This document is a comprehensive bid specification and contract opportunity for Ada County, Idaho, involving the Phase 1 Kitchen Remodel and Site Work at the Ada County Jail located at 7200 Barrister Drive in Boise. The project encompasses providing materials and labor for site work and kitchen remodeling, with a sealed bid submission deadline of December 15, 2025, at 4:00 p.m. local time through the online Bonfire platform. A mandatory pre-bid meeting is scheduled for November 21, 2025, at 8:00 a.m. at the Ada County Sheriff's Office. The bid will be publicly opened on December 16, 2025, at approximately 9:00 a.m., with potential livestream access. The project is to be constructed under a single prime contract, with substantial completion required by July 23, 2027, and final completion by July 30, 2027.

The total contract includes a base bid amount plus an Owner's Contingency Allowance of $1,600,000, bringing the total contract value to a significant amount. Bidders must provide bid security of at least 5% of the total bid amount and must be licensed in the State of Idaho. No state or federal funding will be utilized for this project, and the contract will be awarded to the lowest responsive bidder. The project involves phased construction, including utility relocations, canal tiling, roadway construction, perimeter security, and a kitchen remodel, with a temporary modular kitchen to be used during construction. Contractors must comply with specific security requirements, including background checks for personnel and tool tracking, and must coordinate closely with Ada County Operations throughout the project.

View the file

Other files

File Type Posted
5-Bid26009 Veolia Bid Sheet.pdf PDF
3-Bid26009 Plans.pdf PDF
4-Bid26009 Bidders Bid Form.pdf PDF
2-Bid26009 Specifications Volume 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS | VOL.1

PROJECT: Ada County Jail Phase 1 Kitchen Remodel & Site Work 7210 Barrister Dr.

Boise, ID 83704

OWNER: Ada County Operations 200 W. Front Street Boise, ID 83702

ARCHITECT: Lombard/Conrad Architects 472 W Washington Street Boise, ID 83702 208.345.6677

CONTACT: Ken Gallegos

JOB NO.: 24301.01

DATE July 25, 2025

07/25/25

Ada County Jail Phase 1 Kitchen Remodel & Site Work 24301.01

Table of Contents 000110 - 1

TABLE OF CONTENTS

VOLUME 1 | DIV.00 – DIV.13

DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS

001116 - REQUEST FOR BID

002113 - INSTRUCTIONS TO BIDDERS

004114 - BIDDERS FORM

004393 - CHECK-OFF LIST FOR BID SUBMITTAL

004413 - EXHIBIT B QUALITY CONTROL SPECIFICATION

005132 - GEOTECHNICAL DATA

DIVISION 01 — GENERAL REQUIREMENTS

011000 - SUMMARY

011101 - SPECIAL CONDITIONS

011350 - SECURITY SCREWS

012100 - ALLOWANCES

012500 - SUBSTITUTION PROCEDURES

012600 - CONTRACT MODIFICATION PROCEDURES

012900 - PAYMENT PROCEDURES

013100 - PROJECT MANAGEMENT AND COORDINATION

013300 - SUBMITTAL PROCEDURES

013513.16 - SPECIAL PROJECT PROCEDURES FOR DETENTION FACILITIES

014000 - QUALITY REQUIREMENTS

014200 - REFERENCES

015000 - TEMPORARY FACILITIES AND CONTROLS

015400 - SECURITY

015723 - TEMPORARY STORM WATER POLLUTION CONTROL

016000 - PRODUCT REQUIREMENTS

017300 - EXECUTION

017329 - CUTTING AND PATCHING

017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017700 - CLOSEOUT PROCEDURES

