Summary of RFP-2025-726-AVI-GB: Project Manager and Construction Manager Services
This Request for Proposals (RFP) is issued by the City of Albuquerque's Purchasing Division on behalf of the Albuquerque International Sunport, seeking an experienced Project Management and Construction Management (PMCM) services firm to support capital improvement projects, construction activities, and overall program management. The selected firm(s) will augment internal Sunport staff during capacity constraints and provide comprehensive oversight and coordination for project delivery aligned with the Sunport's strategic objectives, demonstrating expertise in various project delivery methods including Design-Bid-Build, Construction Manager at Risk (CMAR), Design-Build, and Public-Private Partnerships (P3). The deadline for proposal receipt is April 30, 2026, at 4:00 p.m. Mountain Time through the City's eProcurement system. A non-mandatory pre-proposal conference is scheduled for April 7, 2026, at 11:00 a.m. via Zoom. The contract term is anticipated to be four years with one additional one-year extension option for a total of five years. Questions must be submitted by April 20, 2026, at 9:00 a.m. MDT.
The cost proposal shall be based on an hourly rate structure inclusive of all costs to perform the scope of work, with evaluation utilizing a ratio of the lowest cost provider multiplied by available points in the cost category (200 of 1,000 total evaluation points). This is a federally-funded project with no local or disadvantaged business enterprise set-asides applicable. Minimum qualifications require proposers to demonstrate completion of PMCM assignments at a minimum of three commercial service airports within the past five years, with at least one project at a medium or large hub airport as defined by the FAA. Key personnel, including the project manager, must possess at least ten years of demonstrated experience in scheduling, design, project controls, and/or contract management, with experience in commercial airports operating in multi-phase construction projects required. All proposals must comply with federal terms and conditions per 2 CFR Part 200, Appendix II, including Equal Employment Opportunity, Davis-Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, Buy American Preference provisions, and debarment and suspension certifications. Insurance requirements include Commercial General Liability of $2,000,000 per occurrence, Automobile Liability of $1,000,000 combined single limit, and Workers' Compensation Insurance per New Mexico law.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Albuquerque Request for Proposals Solicitation Number: RFP-2025-726-AVI-GB Project Manager and Construction Manager Services March 26, 2026
THIS IS A FEDERALLY-FUNDED PROJECT
Deadline for Receipt of Proposals: April 30, 2026, 4:00 p.m. (Mountain Time) The City eProcurement System will not allow Proposals to be submitted after this date and time.
Non-Mandatory Pre-Proposal Conference: April 7, 2026, 11:00 a.m. via Zoom City of Albuquerque
Department of Finance and Administrative Services
Purchasing Division
V2024.07.10 JLB
TABLE OF CONTENTS
Page
Introduction
Part Instructions to Offerors
Proposal Format
Scope of Services
Evaluation of Proposals
REQUIRED FEDERAL FORMS:
Suspension and Debarment Certification
Lobbying Certification
Certification of Bidder Regarding Equal Employment Opportunity
Appendix A Cost Proposal Forms
Appendix B FAA AIP Contract Provisions
FAA Buy American Preference for Construction
FAA Buy American Preference for Equipment and
Building Projects
Tax Delinquency and Felony Conviction Certification
INTRODUCTION
Albuquerque International Sunport: The Albuquerque International Sunport (ABQ or the Sunport) was recently ranked the 7th best airport in the United States by the Washington Post. This recognition highlights how the Sunport is a leading center for worldwide transportation, advancing local, regional, and international commerce and creating an authentic southwestern travel experience. Its mission is to plan and deliver premier aviation services that contribute positively to Albuquerque and the State of New Mexico by ensuring a safe and pleasurable airport experience for passengers and providing quality services to our customers.
The Sunport is the principal air carrier airport serving the Albuquerque Metropolitan Area and the State of New Mexico. Owned by the City of Albuquerque and operated by the City’s Aviation Department, the Sunport comprises 2,457 acres and is located 5 miles southeast of downtown Albuquerque.
The passenger facilities of the Sunport include a terminal complex with more than 550,000 square feet of interior space, including 22 air carrier aircraft gates as well as one regional/commuter gate area. The 22 air carrier gates are situated in a linear east-west concourse alignment, parallel to the terminal complex and connected to it via a terminal concourse connector. The eastern portion of the concourse is referred to as Concourse A, and the western portion is referred to as Concourse B. An International gate is located at the west end of the terminal complex and is used for International arrivals only. The surrounding terminal area includes a two-level terminal loop roadway system, a 3,400-space 4-level parking garage, and two surface lots: 1) a 573-space uncovered basic economy lot, and 2) a 450-space covered premium economy lot.
The Sunport has two principal runways for air carrier use: Runway 8-26, the primary air carrier/military runway, is 13,793 feet long and 150 feet wide; and Runway 3-31, the secondary runway, is 10,000 feet long and 150 feet wide. The primary aviation runway is a cross-wind air carrier Runway 12-30, and is 6,000 feet in length and 150 feet wide.
The City operates a Consolidated Rental Car Facility, which is located on approximately 76 acres of airport property southwest of the terminal complex. The facility is comprised of a customer service building, ready/return parking area, and service center facilities. The Consolidated Rental Car Facility is currently utilized by eight rental car companies, including Ace Rent a Car, Alamo/National, Avis, Budget, Dollar/Thrifty, Enterprise, Hertz, Payless, and Sixt.
