About this file
2026 Pavement Marking Project Bid Manual
This bid manual is a solicitation document issued by West Cornwall Township in Lebanon County, Pennsylvania for the 2026 Pavement Marking Project. The project involves replacement and installation of standard pavement markings (paint and beads) and hot thermoplastic pavement markings on various roads throughout the township. The work includes markings on Old Mine Road, Northwood Drive, Zinns Mill Road, North Cornwall Road, Starner Road, Spangler Road, and specific intersections including US-322/PA-419 and Main Street crossings. Approximate quantities include 18,374 linear feet of 4-inch standard white edge-of-lane markings, 9,187 linear feet of 4-inch standard yellow double centerline markings, 25 crosswalk bars with hot thermoplastic markings, and miscellaneous 12-inch and thermoplastic stop bars and turn arrows. Sealed proposals must be submitted electronically via PennBid by 10:00 a.m. on Monday, June 8, 2026, with bid results posted immediately thereafter. Interested contractors may schedule site visits by contacting Township Engineer Jeffrey Steckbeck at 717-269-1530. No pre-bid conference is scheduled. Work must be completed on or before September 30, 2026, with liquidated damages assessed at $200 per calendar day for delays beyond this date.
Each proposal must be accompanied by a certified check or bid bond equal to ten percent of the bid total. The project is subject to Pennsylvania's Prevailing Wage Act, with applicable wage rates and fringe benefits specified for various worker classifications including painters for line stripping at rates ranging from $72.03 to $74.53 per hour depending on the effective date. Bidders are required to submit multiple supporting documents including anti-collusion affidavits, workmen's compensation affidavits, and Act 127 E-Verify verification forms. The contract will be awarded to the bidder whose proposal is in the best interests of the owner based on compliance with requirements, qualifications, and experience. Contractors are responsible for traffic control, safety devices, power brooming of roadways prior to work, material delivery documentation, and all incidental preparation and cleanup. The municipality reserves the right to reject any or all bids, waive irregularities, and limit work completion at its discretion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
for
2026 PAVEMENT MARKING PROJECT
located in
West Cornwall Township, Lebanon County, PA
May 2026
SESI Project #: 003-26-001
Prepared By:
WEST CORNWALL TOWNSHIP
2026 PAVEMENT MARKING PROJECT
TABLE OF CONTENTS
Page
ADVERTISEMENT AND INVITATION TO BID 3
INSTRUCTIONS TO BIDDERS 4
MS-981 11
PROPOSAL AND CONTRACT 12
ATTACHMENT 1.1 14
ATTACHMENT 1.2 15
ATTACHMENT 1.3 16
ATTACHMENT 1.4 17
ATTACHMENT 1.5 18
ATTACHMENT 1.6 19
ATTACHMENT 1.7 20
ATTACHMENT 1.8 21
ATTACHMENT 1.9 22
ATTACHMENT 1.10 23
SPECIAL PROVISIONS TO CONTRACT MS-944 (ATTACHMENT 1-A) 24
PERFORMANCE BOND 25
PAYMENT BOND 26
AFFIDAVIT RE (WORKMAN’S COMPENSATION ACT) 27
ANTI-COLLUSION AFFIDAVIT 28
NOTICE OF COMPLETION 29
CERTIFICATE OF COMPLIANCE 30
BID BOND 31
ACT 127 VERIFICATION FORM 33
PREVAILING WAGE RATES DETERMINATION 35
PROJECT SITE MAPS 41
Division 0 – Special Sections Section 00020 – Advertisement & Invitation to Bid
West Cornwall Township 1 2026 Pavement Marking Project
SECTION 00020 – ADVERTISEMENT AND INVITATION TO BID
Sealed proposals will be received electronically via the PennBid program by West Cornwall
Township for the 2026 Pavement Marking Project until 10:00 a.m. prevailing time on Monday, June
8, 2026. The bid results will be posted on PennBid shortly thereafter.
All bidding documents and specifications are available at no cost on PennBid:
https://pennbid.bonfirehub.com
Each proposal must be accompanied by a bank cashier's check or bid bond (in the required form) for ten percent (10%) of the bid total.