017823 - OPERATION AND MAINTENANCE DATA

017839 - PROJECT RECORD DOCUMENTS

017900 - DEMONSTRATION AND TRAINING

019113 - GENERAL COMMISSIONING REQUIREMENTS

DIVISION 02 — EXISTING CONDITIONS

024119 - SELECTIVE DEMOLITION

DIVISION 03 — CONCRETE

031000 - CONCRETE FORMING AND ACCESSORIES

032000 - CONCRETE REINFORCING

033000 - CAST-IN-PLACE CONCRETE

DIVISION 04 — MASONRY

042200 - CONCRETE UNIT MASONRY

DIVISION 05 — METALS

051200 - STRUCTURAL STEEL FRAMING

052100 - STEEL JOIST FRAMING

053100 - STEEL DECKING

055000 - METAL FABRICATIONS

055213 - PIPE AND TUBE RAILINGS

Table of Contents 000110 - 2

DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES

061000 - ROUGH CARPENTRY

061600 - SHEATHING

066400 - PLASTIC PANELING

DIVISION 07 — THERMAL AND MOISTURE PROTECTION

071416 - COLD FLUID-APPLIED WATERPROOFING

072100 - THERMAL INSULATION

072500 - WEATHER BARRIERS

075419 - POLYVINYL-CHLORIDE (PVC) ROOFING

076200 - SHEET METAL FLASHING AND TRIM

078413 - PENETRATION FIRESTOPPING

078443 - JOINT FIRESTOPPING

079200 - JOINT SEALANTS

DIVISION 08 — OPENINGS

081113 - HOLLOW METAL DOORS AND FRAMES

083113 - ACCESS DOORS AND FRAMES

087100 - DOOR HARDWARE

088853 - SECURITY GLAZING

DIVISION 09 — FINISHES

092216 - NON-STRUCTURAL METAL FRAMING

092900 - GYPSUM BOARD

095113 - ACOUSTICAL PANEL CEILINGS

096513 - RESILIENT BASE AND ACCESSORIES

096516 - RESILIENT SHEET FLOORING

096900 - ACCESS FLOORING

099113 - EXTERIOR PAINTING

099123 - INTERIOR PAINTING

099600 - HIGH-PERFORMANCE COATINGS

DIVISION 10 — SPECIALTIES

101426 - POST AND PANEL-PYLON SIGNAGE

102600 - WALL AND DOOR PROTECTION

102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES

102813.63 - DETENTION TOILET ACCESSORIES

104413 - FIRE PROTECTION CABINETS

104416 - FIRE EXTINGUISHERS

DIVISION 11 — EQUIPMENT

114000 - FOOD SERVICE EQUIPMENT

119812 - DETENTION DOORS AND FRAMES

119814 - DETENTION DOOR HARDWARE

DIVISION 13 — SPECIAL CONSTRUCTION

133423.16 - FABRICATED CONTROL BOOTHS

Table of Contents 000110 - 3

VOLUME 2 | DIV.21 – DIV.33

DIVISION 21 — FIRE SUPPRESSION

210500 - COMMON WORK RESULTS FIRE PROTECTION

211000 - WATER BASED FIRE PROTECTION

DIVISION 22 — PLUMBING

220500 - COMMON WORK RESULTS FOR PLUMBING

220509 - PLUMBING FIRE STOPPING

220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

220523 - GENERAL DUTY VALVES FOR PLUMBING PIPING

220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220700 - PLUMBING INSULATION

221116 - DOMESTIC WATER PIPING

221119 - DOMESTIC WATER PIPING SPECIALTIES

221316 - SANITARY WASTE AND VENT PIPING

221319 - SANITARY WASTE PIPING SPECIALTIES

221413 - FACILITY STORM DRAINAGE PIPING

221423 - STORM DRAINAGE PIPING SPECIALTIES

224000 - PLUMBING FIXTURES

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING

230500 - COMMON WORK RESULTS FOR HVAC

230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230519 - METERS AND GAUGES FOR MECHANICAL PIPING

230523 - GENERAL DUTY VALVES FOR HVAC PIPING

230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230548 - VIBRATION AND SEISMIC CONTROL FOR HVAC PIPING AND EQUIPMENT

230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 - TESTING ADJUSTING AND BALANCING FOR HVAC

230700 - HVAC INSULATION

230800 - COMMISSIONING OF HVAC

230923 - DIRECT DIGITAL CONTROLS FOR HVAC

231123 - FACILITY NATURAL GAS PIPING

232113 - HYDRONIC PIPING

232116 - HYDRONIC PIPING SPECIALTIES

232123 - HYDRONIC PUMPS

232513 - WATER TREATMENT FOR CLOSED LOOP HYDRONIC SYSTEMS

233113 - METAL DUCTS

233300 - AIR DUCT ACCESSORIES

233423 - HVAC POWER VENTILATORS

233713 - DIFFUSERS REGISTERS AND GRILLES

235216 - CONDENSING BOILERS

237424 - ROOFTOP MAKE UP AIR UNITS (MAU-1)

237443.13 - ROOFTOP HEATING AND COOLING UNITS RTU (7)

238000 - DECENTRALIZED HVAC EQUIPMENT

238316 - RADIANT HEATING HYDRONIC PIPING

Table of Contents 000110 - 4

DIVISION 26 — ELECTRICAL

260100 - BASIC ELECTRICAL REQUIREMENTS

260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES

260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

260572 - OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY

260573 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

260574 - OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY

260800 - ELECTRICAL COMMISSIONING REQUIREMENTS

260944 - NETWORK LIGHTING CONTROLS

262413 - SWITCHBOARDS

262416 - PANELBOARDS

262726 - WIRING DEVICES

262813 - FUSES

262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

262913 - MANUAL AND MAGNETIC MOTOR CONTROLLERS

263213 - ENGINE GENERATORS

263353 - STATIC UNINTERRUPTIBLE POWER SUPPLY

263600 - TRANSFER SWITCHES

265119 - LED INTERIOR LIGHTING

265219 - EMERGENCY AND EXIT LIGHTING

265613 - LIGHTING POLES AND STANDARDS

265619 - LED EXTERIOR LIGHTING

268000 - ELECTRICAL DEMOLITION AND REPAIR

DIVISION 27 — COMMUNICATIONS

270100 - BASIC COMMUNICATIONS REQUIREMENTS

271000 - COMMUNICATIONS

275133 - EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

DIVISION 28 — ELECTRONIC SAFETY AND SECURITY

280100 - BASIC ELECTRONIC SAFETY AND SECURITY REQUIREMENTS

280200 - DETENTION SECURITY ELECTRONICS SYSTEMS GENERAL PROVISIONS

280513 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

285220 - DETENTION PROGRAMMABLE LOGIC CONTROLLERS

285230 - DETENTION TOUCHSCREEN CONTROL SYSTEM

285240 - DETENTION DIGITAL INTERCOM SYSTEM

DIVISION 31 — EARTHWORK

311000 - SITE CLEARING

312000 - EARTH MOVING

Table of Contents 000110 - 5

DIVISION 32 — EXTERIOR IMPROVEMENTS

321216 - ASPHALT PAVING

321313 - CONCRETE PAVING

321373 - CONCRETE PAVING JOINT SEALANTS

321723 - PAVEMENT MARKINGS

323113 - CHAIN LINK FENCES AND GATES

323114 - CHAIN LINK VERTICAL PIVOT GATES

323115 - CHAIN LINK AUTOMATED OVERHEAD BEAM SLIDING GATES

328400 - LANDSCAPE IRRIGATION

328500 - LANDSCAPE GRADING

329113 - SOIL PREPARATION

329200 - TURF AND GRASSES

329290 - TREE PROTECTION AND TRIMMING

329300 - PLANTS

DIVISION 33 — UTILITIES

331100 - SITE DOMESTIC WATER DISTRIBUTION

331300 - SITE SANITARY SEWERS

334100 - STORM DRAINAGE

BID 26009

ADA COUNTY JAIL PHASE I KITCHEN

REMODEL AND SITE WORK

Ada County Procurement | 200 W. Front St. | Boise, ID 83702

Rod Beck, Commissioner

Ryan Davidson, Commissioner

Thomas Dayley, Commissioner

REQUEST FOR BID

Bid 26009

Ada County Jail Phase I Kitchen Remodel and Site Work

The Board of Ada County Commissioners will receive and publicly open, sealed and clearly marked bids for Bid 26009 Ada County Jail Phase I Kitchen Remodel and Site Work.