Statistical Information: The Sunport is classified as a medium hub airport by the Federal Aviation Administration (FAA). In 2024, approximately 5.5 million passengers used the Sunport. The Sunport primarily serves an origination-destination (O&D) air traffic market, with approximately 90% of the passengers using the Sunport to begin or end their trips in the Albuquerque area and other parts of the State.
| Historical Passenger Activity Calendar Year |
| Enplanements |
| Deplanements |
| 2019 |
| 2,712,464 |
| 2,692,623 |
| 2020 |
| 908,466 |
| 907,945 |
| 2021 |
| 1,719,618 |
| 1,704,485 |
| 2022 |
| 2,360,711 |
| 2,353,693 |
| 2023 |
| 2,658,750 |
| 2,652,214 |
| 2024 |
| 2,737,328 |
| 2,734,350 |
Double Eagle II (DEII) is the City’s primary general aviation airport, providing private aircraft owners a viable alternative to operating at the Sunport. DEII is home to approximately 150 private and corporate aircraft, and accommodates more than 66,000 annual operations, which include training flights, military flights, air ambulance, and charter air service. DEII has two active runways: Runway 4-22 is 7,398 feet in length by 100 feet wide, with full ILS and MALSR; and Runway 17-35 is 5,999 feet in length by 100 feet wide, and has REIL on each end.
Recent Developments The Sunport has recently implemented a series of improvements aimed at modernizing infrastructure and enhancing the passenger experience. A new concessions program, launched in November 2022, reflects the airport’s commitment to showcasing New Mexico’s unique culture. The reimagined offerings include a mix of national brands and beloved local businesses, creating a sense of place and offering travelers more choices and convenience.
Capital Improvement Program: FY 2027 – FY 2031 Looking ahead, the Sunport has outlined over $400 million in planned investments through its five-year Capital Improvement Program. These investments are focused on maintaining safe and efficient operations while preparing the airport for future growth.
Planned improvements include:
· Rehabilitation of key airfield assets to ensure continued compliance and performance
· Modernization of terminal systems and facilities to improve comfort and energy efficiency
· Upgrades to security systems aligned with TSA standards
· Strategic landside infrastructure projects that reconfigure roadways, improve access, and expand parking capacity
· New facilities at DEII to support projected general aviation growth
Together, these projects will ensure that the Sunport continues to deliver reliable, high-quality service to passengers and business partners for years to come.
PART 1
INSTRUCTIONS TO OFFERORS
1.1 RFP Number and Title: RFP-2025-726-AVI-GB Project Manager and Construction Manager Services 1.2 Proposal Due Date: April 30, 2026, 4:00 PM (Local Time MDT) The time and date Proposals are due shall be strictly observed.
1.2.1 Non-Mandatory Pre-Proposal Conference: On Zoom at the link below:
https://cabq.zoom.us/j/83923863466
1.2.2 Questions: All questions shall be submitted in written format in the City’s eProcurement system before April 20, 2026, by 9:00 AM MDT. Questions must be formatted by first stating the Part # and the section to which your question refers.
1.3 Purchasing Division: This Request for Proposals (“RFP”) is issued on behalf of the City of Albuquerque by its Purchasing Division, which is the sole point of contact during the entire procurement process.
1.4 Authority: Chapter 5, Article 5 of the Revised Ordinances of the City of Albuquerque, 1994 (“Public Purchases Ordinance”). The City Council, pursuant to Article 1 of the Charter of the City of Albuquerque and Article X, Section 6 of the Constitution of New Mexico, has enacted this Public Purchases Ordinance as authorized by such provisions and for the purpose of providing maximum local self-government. To that end, it is intended that this Public Purchases Ordinance shall govern all purchasing transactions of the City and shall serve to exempt the City from all provisions of the New Mexico Procurement Code, as provided in Section 13-1-98K, NMSA 1978.
1.5 Acceptance of Proposal: Acceptance of Proposal is contingent upon the Offeror's certification and agreement by submittal of its Proposal, to comply and act in accordance with all provisions of the following:
1.5.1 City Public Purchases Ordinance
1.5.2 City Purchasing Rules and Regulations: These Rules and Regulations (“Regulations”) are written to clarify and implement the provisions of the Public Purchases Ordinance. These Regulations establish policies, procedures, and guidelines relating to the procurement, management, control, and disposal of goods, services, and construction, as applicable, under the authority of the Ordinance.
1.5.3 Civil Rights Compliance: Acceptance of Proposal is contingent upon the Offeror's certification and agreement by submittal of its Proposal, to comply and act in accordance with all provisions of the Albuquerque Human Rights Ordinance, the New Mexico Human Rights Act, Title VII of the U.S. Civil Rights Act of 1964, as amended, and all federal statutes and executive orders, New Mexico statutes and City of Albuquerque ordinances and resolutions relating to the enforcement of civil rights and affirmative action. Questions regarding civil rights or affirmative action compliance requirements should be directed to the City of Albuquerque Human Rights Office.
1.5.4 Americans with Disabilities Act Compliance: The Offeror certifies and agrees, by submittal of its Proposal, to comply and act in accordance with all applicable provisions of the Americans with Disabilities Act of 1990 and federal regulations promulgated thereunder.
1.5.5 Insurance and Bonding Compliance: Acceptance of Proposal is contingent upon the Offeror's ability to comply with the insurance requirements as stated herein. Please include a certificate or statement of compliance in your Proposal and bonds as required.