The work generally includes replacement and installation of standard (paint & beads) and hot thermoplastic pavement markings on various roads throughout the Township. The project work is located entirely in West Cornwall Township, Lebanon County, Pennsylvania. Individual descriptions of the work for each bid item are set forth in the bid documents.
Questions shall be submitted via the “Public Q&A” feature within PennBid.
Pursuant to Act 89, bidders are advised that prevailing wage rates and record-keeping procedures established by the Pennsylvania Department of Labor & Industry shall apply for bids over
$100,000.00 and that minimum salaries and wages as set forth in the Contract Documents shall be paid on the project.
West Cornwall Township hereby reserves the right, which is understood and agreed to by all bidders, to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in any bid at its sole discretion.
West Cornwall Township
73 South Zinns Mill Road
Lebanon, PA 17042
Russel Gibble
Chairman of the Board of Supervisors https://pennbid.bonfirehub.com/
Division 0 – Special Sections Section 00200 – Instructions to Bidders
West Cornwall Township 2 2026 Pavement Marking Project
SECTION 00200 – INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered (Steckbeck Engineering & Surveying, Inc., 279
North Zinns Mill Road, Suite A, Lebanon, PA 17042).
B. Effective Date of the Agreement – The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.
C. Notice of Award – The written notice by Owner to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, Owner will sign and deliver the Agreement.
D. Work – The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents are available at no cost via PennBid.
https://pennbid.bonfirehub.com/
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
2.04 All Bidders must obtain Bidding Documents from the Issuing Office.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit the following information with the Bid:
A. Affidavit RE Accepting Provisions of the Workmen’s Compensation Act
B. Anti-Collusion Affidavit https://pennbid.bonfirehub.com/
West Cornwall Township 3 2026 Pavement Marking Project
C. Certified Check or Bid Bond in the amount of ten percent (10%) of the maximum amount of the bid
D. Act 127 Verification Form
3.02 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND
SITE
4.01 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.
Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.02 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and the other related data identified in the
Bidding Documents;
B. visit the Site if deemed necessary by bidder to submit an accurate bid and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions, if any, at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified.
E. consider the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the
Site; the Bidding Documents; and the Site-related reports and drawings identified in the
Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
West Cornwall Township 4 2026 Pavement Marking Project
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that
Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by
Engineer is acceptable to Bidder; and
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.03 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given
Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – PRE-BID CONFERENCE
5.01 No pre-bid conference is scheduled for this project. Potential bidders may schedule a site visit by contacting the Township Engineer, Jeffrey Steckbeck, P.E., at 717-269-1530.
ARTICLE 6 – SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. If needed, easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing via the “Vendor Discussions” feature in PennBid. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by
Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent
(10%) of Bidder’s maximum Bid price and in the form of a certified check, bank money order, or a bid bond (on the form attached) issued by a surety.
8.02 The Bid security of the Successful Bidder will be retained until such time when Bidder has executed the Contract Documents, furnished the required contract security and met the other
West Cornwall Township 5 2026 Pavement Marking Project conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful
Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults. The Bid security of other Bidders whom
Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven (7) days after the Effective Date of the Agreement or 61 days after the
Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven (7) days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, Milestones are to be achieved and the
Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items.
Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS AND OTHERS
12.01 If the Contract conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the
Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five
(5) days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the
Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement.
West Cornwall Township 6 2026 Pavement Marking Project
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included within the Bidding Documents and the Bid Table on PennBid.
13.02 A Bid shall show the Bidder’s name and official address.
13.03 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be indicated within the PennBid program.
13.04 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
ARTICLE 14 – BASIS OF BID; COMPARISON OF BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price.
ARTICLE 15 – SUBMITTAL OF BID
15.01 Bids shall be submitted electronically via the PennBid Program, which shall include completion of the electronic bid forms, and uploading of all required supporting documents. With each copy of the Bidding Documents, a Bidder is furnished digital copies of the Bid Form and the Bid Bond
Form. The Bid Form and Bid bond are to be completed and uploaded to the PennBid Program.
