1-Bid Drawings Set for Contract 25-1 Pennsville WWTP Expansion Phase I.pdf

PDF 47 MB Posted

Attached to
Pennsville Wastewater Treatment Plant Expansion Phase I
Solicitation number
Not on record
Issued by
Northampton County, Pennsylvania

About this file

The file is a comprehensive set of bid drawings for the Pennsville Wastewater Treatment Plant Expansion Phase I project, involving the Lehigh Township Municipal Authority in Pennsylvania. The project, designated as Contract 25-1, encompasses a phased expansion of the wastewater treatment facility, with Phase 1 focusing on site work, piping, and tank installations. The scope includes erosion and sedimentation controls, stormwater management facilities, site grading, landscaping, and excavation, specifically involving an influent pump station wet well, valve vault, screening chamber, equalization tanks, two Sequencing Batch Reactor (SBR) tanks, yard piping, storm sewers, and gravity sanitary sewer from the Kola Road Pump Station. Sealed bids are to be submitted online via the PennBid Program by 2:00 PM on October 29, 2025, with a non-mandatory pre-bid meeting scheduled for October 16, 2025, at the Authority's building in Walnutport, PA.

The project is financially supported by three grants: 2022 Local Shares Statewide Grant, 2023 Local Shares Statewide Grant, and COVID-19 ARPA H2O PA Grant. Bidders are required to provide a 10% Bid Bond, 100% Performance Bond, 100% Payment Bond, and a 10% Maintenance Bond, along with specified contractor's insurance. The project contact is Dave Getz, Authority Manager, who can be reached at 610.760.2459 for site visit arrangements. Notably, the Phase 1 construction specifically excludes mechanical equipment, structural buildings, and electrical work, focusing solely on the foundational infrastructure elements of the wastewater treatment plant expansion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\L A

N D

D E

V E

L O

P M

E N

T P

L A

N S

\L D

G

R A

D

IN

G .d w g

BMP #1

6.4.2 INFILTRATION BASIN

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

SANITARY MANHOLE ELEVATIONS *

GRAVITY SANITARY SEWER PIPE LEGEND

SANITARY FORCE MAIN PIPE LEGEND

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\L A

N D

D E

V E

L O

P M

E N

T P

L A

N S

\L D

U

T

IL

IT

Y

.d

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\L A

N D

D E

V E

L O

P M

E N

T P

L A

N S

\L D

L

A N

D S

C A

P E

.d

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\L A

N D

D E

V E

L O

P M

E N

T P

L A

N S

\L D

S

T O

R M

S E

W E

R P

R O

F

IL

E S

.d

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\L A

N D

D E

V E

L O

P M

E N

T P

L A

N S

\L D

C

O N

S T

R U

C T

IO

N

D E

T A

IL

S

.d

LEHIG

H TO

W

NSHIP

ALLEN TO

W

NSHIP

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\E

S P

L A

N S

\E

S

C O

N S

T R

U C

T

IO

N L

O C

A T

IO

N

P L

A N

.d

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\E

S P

L A

N S

\E

S

P U

M P

S T

A T

IO

N

.d

SANITARY SEWER CROSSING SEQUENCE OF CONSTRUCTION

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\E

S P

L A

N S

\E

S

S A

N

IT

A R

Y E

X T

E N

T

IO

N .d

STANDARD CONSTRUCTION DETAIL #3-16

PUMPED WATER FILTER BAG

GEOTEXTILE DETAILS - EROSION CONTROL BLANKET

0.7 STAPLES PER SQ. YD.

(0.8 STAPLES PER SQ. M)

1.3 STAPLES PER SQ. YD.

(1.5 STAPLES PER SQ. M)

3.6 STAPLES PER SQ. YD.

(4.3 STAPLES PER SQ. M)(4.1 STAPLES PER SQ. M)

3.4 STAPLES PER SQ. YD.

GREEN

NORTH

AMERICAN

www.nagreen.com 800−772−2040

EVANSVILLE, IN 47725

14649 HIGHWAY 41 NORTH

0.7 GRAPAS POR YD CUAD

(0.8 GRAPAS POR M CUAD)

