1.02 38HZA53302R_00_A01.pdf

PDF 832 KB Posted

Attached to
USS Nueces (APL-40) REPLACE HOT POTABLE WATER PIPING
Solicitation number
N6264926Q0308
Issued by

About this file

This is a Job Specification document for shipboard maintenance work on the USS NUECES (APL-40). The work involves replacing 2 feet of 2-1/2 inch IPS cold potable water piping located in AC Diesel Generator Room No. 2, Upper Level A-318-E (compartment 2-26-4). The piping is specified as CuNi90/10 (Copper-Nickel 90/10 alloy) and is currently leaking with a temporary patch in place. The anticipated award date is 06/30/2026, with production completion scheduled for 08/27/2026. The period of performance runs from 07/07/2026 through 09/28/2026, with work to be performed at Sasebo.

The work requirements include: obtaining and analyzing samples of existing insulation and lagging for asbestos-containing materials; removing and installing new cold potable water piping per Navy specifications S9AA0-AB-GOS-010 REV 11; performing chemical disinfection and bacteriological testing of affected piping; witnessing an operating pressure test with zero allowable leakage; accomplishing insulation and lagging per reference documents; and cleaning and preservation to match surrounding areas. Bacteriological testing must be performed by local government agencies or licensed Japanese laboratories. Government-furnished materials include pipe, fittings, insulation (NH-Armaflex foam), glass cloth, adhesives, welding electrodes, thermal insulation blocks, tape, and miscellaneous hardware. The document was prepared by T. Yoshinaga on 7/9/2025 and approved by S. Murakami with Job Order Number 38HZA53302R, Revision A01.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ShlDIHULL NO. I ShlDIHULL NAME

APL-40 I USS NUECES

ICN:

JON: 38HZA53302R

Rev: Key Op:

A01 fflLE:

Potable Water Piping In 2..28-ii replace

JOB SPECIFICATION

Anticipated Award Date Production Completion Date: PREPARING ACTMTY:

06/30/2026 08/27/2026

POP Start Date: POP End Date: SASEBO 07/07/2026 09/28/2026

PREPARED BY: CODE DATE

T.YOSHINAGA - PYO 7/912025

APPROVED BY: ~Jfvl CODE

S.MURAKAMI S225

CONCURRED BY: 7-7- CODE

T.TAKAMASU S234

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(S!: AP40-L381 CASREP#

SIF CONTACT: SCHUCHARD D. / PASCHKE, J. CWP# CCNS#

T. ESCRITOR-YAMAOA

Approved by S300/8900 ~ Date: 7/,~/uu,- Avl: &CM

LWC:

Work Completed

S/Force: Rate: Date:

SHIPSUPT: Date: SRF CONTROL NO.: 1301383234 wgs~ 5cl;8Tlfl~IIQN SIGNATURg

COMPLE110N OF WORK REVIEW BADGE NO.: SHOP/CODE: PHONE DATE:

Shl-'HULL NO. I Shl-'HULL NAME I ---....a~'----------+----=-"'----------: JON: ICN: I Rev:

I

Key Op:

APL-40 USS NUECES 38HZA53302 R

TITLE:

Potable Water Piping In 2·28-4; replace

1. SCOP&:

1.1 Title: Potable Water Piping in 2-26-4; replace

1. 2 Location of Work:

1.2.1 AC Diesel GEN Room No.2 Upper Level A-318-E (2-26-4)

1.3 Identification:

A01

1.3.1 Quantity (2 FT), 2-1/2 Inch IPS Cold Potable water Piping Located in 1.2.1, CuNi90/10 Piping, See ENCLOSURE (A)

1.3.1.1 Quantity (One EA), Sample of Insulation and Lagging

on 2-1/2 Inch IPS Cold Potable water Piping Located in 1.2.1, NH-Armaflex and Cloth MIL-C-20079

1.3.2 Quantity (One EA), Sample of Insulation and Lagging on

Overhead Located in 1.2.1, Around Cold Potable Water Piping Listed in 1.3.1, 2 Inch Thermal Insulation

2. RBl'l:UNCl:S:

2.1 Standard Items (FY26)

2.2 S9AA0-AB-GOS-010 REV 11, General Specifications for Overhaul of Surface Ships (GSO)

2.3 607-2281864 Rev A, Insulation & Sheathing Below Main Deck

2.4 S9086-VH-STM-010/CH-635/Rev 3, Thermal, Fire, Acoustic Insulation

3. RBQtl'IRBNINTS:

3.1 Obtain each sample listed in 1.3.1.l and 1.3.2 from existing insulation and lagging and analyze each sample for Asbestos-Containing Material.

(V) "RBP0R1'"

3.1.1 Submit One legible condition report listing results from a licensed laboratory to SUPERVISOR.

3.2 Remove existing and install new cold potable water piping to replace cold potable water piping listed in 1.3.1.

3.2.1 Accomplish the requirements of 009-12 of 2.1, including Table One Column A, Lines One through 10.

3.2.1.1 Fabricate each backing ring in accordance with Line

6.