Also upload the following documents:
A. Anti-Collusion Affidavit
B. Affidavit RE Accepting Provisions of the Workmen’s Compensation Act.
C. Act 127 Verification Form
15.02 A Bid shall be submitted no later than the date and time prescribed in the advertisement or invitation to bid. Bids submitted by any other means will not be accepted.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be modified or withdrawn within the PennBid program at any time prior to the due date and time listed in the invitation to bid.
16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
West Cornwall Township 7 2026 Pavement Marking Project
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened shortly after the time indicated as close date on the PennBid program and shown as a public notice.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but
Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible.
Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Owner.
ARTICLE 20 – CONTRACT SECURITY AND INSURANCE
20.01 When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by performance and payment bonds and insurance.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement along with the other Contract
West Cornwall Township 8 2026 Pavement Marking Project
Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
ARTICLE 22 – SALES AND USE TAXES
22.01 Contractor shall be solely responsible for determining whether Contractor is responsible for paying State sales tax on his purchases. Owner will provide such information as Owner has in his possession for the completion of any required forms. Neither Owner nor Engineer profess any knowledge or expertise relative to the applicability of State sales tax on purchases associated with this contract.
ARTICLE 23 – PREVAILING WAGES
23.01 The project is subject to compliance with the Pennsylvania Prevailing Wage Act. If that Act or any portion thereof is finally determined by a court to be invalid and unenforceable, any savings realized by the Contractor as a result of such invalidation accrue to the benefit of the Owner. The prospective Bidder agrees, by submitting this Bid, to make payroll records available for audit by the Owner. In the event that the bidder fails to afford the Owner the benefit of any savings realized under this paragraph the Owner will have the right to withhold payments from this or any other contract in an amount equal to the savings realized plus interest. A schedule of wage rates is enclosed.
END OF INSTRUCTIONS TO BIDDERS
MS-981 (7-09)
First Edition
County:
Municipality: Date:
1 st Date X
2nd Date
One Bidder Only
AMOUNT
Remarks:
DATE :
Resolution: The Officials of by majority action have accepted the Low bid and awarded the contract as indicated above.
Lebanon
Weekly
May 21, 2026 Daily
Bids Open:
Newspaper
10:00 AM
West Cornwall Township June 8, 2026
Project Advertised
BIDDER ADDRESS
AND RETURN TO
2140 Herr Street
May 28, 2026
HERE
NEWSPAPER
ATTACH
CLIPPING
17103-1699
Harrisburg, PA
Chairman-President of Council-Mayor
Supervisor-Other Official
CONTRACT AWARDED TO:
Supervisor- Other Official
Secretary-Seal
MS-944 (7-09)
TIME
, on the above Letting Date.
TIME
and specifications on file at as well as the supplements complete all work within calendar days.
3 Accompanying this proposal is a certified check or bid bond in the amount of made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirements of the proposal.
B. PROPOSAL OF:
1 The only person interested in the proposal as principal (s) is (are):
2 None of the above persons are employees of the municipality.
3 This proposal is made without collusion with any other person, firm or corporation.
10:00 AM
The contractor proposes to furnish and deliver all materials ( including Form CS-4171, CERTIFICATE OF COMPLIANCE and/ or TR-465 DAILY BITUMINOUS MIXTURE
CERTIFICATION ) and to do and perform all work on the following project as more specifically set forth in the Schedule of Prices (Attachment), in accordance with drawings and special requirements contained herein and/ or attached hereto and current PennDOT
Specifications (Publication 408), except (a) bidders need not be prequalified by PennDOT
(Sec.102.01), and (b) Volumetric testing of bituminous paving materials is not required (Sec. 409).
INSTRUCTIONS ON PAGE 4
Bids will be opened and read at approximately
June 8, 2026
10:00 AM
West Cornwall Township
MUNICIPALITY (NAME & TYPE)
DATE
on the above Letting Date.
