This is a Job Specification document for naval ship maintenance work aboard the USS NUECES (APL-40). The work scope involves replacement of hot potable water (HPW) piping in Officer Stateroom No. 0114 (01-24-0-L), specifically one foot of 3/8 inch IPS copper and bronze HPW piping between elbow fittings under a sink, along with two feet of NH-Armaflex insulation and cloth (MIL-C-20079) on the upstream side of the piping.
The anticipated award date is 06/30/2026, with work performance period from 07/07/2026 to 09/28/2026, and production completion by 08/27/2026. Work is to be performed at the SASEBO facility. Key requirements include: obtaining and analyzing insulation samples for asbestos-containing material with submission of a laboratory condition report; removing and installing new HPW piping per Navy specifications (S9AA0-AB-GOS-010 REV 11, section 009-12); performing chemical disinfection of affected piping per section 532p; conducting bacteriological testing by local government or licensed Japanese laboratories with certification of water safety; witnessing an operating pressure test to verify joint tightness with zero allowable leakage; completing insulation and lagging per section 009-11; and cleaning and preserving surfaces per section 009-32. The government will furnish all materials including copper pipe, brazing alloy and flux, pipe covering, glass cloth, adhesives, and bronze fittings. The initial condition notes that HPW piping was cracked and leaking.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6264926Q03080001 SF 30.pdf | ||
| 1.02 38HZA53302R_00_A01.pdf | ||
| Solicitation - N6264926Q0308.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ShlDIHULL NO. Shin/HULL NAME ICN: l Rav: Key Op:
APL-40 USS NUECES
JON: 38HZA52101R I A01
TITLE:
Hot Potable Water Piping In 01-24-0-L; replace
JOB SPECIFICATION
Antlclpabtd Award Pl'Ojluctlon Completion Date: PREPARING AI..TIVITY:
06/30/2026 08/27/2026
U.111 l"'Vr- CIIIIIR uaw: POP End Date: SASEBO 07/07/2026 09/28/2026
PREPARED BY: CODE DATE
H.YAMAOKA PYM 7/41202&
APPROVED BY: -~~)t,A
CODE
I.MURAKAMI S22&
CONCURRED BY: LZ CODE
T.TAKAMASU S234
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
!)ESCRIPTION:
JSNISl: AP40-L382 CASREP#
S/F CONTACT: SCHUCHARD D. / PASCHKE J. CWP# CCNS#
T. ESCRl10R-VAMADA Approved br S300/8900 PMS320 Date: 7 l18'(µ 6s- Avl: ICM
LWC:
Work Completed
S/Force: Rate: Date:
SHIPSUPT: Date: SRF CONTROL NO.: 1301383234
W0BIS Ci;BIIEICAilgfj llittAILl81;1
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: !DATE:
ShlDIHULL NO. ShlDIHULL NAME
JON:
ICN: Rev: Key Op:
APL-40 USS NUECES 38HZA52101 R
TITLE:
Hot Potable Water Piping In 01-24-0-Li replace
1. SCOPE:
1.1 Title: Hot Potable Water (HPW) Piping in 01-24-0-L; replace
1. 2 Location of Work:
1.2.1 Officer Stateroom No. 0114 (01-24-0-L)
1.3 Identification:
1.3.1 Quantity (One FT), 3/8 Inch IPS HPW Piping between Elbow Fittings under The Sink Located in 1.2.1, Copper and Bronze
A01
1.3.2 Quantity (2 FT), Insulation and Lagging on 3/8 Inch IPS HPW Piping Upstream Side of HPW Piping listed in 1.3.1 Located in 1.2.1, NH-Armaflex and Cloth MIL-C-20079
2. Rl:l'SRl:NCl:S:
2 .1 Standard Items ( FY26)
2.2 S9AA0-AB-GOS-010 REV 11, General Specifications for Overhaul of Surface Ships (GSO)
3. Rl:QU:IRBMBNTS:
3.1 Obtain each sample from existing insulation and lagging listed in
1.3.2 and analyze each sample for Asbestos-Containing Material.