1.5.6 Ethics:
1.5.6.1 Fair Dealing. The Offeror warrants that its Proposal is submitted and entered into without collusion on the part of the Offeror with any person or firm, without fraud, and in good faith. Offeror also warrants that no gratuities, in the form of entertainment, gifts or otherwise, were, or will be offered or given by the Offeror, or any agent or representative of the Offeror to any officer or employee of the City with a view toward securing a recommendation of award or subsequent contract or for securing more favorable treatment with respect to making a recommendation of award.
1.5.6.2 Conflict of Interest. The Offeror warrants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required under the contract resulting from this RFP. The Offeror also warrants that, to the best of its knowledge, no officer, agent, or employee of the City who shall participate in any decision relating to this RFP and the resulting contract, currently has, or will have in the future, a personal or pecuniary interest in the Offeror’s business.
1.5.7 Participation/Offeror Preparation: The Offeror may not use the consultation or assistance of any person, firm, or company who has participated in whole or in part in the writing of these specifications or the Scope of Services, for the preparation of its Proposal or in the management of its business if awarded the contract resulting from this RFP.
1.5.8 Debarment or Ineligibility Compliance: By submitting its Proposal in response to this RFP, the Offeror certifies that (i) it has not been debarred or otherwise found ineligible to receive funds by any agency of the federal government, the State of New Mexico, any local public body of the State, or any state of the United States; and (ii) should any notice of debarment, suspension, ineligibility or exclusion be received by the Offeror, the Offeror will notify the City immediately.
Any Proposal received from an Offeror that is, at the time of submitting its Proposal or before receipt of award of a contract, debarred by or otherwise ineligible to receive funds from any agency of the federal government, the State of New Mexico, any local public body of the State, or any state of the United States, shall be rejected.
Upon receipt of notice of debarment of an Offeror awarded a contract as a result of this RFP (“Contractor”), or other ineligibility of the Contractor to receive funds from any agency of the federal government, the State of New Mexico, any local public body of the State, or any state of the United States, the City shall have the right to cancel the contract with the Contractor resulting from this RFP for cause in accordance with the terms of said contract.
1.5.9 Goods Produced Under Decent Working Conditions: It is the policy of the City not to purchase, lease, or rent goods for use or for resale at City-owned enterprises that were produced under sweatshop conditions. The Offeror certifies, by submittal of its Proposal in response to this solicitation, that the goods offered to the City were produced under decent working conditions. The City defines “under decent working conditions” as production in a factory in which child labor and forced labor are not employed; in which adequate wages and benefits are paid to workers; in which workers are not required to work more than 48 hours per week (or less if a shorter workweek applies); in which employees are free from physical, sexual or verbal harassment; and in which employees can speak freely about working conditions and can participate in and form unions. [Council Bill No. M-8, Enactment No. 9-1998]
1.5.10 Graffiti Free: When required, the Contractor will be required to furnish equipment, facilities, or other items required to complete these services that are graffiti-free. Failure of the Contractor to comply with this requirement may result in cancellation of the contract resulting from this RFP.
1.6 City Contact: The sole point of contact for this RFP is the City of Albuquerque Purchasing Division. Questions regarding this RFP should be directed to the following Purchasing representative unless otherwise specified in the solicitation. The City Contact will communicate with Offerors through its e-procurement system, Bonfire. Offerors will receive e-mail notifications from Bonfire to the e-mail address that the Offeror included in its Bonfire registration. Offerors are responsible for monitoring any communications sent through Bonfire and responding to any requests for information or directives within stated deadlines. Offerors who fail to abide by this instruction may be deemed nonresponsive.
· Gerrie Becker, Procurement Administrator, Department of Finance and Administrative Services, Purchasing Division
· Phone: (505) 228-3305 or E-Mail: gbecker@cabq.gov
· Post Office Box 1293, Albuquerque, New Mexico 87103 1.7 Contract Management: The contract resulting from this RFP will be managed by the Aviation Department, Fiscal Division.
1.8 Clarification: Any explanation desired by an Offeror regarding the meaning or interpretation of this RFP must be requested in writing not less than ten (10) working days before the deadline for the receipt of Proposals to allow sufficient time for a reply to reach all Offerors before the submission of their Proposals. No extension of time will be granted based on the submission of inquiries subsequent to the required date, nor will such inquiries be answered. All inquiries must be directed to the Purchasing Division as stated herein and must be submitted through the City’s eProcurement system, Bonfire. The City will not respond to questions that are submitted by any means other than electronically through the City’s eProcurement system. Oral explanations or instructions given before the award of the contract or at any time will not be binding. Purchasing shall prepare answers to questions in the form of Addenda to this RFP and shall post all such Addenda to the online eProcurement System.
1. 9 Submission of Proposals. The Offeror’s Proposal must be submitted electronically through the eProcurement system pursuant to the following requirements:
1.9.1 Electronic Copy. Submit your complete Proposal, including all forms, attachments, exhibits, Technical Proposal, Cost Proposal, etc., using the eProcurement System at https://cabq.bonfirehub.com/portal/?tab=openOpportunities. Please allow a minimum of two (2) business days to submit your proposal. If you do not have a username and password, please register, as this is the only method to submit electronically on the Bonfire portal. Please make sure to register on the system in order to receive notices and submit a response to a solicitation. For assistance, please contact support@gobonfire.com or 1-800-354-8010. Failure to submit your proposal electronically through the City’s eProcurement system shall result in your proposal being deemed nonresponsive.
1.9.2 Format. Each file uploaded to the eProcurement System shall be in a single PDF format unless otherwise indicated. The City’s preferred format is Optical Character Recognition (OCR) searchable PDF format. Do not encrypt files, and do not password-protect the documents submitted.
