1-Conceptual Plan and Elevations.pdf

PDF 720 KB Posted

Attached to
RFP for Professional Engineering and Construction Administration Services Required to CONSTRUCT a GENERAL AVIATION TERMINAL BUILDING
Solicitation number
Not on record
Issued by
Fulton County, Pennsylvania

About this file

This is a conceptual plan and elevations document prepared by L.R. Kimball for the Susquehanna Area Regional Airport Authority (SARAA) detailing the proposed construction of a General Aviation Terminal Building at Franklin County Regional Airport (FCRA) in Chambersburg, Pennsylvania. The project encompasses the design and construction of a new 3,500 square foot terminal building with associated site improvements, including a 15-space parking lot, an 8-foot wide gravel pedestrian/bike trail, concrete sidewalks, a bus shelter, and bike racks. The site plan indicates future expansion areas for hangars and fuel facility, with detailed setback requirements and runway safety area designations. The conceptual floor plan shows a two-story structure with a first floor featuring a reception/lobby, conference office, work room/quiet lounge, and supporting facilities, and a second floor with office spaces. The building design includes roof heights of 16 feet at the high point and 12 feet at the low point.

The rough order of magnitude cost estimate for the project totals $2,768,772.78, including a 15 percent contingency of $361,144.28, with a subtotal construction cost of $2,407,628.50. Major cost components include general construction at $1,137,500, construction professional services and inspection at $140,040, design professional services at $162,320, HVAC construction at $148,750, and electrical construction at $130,375. Additional line items include environmental review and permitting, bidding services, permits and bonding, right-of-way easements, and owner administrative costs. The document is dated November 2021 with October 2024 pending notation, and identifies David E. Spaulding as Deputy Director for Engineering and Planning and Lou J. Pirozzi as the engineering contact for SARAA.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOVEMBER 2021PROJECT NO DATE

CHECKED

APPROVED

DRAWN

DESIGNED

DATE

DATE

DATE

DATE

DATE BY

REVISIONS

DESCRIPTION

RLH

VJD

RAK

RNM 11/21

SQA.M000260.EB19

615 West Highland Avenue Ebensburg, PA 15931 Phone: (814) 472-7700 Fax: (814) 472-7712 Email: rick.holes@lrkimball.com Website: www.lrkimball.com

FRANKLIN COUNTY

REGIONAL AIRPORT

(N68)

1 2 3 4 5

2 3 4 5

A

B

C

D

A

B

C

D

CDI - Infrastructure, LLC dba L.R. KimballÓ

PLAN DRAWINGS OWNER: SUSQUEHANNA AREA

REGIONAL AIRPORT AUTHORITY

ONE TERMINAL DRIVE, SUITE 300

MIDDLETOWN, PA 17057

PHONE: 717.948.3900

3506 AIRPORT ROAD

CHAMBERSBURG, PA 17201

FRANKLIN COUNTY

TIMOTHY J. EDWARDS

EXECUTIVE DIRECTOR

tedwards@saraa.org

DAVID E. SPAULDING, cm

DEPUTY DIRECTOR FOR ENGINEERING

AND PLANNING

DSpaulding@saraa.org

11/21

11/21

00 40' 80'

Scale 1" = 40'

SITE PLAN

35+00 36+00 37+00 38+00 39+00 40+00

+0

+0

+0

+0

45+00

46+00

47+00 48+00

49+

+0

+0

+2

T L O

F A

T L O

F A

18+00 19+00 20+00 21+00

+0

+0

+6

T S

A T

S A

TSATSATSATSATSATSA

T O

F A

TOFATOFATOFATOFATOFATOFA

T O

F A

T S

A T

S A

T S

A

T

S

A

T

S

A

T S

A T

S A

T S

A T

S A

T

S

A

T

S

A

T

S

A

TSA

T S

A

T

S

A

T

S

A

T S

A T

S A

T S

A T

S A

T O

F A

T O

F A

T O

F A

T

O

F

A

T

O

F

A

T

O

F

A

TOFATOFATOFATOFATOFATOFATOFA

TSATSA

T S

A T

S A

T S

A T

S A

TSA

T

S

A

T S

A T

S A

T S

A T

S A

TSA

R O

F A

ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA

RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA

R S

A R

S A

RSARSARSARSARSARSARSARSARSARSARSARSARSA

RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA

R S

A R

S A

R S

A R

O F

A R

O F

A R

O F

A

ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA

TD

G

TD

G

62.4'