1.3 GRAPAS POR YD CUAD

(1.5 GRAPAS POR M CUAD)

1.7 GRAPAS POR YD CUAD

(2.0 GRAPAS POR M CUAD)

3.4 GRAPAS POR YD CUAD

(4.1 GRAPAS POR M CUAD)

3.6 GRAPAS POR YD CUAD

(4.3 GRAPAS POR M CUAD) REV. 1/2004

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\E

S P

L A

N S

\E

S

D E

T A

IL

S

.d

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\E

S P

L A

N S

\E

S

D E

T A

IL

S

.d

LEHIG

H TO

W

NSHIP

ALLEN TO

W

NSHIP

POI #001

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\P C

S M

P L

A N

S \P

C

C O

N S

T R

U C

T

IO

N L

O C

A T

IO

N

P L

A N

.d

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\P C

S M

P L

A N

S \P

C

P U

M P

S T

A T

IO

N

.d

:\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\P C

S M

P L

A N

S \P

C

S A

N

IT

A R

Y E

X T

E N

S

IO

N .d

1.

2.

3.

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\P C

S M

P L

A N

S \P

C

N O

T E

S .d

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\P C

S M

P L

A N

S \P

C

R E

S T

O R

A T

IO

N

.d

DA - PRE

DEVELOPMENT

DRAINAGE AREA

X:\SU

R

VEC

AD

D

\LEH

IG

H

TO

W

N

SH

IP M

U

N

AU

TH

\PEN

N

SVILLE\LVR

S PEN

N

SVILLE\PH

ASE 2\R

EV 2023-2-6\D

R

AIN

AG

E PLAN

S\D

A 1 PR

E.dw

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

DA - POST

DEVELOPMENT

TO BMP #2

INFILTRATION

BED

DA - POST

DEVELOPMENT

UNDETAINED

DA - POST

DEVELOPMENT

TO BMP #1

INFILTRATION

BASIN

UNDETAINED

UNDETAINED

UNDETAINED

U N

D E

T A

IN

E

D

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\D R

A

IN

A G

E P

L A

N S

\D A

P

O S

T .d

BMP #2

6.4.3 INFILTRATION BED

1,500 SF

TOP ELEV 449.50

INV 446.00

Y8

Y7

Y6

Y5

Y9

Y4

Y3

Y2

Y1

TRENCH

X :\S

U R

V E

C A

D D

\L E

H

IG

H T

O W

N S

H

IP

M U

N A

U T

H \P

E N

N S

V

IL

L E

\L V

R S

P E

N N

S V

IL

L

E \P

H A

S E

\R

E V

-2 -6

\D R

A

IN

A G

E P

L A

N S

\D A

IN

L E

T .d

Cowan Drawings
COVER
LD1 RECORD PLAN
LD2 EXISTING FEATURES
LD3 GRADING
LD4 UTILITY
LD5 LANDSCAPE
LD6 STORM SEWER PROFILES
LD7 CONSTRUCTION DETAILS
E&S 1 CONSTRUCTION LOCATION PLAN
E&S 2 WATERLINE
E&S 3 WATERLINE
E&S 4 WATERLINE
E&S 5 CROSSING
E&S 6 PUMP STATION
E&S 7 SANITARY EXTENTION
E&S 8 DETAILS
E&S 9 DETAILS
PC1 CONSTRUCTION LOCATION PLAN
PC2 WATERLINE
PC3 WATERLINE
PC4 WATERLINE
PC5 CROSSING
PC6 PUMP STATION
PC7 SANITARY EXTENSION
PC8 NOTES
DA 1 PRE
DA2 POST
DA3 INLET
PC9 RESTORATION
Ebert Drawings
026175-WWTP-000
026175-WWTP-201
026175-WWTP-202
026175-WWTP-203
026175-WWTP-204
026175-WWTP-205
026175-WWTP-206
026175-WWTP-207
026175-WWTP-301
026175-WWTP-302
026175-WWTP-303
026175-WWTP-401
026175-WWTP-402

File details come from the government source that posted it. Updated .