1.9.3 ALL PROPOSALS MUST BE RECEIVED BY THE CITY PURCHASING DIVISION AS SPECIFIED HEREIN. IF YOU FAIL TO COMPLY WITH THE SUBMISSION REQUIREMENTS IN THIS SECTION 1.9, THE CITY SHALL DEEM YOUR PROPOSAL NONRESPONSIVE.
1.9.4 No other methods of Proposal delivery. Neither telephone, facsimile, nor telegraphic Proposals shall be accepted.
1.9.5 Modification. Proposals may be modified or withdrawn only by written notice, provided such notice is received before the Proposal Due Date.
1.9.6 Receipt of Proposals. The only acceptable evidence to establish the time of receipt of Proposals by the City Purchasing Office is the time‑date stamp of the EProcurement System.
1.9.7 Acknowledgment of Addenda to the Request for Proposals. Receipt of Addenda to this RFP by an Offeror must be acknowledged in the City’s eProcurement system. Failure to acknowledge an Addendum may result in your response being deemed non-responsive.
1.10 Modifications to Scope of Services: In the event that sufficient funds do not become available to complete each task in the Scope of Services, the Scope of Services may be amended, based upon the cost breakdown required in the Cost Proposal.
1.11 Required Contract Terms:
1.11.1 City Terms and Conditions: The Required Contract Terms can be accessed at this link https://www.cabq.gov/dfa/purchasing-division/vendor-services/terms-and-conditions. Click on “Request for Proposals Required Contract Terms”. The Offeror certifies that it accepts the Required Contract Terms in 1.11.1, or has uploaded its exceptions to the Required Contract Terms in the City’s e-Procurement system, under “Requested Information” “Exceptions to Section 1.11.1 Required Contract Terms.” Any exceptions shall be identified by the RFP Section, Subsection, and must state the specific exception the Offeror has, as well as any alternative language. The Offeror certifies that it accepts the Required Contract Terms, or has noted exceptions in its response. The City’s receipt of exceptions in a response is not an acceptance of any requested changes to the Required Contract Terms. The Required Contact Terms may differ from the terms in the final contract awarded under this RFP.
1.11.2 Federal Terms and Conditions: The Federally-required contract provisions in compliance with 2 CFR PART 200, APPENDIX II can be accessed as Appendix B in Bonfire. The Offeror shall certify that it accepts and shall comply with the Federal Terms and Conditions in the City’s e-Procurement system, under “Requested Information”. Agreement to the Federal Terms and Conditions is mandatory. If you fail to agree to the Federal Terms and Conditions, the City will deem your proposal nonresponsive.
1.12 Contract Term: The contract resulting from this solicitation is anticipated to have a term of four (4) years with one additional one (1) year extension for a total of 5 years.
1.13 Evaluation Period: The City reserves the right to analyze, examine, and interpret any Proposal for a period of ninety (90) days after the hour and date specified for the receipt of Proposals. The City reserves the right to extend the evaluation period if it feels, in its sole discretion, that such an extension would be in the best interest of the City.
1.14 Evaluation Assistance: The City, in evaluating Proposals, reserves the right to use any assistance deemed advisable, including City contractors and consultants.
1.15 Rejection and Waiver: The City reserves the right to reject any or all Proposals and to waive informalities and minor irregularities in Proposals received.
1.16 Award of Contract:
1.16.1 When Award Occurs: Award of contract occurs when a Purchase Order is issued or other evidence of acceptance by the City is provided to the Offeror. A Recommendation of Award does not constitute an award of contract.
1.16.2 Award: If a contract is awarded, it shall be awarded to the responsive and responsible Offeror whose Proposal conforming to this RFP will be most advantageous to the City as outlined in the Evaluation Criteria.
1.17 Cancellation: This RFP may be canceled for any reason, and any Proposals may be rejected in whole or in part when it is in the best interests of the City.
1.18 Negotiations: Negotiations may be conducted with the Offeror(s) recommended for award of the contract.
1.19 City‑Furnished Property: No material, labor, or facilities will be furnished by the City unless otherwise provided for in this RFP.
1.20 Public Records:
1.20.1 The Purchasing Division’s procurement file and any documents relating to this RFP, including the Proposals submitted by Offerors, shall be open to public inspection in accordance with applicable law after the recommendation of award of a contract has been approved by the Mayor or the Mayor’s designee.
1.20.2 An Offeror who chooses to submit material they consider a “Trade Secret” must do so in a segregated file clearly designated as containing trade secrets both in the file name and within the contents of the file itself. These segregated files are to be used by the City for reference only. An Offeror’s failure to segregate such materials constitutes a failure to reasonably, under the circumstances, maintain the materials’ secrecy, and Offeror indemnifies and holds the City harmless for any liability resulting from the disclosure of any materials not segregated as described above.
1.20.3 If an Offeror submits with a proposal material required by law to be kept confidential, the Offeror must segregate such material in a separate file. Such a file should be clearly designated as “Legally Confidential” in both the file name and within the contents of the file. The contents of the file must include a description and citation to the legal basis for why the material must be kept confidential. Failure to segregate the material and describe the legal basis for why it is to be kept confidential may result in the information being disclosed. Designating the entire proposal confidential is not acceptable without providing the legal basis and may result in the information being disclosed. Offeror indemnifies and holds the City harmless for any liability resulting from such disclosure, resulting from information not segregated as described above.