42.6'

90.0'

20'

20'

20'

70.0'

50.0'

R30.0'

R70.0'

R40.0'

R25.0' R50.0'

R25.0'

R8.0'R8.0'

R5.0'

40.0'

52.2'

R30.0'

30' SETBACK

30' SETBACK

300' SETBACK

FUTURE

HANGARS

FUTURE FUEL

FACILTIY

NEW

TERMINAL

BUILDING

8' WIDE GRAVEL

PEDESTRIAN/BIKE

TRAIL

35'

WIDTH

15' PARKING SETBACK

50' SETBACK

20' PARKING SETBACK FROM ROW

30' SETBACK

15' PARKING SETBACK

15' PARKING SETBACK

30' SETBACK

R50.0'

PROPOSED BIKE

RACK LOCATION

NEW BUS SHELTER

4' WIDE STREET

CROSSWALK

PARKING LOT

15 SPACES

5 S

PA

CE

S

10.0'

20.0'

14.1'

14.1'

24.0'

20.1'

8' WIDE GRAVEL

PEDESTRIAN/BIKE

TRAIL

8' WIDE GRAVEL

PEDESTRIAN/BIKE

TRAIL

CONCRETE SIDEWALK

LEGEND

EXISTING PROPOSEDITEM

AIRPORT BUILDINGS

AIRPORT PAVEMENT

RUNWAY SAFETY AREA N/A

AIRPORT PROPERTY LINE N/A

RUNWAY LIGHT N/A

ROADWAY PAVEMENT

N/A

N/ASIDEWALK

N/A

CONCEPT FLOOR PLAN & ELEVATIONS

A-1

T V

Whiteboard

S e rv in g C o u n te r

S T

O

I.T.

OFFICE

CONFERENCE

OFFICE

RECEPTION/

LOBBY

VEST.

MECHANICAL

STORAGE/

SUPPLIES

TOILETTOILET

WORK ROOM/

QUIET LOUNGE

T V

T V

LOUNGE

A ir p o rt

G ra p h ic o n W a ll

B ik e R a c k

50'-0"

AIR SIDE

A

IR

S

ID

E

L A

N D

S

ID

E

01 - FIRST FLOOR

0' - 0"

ROOF T.O.S. (HIGH)

16' - 0"

ROOF T.O.S. (LOW)

12' - 0"

REGIONAL AIRPORT

01 - FI

ROOF T

ROOF T

01 - FIRST FLOOR

0' - 0"

ROOF T.O.S. (HIGH)

16' - 0"

ROOF T.O.S. (LOW)

12' - 0"

01 - FIRST FLOOR

0' - 0"

ROOF T.O.S. (HIGH)

16' - 0"

REGIONAL AIRPORT

ROOF T.O.S. (LOW)

12' - 0"

01 - FIRST FLOOR

0' - 0"

02 - SECOND FLOOR

12' - 0"

ROOF T.O.S. (HIGH)

16' - 0"

ROOF T.O.S. (LOW)

12' - 0"

01 - FIRST FLOOR

0' - 0"

02 - SECOND FLOOR

12' - 0"

ROOF T.O.S. (HIGH)

16' - 0"

ROOF T.O.S. (LOW)

12' - 0"

FETY AREA

OPERTY LINE

GHT

AVEMENT

01 - FIRST FLOOR

0' - 0"

SECOND FLOOR

12' - 0"

OOF T.O.S. (HIGH)

16' - 0"

OOF T.O.S. (LOW)

12' - 0"

01 - FIRST FLOOR

0' - 0"

02 - SECOND FLOOR

12' - 0"

ROOF T.O.S. (HIGH)

16' - 0"

ROOF T.O.S. (LOW)

12' - 0"

FLOOR PLAN

SCALE: 1/8" = 1'-0"1

ELEVATION

SCALE: 1/8" = 1'-0" A

ELEVATION

SCALE: 1/8" = 1'-0"

ELEVATION

SCALE: 1/8" = 1'-0"

ELEVATION

SCALE: 1/8" = 1'-0"