Sealed bids are to be submitted online to Ada County Procurement at https://adacounty.bonfirehub.com no later than 4:00 p.m. local time, on December 15, 2025. All bids will be electronically date and time stamped as they are submitted. Bids cannot be accepted if submitted by hard copy, mail, facsimile, or e-mail. Bids will be publicly opened and the names of participating vendors read aloud on December 16, 2025, on or about 9:00 a.m. local time in the Board of Ada County Commissioners’ Conference Room, located on the third floor of the County Courthouse and Administration Building, 200 W. Front Street, Boise, ID 83702. The bid opening may also be viewed at:

https://www.youtube.com/channel/UCmREyet73vxhBFCffWClEKA. The Board of Ada County Commissioners reserves the right to accept or reject any or all bids.

Information and specifications for above named bid may be downloaded free of charge at https://adacounty.bonfirehub.com.

On November 21, 2025, at 8:00 a.m. local time, there will be a mandatory pre-bid meeting at the Ada County Sheriff’s Office, located at 7200 Barrister Dr., Boise, ID 83704, to commence in the lobby. You are requested to have thoroughly reviewed the bid packet prior to the meeting.

Auxiliary aids or services for persons with disabilities are available upon request. Please contact Procurement at (208) 287-7140 to make arrangements.

Rod Beck, Chair

Publish: November 13, 2025 and November 20, 2025 https://adacounty.bonfirehub.com/ https://www.youtube.com/channel/UCmREyet73vxhBFCffWClEKA

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 1

INSTRUCTIONS TO BIDDERS

BID 26009

ADA COUNTY JAIL PHASE I KITCHEN REMODEL AND SITE WORK

OWNER: Ada County

PROJECT: Ada County Jail Phase I Kitchen Remodel and Site Work

ADDRESS: 7200 Barrister Drive, Boise, ID 83704

ARCHITECT: Lombard-Conrad Architects, Inc.

OWNER’S

REPRESENTATIVE: Alex Murray, Project Manager, Ada County Operations

1. Summary of the Work. The Work to be included in the Construction Contract is generally described as: providing materials and labor for site work and remodel of the kitchen at the

Ada County Jail facility located at 7200 Barrister Drive, Boise, Idaho 83704, as more specifically detailed in the Project Manual specifications and drawings (the “Project”).

2. Bids.

a. In compliance with Idaho Code § 67-2805(2), bids for the construction of the above-named Project, in accordance with the Contract Documents, as provided in the Project

Manual and any addenda issued subsequent thereto (“Bids”), will be received online to Ada

County Procurement at https://adacounty.bonfirehub.com no later than 4:00 p.m. local time, on

December 15, 2025. All Bids will be electronically date and time stamped as they are submitted.

Bids cannot be accepted if submitted by hard copy, mail, facsimile, or e-mail. Bids will be publicly opened and read aloud on December 16, 2025, on or about 9:00 a.m. local time in the

Board of Ada County Commissioners Conference Room, located on the third floor of the County

Courthouse and Administration Building, 200 W. Front Street, Room 3255, Boise, ID 83702. The

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 2

Bid opening meeting may also be viewed via livestream at:

https://www.youtube.com/channel/UCmREyet73vxhBFCffWClEKA.

b. Bids will be received for the Project as described in the Project Manual entitled

Bid 26009 Ada County Phase I Kitchen Remodel and Site Work (the “Project Manual”), including addenda issued subsequent thereto.

c. A Bidder’s Bid Form, supplied in the bid packet, shall be used by the bidder to submit its Bid at https://adacounty.bonfirehub.com. Note that the Total Bid Amount (BT-76EU) is required to be completed on Bonfire for submission of Bid amounts, in addition to the upload of the Bidder’s Bid Form in the Bid Packet. Please see Bid Submission Instructions, Exhibit A, for instructions regarding the electronic submission of Bids. A signed Bidder’s Bid Form must be uploaded electronically as set forth herein. Failure to do so will render a Bid non-responsive.

d. The Project includes water system work that has been reviewed and approved by Veolia. A copy of the Veolia-approved plans are included in the Project Manual specifications and drawings. Bidders must have their Veolia-approved contractor complete and sign the Veolia Bid

Sheet attached to these Instructions as Exhibit C. The signed Veolia Bid Sheet must be uploaded electronically along with the Bidder’s Bid Form as set forth herein. Failure to do so will render a Bid non-responsive.

e. No Bid will be considered unless submitted as required herein.

f. Before being uploaded to the Bonfire platform, all forms must be completely filled out in ink or typewriting with signature in long hand, and the completed forms shall be without interlineations, alterations, or erasure. Forms shall contain no recapitulation of the work to be done.

g. The Total Bid Amount shall include an Owner’s Contingency Allowance of

One Million Six Hundred Thousand Dollars ($1,600,000.00), added to the Base Bid Amount. Said

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 3

Contingency Allowance is to be used as directed by the Owner for Owner’s purposes, and only by

Change Orders that indicate the amounts to be charged to the Contingency Allowance. Any and all unused amounts remaining from the Contingency Allowance upon completion of the Project shall be credited to the Owner by deductive Change Order.

h. Bidders shall:

(i) carefully examine the Instructions to Bidders, Bidder’s Bid Form, Veolia Bid Sheet, Contract Documents, and any addenda issued subsequent thereto;

(ii) attend the mandatory pre-bid meeting at the Ada County Sheriff’s

Office, located at 7200 Barrister Dr., Boise, Idaho 83704, on November 21, 2025, at 8:00 a.m. local time, and fully inform themselves as to the existing conditions and limitations;

(iii) include in the Bids sums to cover the cost of all items contemplated by the Contract Documents, including any Contingency Allowance; The Contract Documents include the Bid Documents, Addenda, Construction Contract, the plans and specifications for the Project, plus any additional documents included by the Owner; and

