1-Attachment D - Microsurfacing Prep Quantities.pdf
PDF 19 KB Posted
- Solicitation number
- 260115
- Issued by
- Sedgwick County, Kansas
About this file
This attachment is a microsurfacing preparation quantities document for the City of Wichita, Kansas's 2026 Outsourced Pavement Preservation Program. The document outlines preparation work required across ten mapped locations prior to microsurfacing installation. Preparation quantities include thermal crack repairs (3,500 linear feet total), asphalt full-depth repairs at 8 inches (420 tons), asphalt partial-depth repairs at 6 inches (7,530 tons), concrete base work (1,280 square yards), concrete pavement repairs (5,100 square yards), valley gutter installation (500 square yards), driveway work at 6 inches (3,250 square feet), curb work (11,000 linear feet), inlet hookups (1,500 units), and miscellaneous driveway work at 8 inches (six units). Preparation work is distributed across the ten map locations with varying quantities at each site. The document notes that certain preparation work was completed under the 2025 OP3 contract; however, contractors are required to verify that no additional preparation is needed before microsurfacing application.
No specific pricing information, contract award dates, response deadlines, or funding amounts are provided in this quantities attachment. The document serves as a technical reference for bidders to understand the scope and volume of preparation work required at each location, enabling accurate cost estimation and resource planning for the microsurfacing program.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 Outsourced Pavement Preservation Program 2026 Microsurface Prep Locations 2026 Microsurface
1 950 130 500 940 100
2 200 200 100 520 300 900
5 900 900 1000 2400 200 2
6 850 350 2550 2200 250
7 1670 450 150 700 760 100 2
8 350 2720 260 800 750 400
9 300 90 1940 675 1300 300
10 500 40 375 950
11 300 160 500 150 800 150 2
Total = 3500 420 7530 1280 5100 500 3250 11000 1500 6
PREP COMPLETED ON 2025 OP3 CONTRACT (CONTRACTOR SHALL STILL VERIFY NO PREP NEEDED BEFORE MICRO)
Driveway
(SF) (8")
Asphalt Full
Depth (Tons) Map #
Microsurface Prep Quantities
Concrete
Base (SY)
Concrete
Pavement
Valley
Gutter (SY)
Inlet
Hookups
Driveway
(SF) (6")
Asphalt Partial
Depth (Tons)
Thermal
Crack (LF) Curb (LF)
File details come from the government source that posted it. Updated .