1-BP Attach.pdf
PDF 2 MB Posted
- Attached to
- 2025 Outsourced Pavement Preservation Program Concrete Joint and Crack Seal State and local contract opportunity
- Solicitation number
- 250266
- Issued by
- Sedgwick County, Kansas
About this file
This document details the 2025 Outsourced Pavement Preservation Program for concrete crack sealing services across multiple districts within what appears to be a municipal jurisdiction. The program encompasses 38 street segments totaling approximately 15,900 linear feet across six districts, covering various street classifications including arterials, collectors, and residential roads. Key streets include 21st Street, Washington Street, W Orient Boulevard, and W 25th Street North. The project involves concrete composite joint and crack sealing using rheology-based sealant specifications with specific performance requirements for high temperature, intermediate temperature, low temperature, and aging conditions.
The technical specifications require concrete composite crack sealant meeting stringent performance standards including viscosity requirements of maximum 6000 cP at 350°F, application temperatures between 365-385°F, and adhesion force minimums of 40 lbs-force. Equipment requirements include air compressors with minimum 100 CFM flow and 100 PSI pressure, kettles with 180+ gallon capacity, and various support equipment. Quality control measures mandate crack preparation to depths between 0.5-1.5 inches, material temperature controls between 340-380°F, and environmental restrictions including minimum air temperatures of 34°F and maximum pavement temperatures of 104°F. The work involves precision filling of cracks and joints greater than 1/4" with payment based on contract unit pricing per square yard for "Route Joint and Crack Sealing (Precision Filled)."
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 3-BP 472-2025-086132.pdf | ||
| 2-250266 Bid Table.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O u ts o u rc e d
P a v e m e n t P re s e rv a ti o n
P ro g ra m
C o n c re te C ra c k S e a l
S u b s e g
ID
S tr e e t
F ro m T o
D is tr ic t C la s s
L e n g th W id th
A re a S
Y
-1
S T
C A
R M
E N
H
IL
L S
ID
E
D is tr ic t
A rt e ri a l
.3
.2
-1
S T
E R
IE
C
A R
M E
N D is tr ic t
A rt e ri a l
.6
.3
-1
S
T M
A P
L E
W O
O D
E R
IE
D is tr ic t
A rt e ri a l
.7
-1
S
T V
O L U
T S
IA
M
A P
L E
W O
O D
D is tr ic t
A rt e ri a l
.5
.3
-1
S T
E R
IE
V
O L U
T S
IA
D is tr ic t
A rt e ri a l
.5
.0
-1
S T
E S
T E
L L E
E R
IE
D is tr ic t
A rt e ri a l
.6
.7
-1
S T
P R
IN
C
E E
S T
E L L E
D is tr ic t
A rt e ri a l
.8
.7
-1
S
T G
R O
V E
P R
IN
C
E D is tr ic t
A rt e ri a l
.4
.3
-1
S T
H
IL
L S
ID
E
Y A
L E
D is tr ic t
A rt e ri a l
.0
-1
W A
S H
IN
G
T O
N F
U N
S T
O N
S K
IN
N
E R
D is tr ic t
C o lle c to r
.8
-1
W A
S H
IN
G
T O
N S
K
IN
N E
R M
O U
N T
V E
R N
O N
D is tr ic t
C o lle c to r
.7
.6
-1
W A
S H
IN
G
T O
N M
O U
N T
V E
R N
O N
C L A
R K
D is tr ic t