(iv) make certain that they can meet the Project milestones established in the Contract Documents.

i. The Bidder awarded the Fixed Price Construction Contract (“Construction

Contract”), will not be allowed any extra compensation by reason of any matter or thing concerning that which such Bidder might have been fully informed prior to submitting a Bid. A copy of the

Construction Contract is attached hereto as Exhibit B.

j. No Bid shall be withdrawn for a period of thirty (30) days after the time scheduled for receipt of Bids.

k. An electronic copy of all information and specifications for the Project may be obtained free of charge at https://adacounty.bonfirehub.com.

l. Data contained in the Bid and all documentation provided therein becomes property of the County and the data becomes public information. If the Bidder wishes to have any

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 4

confidential or proprietary information withheld from the public, such information must fall within the definition of “trade secret” contained within the Idaho Public Records Act, Idaho Code § 74-101 et seq. All “trade secret” information a Bidder wishes the County to withhold must be clearly marked “Trade Secret,” with each page of such information being clearly marked. Failure to mark such information as “Trade Secret” shall deem such information open to public inspection. Should Ada County be challenged in court by a third party for a decision to withhold or redact information so identified by Bidder, Bidder agrees, by submitting its Bid, to indemnify, defend, and hold harmless Ada County for any judgments, attorney fees, and/or court costs associated with asserting the documents contain “trade secret” information. Bidder agrees and acknowledges that the

Bidder’s Bid Form, the Veolia Bid Sheet, and Total Bid Amount (BT-76EU) are disclosable public records. Ada County reserves the right to make an independent discretionary decision whether or not the documents marked as “Trade Secret” qualify as such pursuant to the Idaho Public Records Act.

All documents not marked as “Trade Secret” are subject to release in compliance with the Idaho

Public Records Act.

3. Taxes. Bidders shall include in their Bids all taxes which are levied by Federal, State, or Municipal Governments upon labor and for material entering into the Work, including materials purchased by Owner, if any, and the Contractor shall pay all such taxes and show evidence of payment as described in the Construction Contract. Bidders are referred to Idaho Code § 63-3609 for further information.

4. Condition Precedent for Public Works Contract. Bidders must, as a condition precedent to entering into the Construction Contract, review and comply with Idaho Code § 63-1502.

5. Right to Reject Bids. The right to reject any or all Bids or to accept the Bid judged by the Owner as most satisfactory for its requirements is expressly reserved by the Owner. The

Owner reserves the right, in its sole discretion, to waive any technical defect in Bids received when

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 5

the defect is deemed immaterial to the potential acceptance of the Bid by the Owner, and a waiver of the defect would not give the Bidder an unfair advantage in the bid process.

6. Objections to Specifications. Written objections to specifications or bidding procedures must be received by Ada County Procurement at least three (3) business days before the date and time the Bids are scheduled to be received.

7. Requirements for Signing Bids. A signature on the Bid Form certifies that Bidder accepts and agrees to the terms, conditions and requirements contained in this solicitation, including but not limited to, the Contract Documents and these Instructions to Bidders. Further, signing party certifies that it is authorized to sign and submit this Bid on behalf of the Bidder, and further acknowledges that he/she is responsible for reviewing and acknowledging any addenda that have been issued for the solicitation.

8. Explanation to Bidders and Addenda.

a. A mandatory pre-bid meeting will be held for all potential Bidders on

November 21, 2025, at 8:00 a.m. local time, at the Ada County Sheriff’s Office, located at 7200

Barrister Dr., Boise, Idaho 83704, to commence in the lobby. Potential Bidders will be given the opportunity to view the Project areas and ask questions of County staff managing the Project. Bidders interested in bidding on the Project must attend. A Bid from a Bidder failing to attend the mandatory pre-bid meeting shall be deemed non-responsive.

b. Prior to or following the pre-bid meeting, neither the Owner nor the Owner’s

Representative will give verbal answers to any inquiries regarding the meaning of the Contract

Documents or provide verbal instructions prior to the award of the Construction Contract. Any verbal statement regarding same by any persons, prior to the award, shall be unauthoritative.

c. Any and all questions, substitution requests, requests for clarification, or explanations desired by potential Bidders must be submitted in the Vendor Discussions section of the

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 6

Bonfire project listing, and received no later than November 26, 2025, at 4:00 p.m. local time. An addendum will be made available on the Ada County website at https://adacounty.bonfirehub.com on or about December 5, 2025. Notice of any addenda will be sent to only those individuals who have registered as a vendor on Bonfire for this Project.

d. All addenda issued to Bidders prior to date of receipt of Bids shall become a part of these Instructions and/or the Contract Documents and all Bids are to include the work described in all addenda issued. Each Bid submitted must specifically list all addenda in the Bidder’s

Bid Form.

9. Qualifications of Bidders.

a. Bidders must be licensed in the State of Idaho in accordance with the Public

Works Contractor Act, Idaho Code §§ 54-1901 et seq. The Owner waives the requirements of Idaho

Code § 54-1902(2) that the Contractor self-perform at least 20% of the work. Bidders are invited to consult with the Idaho Division of Occupational and Professional Licenses for further requirements of state law. Bidders shall enter on their Bid Form each HVAC, plumbing or electrical subcontractor called for on the Bid Form that the Bidder proposes to use during construction, the amount of the subcontract, and the subcontractor’s address. This includes any Owner required subcontractors that are identified in the plans or specifications. If the Bidder intends to self-perform any HVAC, plumbing or electrical work, both the Bidder’s public works license number and the trade license number for the HVAC, plumbing or electrical work to be self-performed must be stated on the Bid

Form. Failure to list each subcontractor trade, subcontract amount, the Bidder’s current public works license number, and the Bidder’s trade license number(s) (if applicable) as called for on the Bid Form will disqualify the Bid. Upon award, the successful Bidder will be required to submit a complete list of all subcontractors and specialty contractors that will do work on the Project under the Construction Contract. All subcontractors and specialty contractors will be required to be properly

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 7

licensed under the Idaho Public Works Contractor Act, except subcontractors performing work of a value of $100,000 or less under the direct supervision of an Idaho licensed public works contractor who holds a Class “Unlimited,” “AAA,” “AA,” or “A” license under the Idaho Public Works

Contractor Act. The successful Bidder may thereafter substitute subcontractors only as allowed by

Idaho Code § 67-2310(3).

b. The contractor performing the Veolia-approved water system work for the

Project, as identified and described in the Project Manual plans and specifications, must be a Veolia-approved contractor.

c. Bidders shall be responsible for complying with all applicable provisions of the Idaho Code as it relates to bidding of this project or construction of the Work.

d. No state or federal funding will be utilized on this Project.