Shi ULL NO. Shi HULL NAME i ICN:

JON: I 38HZA53302R

Rev: Key Op:

APL-40 USS NUECES

TITLE:

Potable Water Piping In 2-26◄; replace

3.3 Accomplish a chemical disinfection of each affected cold potable water piping listed in 1.3.1, in accordance with Section 532p of 2.2.

3.3.1 Accomplish a bacteriological test for each affected cold potable water piping.

A01

3.3.1.1 Bacteriological testing must be accomplished by local government agency or licensed Japanese laboratories.

(V) REPORT

3.3.1.2 Submit One legible condition report listing results

of the requirements of 3.3.1 with certification that water is safe for human consumption.

(V) (G) ~OPERATING PRESSURE TEST"

3.4 Witness operating pressure test to be conducted by ship's force to verify tightness of each weld joint and mechanical joint affected by this work item, until the specified criteria is verified. Allowable leakage: None. - S130

3.5 Accomplish the requirements of 009-11 of 2.1 for insulation and lagging affected by this work item, using 2.3 for guidance.

3.6 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.

3.6.1 A brush or spray may be used as a paint application for acoustic insulation in 635-7.2.4 of 2.4 as applicable.

4. NO'l'ES:

4.1 Initial Condition - Potable water piping is leaking and temporary patch.

5. GOVERNMENT FURNISHED MATERIAL:

5.1 SRF will provide following material.

MATERIAL LIST

M QTY

ITEM PC REF I STOCK HAZ DOC REQD/ PARA

NO. NO. NO. C DESCRIPTION NUMBER MAT NO. UNIT NO.

001 M PIPE, 2-1/2"IPS, 2.875''0D X 0.083WT, 384710 N 5/FT 3.2

MIL-T-18420 CNA 90/10 002898007

002 C ELBOW, 2-1/2"IPS, 45 DEG, BW, 200#, 984730 N 1/EA 3.2

810-1385990 CNA 90/10 007254465

003 M PIPE COVERING, 2-1/2"IPS, 2.875"ID X 9Q 5840 N 2/EA 3.5

3/4"THK X 8FT, NH ARMAFLEX. NON- SM552493

HALOGEN RUBBER FOAM NHT21034

ShlDIHULL NO. ShlDIHULL NAME I ICN: I Rev: Key Op:

APL-40 USS NUECES JON: 1 38HZA53302 R I A01

TITLE:

Potable Water Piping In 2-28-t; replace

MATERIAL LIST - --M QTY

ITEM PC REF I STOCK HAZ DOC REQDI PARA

NO. NO. NO. C DESCRIPTION NUMBER ~ NO. UNIT NO.

004 - M INSULATION SHEET, 314"THK X 3FT W X 9B5970 N 12/SF 3.5

4FT L, NH ARMAFLEX, NON HALOGEN 015844038

RUBBER FOAM

005 M GLASS CLOTH, 5 FT W X 50 YD, MIL-C- 9B8305 N 1/RO 3.5

20079H TY.I CL.3 L/W 001487383

006 M ADHESIVE, NEOPRENE, MIL-A-2417QA 9B 8040 y 1/GL 3.5

TY.II CL.1 520 R-373 1 GL/UI 005508835

007 M ADHESIVE, WHITE, MIL-DTL-33160 CL.1 , 9B 8040 y 1/GL 3.5

GR.A 1GL/UI 002738708

008 C RUBBER SHEET, RUBBER, 1/6" X 38" X 9B 9320 N 11EA 3.5

36" MIL-G-1149 TY.I CL.1 HS 50 CPR 007295103

009 M WELDING ELECTRODE, 1/16" X 36", MIL- 9B3439 y 1/BX 3.2

RN67 MIL-E-21562 CL.2 GTAW 000868988

010 M INSULATION BLOCK, THERMAL, 2"THK X 9Q 5640 N 1/BX 3.5

38"L X 24-W, MIL-DTL-32585 TY-I FM-1 008096315

FC-B U/1 CONTAINS 10 EA/BX

011 M TAPE.TEXTILE, 2" WIDTH X 50 YD/RO, 9B 8315 N 2/RO 3.5

WHITE MIL-C-20079TY-II CL-1 002671632

012 M CAP.SNAP FASTENER, MIN 0.27" DIA 9B 5325 N 1/HD 3.5

CAP SHANK & 0.879" DIA CAP HEAD, 007377648

ALUMINUM

ShlDIHULL NO. Ship/HULL NAME 1 ICN: Rev:

APL-40 USS NUECES JON: l 38HZA53302R

TITLE:

Potable Water Piping In 2-26-4; replace

2-28-14

HW COV

2-28-10 cw cov

FR 28 1

f\C'C'l f'C'

2-28-12

HW COV

2-28-8 cw cov

ID:1.3 . 1, 2-1/2

2- 28- 4

FL COV

2-26-2 cw cov

2- 28- 2

FL COV

I I

SHIP'S OFFICE

2-24-2-Q ~ .J

FR 24

2- 19- 4

FL COV

2-24-2 cw cov

2-23-2 cw cov

OFFICE

2-22-2-Q

FR 22

AC Diesel GEN Room No . 2 Upper Level A-3 1 8- E (2 - 26 - 4)

ENCLOSURE (A) 1/1

Key Op:

A01

2-19

FL C:

5/s