,PIPE, ELBOW 90, SR, 2"IPS,

9B 4730 014637044 N 1OIEA 3.1

SW, CUNI -90/10

027 M ELBOW 90, ELBOW 90, LR, 2"IPS, SW,

9B 4730 SA4462499 N 8/EA 3.1

CUNI-90/10

028 C ELBOW 90, ELBOW 90, SR, 2"IPS, BW, 9B 4730 SAPKIOO67 N 5/EA N/A

CUNI-90/1 0

029 M ELBOW,TUBE, ELBOW 90, LR, 2"IPS, 9B 4730 007256990 N 5/EA 3.1

BW, CUNI-90/10

030 M ELBOW,PIPE, ELBOW, 1/2"IPS, 90

9B 4730 014637036 N 8/EA 3.1

DEG, SR, SW, 400#, 803-6397430,

CNA 90/10

031 M ELBOW, PIPE, ELBOW, 1/2"IPS, 90 9C 4730 SA4462494 N 5IEA 3.1

DEG, LR, SW, 400#, 803-6397430, CNA

90/10

032 M ELBOW,TUBE, ELBOW 45, 2"IPS, BW, 9B 4730 007203959 N SIEA 3.1

CUNI-90/1 0

033 M ELBOW45, ELBOW45, 1 -1/2"IPS, BW, 9B4730SA4908515 N SIEA 3.1

CUNI-90/1 0

034 M ELBOW45, ELBOW45, 1 -1/4"IPS, BW, 9B4730SA9304158 N 5/EA 3.1

CUNI-90/1 0

035 M ELBOW, PIPE, ELBOW, 1"IPS, 45 DEG, C 4730 SAPKUO495 N 2OIEA 3.1

BW, CL-200,810-1385880, CNA 90/10

036 M ELBOW,PIPE, ELBOW, 3/4"IPS, 45

9B 4730 014637053 N

5/EA 3.1

DEG, SW, 400#, 803-6397430, CNA

90/10

C UNION, UNION, 2"IPS, SW, CUNI-90/1 0 9B 4730 SA4462650 N 2/EA N/A

038 M UNION, UNION, 1/4"IPS, SW, CUNI- 9B 4730 SA4385945 N 2IEA 3.1

90/10

039 M UNION, UNION, 3/4"IPS, SW, CUNI- 9B 4730 SA4462646 N 4/EA 3.1

90/10 040 M UNION,PIPE, UNION, lIPS, SW, 9B4730 015354862 N 20/EA 3.1

CUNI-90/1 0

041 M UNION, UNION, 1 -1/2"IPS, SW, CUNI- 9C 4730 SA4462648 N 4/EA 3.1

90/10

042 M UNION,PI, UNION, 1 -1/4"IPS, SW, 9B 4730 014213431 N 10/EA 3.1

400#, MIL-F-1183, CUNI 70/30

043 M BOSS, PIPE, BOSS, PILOT, 1/4" IPS,

9C 4730 SA4464623 N 1/EA 3.1

SW, 400#, 804-8577030, CNA 70/30

044 M BOSS, PIPE, BOSS, PILOT, 1-1/2" IPS,

9C 4730 5A4639507 N 1/EA 3.1

SW, 400#, 804-8577030, CNA 70/30

045 M SLEEVE,BULKHEAD AND, BHD/DK

9B 2040 002730687 N 20/EA 3.1

SLEEVE, lIPS, STEEL, 810-1385866

046 M BULKHEAD SLEEVE, BHDIDK

9B 2040 002730689 N

5/EA 3.1

SLEEVE, 1 -1/2"IPS, STEEL, 810-

1385866

047 M SLEEVE,BULKHEAD AND, BHD/DK 9B 2040 002730690 N 10/EA 3.1

SLEEVE, 2"IPS, STEEL, 810-1385866

048 M ADAPTER, ADAPTER, 112"IPS FSWX

9B 4730 5A4462637 N

10/EA 3.1

1/2"MPT, CUNI-90/1 0

049 M ADAPTER, ADAPTER, 1"IPS FSWX 9B 4730 SA4462639 N 15/EA 3.1

1"MPT, CUNI-90110

050 M TEE,PIPE, TEE, 3/4"IPS, SW, 400#,

9B 4730 014636648 N 3/EA 3.1

803-6397430, CNA 90/10

Sakura.Yamaguchi.ja

ShipIHULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA-7 USS TRIPOLI JON. 38DJA52106 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

MATERIAL LIST

QTY

ITEM PC REF / STOCK HAZ DOC REQD/ PARA

NO. NO NO.

