(1) Autonomous Floor Scrubber (RFQ 2025_0005).pdf

PDF 243 KB Posted

Attached to
RFQ #2025-0005 (1) Autonomous Floor Scrubber
Solicitation number
PE-33699-NONST-2025-000000047
Issued by
Chatham County, Georgia

About this file

This is a Request for Quotation (RFQ 2025-0003) issued by the Savannah Airport Commission (SAC) for one (1) Autonomous Floor Scrubber (Cenobots Scrubber Dryer, Model L50) including the charging station CWS-01. The RFQ was issued on December 20, 2024, with responses due by January 20, 2025, at 5:00 PM EST. The specifications call for a new unit with all standard equipment meeting state and federal safety regulations. The equipment must include specific dimensions, cleaning capabilities, movement specifications, power requirements including a Lithium Iron Phosphate battery, and AI components featuring Nvidia Xavier AI edge computing chips. Onsite operator and maintenance training may be requested upon delivery.

All responses must be submitted through https://savannahairport.bonfirehub.com/ and will not be accepted via email or mail. Payment terms are net 30 days upon receipt of goods and validation of services. Prices must remain firm for 90 days after the closing date. The delivery point is 640 Gulfstream Road, Savannah, GA 31408. The Commission will award to the most responsible and responsive bidder at the lowest cost. The successful bidder must have parts and service support capabilities available in the Savannah, Georgia area. No dealer advertising is permitted on any unit.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

RFQ 2025-0003

ONE (1) AUTONOMOUS FLOOR SCRUBBER

Issuance Date: December 20, 2024

Due Date: January 20, 2025, by Close of Business (COB)

(5:00 PM EST)

Bidder must fill in the information below:

Company Name:

Address:

City/State/Zip:

Contact Name:

Title:

Contact Phone & Cell:

Fax:

Email: (Point of Contact):

All responses to this RFQ must be submitted through https://savannahairport.bonfirehub.com/, and will not be accepted via email or mail. In order to provide a response to this RFQ, all respondents must first register their company through the link provided above. Registration is easy and free. Please be sure to select the NAICS codes associated with your business and/or organization. For questions regarding vendor registration or instructions on bid response submittal, please contact Melanie Freeman at mfreeman@flysav.com.

It is the sole responsibility of the Vendor to make sure the submitted RFQ is received on time and all required documents are received by the Commission. Responses via mail or email are not acceptable.

Christy Dixon Purchasing Manager Savannah Airport Commission 400 Airways Avenue Savannah, GA. 31408 cdixon@flysav.com https://savannahairport.bonfirehub.com/ mailto:mfreeman@flysav.com mailto:cdixon@flysav.com

1.0 INTRODUCTION

Purpose: The Savannah Airport Commission (SAC) is seeking qualified vendors to provide quotes for the procurement of one (1) Autonomous Floor Scrubber (Cenobots Scrubber Dryer, Model L50). The floor scrubber and costs must include the charging station, CWS-01.

The specifications for the charging station is also noted below. The unit furnished will be new without repair, including all the interior and exterior trim and appointments listed by the manufacturer as standard equipment and must meet all equipment requirements by State and Federal safety and emission regulations. This unit must be of the latest design and model and shall have all the standard equipment normally furnished with such models.

1.1 Quality Assurance Products shall be Designed, Tested, Rated, and Certified in accordance with, and installed in compliance with all local, City, State and Federal Standards and Codes. All material and equipment shall meet or exceed existing material specifications.

Material brand identified is used merely as a specification and not as a statement of a preference for the specific product identified.

1.2 The bidder acknowledges and accepts that any cost incurred from the bidder’s participation in this RFQ shall be at the sole risk and responsibility of the bidder. The Commission will award the most responsible and responsive bidder at lowest cost.

1.3 A copy of the bidder’s specifications for this unit will be submitted with the bid. The successful bidder will have parts and service support capabilities available in the Savannah, Georgia area.

The bidder’s response will meet or exceed all requirements of the listed specifications.