1.20.4 Pricing, makes and models or catalog numbers of items offered, delivery terms, and terms of payment shall not be designated as trade secrets or required to be kept confidential by law.
1.20.5 The City will endeavor to restrict the release of material segregated and designated as “Trade Secret” or “Legally Confidential to only those individuals involved in the review and analysis of the Proposals, and to any other party as required by law or court order. Under the New Mexico Inspection of Public Records Act (Sections 14‑2‑1 et seq, NMSA 1978) (“Act”), the City may redact trade secrets and other material required to be kept confidential by law, but may not redact proprietary or confidential information. Any Proprietary or Confidential Data provided as part of a Proposal is subject to public inspection under the Act. Notwithstanding any provision of this RFP, the City shall not be responsible or liable to the Offeror for any disclosure of records required by the Act or an order of a court or other tribunal with jurisdiction over the City.
1.21 Preferences: THIS IS A FEDERALLY-FUNDED PROJECT. NO PREFERENCES SHALL BE APPLIED.
1.22 Request for Proposals Protest Process:
1.22.1 RFP Documents: If the protest concerns the specifications for the RFP or other matters pertaining to the solicitation documents, the protest must be filed with the Chief Procurement Officer no later than 5:00 p.m., ten (10) business days prior to the deadline for the receipt of Proposals.
1.22.2 Recommendation of Award: If the protest concerns the Recommendation of Award, the protest must be filed with the Chief Procurement Officer no later than 5:00 p.m. of the tenth (10th) business day after the receipt of notice of the Recommendation of Award.
1.22.3 Timely Protests: Protests must be received by the Chief Procurement Officer before the appropriate deadline as set out herein, or they will be rejected. The Chief Procurement Officer may waive the deadline for good cause, including a delay caused by the fault of the City. Late delivery by the U.S. Postal Service or other carrier shall not be considered good cause.
1.22.4 How to File: Any Offeror who is aggrieved in connection with a competitive solicitation or recommendation of award of a contract may protest to the City Chief Procurement Officer. The protest shall be addressed to the Chief Procurement Officer, must be submitted in written form, and must be legible. Protests may be electronically delivered via email or mailed. Facsimile, telephonic, telegraphic, or any other type of electronic protests will not be accepted.
1.22.5 Required Information: The protest shall contain at a minimum the following:
1.22.5.1 The name and address of the protesting party;
1.22.5.2 The number of the competitive solicitation;
1.22.5.3 A clear statement of the reason(s) for the protest detailing the provisions believed to have been violated;
1.22.5.4 Details concerning the facts that support the protest;
1.22.5.5 Attachments of any written evidence available to substantiate the claims of the protest; and
1.22.5.6 A statement specifying the ruling requested.
1.22.6 Delivery of Protests:
1.22.6.1 By Mail: Protests may be mailed in an envelope marked “PROTEST” with the solicitation number. Protests that are mailed should be addressed as follows:
Chief Procurement Officer City of Albuquerque, Purchasing Division P.O. Box 1293
Albuquerque, NM 87103
PROTEST, RFP Number
1.22.6.2 By Electronic Mail: Protests may be emailed to:
Kathleen Oney, Chief Procurement Officer koney@cabq.gov The message should clearly indicate “PROTEST” and the RFP number in the subject line.
1.22.7 Protest Response by Chief Procurement Officer: The Chief Procurement Officer will, after evaluation of a protest, issue a response. Only the issues outlined in the written protest will be considered by the Chief Procurement Officer.
1.22.8 Protest Hearing: If a hearing is requested, the request must be included in the protest and received within the time limit. Only the issues outlined in the protest will be considered by the Chief Procurement Officer, or may be raised at a protest hearing. The granting of a hearing shall be at the discretion of the Chief Procurement Officer following review of the request.
1.23 Insurance
1.23.1 General Conditions: The City will require the successful Offeror, referred to as the Contractor, to procure and maintain at its expense during the term of the contract resulting from the RFP, insurance in the kinds and amounts hereinafter provided with insurance companies authorized to do business in the State of New Mexico, covering all operations of the Contractor under the contract. Upon execution of the contract and on the renewal of all coverages, the Contractor shall furnish to the City a certificate or certificates in form satisfactory to the City, as well as the rider or endorsement showing that it has complied with these insurance requirements. All certificates of insurance shall provide a thirty (30) day written notice be given to the Risk Manager, Department of Finance and Administrative Services, City of Albuquerque, P.O. Box 470, Albuquerque, New Mexico, 87103, before a policy is canceled, materially changed, or not renewed. Various types of required insurance may be written in one or more policies. With respect to all coverages required other than professional liability or workers’ compensation, the City shall be named an additional insured. All coverages afforded shall be primary with respect to operations provided.
1.23.2 Approval of Insurance: Even though the Contractor may have been given notice to proceed, it shall not begin any work under the contract resulting from this RFP until the required insurance has been obtained and the proper certificates (or policies) are filed with the City. Neither approval nor failure to disapprove certificates, policies, or the insurance by the City shall relieve the Contractor of full responsibility to maintain the required insurance in full force and effect. If part of the contract is sublet, the Contractor shall include any or all subcontractors in its insurance policies or require the subcontractor to secure insurance to protect itself against all hazards enumerated herein, which are not covered by the Contractor's insurance policies.