C DESCRIPTION NUMBER MA1 NO. UNIT Na

051 M TEE,PIPE, TEE, 2"IPS, SW, 400#, 803- 9B 4730 014636615 N 5/EA 3.1

6397430, CNA 90/10

052 M TEE,PIPE, TEE, 1 -1/2"IPS, SW, 400#,

9B 4730 014636623 N

7/EA 3.1

803-6397430, CNA 90/10

053 M TEE,PIPE, TEE, 1 -114"IPS, SW, 400#,

9B 4730 014636635 N

5/EA 3.1

803-6397430, CNA 90/10

054 M TEE,PIPE,TEE,STRAIGHT, lIPS, 9B 4730 014636644 N

5/EA 3.1

SW, 400#, 803-6397430, CNA 90/10

055 M BUSI-IING, BUSI-IING, 2"IPSX 1-

9B47305A4462627 N

4/EA 3.1

1/4"IPS, SW, CUNI-90/10

056 M REDUCER,PIPE, BUSHING, 1 -1/2"IPS

9B 4730 014837206 N

4/EA 3.1

X 1"IPS, SW, CUNI-90/10

057 M REDUCER,PIPE, BUSHING, 1/ZIPS X

9B 4730 014900753 N

1/PG 3.1

1/4"IPS, SW, CUNI-90/10, PG/2EA

058 M REDUCER,PIPE, BUSHING, 1 -1/2"IPS

9B 4730 014834058 N

2/EA 3.1

X 1 -1/4"IPS, SW, CUNI-90/10

059 M REDUCER,PIPE, BUSHING, 1 -1/4"IPS

9B 4730 014836165 N

2/EA 3.1

X 3/4"IPS, SW, CUNI-9011 0

060 M REDUCER,PIPE, BUSHING, 1 -1/4"IPS

9B 4730 014836067 N

5/EA 3.1

X lIPS, SW, CUNI-90/10

061 M REDUCER,PIPE, BUSHING, 1'IPSX

9B 4730 014834438 N 5/EA 3.1

314"IPS, SW, CUNI-90/10

062 M REDUCER,PIPE, BUSHING, 3/4"IPS X

9B 4730 014833971 N

5/EA 3.1

1/2"IPS, SW, CUNI-90/10

063 M REDUCER,PIPE, BUSHING, 1-1/2" X

9B 4730 014324783 N

2/EA 3.1

1/2"IPS, SW, 400#, 803-6397430, CNA

70/30

064 M BUSHING,PIPE, BUSHING, 2"IPS X

9B 4730 014835439 N 4/EA 3.1

lIPS, SW, CUNI-90/10

065 M TUBE,METALLIC, PIPE, 1/2"IPS,

9B 4710 014284431 N

2/FT 3.1

0.840"OD X 0.120'Wr, 3300#, MIL-T-

16420, CNA7O/30

066 M TUBE,MET, PIPE, 1/2"IPS, 0.840"ODX

9B4710 002774655 N 2/FT 3.1

0.065"WT, MIL-T-16420, CNA9O/10

067 M REDUCER, PIPE, COUPLING,

9C 4730 SA4462581 N

4/EA 3.1

REDUCING, 3/4 X 1/2"IPS, SW, 400#,

803-6397430, CNA 90/10

068 M BACKING RING, BACKING RING,

9C 4730 5A4617916 N 4/EA 3.1

8"IPS, MIL-STD-22D, FIG. 63, CNA

90/10

069 M RUBBER SHEET,SOLID, SHEET,

9B 9320 010193905 N 2/SR 3.1

RUBBER, 1/16"X36"W, MIL-G-1149

TY.I, CL.2, HS 50, SBR

070 M RUBBERS, SHEET, RUBBER, 1/8" X

9B 9320 003853919 N

2/SH 3.1

36" X 36", MIL-G-1 149 TY.I, CL.2, HS

50, SBR

071 M ROD,WELDING, WELDING ROD,

9B 3439 000888988 Y 8/BX 3.1

RN67, 1/16X36, MIL-E-21562,

1OLB/BX

072 M ROD,WELDING, WELDING ROD, 9B 3439 000888989 '1 3/BX 3.1

RN67, 3/32 X 36, MIL-E-21562,

10LB/BX

073 M ROD,WELDING, WELDING ROD, 70S- 9B 3439 009008737 Y 2/CO 3.1

2, 1/16X12, MIL-E-23765, SLB/CO

074 M ROD,WELDING, WELDING ROD, 70S-

9B 3439 010172792 Y

2/CO 3.1

2, 3/32X36, MIL-E-23765, 10LB/CO

Sakura.Yamaguchi.ja

LHA-7 USS TRIPOLI JON. 380JA521 06 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

MATERIAL LIST

M

QTY

ITEM PC REF I STOCK HAZ DOC REQD/ PARA

NO. NO.