1.4 Pre‐Bid Conference: N/A

1.5 Receipt for RFQ and Addenda: All addenda associated with this RFQ will be provided through https://savannahairport.bonfirehub.com/ by the date noted on page 6 of this document. All questions must also be submitted through https://savannahairport.bonfirehub.com/, and will not be accepted via email or mail. As required, it is the respondent’s responsibility to ensure that all addenda are acknowledged through submission of the Acknowledgement of Addendum Form.

1.6 Except as otherwise provided herein, all responses which are incomplete or which are not in conformance with the law, may be rejected as non‐responsive. Timely responses received will be subject to applicable laws and regulations governing public disclosure. Submission to this request indicates acceptance by the bidder of the conditions contained in this RFQ, and the intent to enter into an Agreement with Commission.

1.7 RFQ Submittal: All responses to this RFQ must be submitted through https://savannahairport.bonfirehub.com/, and will not be accepted via email or mail. For questions regarding vendor registration or instructions on bid response submittal, please contact Melanie Freeman at mfreeman@flysav.com.

1.8 RFQ Opening: The opening of this RFQ will take place at the Savannah Airport Commission.

RFQ information will not be available until after an award has been made. Once an award is made, the awarded bidder(s) will be notified via email.

1.9 Contract Term: N/A

https://savannahairport.bonfirehub.com/ mailto:mfreeman@flysav.com

1.10 Force Majeure: If by reason of Force Majeure, either party hereto will be rendered unable wholly or in part to carry out its obligations under this Agreement then such party will give notice and full particulars of Force Majeure in writing to the other party within 30-calendar days after occurrence of the event or cause relied upon, and the obligation of the party giving such notice, so far as it is affected by such Force Majeure, will be suspended during the continuance of the inability then claimed, except as hereinafter provided, but for no longer period, and such party will endeavor to remove or overcome such inability with all reasonable dispatch.

1.11 Certification: N/A

1.12 Prices to be Firm: Submission of prices in this RFQ will remain firm for 90 days after the closing date of this RFQ.

1.13 Cancellation: In the event of default of the contractor, the contract (PO) may be cancelled by SAC within (30) days written notice, unless otherwise specified. The contractor will be given an opportunity to cure the default within the 30‐day written notice period.

1.14 Payment Terms: Payment terms are net 30 days upon receipt of goods and validation of services by the Commission. All invoices must reference the purchase order number and will be addressed to SAC’s Accounting Department @ accountspayable@flysav.com.

The Commission will not provide prepayment for any order.

1.15 Time of Delivery: The bidder must specify the approximate timeframe of delivery of unit on the Pricing Sheet.

1.16 Warranty: The bidder must specify the warranty associated with the unit, as designated on the Pricing Sheet.

1.17 Delivery Point: The specified shipping address, if application for the unit associated with this RFQ is 640 Gulfstream Road, Savannah, GA. 31408.

1.18 Contract PO Document: The Commission will consider its executed Purchase Order (PO) or executed contract between the bidder and SAC as the primary and binding contract document between SAC and the awarded bidder.

mailto:accountspayable@flysav.com

2.0 REQUIREMENTS FOR SUBMISSION

2.1 The Commission will award the most responsible and responsive bidder at the lowest cost.

2.2 Specifications: CenoBots Scrubber Dryer, Model L50

The Autonomous Floor Scrubber specified is manufactured by Cenozoic Robotics. The requested scrubber is Cenobots Scrubber Dryer, Model L50 and must include the charging station, CWS-01. The specifications for the charging station are also noted below.

Dimensions

Length: 1030 mm| 40.6 in.

Width: 580 mm | 22.8 in.

Height: 1045 mm | 41.1 in.

Weight: 220 KG | 485 lbs.

Cleaning Width 510 mm | 20 in.

Squeegee Width: 740 mm | 29 in.

Cleaning Max. Theoretical Productivity: 2570 m2/hr. | 27663 ft2/hr.

Brush Pressure: 25KG | 55.1 lbs.

Disk Brush Speed: 220 RPM Clean Water Tank Capacity: 55 L | 14.5 gal.

Waste Water Tank Capacity: 55 L | 14.5 gal.

Movement Max. Speed: 1.4 m/s | 3.13 mph Min. Distance from Wall: <50 mm | 2 in.

Min. Passable Width: 900mm | 35.4 in.