1.23.3 Coverage Required: The kinds and amounts of insurance required are as follows:
1.23.3.1 Commercial General Liability Insurance. A commercial general liability insurance policy with combined limits of liability for bodily injury or property damage as follows:
$2,000,000
Per Occurrence
$2,000,000
Policy Aggregate
$1,000,000
Products Liability/Completed Operations
$1,000,000
Personal and Advertising Injury
$ 5,000
Medical Payments
The said policy of insurance must include coverage for all operations performed for the City by the Contractor, and contractual liability coverage shall specifically insure the hold harmless provisions of the contract resulting from this RFP.
1.23.3.2 Automobile Liability Insurance. A comprehensive automobile liability insurance policy with liability limits in amounts not less than $1,000,000 combined single limit of liability for bodily injury, including death, and property damage in any one occurrence. The policy must include coverage for the use of all owned, non-owned, and hired automobiles, vehicles, and other equipment both on and off work.
1.23.3.3 Workers' Compensation Insurance. Workers' compensation insurance policy for the Contractor's employees, in accordance with the provisions of the Workers' Compensation Act of the State of New Mexico (the "Act"). If the Contractor employs fewer than three employees and has determined that it is not subject to the Act, it will certify, in a signed statement, that it is not subject to the Act. The Contractor will notify the City and comply with the Act should it employ three or more persons during the term of the contract resulting from this RFP.
1.23.4 Increased Limits: During the life of the contract, the City may require the Contractor to increase the maximum limits of any insurance required herein. If the Contractor is so required to increase the limits of such insurance, an appropriate adjustment in the contract amount will be made.
1.23.5 Additional Insurance: The City may, as a condition of award of a contract, require a successful Offeror to carry additional types of insurance. The type and limit of additional insurance are dependent upon the type of services provided via the contract by the successful Offeror.
1.24 Pay Equity Documentation. All Proposals shall include a Pay Equity Reporting Form that can be accessed at https://www.cabq.gov/gender-pay-equity-initiative. Offerors who believe they are exempt because they are an out-of-state contractor (meaning that you have no facilities and no employees working in New Mexico) are not required to report data, but must still submit a Pay Equity Reporting Form with the box verifying the exempt status checked. Any Proposal that does not include a Pay Equity Reporting Form shall be deemed nonresponsive, as stated in the Public Purchases Ordinance, 5-5-31. A Pay Equity Reporting Form will be automatically issued within two (2) business days of completing your information at the link above. To ensure you have your form before the deadline for solicitation closes, please access the link at least three (3) business days prior to the solicitation deadline. Please contact the “City Contact” identified above in Section 1.6 with any questions about the Pay Equity Reporting Form.
PART 2
PROPOSAL FORMAT
A “Proposal” consists of two distinct sections—a “Technical Proposal” and a “Cost Proposal”—that are submitted separately in Bonfire. Failure to submit the Technical Proposal and Cost proposal separately shall result in the City deeming your submission non-responsive.
2.1 Technical Proposal Format, Section One: The firm’s proposal should describe the methodology to be used to accomplish the project objectives. The proposal should also describe the work that will be necessary to satisfactorily complete the described requirements.
Please note: this RFP cannot identify each specific, individual task required to implement all projects successfully and completely. The City of Albuquerque relies on the professionalism and competence of the selected firm to be knowledgeable of the general areas identified in the scope of work and to include in its proposal all required tasks and subtasks, personnel commitments, man-hours, direct and indirect costs, etc.
Proposal Format:
Firms are requested to format their proposals so that responses correspond directly to, and are identified with, the specific evaluation criteria stated in Section 6 below. The proposals must be in an 8 ½ X 11 format, minimum 10pt font size, minimum ¾” margins, and may be no more than a total of 50 electronic pages, including cover letters, organization charts, staff resumes, and appendices. NOTE: Front and Back Covers, Dividers, Attachment’s “A”, “B”, and “C”, and Addenda acknowledgments, and the Cost/Rates Proposal (Attachment D*) in a separate electronic file. do NOT count toward the limit (everything else does).
2.1.1 Proposal Content: Offerors must provide the information identified below. All such information shall be presented in a format that directly corresponds to the numbering scheme identified here.
Each Proposal Package must include two separate electronic files as follows:
Electronic File #1, clearly marked “Technical Proposal”, shall include the following items:
Technical Proposal: The Technical Proposal (Electronic File #1) shall be clearly marked as per the instructions above and shall include a statement of agreement to the Required Contract Terms; state exceptions as directed in Section 1.11. Show receipt of Addenda if applicable. Provide a statement or show the ability to carry the insurance specified and the Sections A, B, C, and D below:
Section A1: Firm (including any subcontractors) Qualifications and Experience, including References
A.1.1 Company Overview. Please describe the services that your company has provided in other cities, how long you have been in operation, and any unique features of the services you offer. Please also include how you meet the minimum requirements that will be scored on a pass-fail basis.
A.1.2 Indicate the name of any subcontractor firms or contractors that will be utilized to make up your team. Describe each subcontractor’s qualifications, background, and specific expertise that they bring to the Project.
A.1.3 Identifies whether any staff or sub-contractor firms or contractors hold Program Management Professional (PGMP) or Project Management Professional (PMP) Certifications (optional but highly desirable).
A.1.4 References. Include a minimum of three references on the form provided of recent customers for whom your firm has provided similar services as contemplated herein, and include it with the forms section of your proposal. In addition to the form, in this section of your proposal, please provide any additional information that would explain in more detail the work undertaken with the references provided and any other material information you would like the City to know about your work for that reference that is relevant to the work described in this RFP.
Section A2: Staff, Teams (including any subcontractors) qualifications and experience
A.2.1 Staffing. The proposers shall describe how they plan to staff the project, including any local hires that they would need to make or local partnerships that they would need to establish to ensure successful program implementation.