CHAIRMAN OF BOARD OF SUPERVISORS
If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will
10% https://pennbid.bonfirehub.com
( see attachment 1-A )
It is hereby certified as follows:
NAME / ADDRESS OF CONTRACTOR
CONTRACTORS CERTIFICATION
All plans and specifications referred to above and the site of the work have been examined by the contractor. The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit price listed on the Schedule of Prices. (Attachment 1).
THIS PROPOSAL INCLUDES
INSTRUCTIONS TO BIDDERS
A. DEPOSIT OF PROPOSALS.
Sealed Proposals will be received on or before
All envelopes containing Bid proposals shall be clearly marked “Bid Proposal for letting of
PROPOSAL AND CONTRACT
( WHEN EXECUTED )
BY: DATE:
TITLE:
DATE:
TITLE:
TITLE:
BY:
TITLE:
BY:
TITLE:
TITLE:
TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED
ACCEPTED ON :
MUNICIPALITY
BY:
DATE
ATTESTED BY:
WITNESSED OR ATTESTED BY:
The contractor will comply with all requirements of the laws and implementing regulations of the Commonwealth of Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.
The contractor will provide the municipality with a performance bond, conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions thereof, and a payment bond, conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work, in accordance with the Public Works Contractors’ Bond
Law of 1967; and an affidavit accepting the provisions of the Workmen’s
Compensation Act of 1915, as amended.
CONTRACTOR
SEAL
County:
LF
LF
LS
SUBTOTAL
ATTACHMENT 1.1
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
Lebanon Municipality: West Cornwall Township
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Unit
SCHEDULE OF PRICES
*Description
Project Number:
DESCRIPTION OF WORK:
Old Mine Road, from Butler Road to PA-117
Unit
5 Price
Total
ESCALATOR CLAUSE:( if adopted by Municipality.)
4" standard white edge-of-lane pavement markings (paint & beads)
4" standard yellow double centerline pavement markings (paint & beads)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
Item
1 No.
Approximate
2 Quantities
0901-0330
N/A
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
18,374
9,1870901-0320
BID TOTAL
SUBTOTAL FROM OTHER ATTACHMENTS
4" Standard Pavement Markings, Paint &
Beads, White
Mobilization and Traffic Control
4" Standard Pavement Markings, Paint &
Beads, Yellow (double centerline)
LF
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
--- 1 Mobilization and Traffic Control
0901-0320 4,276 4" Standard Pavement Markings, Paint &
Beads, Yellow (double centerline)
0901-0330 8,552 4" Standard Pavement Markings, Paint &
Beads, White
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Northwood Drive, from Butler Road to Old Mine Road
DESCRIPTION OF WORK:
4" standard white edge-of-lane pavement markings (paint & beads)
4" standard yellow double centerline pavement markings (paint & beads)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.2
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
Lebanon Municipality: West Cornwall Township
Project Number:
LF
LS
SUBTOTAL
Project Number:
ATTACHMENT 1.3
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
Lebanon Municipality: West Cornwall Township
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Zinns Mill Road, from South Lebanon Street to Quentin Road (PA-72)
DESCRIPTION OF WORK:
4" standard white edge-of-lane pavement markings (paint & beads)
4" standard yellow double centerline pavement markings (paint & beads)
All markings to be applied in one coat, except edge lines shall be applied as a double pass application
Bid prices shall exclude reflectivity testing
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
0901-0320 4,646 4" Standard Pavement Markings, Paint &
Beads, Yellow (double centerline)
0901-0330 9,292 4" Standard Pavement Markings, Paint &
Beads, White (double coat)
--- 1 Mobilization and Traffic Control
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
LF
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
--- 1 Mobilization and Traffic Control
0901-0320 1,400 4" Standard Pavement Markings, Paint &
Beads, Yellow (double centerline)
0901-0330 2,800 4" Standard Pavement Markings, Paint &
Beads, White
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
North Cornwall Road, from Zinns Mill Road to Cassadee Court
DESCRIPTION OF WORK:
4" standard white edge-of-lane pavement markings (paint & beads)
4" standard yellow double centerline pavement markings (paint & beads)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.4
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
0901-0330 2,640 4" Standard Pavement Markings, Paint &
Beads, White
--- 1 Mobilization and Traffic Control
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
North Cornwall Road, from Zinns Mill Road to Quentin Road (PA-72)