C o lle c to r
.3
-1
W A
S H
IN
G
T O
N C
L A
R K
K
IN
K A
ID
D is tr ic t
C o lle c to r
.1
.2
-1
W A
S H
IN
G
T O
N K
IN
K
A
ID
B L A
K E
D is tr ic t
C o lle c to r
.8
.8
-1 W
A S
H
IN
G T
O N
B L A
K E
P A
W N
E E
D is tr ic t
C o lle c to r
.4
.6
-1 W
O R
IE
N
T B
L V
D S
E U
C L
ID
A V
E S
H
IR
A M
A V
E D is tr ic t
R e s id e n ti a l
.2
.3
-1 W
O R
IE
N
T B
L V
D S
G L E
N N
S T
S E
U C
L
ID
A V
E D is tr ic t
R e s id e n ti a l
.6
.7
-1 W
O R
IE
N
T B
L V
D S
V
IN
E A
V E
S G
L E
N N
S T
D is tr ic t
C o lle c to r
.6
.0
-4
W O
R
IE
N T
B L V
D S
S E
N E
C A
S T
S D
O D
G E
A V
E D is tr ic t
R e s id e n ti a l
.7
.7
-1
W O
R
IE
N T
B L V
D S
D O
D G
E A
V E
S M
A R
T
IN
S O
N A
V E
D is tr ic t
R e s id e n ti a l
.8
.3
-3
W O
R
IE
N T
B L V
D S
M A
R T
IN
S
O N
A V
E S
E L
IZ
A B
E T
H A
V E
D is tr ic t
R e s id e n ti a l
.8
.0
-1
W O
R
IE
N T
B L V
D S
E L
IZ
A B
E T
H A
V E
S F
E R
N S
T D is tr ic t
R e s id e n ti a l
.3
.0
-1
W O
R
IE
N T
B L V
D S
F E
R N
S T
W H
A R
R Y
S T
D is tr ic t
R e s id e n ti a l
.2
.0
-1
W O
R
IE
N T
B L V
D W
H A
R R
Y S
T S
M
IL
L W
O O
D A
V E
D is tr ic t
C o lle c to r
.3
.0
-1 W
O R
IE
N
T B
L V
D S
M
IL
L W
O O
D A
V E
W H
A R
R Y
S T
D is tr ic t
C o lle c to r
.3
.4
-1 W
O R
IE
N
T B
L V
D W
H A
R R
Y S
T S
V
IN
E A
V E
D is tr ic t
C o lle c to r
.3
-1 W
T
H S
T N
N M
E R
ID
IA
N A
V E
E O
P D is tr ic t
A rt e ri a l
.7
.1
-1 W
T
H S
T N
B U
L L
IN
G E
R D
R E
O P
D is tr ic t
A rt e ri a l
.0
-1 N
H A
L S
T E
A D
S T
N H
A L S
T E
A D
S T
W
T
H S
T N
D is tr ic t
C o lle c to r
.8
.5
-1 N
R
IC
H M
O N
D A
V E
N R
IC
H
M O
N D
A V
E W
T
H S
T N
D is tr ic t
R e s id e n ti a l
.0
-1 N
B U
L L
IN
G E
R D
R N
B U
L L
IN
G E
R D
R W
T
H S
T N
D is tr ic t
R e s id e n ti a l
.7
-1 W
T
H S
T N
N R
IC
H
M O
N D
A V
E N
E D
W A
R D
S A
V E
D is tr ic t
A rt e ri a l
.1
.3
-1 W
T
H S
T N
N E
D W
A R
D S
A V
E N
B U
L L
IN
G E
R D
R D is tr ic t
A rt e ri a l
.1
.3
-1 W
T
H S
T N
N B
U L L
IN
G E
R D
R N
H Y
A C
IN
T
H L
N D is tr ic t
A rt e ri a l
.9
.7
-1 W
T
H S
T N
W
T
H S
T N
N C
H A
R L E
S A
V E
D is tr ic t
A rt e ri a l
.0
-1 W
T
H S
T N
N C
H A
R L E
S A
V E
E O
P D is tr ic t
A rt e ri a l
.5
.5
-1 W
T
H S
T N
N C
L A
R E
N C
E A
V E
N A
T H
E N
IA
N
A V
E D is tr ic t
A rt e ri a l
.4
.2
-2 W
T
H S
T N
N A
T H
E N
IA
N
A V
E N
H A
L S
T E
A D
S T
D is tr ic t
A rt e ri a l
.3
.9
-1 W
T
H S
T N
N H
A L S
T E
A D
S T
N M
E R
ID
IA
N A
V E
D is tr ic t
A rt e ri a l
.9
.7
,7
P a g e o f
Concrete Composite Joint and Crack Sealant
Rheology Based Concrete Composite Crack Sealant Specifications
Table 1: Rheological Performance Tests
Material
Grade
High
Temperature Intermediate Temperature Low Temperature Aging
Jnr, 80°C, 1/KPa (maximum)
G*, MPa (minimum)v cbcbbdd 𝛅, degrees (minimum)
G*, MPa (maximum) 𝛅, degrees (minimum)
G-R ratio (maximum)
Performance 1.0, THT≥64 0.10 75.0 75.0 35.0 2.5
Testing for G* and 𝛅 shall be conducted using ASTM D7175 at the appropriate temperatures.