A.2.2 List the name and qualifications of the key staff/team members that will be assigned to the Project. Provide detailed qualifications of the Project Manager who will be assigned to the Project.
A.2.3. Partners. The respondent should list any organizations they plan to partner with to implement the scope of work.
Section A3: Demonstrated understanding of the overall project and the requested scope of work
A.3.1 Proposed Approach for Implementing the Scope of Work. Please describe how you would approach the Scope of Work for the City of Albuquerque. This would include how you would address or enhance the tasks in the Scope of Work and how you would partner with the City to implement the service.
A.3.2 Anything else the City should consider as part of this process. Proposers should provide any insights or advice they feel may assist the City in implementing the Scope of Work.
A.3.3 Identify any “key” or “critical” issues that you believe may be encountered based on the firm’s prior experiences, and provide steps to be taken to ensure the issues identified do not affect the successful delivery of the service.
2.2 Cost Proposal Format, Section Two: Offerors must include a cost proposal as Attachment “E” in this RFP. The cost proposal file shall be named “RFP-2025-726-AVI-GB Offeror Name Cost Proposal”. The Cost Proposal shall be based on an hourly rate that is inclusive of all costs to perform the scope of work. Do NOT include Sections A-D in the Cost Proposal, Electronic File #2. Cost proposals will be evaluated by utilizing the ratio of the lowest cost provider times the number of points available for this category.
PART 3
SCOPE OF SERVICES
3.1 Overview:
The Albuquerque International Airport (Sunport) is seeking experienced Project Management and Construction Management (PMCM) services firms to support Sunport capital improvement projects, construction activities, and overall program management. The selected firms will serve as a resource to augment internal Sunport staff when capacity limits or staffing challenges arise, ensuring smooth and seamless transitions. Additionally, the firms will provide comprehensive oversight, coordination, and management to ensure successful project delivery aligned with the Sunport’s strategic objectives.
The firms must demonstrate expertise in various project delivery methods, including Design-Bid-Build, Construction Manager at Risk (CMAR), Design-Build, and Public-Private Partnerships (P3). A thorough understanding of the distinct roles and interactions between contractor, designer, and owner within each delivery method is required.
3.2 Detailed Scope of Work
The PMCM firms shall be responsible for the following functions:
1. Program and Project Management Support
· Act as the point of coordination for capital projects, ensuring alignment with the Sunport's strategic objectives and Capital Improvement Plan (CIP), working closely with consultants and other internal stakeholders.
· Provide specialized knowledge in aviation infrastructure (airside and landside) projects such as runways, taxiways, terminal expansions, inline baggage systems, safety and security systems, and fire suppression.
· Develop and maintain a detailed program management plan, including schedules, budgeting, and resource allocation.
· Facilitate regular project coordination meetings with stakeholders, consultants, and contractors.
· Provide regular status updates and detailed reporting to Sunport management.
2. Construction Management and Quality Assurance
· Conduct, develop, and implement on-site inspections and monitoring to ensure construction compliance with project specifications and regulatory standards.
· Manage constructability reviews, ensuring projects are feasible and optimized for successful execution.
· Oversee quality assurance, field measurements, and verification activities to maintain high construction standards.
· Clarify requests, submittals, and change orders effectively and efficiently.
· Provide oversight and monitoring with a keen eye for potential red flags of RFI, ASI, submittals, and change orders; enhancing internal City inspections.
3. Technology Projects (Information Technology (IT), Operational Technology (OT), and Special Systems)
· Work with Airport IT, Operations, Security, Airlines, TSA, and CBP define requirements for technology-dependent projects.
· Develop or apply airport technical standards for networks, servers, storage, wireless, cybersecurity, and critical systems integration.
· Coordinate designs and installations for systems such as network and fiber backbone, Wi-Fi, access control, video management, public address, flight and baggage information displays, AODB and resource systems, building and baggage controls, and life-safety interfaces.
· Produce interface control documents and data mapping for integrations with existing platforms.
· Plan and manage procurement activities, and oversee subsequent factory testing, configuration, installation, and cutover, ensuring airport operations remain uninterrupted.
· Conduct performance and acceptance testing, including soak tests and failover tests, and document results.
· Turn over system documentation, license keys, configuration backups, network diagrams, and administrator credentials to Airport IT.
· Establish support and warranty paths, and define monitoring and alerting handoffs.
· Provide IT security reviews with the owner’s cybersecurity team and close findings before go-live.
· Train Airport IT and Operations staff and provide post-cutover hyper care.
4. Risk Management and Issue Resolution
· Develop and maintain comprehensive risk and opportunity matrices for each project.
· Identify potential risks early, recommend mitigation strategies, and actively manage issue resolution.
· Provide support for dispute resolution and claims avoidance, ensuring minimal disruptions to project timelines and budgets.
5. Planning and Integration
· Facilitate integration between planning, design, construction, and operations teams to ensure cohesive project execution.
· Coordinate closely with other ongoing initiatives, such as concessions redevelopment, terminal enhancements, landside projects, and specialized infrastructure upgrades, including but not limited to projects such as runways, taxiways, terminal expansions, inline baggage systems, safety and security systems, and fire suppression.
6. Asset Management Support
· Manage and coordinate with the airport staff and/or on-site contractor
· Ensure asset ID standards, locations, and system associations align with airport Geographic Information System (GIS) and Building Information Modeling (BIM) records.
· Oversee validation of asset data from submittals, O&M manuals, and as builts for field accuracy.