10. Bonds. Before the Construction Contract is signed, the successful Bidder must furnish performance and labor and material payment bonds in the amount of 100% of the Construction

Contract amount, as allowed in Idaho Code § 54-1926. The bonds shall be provided by a surety company or companies with AM Best rating(s) of A-VIII or better. If the surety does not have a current AM Best rating it must be currently certified by the U.S. Department of Treasury as an approved surety with an underwriting limitation greater than the bond amount. All sureties must be authorized to do business in the state of Idaho. All bonds shall name the County as obligee with copies of the bonds provided to Ada County Procurement. The Bidder shall include the premiums for such bonds in its Bid.

11. Examination of Bids. After the Bids are opened by the Board of Ada County

Commissioners, Ada County Procurement will review the Bids for compliance with these instructions and Idaho Code. After that review, Ada County Procurement will provide a written recommendation

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 8

to the Board of Ada County Commissioners. Bidders will be supplied with a copy of the recommendation on or about December 17, 2025.

12. Basis of Recommendation. Ada County Procurement will recommend the

Construction Contract be awarded to the responsive Bidder submitting the lowest Total Bid Amount.

13. Protest of Recommendation. Any Bidder’s protest of the recommendation must be in writing and received by Ada County Procurement at procurement@adacounty.id.gov no later than

4:00 p.m. local time on December 19, 2025.

14. Award of Contract. The Construction Contract shall be deemed as having been awarded when the Bid has been accepted by formal motion made by the Board of Ada County

Commissioners during the open business meeting commencing at or about 9:00 a.m. local time, December 23, 2025, in the Board of Ada County Commissioners Conference Room, 200 West Front

Street, Room 3255, Boise, Idaho 83702. The Bid award meeting may also be viewed via livestream at: https://www.youtube.com/channel/UCmREyet73vxhBFCffWClEKA. The successful Bidder shall present all documents required for executing the Construction Contract to the Ada County

Operations Department, c/o Director, no later than 4:00 p.m. local time on December 30, 2025, unless otherwise provided, so that the Board of Ada County Commissioners may consider the

Construction Contract on January 6, 2026. The Bidder selected for the Project must execute a contract in substantially the form provided in Exhibit B. Bidders should read the Construction

Contract carefully, as the selected Bidder will be subject to all contract requirements contained therein, including the provision of insurance coverages. The terms of the Construction Contract will not be negotiated.

15. Time of Starting and Completion.

a. Owner estimates issuing a Notice to Proceed no more than ten (10) days after executing the Construction Contract. Substantial Completion of the entire Project is required no later mailto:procurement@adacounty.id.gov

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 9

than July 23, 2027, with Final Completion of the entire Project required no later than July 30, 2027.

Bidders are referred to Article VI of the Construction Contract for definitions of Substantial

Completion and Final Completion. Owner reserves the right to adjust these times as provided in the

Construction Contract. After commencement of work on the Project, Contractor shall be expected to diligently perform the work needed to complete the Project, without undue delay or interruption.

b. A portion of the Project work includes tiling a section of a lateral ditch referred to as the Brose Lateral, per the plans and specifications in the Project Manual. The Nampa & Meridian

Irrigation District (NMID) has granted Ada County a license to perform the tiling work between

October 15, 2025, and March 15, 2026. Accordingly, Substantial Completion of the lateral tiling portion of the Project work is required no later than March 8, 2026, with Final Completion required by no later than March 15, 2026. Due to NMID’s requirements and estimated lead times for ordering certain materials needed for the tiling work, Ada County is separately ordering the tiling work materials directly from a vendor. Such materials will be made available to the selected Contractor for use in the Project. The Contractor shall be responsible for payment of all use taxes associated with the materials, as required by Idaho Code § 67-6309 and IDAPA 35.01.02 (Rule 012), and shall provide evidence of such payment as described in the Construction Contract. If the lateral tiling work is not completed by the required dates identified above, thus delaying work on the entire Project, any costs or expenses incurred as result of such failure shall be the responsibility of, and be borne by, the awarded Bidder, including, but not limited to, mobilization costs, increased labor and material costs, extended equipment rentals, higher overhead and general conditions (such as site management, bonding and insurance), and reduced productivity.

16. Bidder’s Security.

a. Each Bid shall contain one of the following forms of Bidder’s security:

(i) Cash.

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 10

(ii) A cashier check from a bank insured by FDIC made payable to Ada

County.

(iii) A certified check from a bank insured by FDIC made payable to Ada

County.

(iv) A Bidder’s bond executed by a qualified surety company with an

AM Best rating(s) of A-VIII or better and licensed in the State of Idaho, made payable to Ada County. If the surety does not have a current AM Best rating it must be currently certified by the US Department of Treasury as an approved surety with an underwriting limitation greater than the bond amount. All sureties must be authorized to do business in the state of Idaho.

b. The security shall be in an amount equal to at least five percent (5%) of the combined amount of the Total Bid Amount (the combined total of the Base Bid Amount and

Owner’s Contingency Allowance). A Bid shall not be considered unless one of the forms of

Bidder’s security is enclosed with it.

