3-HOP Supplement (08115690-01).pdf
PDF 45 KB Posted
- Attached to
- Main Street & Zinns Mill Road Sidewalk Project
- Solicitation number
- US.201354
- Issued by
- Lawrence County, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Bid Manual (WCT Sidewalk).pdf | ||
| 2-Bid Plan (WCT Sidewalk).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The original permit, bearing number shown on this supplement, was issued to:
West Cornwall Township 73 South Zinns Mill Road Lebanon, PA 17042
Original Permit No.: 08115690
County: Lebanon
Issuing District Office: 8-0
District Contact No.: (717) 705-0925
Municipalities: West Cornwall Township
Supplement Type: Change in Work
Supplement Issue Date: 9/9/2025
Permit Expiration Date: 10/9/2025
Application No.: 345939-01
Account No.:
Supplement Fee: $ 0.00
Commonwealth of Pennsylvania
Under and subject to all the minimum conditions and regulations prescribed by the PA Department of Transportation (see in particular 67
PA Code, Chapter 441 and 459) and on the original permit.
Supplement Description : Change in Work Supplement No.: 08115690-01
The Applicant (West Cornwall Township) has installed the inner curb related to this permit. The Township now proposes to install sidewalk, a curb ramp, inlets, and stormwater piping. Please refer to the attached plan (HOP Plan 250731).
Supplement Conditions Supplement No.: 08115690-01
1 of 37 NOTIFY THE TRAFFIC MANAGEMENT CENTER (TMC) AT 717-265-7600 TWO DAYS IN
ADVANCE OF ANY PROPOSED LANE OR SHOULDER RESTRICTIONS AND 15 (FIFTEEN)
MINUTES PRIOR TO THE ACTUAL RESTRICTIONS AND PROVIDE THIS PERMIT NUMBER
TO THE TMC OPERATOR PRIOR TO SETTING UP ANY LANE CLOSURES OR RESTRICTIONS,
AND CALL AGAIN WHEN THE CLOSURE/RESTRICTION IS REMOVED, AND THE ROAD IS
RESTORED TO NORMAL OPERATION.
2 of 37 SHOULDERS MUST BE RESTORED IN ACCORDANCE WITH APPROPRIATE SECTION OF
PUB. 408 AND ROADWAY CONSTRUCTION STANDARDS RC-25M.
3 of 37 PERMITTEE'S CONTRACTOR MUST PROVIDE PROPOSED WORK SCHEDULE 3 DAYS
BEFORE START OF WORK. ALSO, PROVIDE AN EMERGENCY PHONE CONTACT NUMBER
TO THE DEPARTMENT.
4 of 37 CONTACT THE COUNTY PERMIT INSPECTOR AT LEAST 5 WORK DAYS PRIOR TO THE
START OF WORK BY PHONE OR EMAIL AT 717-257-6128 OR, MARQUSMITH@PA.GOV
5 of 37 CONTACT COUNTY PERMIT INSPECTOR AT LEAST 3 WORK DAYS IN ADVANCE OF
PERFORMING FINAL RESTORATION.
6 of 37 BLASTING IS NOT PERMITTED IN THE DEPARTMENTS RIGHT OF WAY. IF THE PERMITTEE
EXPECTS THAT BLASTING IS TO OCCUR, THEN A COMPLETE BLASTING PLAN MUST BE
SUBMITTED TO THE DEPARTMENT FOR REVIEW, AND APPROVAL, AT LEAST 15 DAYS
PRIOR TO THE BLASTING. NO BLASTING MAY BE PERFORMED UNTIL PROOF OF
INSURANCE IS PROVIDED TO THE DEPARTMENT IN ACCORDANCE WITH 67 PA CODE,
SECTION 459.7(12).
7 of 37 A CERTIFICATE OF INSURANCE SHALL BE SUBMITTED TO THE DEPT. BY THE PERMITTEE
OR ITS CONTRACTOR 30 DAYS PRIOR TO START OF WORK.
8 of 37 THE MUNICIPALITY WILL OBTAIN SECURITY ADEQUATE TO ENSURE COMPLETION OF
THE PERMITTED WORK PRIOR TO THE START OF WORK IN DEPARTMENT RIGHT OF WAY
CONSISTENT WITH 36 P.S. §670-420 AND 67 PA. CODE §441.6 DAMAGE TO HIGHWAY.