Table 2: Rheological Performance Tests - Ductility
Material Grade Original 4°C Ductility PAV Aged 4°C Ductility cm (minimum) cm (minimum)
Performance 35 25
Table 3: Adhesion Performance Requirements
Adhesion in Peel to Mortar (ASTM C794) Max Adhesion Force lbs-force), minimum
Performance 40
Table 4: Rotational Viscosity Requirements
Brookfield Viscosity (ASTM
D4402/AASHTO T316)
350°F Viscosity (cP), maximum
Recommended Application
Temperature
Performance 6000 365-385°F
Notes for Guidance: Concrete Composite Crack Sealant Selection
Table 7: Location Based Performance Specification
Location Low Low + 30 rounded Int. + 4
Int.
(Rounded) High Sealant Grade1
Waco -8 20 29-33 30 73 76(30)-10
Kansas City -21 8 22 22 61 64(22)-22
1. Sealant grade is using the basis as the PG grade system for binders. Use SG to reflect standard grade and PG to reflect
Performance grade.
Section 3: Concrete Composite Crack Sealant Placement
I. Equipment Requirements:
A. Air Compressor
i. Minimum of 100 CFM (cubic Feet per Minute) flow
ii. Minimum of 100 PSI (Pound per Square Inch) pressure
iii. Air lance attachment with diameter no larger than 1 inch to allow for precision blow-out
iv. Heat lance attachment that can be used to dry and heat areas of dsssssssssssdmoisture while blowing out cracks simultaneously
B. Kettle
v. Application and storage tank capacities of 180 gallons or more to ensure uniform heating and appropriate viscosity profile
vi. Ability to agitate application tank to minimize colds pockets and coking inside the kettle
vii. Temperature control equipment and application wand that ensures placement temperatures (at the point of crack and joint sealing) over 300 degrees F with appropriate material viscosity to ensure strong sidewall adhesion
C. Support Equipment
i. Power Rotary Wire Wheels for proper clean out of dirt and vegetation
ii. Dust Suppression Sprayers for Lasso use ahead of application trucks in areas with a high concentration of dirt or gravel
iii. Kinder Torches that can be used to dry and heat areas of moisture while blowing out cracks and joints simultaneously
Never allow sealant temperature to exceed 400°F, even momentarily
iv. Grass/Vegetation picks for areas of vegetation that must be manually removed
III. Crack Preparation Steps
A. Cracks will be thoroughly blown out using air compressor and air lance with minimum of 100 PSI
B. If necessary, Kinder Torches will be used to remove moisture from cracks and joints
C. Cracks and joints to be clean and free of debris to a minimum of 0.5 inches and no deeper than 1.5 inches
D. Cracks and joints will have no free or standing water after preparation steps are completed
E. Sealant will be brought up to specified temperature to ensure effective viscosity for placement
V. Sealant Application
A. Check to ensure all safety requirements are being met including:
ii. Final check that areas are blocked off to protect the general public
iii. Final safety check of equipment operability
iv. Final temperature check to ensure appropriate viscosity
v. Engage application wand and begin work
B. Oversized Crack Segment Cracks and Joints larger than 1.5 inches and less than 3 inches - Where pavement distress extends into the pavement base:
iii. Determine best remediation
iv. If backer rod method is being used, select a melt resistant material
v. If choosing to build an in-situ macadam, complete the following steps:
1. Apply crack sealant into the distress to serve as an aggregate lock
2. Place a compressible aggregate (GTR size 18-32 mesh) into the pavement with a 1 inch reservoir at the surface
3. Apply crack sealant
iv. Crack sealant should be filled in a uniform manner that is visually appealing with a consistent over banding, ideally no greater than 0.5 inches
v. Highly fatigued cracking areas on asphalt pavements should not be crack sealed. Alternative strategies such as surface patches should be considered for these areas
C. Typical Crack Segment (less than 1.5 inches):
i. Determine best remediation
ii. If backer rod method is being used, select a melt resistant material
iii. Highly fatigued cracking areas on asphalt pavements should not be crack sealed. Alternative strategies such as surface patches should be considered for these areas.