(i) If submitting cash or check for Bidder’s security, please hand deliver the cash or check to Ada County Procurement, 200 W. Front St. Boise, ID 83702, 2nd Floor Ada County Courthouse and Administration Building. Cash or check must be submitted prior to the bid due date and time: December 15, 2025, at 4:00 p.m. local time.

(ii) If submitting a Bidder’s bond for Bidder’s security please upload a full copy of the surety issued bid bond into Bonfire along with the Bidder’s Bid Form. The successful Bidder will be required to submit the original surety issued bid bond to Owner upon award.

c. The Bidder’s security of all except the three (3) lowest Bidders will be returned within seven (7) days after the opening of Bids. The security of the three (3) lowest Bidders will be returned within forty-eight (48) hours after the executed contract and required bonds have been submitted by the Bidder finally approved by the Owner. Bid bonds submitted as security from surety companies will not be returned unless specifically requested by the Bidder. Failure of the successful Bidder to provide the necessary performance and labor and material bonds or execute the

Construction Contract shall result in forfeiture of Bidder’s security.

BID 26009 INSTRUCTIONS TO BIDDERS – PAGE 11

17. Security Clearance and Confidentiality Requirements. No employee, agent or subcontractor of the selected Bidder will be permitted access to designated restricted areas prior to: (1) obtaining security clearance from the appropriate County agency, and (2) returning signed copies of the confidentiality agreements and acknowledgements provided by the County, as may be required by Owner. Owner reserves the right to change the restricted areas as needed.

Security clearance requires passing a background check that includes fingerprinting. Ada

County may, in its sole discretion, refuse to allow an employee, agent or subcontractor access to a restricted area. The following reasons are examples of possible reasons for security clearance denial:

a. Felony convictions and some misdemeanor convictions (depending on particular charges and circumstances);

b. Connection with current criminal investigation or prosecution;

c. Outstanding warrants (including traffic and parking violations); or

d. Currently on parole or probation.

Ada County Operations will provide the successful Bidder with all forms and instructions needed for security clearance checks, and Owner will not charge Bidder, its employees, agents or subcontractors for background checks or fingerprinting.

BID 26009 INSTRUCTIONS TO BIDDERS - EXHIBIT A

EXHIBIT A

BID SUBMISSION INSTRUCTIONS

PLEASE READ CAREFULLY:

Sealed Bids are to be submitted online to Ada County Procurement at https://adacounty.bonfirehub.com no later than 4:00 p.m. local time, on December 15, 2025. All Bids will be electronically date and time stamped as they are submitted. Bids cannot be accepted if submitted by hard copy, mail, facsimile, or e-mail.

Important Notes:

• Logging in and/or uploading your file(s) does not mean your Bid is submitted. Bidders must successfully upload all the file(s) and MUST click the submit button before the closing time.

• You will receive an email confirmation receipt with a unique confirmation number once you finalize your submission. This will confirm that you have successfully submitted your Bid.

• Each submitted item of requested information will only be visible to Ada County upon its opening of Bids on December 16, 2025, at or around 9:00 a.m., local time.

• If the Requested Information is listed as “required,” you will not be able to complete your Bid submission until the requirement is met.

• Uploading large documents may take significant time, depending on the size of the file(s) and your Internet connection speed. Please plan accordingly!

• Please note the type and number of files allowed. The maximum upload file size is 1000 MB. Please do not embed any documents within your uploaded files, as they will not be accessible or evaluated.

• Minimum system requirements: Internet Explorer 11, Microsoft Edge, Google Chrome, or Mozilla Firefox. Java Script must be enabled.

• Mac users: When a Bid Table is required for Proposal submission, in order for it to be formatted correctly you will need to download Microsoft Excel. The Bid Tables will not work with another Spreadsheet tool.

• Emails received from Bonfire do not have attachments; click the View Opportunity link and login to Bonfire to view attachments under the Messages section, then click Vendor Discussions. You can then download the message attachment.

Need Help? Please contact Bonfire directly at Support@GoBonfire.com for technical questions or issues related to your submission. You can also visit their help forum at https://bonfirehub.zendesk.com/hc mailto:Support@GoBonfire.com https://bonfirehub.zendesk.com/hc

BID 26009 INSTRUCTIONS TO BIDDERS – EXHIBIT B

EXHIBIT B

SAMPLE CONSTRUCTION CONTRACT

(42 pages – attached)

FIXED PRICE CONSTRUCTION CONTRACT

BETWEEN OWNER AND CONTRACTOR

NCLC DOCUMENT 10

1994 EDITION (MODIFIED AS OF DECEMBER 2024)

ADA COUNTY JAIL PHASE I KITCHEN REMODEL AND SITE WORK

PROJECT NO. 26009

i

TABLE OF CONTENTS

I. DOCUMENTS INCORPORATED BY REFERENCE

II. REPRESENTATIONS AND WARRANTIES

OF THE CONTRACTOR

III. INTENT AND INTERPRETATION

IV. OWNERSHIP OF THE CONTRACT DOCUMENTS

V. CONTRACTOR’S PERFORMANCE

VI. TIME FOR CONTRACTOR’S PERFORMANCE

VII. FIXED PRICE AND CONTRACT PAYMENTS

VIII. INFORMATION AND MATERIAL SUPPLIED BY THE OWNER

IX. CEASE AND DESIST ORDER

X. DUTIES, OBLIGATIONS, AND RESPONSIBILITIES

OF THE CONTRACTOR

XI. INDEMNITY

XII. THE PROJECT ARCHITECT

XIII. CLAIMS BY THE CONTRACTOR

XIV. SUBCONTRACTORS

XV. CHANGE ORDERS

XVI. DISCOVERING AND CORRECTING DEFECTIVE

OR INCOMPLETE WORK

XVII. TERMINATION BY THE CONTRACTOR

XVIII. OWNER’S RIGHT TO SUSPEND CONTRACTOR’S

PERFORMANCE

XIX. TERMINATION BY THE OWNER

XX. INSURANCE

ii

XXI. SURETY BONDS

XXII. PROJECT RECORDS

XXIII. APPLICABLE LAW

XXIV. SUCCESSORS AND ASSIGNS

XXV. SEVERABILITY

XXVI. AMENDMENTS

XXVII. AUTHORITY

FIXED PRICE CONSTRUCTION CONTRACT BETWEEN OWNER AND CONTRACTOR –

FIXED PRICE CONSTRUCTION CONTRACT

BETWEEN OWNER AND CONTRACTOR

NCLC DOCUMENT 10

1994 EDITION

(MODIFIED)

THIS FIXED PRICE CONSTRUCTION CONTRACT BETWEEN OWNER AND

CONTRACTOR (the “Construction Contract”) is made and entered into by and between Ada County, a duly formed and existing county pursuant to the laws and Constitution of the State of Idaho, (the “Owner”) and (the “Contractor”). This Construction Contract shall be effective on the date executed by the last party.