M-945S (10/12)
Highway Occupancy Permit Supplement Supplement No.: 08115690- 01
Page 1 of Supplement # 08115690-01
Supplement Conditions Supplement No.: 08115690-01
9 of 37 A FULL-TIME INSPECTOR WILL BE ASSIGNED WHEN WORKING WITHIN THE
DEPARTMENT RIGHT OF WAY (ROW) AND OR WORK ASSOCIATED WITH WORK ZONE
TRAFFIC CONTROLL (WZTC) PLAN. PERMITTEE WILL BE CHARGED FOR ALL INSPECTION
COSTS INCLUDING HOURS WORKED, MILAGE, CELL PHONE, BOARDING AND LODGING
BILLED TO THE DEPARTMENT AS PER THE CONSULTANT INSPECTION AGREEMENT.
PERMITTEE SHALL ASSIGN A PERSON AUTHORIZED TO SIGN THE DAILY TIME SHEET OF
INSPECTOR CLEARLY INDICATING THE HOURS WORKED AND MILEAGE ON JOB SITE.
DEPARTMENT MAY STOP THE WORK / REVOKE THE PERMIT IF PERMITTEE FAILS TO PAY
ALL INVOICES ON TIME OR IF PERMITTEE IS NOT IN COMFORMFANCE WITH THE
APPROVED PERMIT.
10 of 37 INSPECTION OF FABRICATED PRODUCTS WILL BE REQUIRED BY THE DEPARTMENT.
PERMITTEE WILL BE CHARGED ALL INSPECTION COSTS INCURRED BY THE
DEPARTMENT. PRIOR TO FABRICATION, PERMITTEE SHALL PROVIDE TO THE DISTRICT
OFFICE A COMPLETED CS-430 FORM (NOTIFICATION OF INSPECTION).
11 of 37 FACILITY MAY BE PLACED IN PAVEMENT OR SHOULDER, AS PER PLANS, PROVIDED
BASE AND WEARING COURSES ARE OPENED BY SAW CUT METHOD.
12 of 37 THIS PERMIT AUTHORIZES WORK ONLY IN DEPARTMENT HIGHWAY RIGHT OF WAY.
13 of 37 2A COARSE AGGREGATE BACKFILL MATERIAL IS REQUIRED UNDER 67 PA CODE, SECTION 459.8 (G)(2) AND SECTION 703.2 OF PUBLICATION 408.
14 of 37 RETAINED SUITABLE MATERIAL BACKFILL IS AUTHORIZED OUTSIDE SHOULDERS &
UNIMPROVED SHOULDERS MORE THAN 3' FROM EDGE OF PAVE AND MORE THAN 3'
BELOW THE SURFACE.
15 of 37 DEPARTMENT MUST BE NOTIFIED IN WRITING TWO WEEKS IN ADVANCE OF PRE-
CONSTRUCTION MEETING.
16 of 37 DEPARTMENT MUST BE NOTIFIED IN WRITING TWO WEEKS IN ADVANCE TO SCHEDULE
SEMI-FINAL INSPECTION.
17 of 37 THE PERMITTEE IS REQUIRED TO USE HOT MIX OR WARM MIX MATERIAL FOR
TEMPORARY RESTORATION. COLD MIX WILL BE PERMITTED AT THE DISCRETION OF
THE DEPARTMENT. PERMITTEE MUST MAINTAIN A SMOOTH PAVEMENT SURFACE
SUITABLE FOR DRIVING FOR THE DURATION OF THE TEMPORARY PAVEMENT.
18 of 37 BACKFILL COMPACTION TESTING IS REQUIRED A MINIMUM ONE TEST PER LIFT DAILY.
FOR OPENINGS LESS THAN OR EQUAL TO 500 TOTAL FEET IN PAVEMENT, SHOULDER OR
SIDEWALK, THE PERMITTEE MAY CHOOSE THE COMPACTION TEST METHOD, PROVIDED
THE TEST METHOD IS PERFORMED CONSISTENT WITH DEPARTMENT PUBLICATIONS,
AND ON THE CONDITION THAT THE PERMITTEE PROVIDE THE COMPLETED CS-6 (PIPE
INSTALLATION INSPECTION FORM) AND ACCOMPANYING TR-478A AND/OR TR-4276
FORMS WITHIN TWO WEEKS OF THE COMPLETION OF THE WORK REPRESENTED ON THE
FORM. PENNDOT WILL NOT CLOSE-OUT THE PERMIT PRIOR TO RECEIVING THE
COMPLETED FORMS.
19 of 37 CURB MUST BE INSTALLED IN ACCORDANCE WITH PENNDOT ROADWAY STANDARDS
RC-64M AND RC-67M.
20 of 37 SURFACE DRAINAGE MAY NOT BE DIRECTED ONTO STATE HIGHWAY RIGHT OF WAY.