NO. C DESCRIPTION NUMBER MA1 NO. UNIT N

075 M ROD,WELDING, WELDING 9B 3439 004344851 Y 2IBX 3.1

ELECTRODE, 1/16X 12, MIL-RN82,

MIL-E-21562, CL.2, GTAW, INCONNEL

076 M ROD,WELD, WELDING ELECTRODE,

9B 3439 009357873 Y

2/CO 3.1

3/32 X 36, MIL-RN82, MIL-E-21562,

CL.2, GTAW, INCONNEL

077 M BRAZING ALLOY,SILVE, BRAZING

9B 3439 004331919 Y 2/CO 3.1

ALLOY, ROD, 118"X1/8"X36", 6 ENLB,

QQ-B-654, BCUP-5, GRIll, 10 LB/CO

078 M FLUX,BRAZING, FLUX,O-F-499 TYPE

9B 3439 009967176 Y

5/JR 3.1

B, 8 LB/JR

079 M INSUL, PIPE, PIPE COVERING, 8"IPS,

9Q 5640 SA9607851 N 5/EA 3.2

8-5/8" ID X 3/4" THK X 6 FT LG, 6FTIEA

080 M INSUL, SHEET, SHEET, 3/4"THKX 3FT

90 5640 5A9607854 N

5/SH 3.2

W X 4FT L, K-FLEX ECO, NON

HALOGEN RUBBER FOAM

081 M COVER, PIPE, PIPE COVERING,

90 5640 SA4783096 N 5IEA 3.2

lIPS, 1-3/8" IDX3/4"THKX6FTLG, 6FT/EA

082 M CLOTH,PL, GLASS CLOTH, 5 FTWX

9B 8305 001487363 N 1/RO 3.2

50 YD, MIL-C-20079H TY.I, CL.3, LIW

083 M ADHESIVE, ADHESIVE, WHITE, MIL-

9B 8040 002738708 Y 4IGL 3.2

DTL-3316D CL.1, GR.A 1GL/UI

084 M ADHESIVE, ADHESIVE, NEOPRENE,

9B 8040 008419773 Y

10/PT 3.2

MIL-A-241 79A TY.II, CL.1, 1 PT-CAN

085 M INSULATI, INSULATION BLOCK,TH,

90 5640 008096312 N

3/BX 3.2

THERMAL BOARD, 1 INCH THK, 24

INCHES X 36 INCHES , MIL-DTL-

32585A, TYPE 1, FORM 1, FACING B,

12 ENBX

086 M ADHESIVE,FIRE RES,I, ADHESIVE, 90 8040 LHA008518 Y 2/CA 3.2

MIL-A-3316D CL.3, GR.A PELICAN

301A ADHESIVE, 1 GLICA

087 M SEALING COMPOUND, SEALING

9B 8030 001742588 Y 4/GL 3.2

COMPOUND, MIL-C-19565CTY.II, 1,

1GL/UI, VAPOR BARRIER

088 C VALVE,GATE,VALVE, 1 -1/4"IPS,

3B 4820 015772747 N 2/EA N/A

GATE, STOP, UE, 400#, 803-1385714-

6AF MODIFIED, BRONZE

089 C VALVE,GATE, VALVE, lIPS, GATE, 3B 4820 015502905 N 2IEA N/A

STOP, UE, 400#, 803-1385714-51AF,

BRONZE

090 C VALVE,GATE, VALVE, 1 -1/2"IPS, 3B 4820 015502954 N 2/EA N/A

GATE, STOP, UE, 400#, 803-1385714-

71AF, BRONZE

091 C VALVE,GATE, VALVE, 3/4"IPS, GATE, 3B 4820 015502897 N 2/EA N/A

STOP, UE, 400#, 803-1385714-4 AF,

BRONZE

092 M GASKET, GASKET, METALLIC & 9B 5330 013776202 N 8/EA 3.1