This Construction Contract is for the construction of a project identified as providing materials and labor for site work and remodel of the kitchen at the Ada County Jail facility located at 7200 Barrister Drive, Boise, Idaho 83704, as more specifically detailed in the Project Manual specifications and drawings (the “Project”).

NOW, THEREFORE, in consideration of the mutual promises, covenants, and agreements stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, the parties agree:

ARTICLE I.

DOCUMENTS INCORPORATED BY REFERENCE

The Contract Documents include the Construction Contract, the plans and specifications for the Project identified thereon as such, the Project quality control plan, plus the following (if any) to the extent these documents do not conflict with the Construction Contract (together the “Contract Documents”):

all of which are hereby incorporated herein by reference and made a part hereof. Change Orders issued hereafter, and any other amendments executed by the Owner and the Contractor, shall become and be a part of the Contract Documents. Documents not included or expressly contemplated in this Article do not, and shall not, form any part of the Contract Documents.

ARTICLE II.

REPRESENTATIONS AND WARRANTIES OF THE CONTRACTOR

In order to induce the Owner to execute this Construction Contract and recognizing that the Owner is relying thereon, the Contractor, by executing this Construction Contract, makes the following express representations to the Owner:

A. The Contractor is fully qualified to act as the Contractor for the Project and has, and shall maintain, any and all licenses, permits, or other authorizations necessary to act as the Contractor for, and to construct, the Project;

B. The Contractor has become familiar with the Project site and the local conditions under which the Project is to be constructed and operated;

C. The Contractor represents it has received, reviewed, compared, studied, and carefully examined all of the Contract Documents and has found them in all respects to be complete, accurate, adequate, consistent, coordinated, and sufficient for construction. Such review, comparison, study, and examination shall be a warranty that the Contract Documents are complete and the Project is buildable as described except as reported. Reported errors, inconsistencies, or omissions shall constitute a claim pursuant to Article XIII hereof, if appropriate;

D. The Contractor warrants that the Contract Time is a reasonable period for performing the work.

E. Pursuant to Idaho Code § 67-2346, if this Construction Contract is one hundred thousand dollars ($100,000) or more and/or Contractor employs ten (10) or more persons, Contractor certifies that it is not currently engaged in, and will not for the duration of the Project engage in, a boycott of goods or services from Israel or territories under its control.

F. Pursuant to Idaho Code § 67-2359, Contractor certifies that it is not currently owned or operated by the government of China and will not, for the duration of this Contract, be owned or operated by the government of China.

G. Pursuant to Idaho Code § 67-2347A, if this Construction Contract is One Hundred Thousand Dollars ($100,000) or more and if Contractor employs ten (10) or more persons full-time, Contractor certifies that it is not currently engaged in and will not, for the duration of this Contract engage in, a boycott of any individual or company because that individual or company: (1) engages in or supports the exploration, production, utilization, transportation, sale, or manufacture of fossil fuel-based energy, timber, minerals, hydroelectric power, nuclear energy, or agriculture; or (2) engages in or supports the manufacture, distribution, sale, or use of firearms.

ARTICLE III.

INTENT AND INTERPRETATION

A. The Contract Documents, as described herein, constitute the entire and exclusive agreements between the parties with reference to the Project, and said Contract Documents supersede any and all prior discussions, communications, representations, understandings, negotiations, or agreements;

B. Anything that may be required, implied, or inferred by the Contract Documents, shall be provided by the Contractor for the Contract Price;

C. Nothing contained in this Construction Contract shall create, nor be interpreted to create, privity or any other relationship whatsoever between the Owner and any person except the Contractor;

D. When a word, term, or phrase is used in the Contract Documents, it shall be interpreted or construed first, as defined herein; second, if not defined, according to its generally accepted meaning in the construction industry; and third, if there is no generally accepted meaning in the construction industry, according to its common and customary usage;

E. The words “include,” “includes,” or “including,” as used in the Contract Documents, shall be deemed to be followed by the phrase “without limitation;”

F. The specification herein of any act, failure, refusal, omission, event, occurrence, or condition as constituting a material breach of the Contract Documents shall not imply that any other, non-specified act, failure, refusal, omission, event, occurrence, or condition shall be deemed not to constitute a material breach of the Contract Documents;

G. The Contractor shall have a continuing duty to read, examine, review, compare, and contrast each of the Contract Documents, shop drawings, and other submittals and shall give written notice to the Owner and the Architect of any conflict, ambiguity, error, or omission which the Contractor may find with respect to these documents before proceeding with the affected work. Reported errors, inconsistencies, or omissions shall constitute a claim pursuant to Article XIII hereof, if appropriate.