DESCRIPTION OF WORK:
4" standard white edge-of-lane pavement markings (paint & beads)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.5
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
0901-0330 10,554 4" Standard Pavement Markings, Paint &
Beads, White
--- 1 Mobilization and Traffic Control
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Starner Road, from Butler Road to US-322
DESCRIPTION OF WORK:
4" standard white edge-of-lane pavement markings (paint & beads)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.6
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
0901-0330 9,504 4" Standard Pavement Markings, Paint &
Beads, White
--- 1 Mobilization and Traffic Control
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Spangler Road, from US-322 to Township line
DESCRIPTION OF WORK:
4" standard white edge-of-lane pavement markings (paint & beads)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.7
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
EA
EA
LF
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
--- 1 Mobilization and Traffic Control
0960-0021 1 Stop Bar, 24" White Hot Thermoplastic
Pavement Markings
0901-0333 225 12" Standard Pavement Markings, Paint &
Beads, White
0901-0330 150 4" Standard Pavement Markings, Paint &
Beads, White
--- 2 Turn Arrows, White Hot Thermoplastic
Pavement Markings
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L
E T
E D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Intersection of US-322 and PA-419 (Main Street)
DESCRIPTION OF WORK:
Standard white pavement markings (paint & beads) and white thermoplastic pavement markings
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
Work shall include traffic control, flaggers, and half road closure until paint dries
Refer to Site Map 1
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.8
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
EA
LS
SUBTOTAL
Mobilization and Traffic Control1---
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
--- 25 Crosswalk Bars, White Hot Thermoplastic
Pavement Markings
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Zinns Mill Road, Lebanon Street, and Locust Lane intersections with Main Street (PA-419)
DESCRIPTION OF WORK:
Replace 5 crosswalk bars per crossing (5 crossings, 25 bars) with white hot thermoplastic pavement markings (size to match existing)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
Refer to Site Map 2
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.9
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
LS
SUBTOTAL
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
SUBTOTAL FROM OTHER ATTACHMENTS
BID TOTAL
0901-0333 130 12" Standard Pavement Markings, Paint &
Beads, White
--- 1 Mobilization and Traffic Control
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Butler Road at Lebanon Valley Rail-Trail intersection
DESCRIPTION OF WORK:
Replace 130' of 12" white pavement markings (paint & beads) (to match existing)
All markings to be applied in one coat
Bid prices shall exclude reflectivity testing
Work shall include traffic control, flaggers, and half road closure until paint dries before completing the other half
Refer to Site Map 3
ESCALATOR CLAUSE:( if adopted by Municipality.)
N/A
ATTACHMENT 1.10
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
X Traffic Control and Safety Devices to be provided by the Contractor.
X ( Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)
X Delivery tickets for all materials.
X CS-4171 Certificate of Compliance and/ or TR-465 Daily Bituminous Mixture Certification required for all materials.
X Notify the Municipality 5 working days prior to start of project.
X Work to be completed on or before 9/30/2026 . After 9/30/2026 Liquidated damages apply at the rate of $ 200 per calendar day.
X Roadway to be power broomed by (contractor X municipality )prior to start of project.
X Excess material to be removed by (contractor X municipality .)
X Municipality to inspect project.
Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.
Tack Coat required per Section 460, or 409 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.
Prime Coat required per Section 461 of Specifications 408.
Bituminous Seal on all abutting pavement and curbs required.
Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.
Scratch/ Leveling Courses to be placed at the discretion of appointed inspector(s).
Full width pavement with one pass required. .
X Municipality reserves the right to limit work completed.
Taper pavement the last 3 feet to curb.
For FOB Source bids, hauling distance will determine selection of bid award.
Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.
X Incidental Preparation and clean up required. ( Project Construction Materials )
X The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.
X Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.
X Contractor responsible for defects that occur within one year of applications.
Contractor required to review proposed project with Municipality’s Representative prior to bidding.
Oil Samples required from each distributor truck by contractor (1) one quart : A.M. & P.M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)
At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.
Complete all testing in accordance with Specification Form 408 Section 409 except for superpave volumetric testing.
X Notice to Proceed will be the date of Contract acceptance.
X Final Completion Certificate & Notice of Completion required.
X Future award of Contract will be based on quality of work as determined by the municipality.
X Contractor, notify all residents of pending work to be performed.
My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
Date
Company Municipality
Contractor's Representative Municipality's Representative Date
West Cornwall Township
(5-06) SPECIAL PROVISIONS TO CONTRACT MS-944 ( Attachment 1-A )
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an "X".
Attachment 2
($ ) dollars
WHEREAS, the above bounden Principal has entered into a contract with the above Municipality, bearing even date herewith, for
It is further provided that any alteration which may be made in the terms of the contractor or its specifications with the express authorizing the same to be done on .
BY
TITLE:
TITLE:
TITLE:
CONTRACTOR
SURETY COMPANY
Attest / Witness:
(DATE OF BOND)
approval of the Municipality or the Principal to the other, shall not in any way release the Principal and the Surety or either or any of them, to and made a part thereof, and such alterations as may be made in said Specifications as therein provided, and shall well and truly, and in a manner satisfactory to the municipality fulfill all obligations as therein set forth, then this Obligation shall be void, but otherwise the same the undertaking of certain obligations as therein set forth.
respects comply with and faithfully perform the terms and conditions of said Contract, including the Specifications and conditions referred their heirs, executors, administrators, successors or assigns from their liability hereunder, notice to the surety of any such alteration or
(With Corporate Surety)
Attest / Witness:
IN WITNESS WHEREOF, the said Principal and Surety have duly executed this Bond under Seal, pursuant to due and legal action
NOW, THEREFORE, the condition of this obligation is such that if the above bounden Principal, as Contractor, shall in all lawful money to the United States of America, to be paid to the above Municipality or its assigns, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
forebearance being hereby waived.
shall be and remain in full force, virtue and effect.
as Principal and a corporation incorporated under the laws of the State of
(SURETY COMPANY)
(NAME AND ADDRESS OF CONTRACTOR)
PERFORMANCE BONDMS-944-S (7-09)
(NAME OF MUNICIPALITY)
West Cornwall Township in the full and just sum of
(NAME OF STATE)
are held and firmly bound unto
KNOW ALL MEN BY THESE PRESENTS, That we, as Surety
PLACE
SEAL
HERE
PLACE
HERE
MS-944S
KNOW ALL MEN BY THESE PRESENTS, that we a corporation incorporated under the laws of the State of as SURETY, are held and firmly bond unto the , in the full and just sum of
($ )dollars, lawful money of the United States of America, to be paid to the said or its assigns, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the above bounden Principal has entered into a contract with the above municipality hereinafter called Obligee, bearing even date herewith, for the improvement of a certain section of highway or bridge in said Municipality consisting of:
for approximately the sum of: ($ ) dollars.
NOW, THEREFORE, the condition of this obligation is such that if the above bounden PRINCIPAL shall and will promptly pay or cause to be paid in full all sums of money which may be due by contract or otherwise, to any individual, firm, partnership, association or corporation, for all material furnished or labor supplied or performed in the prosecution of the work, whether or not the said for material or labor entered into and became component parts of the work and for rental of the equipment used and services rendered by public utilities in, or in connection with the prosecution of such work, then this obligation to be void, otherwise to remain in full force and effect.
The PRINCIPAL and SURETY, hereby, jointly and severally, agree with the Obligee herein that any individual firm, partnership, association or corporation, which has performed labor or furnished material in the prosecution of the work as provided, and any public utility which has not been paid in full therefor, may sue in assumpsit on this Payment Bond in his, their, or its own name and may prosecute the same to final for such sum or sums as may be justly due him, them or it, and have execution thereon. Provided, however, that the Obligee shall not be liable for the payment of any costs of expenses of such suit.