RUBBER, G24748 TY.B, 2.734"ID X

3.391"OD, M24748NBR2.000, NBR

093 M GASKET, 1" UNION GASKET,

9B 5330 013596970 N 3OIEA 3.1

METALLIC & RUBBER, MIL-G-24748

TY.A

094 M GASKET,, GASKET, 0-RING WITH 9B 5330 013773268 N 8/EA 3.1

RETAINER RING FOR 1-1/2" IPS

095 M GASKET, GASKET, 0-RING WITH

9B 5330 015860604 N 16/EA 3.1

RETAINER RING FOR 1-1/4" IPS

Sakura.Yamaguchi.ja

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Ôp:

LHA-7 USS TRIPOLI 38DJA521 06 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

MATERIAL LIST

QTY

ITEM PC REF / STOCK HAZ DOC REQD/ PARA

NO. NO.

NO. C DESCRIPTION NUMBER MA1 NO. UNIT NO.

096 M GASKET, GASKET, 3/4", MIL-G-24748 9B 5330 013773267 N 8/EA 3.1

TY.A, METALLIC & RUBBER

097 M GASKET, 0-RING FOR 114" UNION.

9B 5330 014309483 N 2/EA 3.1

NBR, MIL-G-24748 TY.A

098 M TEE,PIPE, TEE, 2"IPS, SB, 400#, MIL-

9B 4730 005425253 N 2/EA 3.1

F-i 183/9-107, BRONZE 099 C TEE,PIPE,TEE, 1 -i/2"IPS, SB,400#, 9B 4730 005425252 N 4/EA N/A

MIL-F-i 183/9-106, BRONZE 100 C TEE,PIPE,TEE, i-114"IPS, SB,400#, 9B 4730 005425264 N 3/EA N/A

MIL-F-i 183/9-105, BRONZE 101 C TEE,PIPE, TEE, lIPS, SB, 400#, MIL-

9B 4730 005425250 N 2/EA NIA

F-i 183/9-i 04, BRONZE

102 C TEE,PIPE, TEE, 3/4"IPS, SB, 400#, 9B 4730 005425262 N 1/EA NIA

MIL-F-i 183/9-i 03, BRONZE

/0/

Sakura.Yamaguchi.ja

LHA-7 USS TRIPOLI JON. 38DJA521 06 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

Ii--. -rH I 0

'I L____ I . .

H +

I I

- Iu_

LLJ

-Z Iu 0

I

I 0 .L -

- H ____ -h1N //!? \\-

JL

-----..-H' --.1'--. ¯1-)

1L 'J _ I.,

- i- -t l:IL I

1'

I\ I

I I

ENCLOSURE (A) 1/2

Sakura.Yamaguchi.ja

LHA -7 USS TRIPOLI

JON. 38DJA52106 AOl

TITLE:

Seawater Flushing Piping in 02 Deck Through 2nd Deck Level; replace

TiflFE[IE

- F

___LL'

F!

F! -r FI, F1 F!::, F, F

F1

T24-L4"CD\ t

--L t: _____FT -T I N .

F44 ___I I H- L L N 4

H í F

-I f- - 44 ;2° l::' H

2'3_1,/4"

Fl: /

DENOTE TO BE REPLACED (Listed in 1.3.1)

1:ECTk'-J F:F

[:21K NI

ZKNE -:

ENCLOSURE (A) 2/2

(2 [IL

Sakura.Yamaguchi.ja

File details come from the government source that posted it. Updated .