Gradeability: 6”

Power Battery Type: Lithium Iron Phosphate Battery Capacity: 120 Ah Rated Voltage: 24 VDC Charging Time: 4 Hours Max. Runtime: 6 hours

Sensing 3D LiDAR, 2D LiDAR, 3D Depth Camera Ultrasonic Sensor, Bumper Sensor

Sound Pressure Level: At least as 67 dB(A)

Key Components for AI Process Chip: Nvidia Xavier AI edge computing chips with up to 32 TOPS AI performance Mapping Sensor: 3D LiDAR with 150m detection range

Charging Station (Charging Workstation CWS-01) Weight: 99 lbs.

Input Voltage: 100-240 V AC Max. Power: 1000W-1.34 HP

Output Voltage: 24 VDC

2.3 Advertising: No dealer advertising is to be on any unit.

2.4 Parts Manuals: All units delivered to the Savannah Airport Commission must be accompanied by two (2) copies of complete parts, shop repair, and operator's manuals through actual paper copies or digitally. The parts manuals must show all component parts including, but not limited to, component assemblies and their substitute components identified by manufacturers part number. Any component or sub-assembly not manufactured by the O.E.M. must be identified including the name of the manufacturer of said component and said manufacturer's part numbers and nomenclature. All parts information must be specific to the unit delivered to the Savannah Airport Commission. All shop repair manuals will include, but not be limited to the following. Complete disassembly instructions, adjustments, and replacement procedures, wiring diagrams, hydraulic schematics (where applicable), hose routing, location and function of sensors, time standards where available, and trouble-shooting guide.

2.5 Preventive Maintenance: All units must be accompanied by a factory recommended preventative maintenance schedule including procedures, time, hours, mileage intervals, pre-placement part numbers, and fluid specifications.

2.6 Keys: N/A

2.7 Onsite Training: Onsite operator and maintenance training upon delivery of unit may be requested by SAC.

GENERAL REQUIREMENTS:

3.0 Terms and Conditions: By signing this document, the bidder agrees to abide by all the terms and conditions contained in this RFQ. Any exceptions to the requirements of this RFQ, or the SAC terms and conditions of this RFQ will be noted in writing, with detailed explanation, and included with the RFQ submittal by using the attached exceptions sheet. The contractor acknowledges that taking exceptions to this RFQ may subject the response submittal to be rejected.

3.1 Cone of Silence: The bidder will not attempt to discuss any aspects of the request with any other party except for the POC noted in this RFQ. No verbal agreements will be considered during the bid/quote process. The Commission reserves the right to reject the bid/quote of any bidder violating this provision.

3.2 Supplemental Agreements: The awarded contractor may enter into a separate supplemental agreement to further define the level of service requirements over and above the minimum defined in this contract (i.e., invoice requirements, ordering requirements, specialized delivery, etc.). Any supplemental agreement developed as a result of this contract is exclusively between the participating entity and the contracted bidder.

3.3 Completeness: All requested information and required forms must be completed, signed, and submitted with this document to constitute a proper bid/quote. The entire package must be returned, complete with all required forms, signature, and information. Failure to complete or comply with any part of the specifications or requirements in this RFQ may constitute a basis of rejection. It is within the rights of the Commission to reject any RFQ submittal in this solicitation document.

3.4 Broker’s Clause: To be eligible for award, Bidders shall be a bona fide wholesale stocking distributor, dealer or manufacturer of the products listed in this bid, with the facilities, personnel and equipment to fulfil all requirements of this solicitation.

3.5 Required Forms:

(a) The full bid response will be completed in its entirety.

(b) Local, Small Business Form: If your company does not hold the LSBE designation, please check the box noted as non-applicable. If your company is an LSBE, please complete the form, while also including your LSBE Certificate along with the form in this section.

(c) Vendor Certification Form: Please complete the form in its entirety.

(d) Unit Pricing Sheet: Please complete the unit pricing sheet in its entirety. Please include the warranty and Estimated Time of Delivery after award.

(e) Exceptions Sheet: If there are any differences or additional requirements to the item or requests of this RFQ, please be sure to list them on the Exceptions Form. If not, please note it as non-applicable (N/A).