iv. All construction joints and cracks greater than 1/4“will be sealed on concrete pavement.The sealant shall be applied in the crack or joint reservoir uniformly from the bottom to the top and shall be filled without formation of entrapped air or voids.Pouring pots or gravity-fed sealant applicators shall not be used for sealing cracks and joints. Joints and cracks shall be precision filled to just below the surface of the pavement. Overbanding may not be used unless it is approved by the Engineer or Inspector. After the has cooled, settling shall not exceed 3/8” below the surface. All sealant placed will be paid for by the contract unit price bid per square yard with the bid item “Route Joint and Crack Sealing (Precison Filled)”.
D. Kettle Temperatures:
i. Overheating Parameters
1. Max Material Temperature Set Limit of 380 degrees F
2. Alerts when material temperatures exceed 400 degrees F inside kettle
3. If material exceeds 420 degrees F inside kettle operations will be halted to allow kettle to return to specified temperature range
ii. Under-Heating Parameters
1. Minimum Material Temperature Set Limit of 340 degrees F
2. Alerts when material temperature drops below 340 degrees F inside kettle
3. If material drops below 340 degrees F inside the kettle operations will be halted to allow kettle to return to specified temperature ranges
E. Environmental Conditions
i. Air temperatures not to be below 34℉ (1℃) + rising to ensure proper sidewall adhesion.
Goal is to have pavement temperatures no lower than 34℉ (1℃), or rising.
ii. Pavement Temperatures not to exceed 104℉(40℃) to ensure acceptable set time and non-tracking of material. Goal is to have pavement temperatures no higher than 140℉ (60℃), or lower - alternatively anti-tracking strategies as cooling water misting can be applied.
iii. In the event of rain or wet weather, operations will be stopped until weather has stopped and streets have had sufficient time to dry
Section 4: Quality
A. Inspection
i. Crack Preparation - If the inspector observe poor quality on any of these stretches the contractor will return to that particular street to re prep the road.
1. Reservoir depth will be measured with appropriate tool
2. Moisture in the cracks will be measured using blotting paper or moisture test strips
3. Cleanliness of cracks will be checked visually and clean rags may be used to check that cracks are free of debris
ii. Application – If the inspector observe poor quality on any of these stretches the contractor will return to that particular street to re prep the road
1. Aesthetically pleasing placement will be undertaken
2. Crack reservoir will be filled and the sealant will have a uniform strike off
3. Active cracks will be sealed
4. Attention to transverse and longitudinal cracks to ensure waterproofing of the pavement
5. Failed pavements that are defined as a series of fatigue cracks will not be sealed. This will include “bird bath areas.” A simple field evaluation criteria is the ability to touch three or more cracks when placing the inspectors hand on the pavement.
| Attachment A-1, Concrete Crackseal Street List |
| Attachment A-2.1, Concrete Crack Seal Map 1 - Orient Blvd. |
| Attachment A-2.2, Concrete Crack Seal Map 2 - Washington Ave. |
| Attachment A-2.3, Concrete Crack Seal Map 3 - 21st St. |
| Attachment A-2.4, Concrete Crack Seal Map 4 - 25th St. |
| Attachment A-2.5, ALL Concrete Crack Seal Maps |
| Attachment B, Concrete Joint Sealant Specifications |
File details come from the government source that posted it. Updated .