B

C

D

A

D

C

B

OCTOBER 2024PENDING

LOU J. PIROZZI, PE, CM

lpirozzi@sarra.org

EX - 1

FCRA COMMUNITY CENTER BUILDING

Franklin County

Franklin County

UNIT COST

$ 31,830.00 $ 29,715.00

$ 20.00 $ 71,825.00 $ 31,830.00

$ 26.75 $ 3,185.00 $ 2,655.00 $ 2,975.00 $ 15,915.00 $ 5,305.00 $ 53,045.00 $ 29,725.00

$ 53.25 $ 18.15

$ 170.00

$ 215.00

$ 118,125.00 $ 325.00 $ 42.50 $ 32.00 $ 37.25

$ 26,525.00 $ 162,320.00 $ 12,735.00 $ 140,040.00 $ 2,655.00 $ 29,175.00 $ 11,140.00 $ 1,595.00

Rough Order of Magnitude (ROM) Estimate

CONTENGENCY @ 15%

TOTAL

$ 361,144.28

$ 2,768,772.78

Franklin County Regional Airport (FCRA) Community Center Building

SUBTOTAL $ 2,407,628.50

OWNER/SPONSOR ADMINISTRATIVE COSTS (ADVERTISEMENT) LS 1 $ 1,595.00

PERMITS/BONDING - OTHER LS 1 $ 29,175.00

RIGHT OF WAY EASEMENTS LS 1 $ 11,140.00

LEGAL: CONTRACT REVIEW LS 1 $ 2,655.00

BIDDING SERVICES LS 1 $ 12,735.00

CONSTRUCTION PROFESSIONAL SERVICES/INSPECTION LS 1 $ 140,040.00

COMPLETE ENVIRONMENTAL CATEX LS 1 $ 26,525.00

DESIGN PROFESSIONAL SERVICES LS 1 $ 162,320.00

PROFESSIONAL SERVICES, ENVIRONMENTAL & PERMITING

ELECTRICAL CONSTRUCTION SF 3,500 $ 130,375.00

HVAC CONSTRUCTION SF 3,500 $ 148,750.00

PLUMBING CONSTRUCTION SF 3,500 $ 112,000.00

GENERAL CONDITIONS LS 1 $ 118,125.00

GENERAL CONSTRUCTION SF 3,500 $ 1,137,500.00

CONSTRUCT COMMUNITY CENTER BUILDING

6" CEMENT CONCRETE SIDEWALKS SY 160 $ 34,400.00

SUBBASE 6" DEPTH (NO. 2A) SY 790 $ 14,338.50

SUPERPAVE ASPHALT MIXTURE DESIGN, HMA WEARING COURSE, PG 64-22, <0.3, MILLION

ESALS, 12.5 MM MIX, 2" DEPTH, SRL-H

TN 91 $ 15,470.00

ELECTRICAL CONNECTION LS 1 $ 29,725.00

4" SCH. 40 ELECTRICAL CONDUITS LF 140 $ 7,455.00

INSTALL WELL, TREATMENT & PROCESS PIPING FOR POTABLE WATER LS 1 $ 53,045.00

SANITARY SEWER MANHOLES & CLEANOUTS EA 1 $ 5,305.00

POLYMER/HYDROCOLLOID BINDER MATRIX MULCHING AC 1.0 $ 2,975.00

SANITARY SEWER - LEACHFIELD, SEPTIC TANKS, COLLECTION PIPING LS 1 $ 15,915.00

6' X 3' PEDESTRIAN CHAIN-LINK GATE EA 1 $ 3,185.00

SEEDING AND SOIL SUPPLEMENTS, FORMULA B AC 1.0 $ 2,655.00

CONSTRUCTION SURVEYING LS 1 $ 31,830.00

UNCLASSIFIED EXCAVATION CY 300 $ 8,025.00

FILTER SOCK, 18 INCH LF 850 $ 17,000.00

MOBILIZATION / CONTRACTOR'S PLANT LS 1 $ 71,825.00

TEMPORARY EROSION AND SEDIMENT CONTROL LS 1 $ 31,830.00

ROCK CONSTRUCTION ENTRANCE EA 1 $ 29,715.00

SITE PREPERATION

ITEM DESCRIPTION UNIT QUANTITY SUBTOTAL

File details come from the government source that posted it. Updated .