The express or implied approval by the Owner or the Architect of any shop drawings or other submittals shall not relieve the Contractor of the continuing duties imposed hereby, nor shall any such approval be evidence of the Contractor’s compliance with the Contract Documents. The Owner has requested the Architect to only prepare documents for the Project, including the plans and specifications for the Project, which are accurate, adequate, consistent, coordinated, and sufficient for construction. HOWEVER, THE OWNER MAKES NO REPRESENTATION OR WARRANTY

OF ANY NATURE WHATSOEVER TO THE CONTRACTOR CONCERNING SUCH

DOCUMENTS. The Contractor again hereby acknowledges and represents that it has received, reviewed, and carefully examined such documents, has found them to be complete, accurate, adequate, consistent, coordinated, and sufficient for construction, and that the Contractor has not, does not, and will not rely upon any representations or warranties by the Owner concerning such documents, as no such representations or warranties have been or are hereby made;

H. In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents, the following shall control:

1. As between figures given on plans and scaled measurements, the figures shall govern;

2. As between large scale plans and small scale plans, the large scale plans shall govern;

3. As between plans and specifications, the requirements of the specifications shall govern;

4. As between the Instructions to Bidders and plans and specifications, the Instructions to Bidders shall govern;

5. As between the Construction Contract and other Contract Documents, the

Construction Contract shall govern.

ARTICLE IV.

OWNERSHIP OF THE CONTRACT DOCUMENTS

The Contract Documents, and each of them, as well as any other documents furnished by the Owner, shall remain the property of the Owner. The Contractor shall have the right to keep one (1) copy of the Contract Documents upon completion of the Project; provided, however, that in no event shall the Contractor use, or permit to be used, any portion or all of such Contract Documents on other projects without the Owner’s prior written authorization.

ARTICLE V.

CONTRACTOR’S PERFORMANCE

The Contractor shall perform all of the work required, implied, or reasonably inferable from the Contract Documents including, but not limited to, the following:

A. Construction of the Project;

B. The furnishing of any required surety bonds and insurance;

C. The provision or furnishing, and prompt payment therefor, of labor, supervision, services, materials, supplies, equipment, fixtures, appliances, facilities, tools, transportation, storage, power, fuel, heat, light, cooling, or other utilities required for construction and all necessary building permits and other permits required for the construction of the Project;

D. The creation and submission to the Owner of detailed and comprehensive as-built drawings depicting all as-built construction. Said as-built drawings shall be submitted to the Owner upon Final Completion of the Project, and receipt of same by the Owner shall be a condition precedent to final payment to the Contractor.

ARTICLE VI.

TIME FOR CONTRACTOR’S PERFORMANCE

A. The Contractor shall commence the performance of the Work upon issuance of the Notice to Proceed and shall diligently continue its performance to and until Final Completion of the Project. The Contractor shall accomplish Substantial Completion of the Project within five hundred sixty (560) days of issuance of the Notice to Proceed;

B. The Contractor shall pay the Owner the sum of Five Thousand Dollars ($5,000) per day for each and every calendar day of unexcused delay in achieving Substantial Completion beyond the time allowed herein for Substantial Completion. Any sums due and payable hereunder by the

Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the Owner, estimated at the time of executing this Construction Contract. When the Owner reasonably believes that Substantial Completion will be unexcusably delayed, the Owner shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the Owner to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages;

C. The term “Substantial Completion,” as used herein, shall mean that point at which, as certified in writing by the Architect, the Owner has received a Certificate of Occupancy (if applicable), and the Project is at a level of completion in strict compliance with the Contract Documents such that the Owner or its designee can enjoy beneficial use or occupancy and can use or operate it in all respects for its intended purpose. Partial use or occupancy of the Project shall not result in the Project being deemed substantially complete, and such partial use or occupancy shall not be evidence of Substantial Completion;

D. Contractor shall achieve Final Completion within seven (7) days of the date of Substantial Completion;

E. Contractor shall pay the Owner the sum of Five Thousand Dollars ($5,000) per day for each and every calendar day of unexcused delay in achieving Final Completion beyond the date set forth herein for Final Completion of the Work. Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the Owner, estimated at or before the time of executing this Construction Contract. When the Owner reasonably believes that Final Completion will be unexcusably delayed, the Owner shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the Owner to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Final Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages;

F. A portion of the Project Work includes tiling a section of a lateral ditch referred to as the Brose Lateral, per the plans and specifications in the Project Manual. The Nampa & Meridian Irrigation District (NMID) has granted Ada County a license to perform the tiling work between October 15, 2025, and March 15, 2026. Accordingly, Substantial Completion of the lateral tiling portion of the Project work is required no later than March 8, 2026, with Final Completion required by no later than March 15, 2026. If the lateral tiling work is not completed by the required dates identified above, thus delaying work on the entire Project, any costs or expenses incurred as result of such failure shall be the responsibility of, and be borne by, the Contractor, including, but not limited to, mobilization costs, increased labor and material costs, extended equipment rentals, higher overhead and general conditions (such as site management, bonding and insurance), and reduced productivity.

G. All limitations of time set forth herein are material and are of the essence of the Contract Documents.

ARTICLE VII.

FIXED PRICE AND CONTRACT PAYMENTS

A. The Owner shall pay, and the Contractor shall accept, as full and complete payment for the Contractor’s timely performance of its obligations hereunder the fixed price of Dollars ($_______________), which fixed price includes an Owner’s contingency allowance of One Million Six Hundred Thousand Dollars ($1,600,000). Said contingency allowance is to be used as directed by the Owner for Owner’s purposes, and only by Change Orders that indicate the amounts to be charged to the contingency allowance. Any and all unused amounts remaining from the contingency allowance upon completion of the Project shall be credited to the Owner by deductive Change Order. The price set forth in this paragraph shall constitute the Contract Price, which shall not be modified except by Change Order as provided in the Contract Documents. All requests by the Contractor for an increase in the Contract Price must be submitted as a written claim under Article

XIII;

B. Within ten (10) calendar days of the effective date hereof, the Contractor shall prepare and present to the Owner and the Architect the Contractor’s Schedule of Values apportioning the Contract Price among the different elements of the Project for purposes of periodic and final payment.

The Contractor’s Schedule of Values shall be presented in whatever format, with such detail, and backed up with whatever supporting information the Architect or the Owner requests. The Contractor shall not imbalance its Schedule of Values nor artificially inflate any element thereof. The violation of this provision by the Contractor shall constitute a material breach of the Contract Documents.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .