1-Bid Drawings Set for Contract 25-1 Pennsville WWTP Expansion Phase I.pdf
PDF 47 MB Posted
- Solicitation number
- Not on record
- Issued by
- Northampton County, Pennsylvania
About this file
The file is a comprehensive set of bid drawings for the Pennsville Wastewater Treatment Plant Expansion Phase I project, involving the Lehigh Township Municipal Authority in Pennsylvania. The project, designated as Contract 25-1, encompasses a phased expansion of the wastewater treatment facility, with Phase 1 focusing on site work, piping, and tank installations. The scope includes erosion and sedimentation controls, stormwater management facilities, site grading, landscaping, and excavation, specifically involving an influent pump station wet well, valve vault, screening chamber, equalization tanks, two Sequencing Batch Reactor (SBR) tanks, yard piping, storm sewers, and gravity sanitary sewer from the Kola Road Pump Station. Sealed bids are to be submitted online via the PennBid Program by 2:00 PM on October 29, 2025, with a non-mandatory pre-bid meeting scheduled for October 16, 2025, at the Authority's building in Walnutport, PA.
The project is financially supported by three grants: 2022 Local Shares Statewide Grant, 2023 Local Shares Statewide Grant, and COVID-19 ARPA H2O PA Grant. Bidders are required to provide a 10% Bid Bond, 100% Performance Bond, 100% Payment Bond, and a 10% Maintenance Bond, along with specified contractor's insurance. The project contact is Dave Getz, Authority Manager, who can be reached at 610.760.2459 for site visit arrangements. Notably, the Phase 1 construction specifically excludes mechanical equipment, structural buildings, and electrical work, focusing solely on the foundational infrastructure elements of the wastewater treatment plant expansion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\L A
N D
D E
V E
L O
P M
E N
T P
L A
N S
\L D
G
R A
D
IN
G .d w g
BMP #1
6.4.2 INFILTRATION BASIN
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
SANITARY MANHOLE ELEVATIONS *
GRAVITY SANITARY SEWER PIPE LEGEND
SANITARY FORCE MAIN PIPE LEGEND
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\L A
N D
D E
V E
L O
P M
E N
T P
L A
N S
\L D
U
T
IL
IT
Y
.d
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\L A
N D
D E
V E
L O
P M
E N
T P
L A
N S
\L D
L
A N
D S
C A
P E
.d
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\L A
N D
D E
V E
L O
P M
E N
T P
L A
N S
\L D
S
T O
R M
S E
W E
R P
R O
F
IL
E S
.d
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\L A
N D
D E
V E
L O
P M
E N
T P
L A
N S
\L D
C
O N
S T
R U
C T
IO
N
D E
T A
IL
S
.d
LEHIG
H TO
W
NSHIP
ALLEN TO
W
NSHIP
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\E
S P
L A
N S
\E
S
C O
N S
T R
U C
T
IO
N L
O C
A T
IO
N
P L
A N
.d
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\E
S P
L A
N S
\E
S
P U
M P
S T
A T
IO
N
.d
SANITARY SEWER CROSSING SEQUENCE OF CONSTRUCTION
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\E
S P
L A
N S
\E
S
S A
N
IT
A R
Y E
X T
E N
T
IO
N .d
STANDARD CONSTRUCTION DETAIL #3-16
PUMPED WATER FILTER BAG
GEOTEXTILE DETAILS - EROSION CONTROL BLANKET
0.7 STAPLES PER SQ. YD.
(0.8 STAPLES PER SQ. M)
1.3 STAPLES PER SQ. YD.
(1.5 STAPLES PER SQ. M)
3.6 STAPLES PER SQ. YD.
(4.3 STAPLES PER SQ. M)(4.1 STAPLES PER SQ. M)