21 of 37 IT IS THE PERMITTEES RESPONSIBILITY TO MAINTAIN/REPLACE ALL PAVEMENT
MARKINGS INCLUDING ACCESS SIGNING, LANE MARKINGS, AND OTHER SIGNS
INSTALLED UNDER THIS PERMIT.
M-945S (10/12)
Highway Occupancy Permit Supplement Supplement No.: 08115690- 01
Page 2 of
22 of 37 SIDEWALK CONSTRUCTION OR REPLACEMENT SHALL PROVIDE ACCOMMODATIONS
FOR PERSONS WITH DISABILITIES CONSISTENT WITH ADA AND PENNDOT STANDARDS.
23 of 37 IT IS THE PERMITTEE'S RESPONSIBILITY TO IDENTIFY ALL PENNDOT OWNED/OPERATED
FACILITIES WITHIN THE LIMITS OF PERMITTED WORK. IF DAMAGED BY THE PERMITTED
WORK, IT IS PERMITTEES RESPONSIBILITY TO CONTACT THE DEPARTMENT
IMMEDIATELY AND RESTORE THE FACILITY TO ITS ORIGINAL CONDITION OR AS
DIRECTED BY THE DEPARTMENT.
24 of 37 ALL DISTURBED AREAS OUTSIDE THE PAVEMENT OR SHOULDER SHALL BE RESTORED
TO A CONDITION AT LEAST EQUAL TO THAT WHICH EXISTED BEFORE THE START OF
WORK.
25 of 37 MINIMUM WORK ZONE TRAFFIC CONTROL TO BE IN ACCORDANCE WITH PUB. 213. SEE
PUB 212 FOR ADDITIONAL DETAILS.
26 of 37 NO LANES MAY BE RESTRICTED BETWEEN THE HOURS OF 6:00 AM TO 9:00 AM OR
BETWEEN THE HOURS OF 3:00 PM TO 6:00 PM.
27 of 37 LANE CLOSURES WILL NOT BE PERMITTED DURING THE FOLLOWING PERIODS: EASTER
WEEKEND - FRIDAY 6:00AM TO TUESDAY 9:00AM; MEMORIAL DAY WEEKEND - FRIDAY
6:00AM TO TUESDAY 9:00AM; FOURTH OF JULY HOLIDAY - REQUEST INFORMATION
FROM DISTRICT OR COUNTY PERMIT OFFICE; LABOR DAY WEEKEND - FRIDAY 6:00AM
TO TUESDAY 9:00AM; THANKSGIVING WEEKEND -WEDNESDAY 6:00AM TO MONDAY
9:00AM; CHRISTMAS HOLIDAY-DECEMBER REQUEST INFORMATION FROM DISTRICT OR
COUNTY PERMIT OFFICE; NEW YEAR'S HOLIDAY - REQUEST INFORMATION FROM
DISTRICT OR COUNTY PERMIT OFFICE; PRIMARY AND GENERAL ELECTION DAYS-
TUESDAY 6:00AM TO 9:00PM; THERE MAY BE ADDITIONAL TRAFFIC RESTRICTIONS FOR
SPECIAL EVENTS THAT ATTRACT LARGE VOLUMES OF TRAFFIC IN THE AREA OF THE
HOP.
28 of 37 DRAINAGE INSTALLED BY THIS PERMIT IS THE RESPONSIBILITY OF THE PERMITTEE TO
CONTINUALLY MAINTAIN OR REPLACE.
29 of 37 PERMITTEE IS RESPONSIBLE FOR ENSURING THAT MUD, SILT AND OTHER DEBRIS IS
REMOVED FROM VEHICLES AND TIRES (BY POWER WASH, ETC.) BEFORE ENTERING
ONTO THE HIGHWAY.
30 of 37 THE DEPARTMENT MUST BE NOTIFIED IN THE EPERMITTING SYSTEM DROPDOWN MENU, NOTIFY PENNDOT, UPON COMPLETION OF WORK.
31 of 37 ALL WORK WITHIN DEPARTMENT RIGHT OF WAY MUST COMPLY WITH THE LATEST
EDITIONS OF THE DEPARTMENT'S PUBLICATION 408 (SPECIFICATIONS), PUBLICATION
72M (STANDARDS FOR ROADWAY CONSTRUCTION), PUBLICATION 111 (TRAFFIC
CONTROL - PAVEMENT MARKINGS AND SIGNING STANDARDS), AND PUBLICATION 213
(TEMPORARY TRAFFIC CONTROL GUIDELINES).