(f) Acknowledgement of Addenda Form: If applicable, please sign and complete the form in its entirety. If there is not an associated addendum with this RFQ, the Addendum Form is not required to be submitted. The form must be submitted if there is an associated addendum. Please do not submit your bid until after SAC has issued the final addendum, per the date noted in 3.6 of this RFQ. Early submissions before final the final addendum is published can result in absence of Acknowledgement of Addendum, resulting in a non-responsive bid.

3.6 RFQ Procurement Schedule

3.7 Errors: Bidders or their authorized representatives are expected to fully inform themselves as to the conditions, requirements, and specifications before submitting bids/quotes.

Bidders are cautioned not to obliterate, erase, or strike‐over any printed material as set forth in this RFQ. In quoting prices, wherever the bidder has made an error and has corrected, all such corrections should be initialed by the person signing this RFQ. If errors occur in the extension of prices in the RFQ, the unit prices will govern. Failure to comply with this provision may result in rejection of bidder’s submittal. All documents submitted

RFQ Opens December 20, 2024 Questions From Bidders Are Due No Later Than (NLT) 5pm on December 31, 2024 SAC Issues Last Addendum to Answered Questions (if applicable) January 3, 2025 Bidder’s Final Responses Are Due to SAC COB (5:00PM EST), January 20, 2025 SAC Evaluates Responses January 21, 2025 – March 4, 2025 SAC Makes Contact With the "Successful Bidder" NLT March 5, 2025 SAC Makes Contact With the "Unsuccessful Bidder(s)" NLT March 5, 2025 must be legible.

3.8 Changes/Modifications: No changes or modifications will be made to any Savannah Airport Commission forms, or your request may be considered null or void. If changes or modifications are noted by SAC, the bid submitted by the bidder may be rejected.

3.9 Compliance with Laws: The bidder will obtain and maintain all licenses, permits, liability insurance, workman’s compensation insurance, and maintain compliance with any other federal, state, or local requirements during the term of the contract with SAC.

3.10 Specifications: Whenever mention is made of any article, material, or workmanship to be in accordance with any laws, ordinances, codes, regulations, etc., these requirements will be construed to be the minimum requirements of these specifications.

3.11 Multiple Request: Depending upon product/service being requested, the bidder may be required to submit more than one RFQ response. Any alternate responses to the RFQ must be brought to the Savannah Airport Commission’s attention and noted on submitted documentation as a separate and alternative request.

3.12 Invoicing: The Commission normally will pay properly submitted bidder invoices within thirty

(30) days of receipt providing goods and/or services have been delivered, installed (if required), and accepted as specified. Invoices presented for payment must be submitted in accordance with instructions contained on the purchase order (PO) with reference to the PO number and submitted to the correct address for processing.

3.13 Description of Materials: N/A

3.14 Brand Name: If and wherever brand names, make, manufacturers, trade names, bidder catalogs, or model numbers are stated, they are for the sole purpose of establishing a grade or quality of material.

3.15 “OR EQUAL” Interpretation: It is the bidder’s responsibility to prove to SAC that each item offered by the bidder is equal to the grade or quality of material specified. The bidder will clearly indicate the product, including brand, catalog, model number, etc. being offered and supply sufficient data in detail to enable an intelligent comparison to be made with the brand or manufacturer specified. Failure to submit the required information may be sufficient grounds for rejection of bid/quote. The Commission will be the sole judge concerning the merits of the RFQ response submitted.

3.16 Quality: All items used for the manufacture or construction of any supplies, materials, equipment, or service will be new unless otherwise specified. All materials will be of the best quality, and to the highest grade of workmanship that meets the specs in this document. Materials or service must comply with all applicable Federal, State, or OSHA requirements.

3.17 Acceptance of Material: N/A

3.18 Default: Any contract made between SAC and the bidder may be cancelled by SAC in whole or in part via written notice, upon the bidder’s non‐performance or violation of contract terms. An award may be made to the lowest quoting bidder for material or services specified, with consideration of lead time and purchases may be made on the open market. The defaulting bidder will be liable for costs to the Commission in excess of the defaulted contract prices. The bidder will continue the performance of this contract to the extent any part is not terminated under the provisions of this clause.