· Review contractor procedures for Computer Maintenance Management System (CMMS) data loading, preventive maintenance plan setup, and work order generation.
· Monitor equipment tagging with barcodes or QR codes and confirm completeness of tag mapping.
· Review critical spares lists and recommended stock levels.
· Verify completeness of asset handover materials, including training, spares, warranties, and O&M documentation.
· Coordinate integration of lifecycle renewal and replacement forecast into the capital plan.
· Support airport staff training on updated asset records, PM plans, and warranty procedures.
· Confirm asset register and PM library updates following punch list closure, seasonal testing, or design changes.
7. Compliance and Regulatory Oversight
· Ensure familiarity with FAA-specific procedures, filings (e.g., Form 7460), and regulatory processes impacting airspace and operations.
· Demonstrate expertise in airport security protocols, including badging processes and restricted area compliance.
· Ensure adherence to all applicable environmental regulations, including compliance with National Environmental Policy Act (NEPA) processes.
· Conduct oversight to maintain compliance with Disadvantaged Business Enterprise (DBE), Small Business Enterprise (SBE), and labor compliance requirements.
· Oversee safety compliance and contractor safety protocols on-site.
8. External Funding Support
· Assist the airport in identifying and securing external funding opportunities, such as Federal Aviation Administration (FAA) grants.
· Support the preparation and submission of grant applications and associated documentation required by funding agencies.
· Ensure compliance with funding agency requirements throughout the project lifecycle.
9. Training and Mentorship
· Provide guidance and mentorship to Sunport staff, facilitating knowledge transfer in specialized areas of Sunport project and construction management.
· Focus training on aviation-related projects, emphasizing external funding processes, FAA compliance, regulatory requirements, and specialized project delivery methods.
· Foster a collaborative environment that promotes professional growth among Sunport project managers and related personnel.
10. Stakeholder Engagement and Communication
· Coordinate and participate in presentations, meetings, and briefings with stakeholders, regulatory agencies, and Sunport management.
· Prepare and disseminate meeting agendas and detailed minutes, ensuring transparent and efficient communication across all project levels.
11. Project Closeout and Commissioning
· Develop the commissioning plan early and align it with design milestones and construction sequencing.
· Review design for testability and access, and incorporate commissioning requirements in contractor submittals and work plans.
· Prepare and execute pre-functional checklists, functional performance tests, integrated systems tests, and seasonal tests for mechanical, electrical, plumbing, fire protection, building automation, baggage systems, security, communications, and other specialty systems.
· Witness factory and site acceptance tests and verify testing, adjusting, and balancing (TAB) results and setpoints.
· Track deficiencies and corrective actions through closure and retest.
· Coordinate training agendas and attendance for Maintenance and Operations staff, and confirm training materials are turned over.
· Manage burn-in periods and reliability runs for critical systems, then recommend readiness for operational use.
· Deliver the final commissioning report with test forms, issues logs, and as-found and as-left settings.
· Support Operational Readiness and Airport Transfer (ORAT) activities, including trials, drills, and cutover playbooks where requested.
· Confirm all O&M manuals, warranties, and record documents are complete before final closeout.
3.3 Minimum Qualifications:
To be considered for the Project Management and Construction Management (PMCM) engagement at the Albuquerque International Sunport, proposers must demonstrate, at the time of proposal submission, that they meet the following minimum qualifications. These qualifications are designed to ensure that the selected firm(s) possess the appropriate aviation-specific experience, technical expertise, and operational readiness to augment the Sunport's internal staff and effectively manage and support complex capital projects in an active airport environment.
The Proposer must have the following experience:
1. Proposer must have completed PMCM assignments at a minimum of three (3) or more commercial service airports in the United States within the past five (5) years.
2. At least one project must have been conducted at a medium or large hub airport (as defined by the FAA)
3.4 Management Qualifications:
A. Knowledge:
1. The Proposers submitting a Statement of Qualifications & Experience (SOQ&E) should possess demonstrable skills, detailed knowledge, and applied experience in each of the Areas a-k as detailed in the Scope of Work, including but not limited to:
a. Program and Project Management Support
b. Construction Management and Quality Assurance
c. Technology Projects (IT, OT, and Special Systems)
d. Risk Management and Issue Resolution
e. Planning and Integration
f. Asset Management Support
g. Compliance and Regulatory Oversight
h. External Funding Support
i. Training and Mentorship
j. Stakeholder Engagement and Communication
k. Project Closeout and Commissioning, including Project Start-Up
2. For each area, the proposer must provide at least one example project where the firm or team provided these services.
a. Responses must include a brief description of the proposer’s role, the outcomes, and the timeframe.
B. Key Personnel Requirements:
1. Each key staff member assembled on the proposed team shall have at least 10 years of demonstrated experience in any/all of the areas indicated: scheduling, design of architectural or civil projects, project controls, and/or contract management.
2. The Proposers shall identify and provide a detailed resume for the proposed project manager for this assignment, including full work history, special qualifications, and demonstrated experience. Experience working at a commercial airport in an operational public environment on multi-phase construction projects is required.
3. The Proposers shall identify all key personnel assigned to work on the assignment throughout the life of the program. Recommended key staff include the Project Manager, Scheduler, Controls Manager, Change Control Manager, and Design Manager. The Proposers will be required to obtain Sunport approval for key personnel changes from the executive team throughout the life of the contract, and newly assigned key personnel will be required to meet the above requirements
PART 4
EVALUATION OF PROPOSALS
4…