32 of 37 PERMITTEE WILL BE RESPONSIBLE FOR COORDINATING RELOCATION OF ANY UTILITY
FACILITY CONFLICTS WHICH ARE A RESULT OF ACTIVITES CONDUCTED UNDER THIS
PERMIT. ALL UTILTIY FACILITY COORDINATION AND RELOCATION MUST BE IN
ACCORDANCE WITH 67 PA. CODE CHAPTER 459, OCCUPANCY OF HIGHWAYS BY
UTILITIES.
33 of 37 IT IS THE PERMITTEES RESPONSIBILITY TO PROVIDE NECESSARY EQUIPMENT FOR
TESTING OF MATERIALS DELIVERED ON SITE INCLUDING CERTIFIED TECHNICIANS.
M-945S (10/12)
Highway Occupancy Permit Supplement Supplement No.: 08115690- 01
Page 3 of
34 of 37 SUBMIT FORM M-937R (ROUTE/BRIDGE RESTRICTION), TO THE COUNTY PERMIT
INSPECTOR AT LEAST 15 DAYS IN ADVANCE FOR ANY LANE RESTRICTIONS, LANE
CLOSURES OR APPROVED DETOURS. THE INSPECTOR WILL REVIEW AND FORWARD THE
REQUEST TO THE DISTRICT HAULING UNIT FOR APPROVAL.
35 of 37 FOLLOWING CONSTRUCTION OF EACH CURB RAMP, COMPLETE AND SUBMIT TO THE
DEPARTMENT CURB RAMP INSPECTION FORM (CS-4401). CHECK ALL SLOPES WITH A
FOUR FOOT SMART LEVEL FOR COMPLIANCE. CURB RAMPS THAT ARE FOUND TO BE
NON-COMPLIANT AS A RESULT OF COMPLETING THE INSPECTION FORM WILL BE
RECONSTRUCTED UNLESS THE CURB RAMP DETAIL IN QUESTION HAD BEEN
AUTHORIZED TO BE CONSTRUCTED THROUGH THE USE OF AN APPROVED
TECHNICALLY INFEASIBLE FORM.
THE DEPARTMENT WILL NOT ACCEPT ANY NEWLY CONSTRUCTED CURB RAMP THAT
DOES NOT FULLY COMPLY WITH THE STANDARD DRAWINGS RC - 67M REQUIREMENTS
UNLESS THE CURB RAMP DETAIL IN QUESTION HAD BEEN AUTHORIZED TO BE
CONSTRUCTED THROUGH THE USE OF AN APPROVED TECHNICALLY INFEASIBLE FORM
(TIF). A TIF WILL NOT BE APPROVED AFTER A RAMP HAS BEEN CONSTRUCTED.
THE CURB RAMP INSPECTION FORM (CS-4401) MUST BE FULLY COMPLETED INCLUDING
THE NAME OF THE PERSON WHO FIELD VIEWED THE SITE (DESIGNER), THE RAMP
LOCATION IN THE DIAGRAM, PHOTOS AND ADDITIONAL TABS TO INCLUDE FURTHER
JUSTIFICATION/EXPLANATION FOR THE PROPOSED DESIGN. PLEASE MAKE SURE THAT
ALL APPROPRIATE CELLS ARE COMPLETED AND INCLUDE PHOTOS DEPICTING THE
PROPOSED RAMP LOCATION FROM DIFFERENT ANGLES. THE PHOTOS SHOULD BE CLOSE
ENOUGH THAT DETAILS FOR DESIGN CAN BE SEEN AND EVALUATED.
36 of 37 IT IS THE PERMITEES RESPONSIBILITY TO IDENTIFY ALL STORMWATER MANAGEMENT
FACILITIES WITHIN THE PERMITS AREA OF LIMITS. ANY STORMWATER MANAGEMENT
FACILITY DISTURBED BY THE PERMITTED WORK MUST BE RESTORED TO ITS ORIGINAL
CONDITION.
37 of 37 PERMITTEE IS RESPONSIBLE TO HAVE APPROVED FLAGGERS DURING WORK HOURS TO
ENSURE SAFETY WHEN CONSTRUCTION EQUIPMENT AND VEHICLES ARE ENTERING
AND EXITING THE CONSTRUCTION ENTRANCE. PROPER SIGNAGE MAY BE REQUIRED,
PLEASE CHECK WITH COUNTY SUPERVISOR.
Michael B. Carroll
Secretary of Transportation
Kevin M. Keefe, P.E.
District Executive
M-945S (10/12)
Highway Occupancy Permit Supplement Supplement No.: 08115690- 01