3.19 Guarantee: The bidder will unconditionally guarantee items and workmanship on all uniforms/items for the bidder’s specified guaranteed period, unless otherwise stated. Within the guarantee period, if any defects occur which are due to faulty items and/or services must be satisfied to the complete satisfaction of the Commission.

3.20 Add/Delete Items: During the term of the contract, items and or services may be added and/or deleted to the contract upon agreement between the successful bidder and SAC.

3.21 Additional Information: Prior to the final selection, bidders may be required to submit additional information which may be necessary to further evaluate the bidder’s response and/or qualifications. If such information is required, the bidder will be notified and will be permitted approximately seven (7) days to submit the information requested.

3.22 Reimbursement: The Commission will not reimburse the bidder for any costs associated with the preparation and submittal of any RFQ response, or for any travel and/or per diem costs that are incurred.

3.23 Gratuity: Bidders will not offer gratuities, favors, or anything of monetary value to any official, employee or agent of the Commission as a means of influencing consideration of this RFQ.

3.24 Submitted Material: All requests, responses, inquiries, or correspondence relating to, or in‐ reference to this document submitted by bidders will become the property of the Commission when received. Once an award is made, all excess copies that bidders request may be destroyed.

4.0 SPECIAL CONDITIONS:

4.1 Mandatory Requirements: The Commission has established certain requirements with respect to solicitations to be submitted by bidders. Whenever the terms “must,” “” or “is” are used in the package, the specifications being referred to are a mandatory requirement.

Failure to meet any requirement(s) may cause rejection of the bidder’s submittal.

4.2 Tax Exempt: The Commission is exempt from State Sales Tax. If a tax‐exempt certificate is necessary, please contact the SAC Purchasing Department.

4.3 Indemnification: Seller/Vendor agrees for itself and its contractors, subcontractors, suppliers, employees, agents, servants, patrons, customers, visitor and licenses to indemnify, protect, save and hold harmless the SAC, its members, directors, officers, employees, and agents against any expense, loss or liability paid, suffered or incurred, including any environmental fines and/or penalties, as a result of any breach by Seller/Vendor, Seller/Vendor’s agents, servants, employees, patrons, contractors or subcontractors, suppliers, customers, visitors or licenses of any covenant or condition of any agreement with Buyer/SAC or as a result of the seller’s/buyer’s work or a product or service provided by seller/vendor or the seller’s/Vendor’s use, occupancy or presence on SAC’s property or the carelessness, negligence or improper conduct of seller/Vendor, seller’s/Vendor’s contractors, subcontractors, suppliers, employees, agents, servants, patrons, customers, visitors, or licenses. Such indemnification will be to the extent caused in whole or in part by negligent acts or omissions by the Seller/Vendor, its contractors, subcontractors, suppliers, employees, agents, servants, patrons, customers, visitors or licensees. Seller/vendor agrees to defend buyer/SAC from any legal or equitable actions brought against buyer/SAC based on the work or a product or service provided by seller/vendor or the carelessness, negligence or improper conduct of Seller/Vendor, Seller’s/Vendor’s contractors, subcontractors, suppliers, employees, agents, servants, patrons, customers, visitors, or licenses.

4.4 Basis of Award: Any contract awarded as a result of a selection process is to be awarded to the most responsive and responsible bidder whose bid is evaluated to be the most advantageous to the Commission. All other bidder accommodation that best suits the needs of the Commission will also serve as the basis of the award. Bidder availability to seek or exceed SAC’s specifications and requirements will be considered.

4.5 Changes and Alterations: N/A

4.6 Statutory Affidavit: N/A

4.7 Cure and Cover Clause: If a successful bidder fails, or SAC concludes that there is a reasonable likelihood that the bidder will not be able to timely perform its obligations under this RFQ and/or contract, SAC may (in addition to any other contractual, legal, or equitable remedies) proceed to take any of the following actions after a five (5) day written notice to the bidder.

(a) Withhold any monies then or next due to the bidder; or

(b) Terminate the contract and obtain the deliverables (or equivalent) or portion thereof (or equivalent) from a third party, pay the third party for the same, and withhold the amount so paid from any money then or thereafter due party bidder and hold bidder liable for any amounts paid to the third party (or parties) to the extent that withholding payments to the contractor does not cover SAC’s cost of cover.