RECOVERY by any individual, firm, partnership, association or corporation hereunder shall be subject to the provisions of the “Public Works Contractors’ Bond Law of 1967", Act No. 385, approved December 20, 1967,P.L. 869, which Act shall be incorporated herein and made a part hereof, as fully and completely as though its provisions were fully and at length herein recited.
It is further provided that any alterations which may be made in the terms of the contract or in the work to be done or materials to be furnished or labor to be supplied or performed under it or the giving by the Obligee of any extension of time for the performance of the contract or any other forebearance on the part of either the Obligee or the Principal to the other, shall not in any way release the PRINCIPAL and the SURETY or SURETIES of any such alteration, extension of forebearance being hereby waived.
IN WITNESS WHEREOF, the said PRINCIPAL and SURETY have duly executed this Bond under seal this ,20 .
WITNESS:
CONTRACTOR
BY:
SURETY COMPANY
TITLE: TITLE:
TITLE:
WITNESS:
day of
PAYMENT BOND Attachment 3 as PRINCIPAL and
West Cornwall Township
PLACE
SEAL
HERE
PLACE
HERE
Attachment 4
State of )
) ss:
County of ) he has being duly sworn according to law deposes and says that they have it has accepted the provisions of the Workmen’s Compensation Act of 1915 of the Commonwealth of Pennsylvania, with has his its supplements and amendments, and have insured their liability thereunder in accordance with the terms of said its
Act with .
( TYPE OR PRINT)
BY
day of A.D. 20 .
My Commission Expires
CONTRACTOR
SIGNATURE
Sworn to and subscribed before me this
( DATE )
SIGNATURE
(SURETY COMPANY)
AFFIDAVIT RE
ACCEPTING PROVISIONS OF THE WORKMEN’S COMPENSATION ACT
D-7126 ( 7-09 )
County
Municipality
Project Number
State of Fed. Project No.
( If Applicable )
The undersigned deponent deposes and says that he is the of the
BY
Sworn to and subscribed before me the undersigned notary public this day of , .
Notary Public
My Commission expires
(Contractor) competitive bidding in connection with such contract.
into any agreement, participated in any collusion, or otherwise taken any action in restraint of free
Company; that he is authorized to make this
Publication 408, as amended and that the said company has not, either directly or indirectly, entered affidavit on behalf of said company in compliance with section 102.06 (e) of Department Specifications, County of
ANTI-COLLUSION AFFIDAVIT
Lebanon
MS-NCP
MUNICIPALITY
Name of Contractor
Performance of work as specified on the above numbered contract is completed and final pavement inspection has been made by the contractor and municipality in accordance with the terms of the contract awarded.
DATE OF AWARD
Both copies of this form to be filled by the Contractor-Municipality on completion of final pavement restoration.
*DATE
period of one year from this date.
* The contractor is responsible for maintenance of permanent pavement repairs for a
By the affixing of my signature I hereby certify that final
NOTICE OF COMPLETION
IN REFERENCE TO PROJECT #
accordance with the above contract # and is hereby accepted inspection has been made and all work has been performed in
FINAL COMPLETION CERTIFICATE
THIS PORTION TO BE COMPLETED BY MUNICIPALITY
Authorized Agent for the Municipality by the municipality as completed.
West Cornwall Township
Signature of Contractor
Signature of Municipality
Division 0 – Special Sections Section 00430 – Bid Bond
West Cornwall Township 31 2026 Pavement Marking Project
SECTION 00430 – BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
73 South Zinns Mill Road
Lebanon, PA 17042
BID
Bid Due Date: June 8, 2026
Description: 2026 Pavement Marking Project
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid
Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Above addresses are to be used for giving any required notice. Provide execution by any additional parties, such as joint venturers, if necessary.
Division 0 – Special Sections Section 00430 – Bid Bond
West Cornwall Township 32 2026 Pavement Marking Project
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this
Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the
Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents
(or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of
Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be…