3.1.l Submit One legible condition report listing results from a licensed laboratory to SUPERVISOR.
3.2 Remove existing and install new HPW piping to replace the HPW piping listed in 1. 3 .1.
3.2.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column B, Lines One through 10.
3.3 Accomplish a chemical disinfection of each affected HPW piping listed in 1.3.1, in accordance with Section 532p of 2.2.
3.3.1 Accomplish a bacteriological test for each affected potable water system.
3.3.1.1 Bacteriological testing must be accomplished by local government agency or licensed Japanese laboratories.
(V) "Rl:PORT"
Ship/HULL NO. Shlo/HULL NAME
JON:
ICN: Rev: Key Op:
APL-40 USS NUECES 38HZA52101R A01
TITLE:
Hot Potable Water Piping In 01-24-0-L; replace
3.3.1.2 Submit One legible condition report listing results
of the requirements of 3.3.1 with certification that water is safe for human consumption.
(V) (G) "OPERATING PRESSURE TEST"
3.4 Witness an operating pressure test to be conducted by Ship's Force to verify tightness of each brazed joint and each mechanical joint affected by this work item, until the specified criteria is verified. Allowable leakage:
None. - 8130
3.5 Accomplish the requirements of 009-11 of 2.1 for insulation and lagging on the piping affected by this work item.
3.6 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.
4. NOTES:
4.1 Initial Condition - HPW piping in 01-24-0-1 was cracked and leaking.
5. GOVERNMENT FURNISHED MATERIAL:
5.1 SRF will provide following material.
MATERIAL LIST
ITEM PC REF M STOCK QTY PARA
NO. NO. NO. I DESCRIPTION NUMBER HAZ DOC REQD/ NO. C MAT NO. UNIT
001 M PIPE,3/8"IPS, MIL•T-24107 0.675 X T0.065, 9B 4710
N 4/FT 3.2 COPPER 002774597
002 M BRAZING ALLOY, 1/8" X 0.050" X 20", GR.Ill, 9B 3439 y 1/LB 3.2 STRIP BCUP-5 QQ-B-654 28 EA/LB 005288578
003 M BRAZING FLUX, O-F-499 TYPE B, GR.Ill & IV, 16 9B 3439 y 1/JR 3.2 OZ/JR 009148390 PIPE COVERING, 3/8"IPS, 0.675"ID X 3/4''THK X 9B 5970 004 M 6FT, NH ARMAFLEX, NON-HALOGEN RUBBER 015937168 N 1/EA 3.5
FOAM NHT05834
005 M
GLASS CLOTH, 5 FT W X 50 YD, MIL-C-20079H 9B 8305
N 1IRO 3.5 TY.I CL.3 LN/ 001487363
006 M ADHESIVE, WHITE, MIL-DTL-3316D CL.1, GR.A 9B 8040 y 1/GL 3.5 1GL/UI 002738708
007 M ADHESIVE, NEOPRENE, MIL-A-24179A TY.II, 9B 8040 y 1/PT 3.5 CL.1 1PT-CAN 008419TT3
100 C TUBE 0.625" OD X 0.040" THK, ASTM B280, 9B 4710
N 4IFT NIA COPPER 002525116
101 C
COUPLING, 3/8"IPS, SB, 400#, MIL-F-1183/3-02, 9B 4730
N 1/PG NIA BRONZE 005425101
102 C
ELBOW, 3/B"IPS, 90DEG, SR, SB, 400#, MIL-F- 9B 4730
N 2IEA NIA 1183/5-02 BRONZE 005425141
103 C
2" OD ROUND BAR, 13IN/EA, QQ-C-390, ALLOY 9B 9530
N 1/EA NIA 903 BRONZE 002387185
¾