3.4 STAPLES PER SQ. YD.
GREEN
NORTH
AMERICAN
www.nagreen.com 800−772−2040
EVANSVILLE, IN 47725
14649 HIGHWAY 41 NORTH
0.7 GRAPAS POR YD CUAD
(0.8 GRAPAS POR M CUAD)
1.3 GRAPAS POR YD CUAD
(1.5 GRAPAS POR M CUAD)
1.7 GRAPAS POR YD CUAD
(2.0 GRAPAS POR M CUAD)
3.4 GRAPAS POR YD CUAD
(4.1 GRAPAS POR M CUAD)
3.6 GRAPAS POR YD CUAD
(4.3 GRAPAS POR M CUAD) REV. 1/2004
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\E
S P
L A
N S
\E
S
D E
T A
IL
S
.d
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\E
S P
L A
N S
\E
S
D E
T A
IL
S
.d
LEHIG
H TO
W
NSHIP
ALLEN TO
W
NSHIP
POI #001
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\P C
S M
P L
A N
S \P
C
C O
N S
T R
U C
T
IO
N L
O C
A T
IO
N
P L
A N
.d
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\P C
S M
P L
A N
S \P
C
P U
M P
S T
A T
IO
N
.d
:\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\P C
S M
P L
A N
S \P
C
S A
N
IT
A R
Y E
X T
E N
S
IO
N .d
1.
2.
3.
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\P C
S M
P L
A N
S \P
C
N O
T E
S .d
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\P C
S M
P L
A N
S \P
C
R E
S T
O R
A T
IO
N
.d
DA - PRE
DEVELOPMENT
DRAINAGE AREA
X:\SU
R
VEC
AD
D
\LEH
IG
H
TO
W
N
SH
IP M
U
N
AU
TH
\PEN
N
SVILLE\LVR
S PEN
N
SVILLE\PH
ASE 2\R
EV 2023-2-6\D
R
AIN
AG
E PLAN
S\D
A 1 PR
E.dw
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
DA - POST
DEVELOPMENT
TO BMP #2
INFILTRATION
BED
DA - POST
DEVELOPMENT
UNDETAINED
DA - POST
DEVELOPMENT
TO BMP #1
INFILTRATION
BASIN
UNDETAINED
UNDETAINED
UNDETAINED
U N
D E
T A
IN
E
D
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\D R
A
IN
A G
E P
L A
N S
\D A
P
O S
T .d
BMP #2
6.4.3 INFILTRATION BED
1,500 SF
TOP ELEV 449.50
INV 446.00
Y8
Y7
Y6
Y5
Y9
Y4
Y3
Y2
Y1
TRENCH
X :\S
U R
V E
C A
D D
\L E
H
IG
H T
O W
N S
H
IP
M U
N A
U T
H \P
E N
N S
V
IL
L E
\L V
R S
P E
N N
S V
IL
L
E \P
H A
S E
\R
E V
-2 -6
\D R
A
IN
A G
E P
L A
N S
\D A
IN
L E
T .d
| Cowan Drawings |
| COVER |
| LD1 RECORD PLAN |
| LD2 EXISTING FEATURES |
| LD3 GRADING |
| LD4 UTILITY |
| LD5 LANDSCAPE |
| LD6 STORM SEWER PROFILES |
| LD7 CONSTRUCTION DETAILS |
| E&S 1 CONSTRUCTION LOCATION PLAN |
| E&S 2 WATERLINE |
| E&S 3 WATERLINE |
| E&S 4 WATERLINE |
| E&S 5 CROSSING |
| E&S 6 PUMP STATION |
| E&S 7 SANITARY EXTENTION |
| E&S 8 DETAILS |
| E&S 9 DETAILS |
| PC1 CONSTRUCTION LOCATION PLAN |
| PC2 WATERLINE |
| PC3 WATERLINE |
| PC4 WATERLINE |
| PC5 CROSSING |
| PC6 PUMP STATION |
| PC7 SANITARY EXTENSION |
| PC8 NOTES |
| DA 1 PRE |
| DA2 POST |
| DA3 INLET |
| PC9 RESTORATION |
| Ebert Drawings |
| 026175-WWTP-000 |
| 026175-WWTP-201 |
| 026175-WWTP-202 |
| 026175-WWTP-203 |
| 026175-WWTP-204 |
| 026175-WWTP-205 |
| 026175-WWTP-206 |
| 026175-WWTP-207 |
| 026175-WWTP-301 |
| 026175-WWTP-302 |
| 026175-WWTP-303 |
| 026175-WWTP-401 |
| 026175-WWTP-402 |
File details come from the government source that posted it. Updated .