4.8 The Savannah Airport Commission Reserves the Right:

(a) to reject any or all RFQs or any part thereof; and

(b) to waive any irregularities and/or technicalities on the RFQ; and

(c) to accept the bidder that is in the best interest of SAC; and

(d) to obtain clarification or additional information; and

(e) to purchase either selected items, or to not select any bidder or purchase any goods and/or services resulting from this request; and

(f) to reject any bidder who has previously failed to perform properly or complete on time projects of a similar nature, or

(g) to reject any bidder whom an investigation shows bidder is not in a position to perform the project and/or service as specified in this RFQ.

(h) to cancel a Purchase Order (PO) and/or contract if the bidder fails to meet the obligations/agreement in the bid response (i.e., pricing, agreed timeframe of delivery).

///////////////////////////////////NOTHING

FOLLOWS/////////////////////////////////

REQUEST FOR QUOTATION
RFQ 2025-0003
ONE (1) AUTONOMOUS FLOOR SCRUBBER
Issuance Date: December 20, 2024
Bidder must fill in the information below:
1.0 INTRODUCTION
Purpose: The Savannah Airport Commission (SAC) is seeking qualified vendors to provide quotes for the procurement of one (1) Autonomous Floor Scrubber (Cenobots Scrubber Dryer, Model L50). The floor scrubber and costs must include the charging station...
2.0 REQUIREMENTS FOR SUBMISSION
2.1 The Commission will award the most responsible and responsive bidder at the lowest cost.
2.2 Specifications: CenoBots Scrubber Dryer, Model L50
The Autonomous Floor Scrubber specified is manufactured by Cenozoic Robotics. The requested scrubber is Cenobots Scrubber Dryer, Model L50 and must include the charging station, CWS-01. The specifications for the charging station are also noted below.
Dimensions
Length: 1030 mm| 40.6 in.
Width: 580 mm | 22.8 in.
Height: 1045 mm | 41.1 in.
Weight: 220 KG | 485 lbs.
Cleaning Width 510 mm | 20 in.
Squeegee Width: 740 mm | 29 in.
Cleaning
Max. Theoretical Productivity: 2570 m2/hr. | 27663 ft2/hr.
Brush Pressure: 25KG | 55.1 lbs.
Disk Brush Speed: 220 RPM
Clean Water Tank Capacity: 55 L | 14.5 gal.
Waste Water Tank Capacity: 55 L | 14.5 gal.
Movement
Max. Speed: 1.4 m/s | 3.13 mph
Min. Distance from Wall: <50 mm | 2 in.
Min. Passable Width: 900mm | 35.4 in.
Gradeability: 6”
Power
Battery Type: Lithium Iron Phosphate
Battery Capacity: 120 Ah
Rated Voltage: 24 VDC
Charging Time: 4 Hours
Max. Runtime: 6 hours
Sensing
3D LiDAR, 2D LiDAR, 3D Depth Camera
Ultrasonic Sensor, Bumper Sensor
Sound Pressure Level: At least as 67 dB(A)
Key Components for AI
Process Chip: Nvidia Xavier AI edge computing chips with up to 32 TOPS AI performance
Mapping Sensor: 3D LiDAR with 150m detection range
Charging Station (Charging Workstation CWS-01)
Weight: 99 lbs.
Input Voltage: 100-240 V AC
Max. Power: 1000W-1.34 HP
Output Voltage: 24 VDC
2.3 Advertising: No dealer advertising is to be on any unit.
2.4 Parts Manuals: All units delivered to the Savannah Airport Commission must be accompanied by two (2) copies of complete parts, shop repair, and operator's manuals through actual paper copies or digitally. The parts manuals must show all component ...
2.6 Keys: N/A
2.7 Onsite Training: Onsite operator and maintenance training upon delivery of unit may be requested by SAC.
GENERAL REQUIREMENTS:
4.0 SPECIAL CONDITIONS:
4.8 The Savannah Airport Commission Reserves the Right:

///////////////////////////////////NOTHING FOLLOWS/////////////////////////////////

File details come from the government source that posted it. Updated .